Loading...
2010, 04-16 Permit App: 10001020 Garage Project Number: 10001020 Inv: 1 Application Date: 4/16/2010 Page 1 of 2 THIS IS NOT A PERMIT Penalties will be assessed for commencing work without a permit Project Information: Permit Use: ADD 15 X 20 GARAGE TO EXISTING GARAGE Contact: A &P CONSTRUCTION Address: 1349 POLELINE C-S-Z: POST FALLS ID 83854 Setbacks:Front Left: Right: Rear: Phone: (208)818-5280 Group Name: Site Information: Project Name: ..f.. rir .-: . _ Wim.. 4Ahu,„ Plat Key: 003162 Name: PONDRA PINES 01ST ADD District: Sout Parcel Number: 44051.1902 Block: Lot: SiteAddress: 4616 S VAN MARTER RD Owner:Name: KEENE,LEE M &M D Address: 4616 S VAN MARTER RD Location::CSV SPOKANE VALLEY,WA 99206 Zoning: R-3 SF Res District Water District: Hold: ❑ Area: 18,000 Sq Ft Width: 120 Depth: 150 Right Of Way(ft): 0 Nbr of Bldgs: 0 Nbr of Dwellings: 1 Review Information: -e x ,_£. . k44%p., �.. -4,4vivo � ._. :._.. roma Review Building Plan Review Released By: Originally Released: 4/15/2010 By: tmelbourn Landuse/Zoning/HE Conditions Released By: Originally Released: 4/14/2010 By: KKENDAL Permits: 4Mn. '.: . Operator: jmm Printed By: JD Print Date: 4/16/2010 Project Number: 10001020 Inv: 1 Application Date: 4/16/2010 Page 2 of 2 THIS IS NOT A PERMIT Penalties will be assessed for commencing work without a permit Building Permit Contractor: A &P CONSTRUCTION& Firm: A &P CONSTRUCTION&DEVEL Address: 1349 POLELINE Phone: (208)818-5280 POST FALLS ID 83854 This Application: Total Project: Description Grp Type Notes Sq Ft Valuation Sq Ft Valuation GAR WOOD U-1 VB 300 $5,700.00 300 $5,700.00 Totals: 300 $5,700.00 300 $5,700.00 Item Description Units Unit Desc Fee Amount RESIDENTIAL PERMIT FEE 1 SELECT $125.25 ACCESSORY PLANS REVIEW 1 SELECT $31.31 WSBCC SURCHARGE 1 SELECT $4.50 Permit Total Fees: $161.06 Notes: .._,� .... p'..tAtfaTIVAMINVANNI Payment Summary Permit Type Fee Amount Invoice Amount Amount Paid Amount Owing Building Permit $161.06 $161.06 $31.30 $129.76 $161.06 $161.06 $31.30 $129.76 Disclaimer: Submittal of this application certifies the owner(or person(s)authorized by the owner)has both examined and finds the information contained within to be true and correct,and agrees that all provisions of laws and/or regulations governing this type of work will be complied with. Subsequent issuance of a permit shall not be construed to be a permit for,or an approval of,any violation of any of the provisions of the code or of any other state or local laws or ordinances. Signature: Operator: jmm Printed By: JD Print Date: 4/16/2010 CITvOF (Staff Use Only) J _ SpokanePERMIT NUMBER: 1(�"l O`'(-) Valley a PERMIT FEE: CITY OF SPOKANE VALLEY RECEi Y EO Community Development Departm nt CSV PERMIT CENTER Permit Center 11703 East Sprague Avenue, Suite B-3 1 4 7010 Spokane Valley, WA 99206 APR Tel: (509) 688-0036 Project#� LL__ Fax: (509) 688-0037 ferne permitcenter@spokanevalley.org Submittal## RESIDENTIAL CONSTRUCTION PERMIT APPLICATION Q NEW CONSTRUCTION ei ADDITION/REMODEL 0 ACCESSORY BUILDING DECK 0 OTHER SITE ADDRESS:4616 VAN MARTER ASSESSORS PARCEL NO.:44051.1902 LEGAL DESCRIPTION:Lor 2 BLOCK 2 PONDEROSA 1ST BUILDING OWNER NAME:DOUG KEENE NAME: ADDRESS:4818 VAN MARTER CITY:SPOKANE VALLEY STATE:WA ZIP:99206 PHONE:760 994 9742 FAX: CELL: CONTACT NAME:SAME PHONE:SAME FAX: CELL: CONTRACTOR NAME:A&P CONSTRUCTION MAILING ADDRESS:1349 POLELINE CIT':POST FALLS STATE:ID ZIP:83854 PHONE:208 818 5280 FAX: CELL: CONTRACTOR LICENSE NO.:PCONSPC955PL EXPIRES:8/11 CITY BUSINESS LICENSE NO.: DESCRIBE THE SCOPE OF WORK IN DETAIL AND INDICATE USE: ADDITION OF A 1 5x20 GARAGE ON THE SOUTH SIDE OF EXISTING GARAGE PROPOSED USE: SHOP LIKE ACTIVITY Effective October 28, 2007 Page 1 of 2 C:\Users\A& P\AppData\Local\Microsoft\Windows\Temporary Internet Files\Low\Content.I E5\Z22LD55C\Residentia I%2OConstruction%2OPermit%20App.1[1].doc ****YOU MUST COMPLETE THE FOLLOWING**** MARK N/A IF NOT APPLICABLE Height to Peak:14' Dimensions:15x20 No. of Stories:1 Total Habitable Space:0 Main Floor SQ FT:300 Upper Floor SQ FT:N/A Unfinished Basement Finished Basement SQ FT:N/A SQ FT:N/A Garage SQ FT:300 Deck/Covered Patio Impervious Surface 30% Slopes on v(� ��IT•o� SQ FT:N/A Area:420 Property:N/A No. of Bedrooms:N/A Construction Heat Source:N/A Sewer or Septic:N/A Type:wooD FRAME TOTAL COST OF PROJECT: $7500 DISCLAIMER The permitted verifies,acknowledges and agrees by their signature that: 1) if this permit is for construction or on a dwelling,the dwelling is/will be served by potable water. 2) Ownership of this City of Spokane Valley permit inure to the property owner. 3) The signatory is the property owner or has permission to represent the property owner in this transaction. 4) All construction is to be done in full compliance with the City of Spokane Valley Development code. Referenced codes are available for review at the City of Spokane Valley Permit Center. 5) The City of Spokane Valley permit is not a permit or approval for any violation of federal, state or local laws, codes or ordinances. 6) Plans or additional information may be required to be submitted and subsequently approved before this application can be processed. Signature -' _ Date: y/i V/0 Method of payment: ❑ Cash ❑ Check ❑ Visa ❑ Mastercard Bankcard #: EXP: VIN#: Authorized Signature: Effective October 28, 2007 Page 2 of 2 C:\Users\A& P\AppData\Local\Microsoft\Windows\Temporary Internet Files\Low\Content.I E5\Z22LD55C\Residential%20Construction%20Permit%20App.1[1].doc For City Use Only CITYPLUS Project Number /0Spokane Project Address chi(sa //oil )/10 valley® 11703 E Sprague Ave Suite B-3 • Spokane Valley WA 99206 509.688.0036 • Fax: 509.688.0037 • permitcenter®spokanevalley.org As part of our on-going commitment to customer service during the review process of your project application, we are providing you with a TARGET DATE for the initial technical application review. If for any reason we cannot meet this date, we will contact you with a revised target date. Your application review TARGET DATE is The TARGET DATE is the date we estimate your project application will have had its initial technical review. It is not the date for approval or permit issuance. Tips for a Smoother Project Application Review ➢ Submit complete, accurate plans and documents. Extra time may be required for re-submittals as project application reviewers work on multiple applications and it may be several days before they can look at your new or revised information. r 1 ➢ Designate a specific contact person to communicate with the City. While the person designated as the applicant's contact person with the City can be changed, one individual with the expertise for dealing with reviewer comments would be the best choice for the entire review process. ➢ Call staff regarding the status of your project only after the target date shown at the top of the page. Although you should be contacted on or by the target date,please feel free to contact us if you haven't heard from us by your target date. Staff may contact you before the target date if the initial review is complete. By following this procedure,you will save time and allow the reviewers to complete the work more expeditiously. Steps in the Permit Process 1. Counter Complete. Your application has been accepted as counter complete. This means all of the required documents, as indicated on your Pre-Application Checklist have been submitted or have been approved for deferred submittal. This does not prevent technical staff from requesting additional information as a result of their technical review. 2. Quality Check. The next step in the process is a quality check to make sure that the application is reviewable and free from substantive flaws that would prevent technical staff from completing the technical review once it is started. When this step is complete, your application will be routed to the appropriate staff and remain in their review queue until it comes up for review. 3. Technical Compliance. Once an application is administratively complete, it is routed to technical staff for compliance review. Depending on the type of project, technical staff may include multiple reviewers. You should be contacted by phone,fax, email,or mail by your TARGET DATE once the initial technical compliance review is complete. 4. Permit Issuance. When the technical compliance review of the application is complete, including any subsequent re- submittals, each reviewer will approve their section of the application and route it to the Permit Center. When all sections of the application are received, a Permit Specialist will process the application and contact the person specified on your application for permit pick-up. Information regarding fees and pre-construction meetings (if required) will be provided by ( the Permit Specialist at that time. WHITE-APPLICANT PINK-BUILDING FILE REV 9/07 v 11.11 11111111-174 \ • rAil i DATE: ' - p _ (--- --- ss 0 ■ ■ - ■ — . ___=.1111111eri , I Mit s� 1 'i -- tam I __-1 III■■ --t -- 4- 5 P 1,...=M - ■ ' d1,______4_ I , `ti.r' • dis7111; .21111111111hk II �., . t I -- M Anl MAk7--6 12 P. Ti4