2013, 08-06 Permit: SW-13001379 SewerSPOKANE COUNTY UTILITIES PERMIT Application Number: SW -13001379 Permit Issued Date: 08/06/2013 Expiration Date: 08/06/2014 Project Description: SEWER CONNECTION Project Name: S GREENACRES Primary Contact: H & S CONSTRUCTION Phone: 509-926-8964 Applicant: H & S CONSTRUCTION Address: 11817 E VALLEYWAY SPOKANE VALLEY, WA 99206 Phone: 509-926-8964 Email: SITE INFORMATION: Site Address: Parcel Number: 18323 E RIVERWAY AVE 55074.3005 Assessor's Description: SP87-522 TR "B" OF SD SP & A PTN OF TR "A" DAF THAT PTN OF TR "A" LYG SELY OF THE FOLLOWING DESCRIBED LINE; BEG AT NWLY COR OF TR "A"; TH S 29DEG 28MIN 30SDS E 100FT TO THE POB OF SD LN DESCRIPTION; T Inspection Area: : (509)-477-3675 Owner: TURNER, WAYNE & BARBARA Address: 18323 E RIVERWAY AVE GREENACRES, WA 99016-9361 Phone: Email: Water District: Consolidated Irrigation Fire District: Spokane Valley Fire District #19 Zoning: Land Area: CONTRACTOR INFORMATION• HSCON**123KF, Exp. 05/08/2015 H & S CONSTRUCTION 11817 E VALLEYWAY SPOKANE VALLEY, WA 99206 509-926-8964 DETAILS' Class Type SEWER FEE DETAIL. Processing - Utilities Utilities Permit SEWER CONNECTION Total Fee: $26.32 $125.00 $151.32 Quantity Unit Charge Value 1 $125.00 $125.00 $125.00 CONDITIONS: Inside Public Transit Benefit Area Inside Public Transit Benefit Area Possible Floodplain Possible Shoreline On Site Possible FEMA Flood Zone Date Printed: 08/06/2013 10:22:06 Project Coordinator: Dawn Dompier SPOKANE COUNTY UTILITIES PERMIT Application Number: SW -13001379 Permit Issued Date: 08/06/2013 Expiration Date: 08/06/2014 CALL 1-800-424-5555 BEFORE YOU DIG—AT LEAST 2 WORKING DAYS IN ADVANCE. SPOKANE COUNTY CODE REQUIRES THE INSTALLER COMPLY WITH ALL REQUIREMENTS OF THE WA STATE DEPT OF LABOR & INDUSTRIES, INCLUDING THOSE RELATED TO TRENCH SAFETY. SEWER PERMITS ARE VALID FOR ONE (1) YEAR FROM THE DATE OF ISSUANCE. FOR SEWER INSPECTIONS CALL THE UTILITIES DEPT AT (509) 477-3604 FROM 8:30-5:00 MONDAY -FRIDAY PRIOR TO COVER. ONE WORKING DAY NOTICE REQUIRED. PERMIT ALLOWS FOR A 30 -MINUTE INSPECTION. ADDITIONAL INSPECTION FEES APPLY AFTER 30 MINUTES. INSTALLER IS RESPONSIBLE TO INSURE ALL WASTEWATER DRAINS ARE CONNECTED TO THE SEWER AND MAY BE REQUIRED TO PERFORM TESTS FOR VERIFICATION. INSTALLER IS TO FIELD LOCATE AND CONFIRM THE ELEVATION AND POSITION OF SEWER STUB PRIOR TO ANY OTHER EXCAVATION. SEWER STUBS AND DRY SIDE SEWERS ARE TO BE CHECKED PRIOR TO CONNECTION TO ENSURE THAT THEY HAVE ACCEPTABLE GRADE AND ARE CLEAR AND UNOBSTRUCTED. SEWER LINES SHOULD BE CONSTRUCTED TO ALLOW FOR GRAVITY FLOW FROM THE LOWEST LEVEL OF THE STRUCTURE. THE INSTALLER AND THIS PERMIT MUST BE PRESENT AT THE JOB SITE AT THE SCHEDULED INSPECTION TIME. BOTH STATE LAW RCW 19.122 AND COUNTY CODE REQUIRES THE INSTALLER TO GIVE NOTICE OF EXCAVATION TO OWNERS OF UNDERGROUND FACILITIES. Date Printed: 08/06/2013 10:22:06 Project Coordinator. Dawn Dompier