2012, 08-03 Permit: SW-12001902 SewerSPOKANE COUNTY BUILDING AND PLANNING
PERMIT .
Application Number: SW -12001903
Permit Issued Date:
08/03/2012
Expiration Date:
Project Description: DRY SIDE SEWER
Project Name: SOUTH GREEN ACRES 3
Permit Type: SEWER
Primary Contact: JEFF S LENZ CONSTRUCTION INC
Applicant: JEFF S LENZ CONSTRUCTION INC
Address: PO BOX 483
DEER PARK, WA 99006
Phone: 509-869-2079
Email:
SITE INFORMATION'
Site Address:
Parcel Number:
18315 E RIVERWAY AVE
55075.2913
Subdivision: SP -521-87
Assessor's Description: 7-25-45, PTN OF E 1/2 DAF: PARCEL "B-1" SP 91
-703 TOG W/ PARCEL LYG ELY & ADJ TO DAF;
BEG MOST ELY COR OF PARCEL "B-1", TH N
36*59'40" W ALG ELY LN OF "B-1" 40.35 FT TO
NELY COR, TH N 60*31'30" E 50
Inspection Area:
Water District:
Consolidated Irrigation
District #19
Zoning: Land Area: 15781 Square Feet
Owner:
Address:
Phone:
Email:
BERG, R A & J I
18313 E RIVERWAY
GREENACRES, WA 99016
509-218-0008
Fire District: Spokane Valley Fire
CONTRACTOR INFORMATION'
General Contractor
JEFFSSL962D6
JEFF S LENZ CONSTRUCTION INC
PO BOX 483
DEER PARK, WA 99006
509-869-2079
DETAILS:
Class
Type
Quantity Unit Charge Value
SEWER DRY SIDE SEWER 1 $125.00 $125.00
FEE DETAIL:
Processing - Utilities
Utilities Permit
Total Fee:
$125.00
$25.94
$125.00
$150.94
CONDITIONS -
Possible FEMA Flood Zone
Possible Floodplain
Date Printed: 08/03/2012 07:58:15
Printed by: IIS APPPOOLWSP.NET v4.0
SPOKANE COUNTY BUILDING AND PLANNING
PERMIT
Application Number: SW -12001903
Inside Public Transit Benefit Area
Possible Shoreline On Site
Permit Issued Date:
08/03/2012
Expiration Date:
CALL 1-800-424-5555 BEFORE YOU DIG—AT LEAST 2 WORKING DAYS IN ADVANCE. SPOKANE COUNTY CODE REQUIRES THE
INSTALLER COMPLY WITH ALL REQUIREMENTS OF THE WA STATE DEPT OF LABOR & INDUSTRIES, INCLUDING THOSE
RELATED TO TRENCH SAFETY.
FOR SEWER INSPECTIONS CALL THE UTILITIES DEPT AT (509) 477-3604 FROM 8:30-5:00 MONDAY -FRIDAY PRIOR TO COVER.
ONE WORKING DAY NOTICE REQUIRED. PERMIT ALLOWS FOR A 30 -MINUTE INSPECTION. ADDITIONAL INSPECTION FEES
APPLY AFTER 30 MINUTES.
INSTALLER IS RESPONSIBLE TO INSURE ALL WASTEWATER DRAINS ARE CONNECTED TO THE SEWER AND MAY BE REQUIRED
TO PERFORM TESTS FOR VERIFICATION. INSTALLER IS TO FIELD LOCATE AND CONFIRM THE ELEVATION AND POSITION OF
SEWER STUB PRIOR TO ANY OTHER EXCAVATION.
SEWER STUBS AND DRY SIDE SEWERS ARE TO BE CHECKED PRIOR TO CONNECTION TO ENSURE THAT THEY HAVE
ACCEPTABLE GRADE AND ARE CLEAR AND UNOBSTRUCTED. SEWER LINES SHOULD BE CONSTRUCTED TO ALLOW FOR
GRAVITY FLOW FROM THE LOWEST LEVEL OF THE STRUCTURE.
THE INSTALLER AND THIS PERMIT MUST BE PRESENT AT THE JOB SITE AT THE SCHEDULED INSPECTION TIME. BOTH STATE
LAW RCW 19.122 AND COUNTY CODE REQUIRES THE INSTALLER TO GIVE NOTICE OF EXCAVATION TO OWNERS OF
UNDERGROUND FACILITIES.
Date Printed: 08/03/2012 07:58:15
Printed by: IIS APPPOOLV1/4SP.NET v4.0