Loading...
2012, 08-03 Permit: SW-12001904 SewerSPOKANE COUNTY BUILDING AND PLANNING PERMIT Application Number: SW -12001904 r Permit Issued Date: 08/03/2012 Expiration Date: Project Description: Project Name: Permit Type: DRY SIDE SEWER SOUTH GREEN ACRES 3 SEWER Primary Contact: JEFF S LENZ CONSTRUCTION INC Applicant: JEFF S LENZ CONSTRUCTION INC Address: Phone: Email: PO BOX 483 DEER PARK, WA 99006 509-869-2079 SITE INFORMATION: Site Address: Parcel Number: Subdivision: Assessor's Description: Inspection Area: Zoning: 18317 E RIVERWAY AVE 55075.2914 SP -521-87 7-25-45, PTN OF E 1/2 DAF: PARCEL "3-2" SP 91 -703 TOG W/ PARCEL LYG ELY & ADJ TO DAF; BEG MOST ELY COR OF PARCEL "B-2", TH N 36'59'40" W ALG ELY LN OF "B-2" 40.35 FT TO NELY COR, TH N 60'31'30" E 50 Water District: Consolidated Irrigation District #19 Owner: Address: Phone: Email: BERG, RA&JI 18313 E RIVERWAY GREENACRES, WA 99016 509-218-0008 Fire District: Spokane Valley Fire Land Area: 0.37 Acre(s) CONTRACTOR INFORMATION: General Contractor JEFFSSL962D6 JEFF S LENZ CONSTRUCTION INC PO BOX 483 DEER PARK, WA 99006 509-869-2079 DETAILS. Class Type Quantity Unit Charge Value SEWER DRY SIDE SEWER FEE DETAIL. Processing - Utilities Utilities Permit 1 $125.00 $125.00 $125.00 Total Fee: $25.94 $125.00 $150.94 CONDITIONS. Possible FEMA Flood Zone Possible Shoreline On Site Date Printed: 08/03/2012 07:58:48 Printed by: IIS APPPOOLWSP.NET v4.0 SPOKANE COUNTY BUILDING AND PLANNING PERMIT Application Number: SW -12001904 Inside Public Transit Benefit Area Permit Issued Date: 08/03/2012 Expiration Date: Possible Floodplain CALL 1-800-424-5555 BEFORE YOU DIG—AT LEAST 2 WORKING DAYS IN ADVANCE. SPOKANE COUNTY CODE REQUIRES THE INSTALLER COMPLY WITH ALL REQUIREMENTS OF THE WA STATE DEPT OF LABOR & INDUSTRIES, INCLUDING THOSE RELATED TO TRENCH SAFETY. FOR SEWER INSPECTIONS CALL THE UTILITIES DEPT AT (509) 477-3604 FROM 8:30-5:00 MONDAY -FRIDAY PRIOR TO COVER. ONE WORKING DAY NOTICE REQUIRED. PERMIT ALLOWS FOR A 30 -MINUTE INSPECTION. ADDITIONAL INSPECTION FEES APPLY AFTER 30 MINUTES. INSTALLER IS RESPONSIBLE TO INSURE ALL WASTEWATER DRAINS ARE CONNECTED TO THE SEWER AND MAY BE REQUIRED TO PERFORM TESTS FOR VERIFICATION. INSTALLER IS TO FIELD LOCATE AND CONFIRM THE ELEVATION AND POSITION OF SEWER STUB PRIOR TO ANY OTHER EXCAVATION. SEWER STUBS AND DRY SIDE SEWERS ARE TO BE CHECKED PRIOR TO CONNECTION TO ENSURE THAT THEY HAVE ACCEPTABLE GRADE AND ARE CLEAR AND UNOBSTRUCTED. SEWER LINES SHOULD BE CONSTRUCTED TO ALLOW FOR GRAVITY FLOW FROM THE LOWEST LEVEL OF THE STRUCTURE. THE INSTALLER AND THIS PERMIT MUST BE PRESENT AT THE JOB SITE AT THE SCHEDULED INSPECTION TIME. BOTH STATE LAW RCW 19.122 AND COUNTY CODE REQUIRES THE INSTALLER TO GIVE NOTICE OF EXCAVATION TO OWNERS OF UNDERGROUND FACILITIES. Date Printed: 08/03/2012 07:58:48 Printed by: IIS APPPOOLWSP.NET v4.0