2010, 04-16 Permit App: 10001020 Garage Project Number: 10001020 Inv: 1 Application Date: 4/16/2010 Page 1 of 2
THIS IS NOT A PERMIT
Penalties will be assessed for commencing work without a permit
Project Information:
Permit Use: ADD 15 X 20 GARAGE TO EXISTING GARAGE Contact: A &P CONSTRUCTION
Address: 1349 POLELINE
C-S-Z: POST FALLS ID 83854
Setbacks:Front Left: Right: Rear: Phone: (208)818-5280
Group Name:
Site Information:
Project Name:
..f.. rir .-: . _ Wim.. 4Ahu,„
Plat Key: 003162 Name: PONDRA PINES 01ST ADD District: Sout
Parcel Number: 44051.1902 Block: Lot:
SiteAddress: 4616 S VAN MARTER RD Owner:Name: KEENE,LEE M &M D
Address: 4616 S VAN MARTER RD
Location::CSV SPOKANE VALLEY,WA 99206
Zoning: R-3 SF Res District
Water District: Hold: ❑
Area: 18,000 Sq Ft Width: 120 Depth: 150 Right Of Way(ft): 0
Nbr of Bldgs: 0 Nbr of Dwellings: 1
Review Information: -e x ,_£. . k44%p., �.. -4,4vivo � ._. :._.. roma
Review
Building Plan Review Released By:
Originally Released: 4/15/2010 By: tmelbourn
Landuse/Zoning/HE Conditions Released By:
Originally Released: 4/14/2010 By: KKENDAL
Permits: 4Mn. '.: .
Operator: jmm Printed By: JD Print Date: 4/16/2010
Project Number: 10001020 Inv: 1 Application Date: 4/16/2010 Page 2 of 2
THIS IS NOT A PERMIT
Penalties will be assessed for commencing work without a permit
Building Permit
Contractor: A &P CONSTRUCTION& Firm: A &P CONSTRUCTION&DEVEL
Address: 1349 POLELINE Phone: (208)818-5280
POST FALLS ID 83854
This Application: Total Project:
Description Grp Type Notes Sq Ft Valuation Sq Ft Valuation
GAR WOOD U-1 VB 300 $5,700.00 300 $5,700.00
Totals: 300 $5,700.00 300 $5,700.00
Item Description Units Unit Desc Fee Amount
RESIDENTIAL PERMIT FEE 1 SELECT $125.25
ACCESSORY PLANS REVIEW 1 SELECT $31.31
WSBCC SURCHARGE 1 SELECT $4.50
Permit Total Fees: $161.06
Notes: .._,� .... p'..tAtfaTIVAMINVANNI
Payment Summary
Permit Type Fee Amount Invoice Amount Amount Paid Amount Owing
Building Permit $161.06 $161.06 $31.30 $129.76
$161.06 $161.06 $31.30 $129.76
Disclaimer:
Submittal of this application certifies the owner(or person(s)authorized by the owner)has both examined and finds the information
contained within to be true and correct,and agrees that all provisions of laws and/or regulations governing this type of work will be
complied with. Subsequent issuance of a permit shall not be construed to be a permit for,or an approval of,any violation of any of
the provisions of the code or of any other state or local laws or ordinances.
Signature:
Operator: jmm Printed By: JD Print Date: 4/16/2010
CITvOF (Staff Use Only) J _
SpokanePERMIT NUMBER: 1(�"l O`'(-)
Valley a PERMIT FEE:
CITY OF SPOKANE VALLEY RECEi Y EO
Community Development Departm nt CSV PERMIT CENTER
Permit Center
11703 East Sprague Avenue, Suite B-3 1 4 7010
Spokane Valley, WA 99206 APR
Tel: (509) 688-0036 Project#� LL__
Fax: (509) 688-0037 ferne
permitcenter@spokanevalley.org Submittal##
RESIDENTIAL CONSTRUCTION PERMIT APPLICATION
Q NEW CONSTRUCTION ei ADDITION/REMODEL 0 ACCESSORY BUILDING
DECK 0 OTHER
SITE ADDRESS:4616 VAN MARTER
ASSESSORS PARCEL NO.:44051.1902 LEGAL DESCRIPTION:Lor 2 BLOCK 2
PONDEROSA 1ST
BUILDING OWNER NAME:DOUG KEENE
NAME:
ADDRESS:4818 VAN MARTER
CITY:SPOKANE VALLEY STATE:WA ZIP:99206
PHONE:760 994 9742 FAX: CELL:
CONTACT NAME:SAME
PHONE:SAME FAX: CELL:
CONTRACTOR NAME:A&P CONSTRUCTION
MAILING ADDRESS:1349 POLELINE
CIT':POST FALLS STATE:ID ZIP:83854
PHONE:208 818 5280 FAX: CELL:
CONTRACTOR LICENSE NO.:PCONSPC955PL EXPIRES:8/11 CITY BUSINESS LICENSE NO.:
DESCRIBE THE SCOPE OF WORK IN DETAIL AND INDICATE USE:
ADDITION OF A 1 5x20 GARAGE ON THE SOUTH SIDE OF EXISTING GARAGE
PROPOSED USE:
SHOP LIKE ACTIVITY
Effective October 28, 2007 Page 1 of 2
C:\Users\A& P\AppData\Local\Microsoft\Windows\Temporary Internet
Files\Low\Content.I E5\Z22LD55C\Residentia I%2OConstruction%2OPermit%20App.1[1].doc
****YOU MUST COMPLETE THE FOLLOWING****
MARK N/A IF NOT APPLICABLE
Height to Peak:14' Dimensions:15x20 No. of Stories:1 Total Habitable
Space:0
Main Floor SQ FT:300 Upper Floor SQ FT:N/A Unfinished Basement Finished Basement
SQ FT:N/A SQ FT:N/A
Garage SQ FT:300 Deck/Covered Patio Impervious Surface 30% Slopes on
v(� ��IT•o� SQ FT:N/A Area:420 Property:N/A
No. of Bedrooms:N/A Construction Heat Source:N/A Sewer or Septic:N/A
Type:wooD FRAME
TOTAL COST OF PROJECT: $7500
DISCLAIMER
The permitted verifies,acknowledges and agrees by their signature that: 1) if this permit is for construction or on a dwelling,the dwelling is/will
be served by potable water. 2) Ownership of this City of Spokane Valley permit inure to the property owner. 3) The signatory is the property
owner or has permission to represent the property owner in this transaction. 4) All construction is to be done in full compliance with the City of
Spokane Valley Development code. Referenced codes are available for review at the City of Spokane Valley Permit Center. 5) The City of
Spokane Valley permit is not a permit or approval for any violation of federal, state or local laws, codes or ordinances. 6) Plans or additional
information may be required to be submitted and subsequently approved before this application can be processed.
Signature -' _ Date: y/i V/0
Method of payment: ❑ Cash ❑ Check ❑ Visa ❑ Mastercard
Bankcard #: EXP: VIN#:
Authorized Signature:
Effective October 28, 2007 Page 2 of 2
C:\Users\A& P\AppData\Local\Microsoft\Windows\Temporary Internet
Files\Low\Content.I E5\Z22LD55C\Residential%20Construction%20Permit%20App.1[1].doc
For City Use Only
CITYPLUS Project Number /0Spokane Project Address chi(sa //oil )/10
valley® 11703 E Sprague Ave Suite B-3 • Spokane Valley WA 99206
509.688.0036 • Fax: 509.688.0037 • permitcenter®spokanevalley.org
As part of our on-going commitment to customer service during the review process of your project
application, we are providing you with a TARGET DATE for the initial technical application review. If for
any reason we cannot meet this date, we will contact you with a revised target date.
Your application review TARGET DATE is
The TARGET DATE is the date we estimate your project application will have had its initial technical
review. It is not the date for approval or permit issuance.
Tips for a Smoother Project Application Review
➢ Submit complete, accurate plans and documents.
Extra time may be required for re-submittals as project application reviewers work on multiple applications and it
may be several days before they can look at your new or revised information.
r
1
➢ Designate a specific contact person to communicate with the City.
While the person designated as the applicant's contact person with the City can be changed, one individual with the
expertise for dealing with reviewer comments would be the best choice for the entire review process.
➢ Call staff regarding the status of your project only after the target date shown at the top of the page.
Although you should be contacted on or by the target date,please feel free to contact us if you haven't heard from us
by your target date. Staff may contact you before the target date if the initial review is complete. By following this
procedure,you will save time and allow the reviewers to complete the work more expeditiously.
Steps in the Permit Process
1. Counter Complete. Your application has been accepted as counter complete. This means all of the required
documents, as indicated on your Pre-Application Checklist have been submitted or have been approved for deferred
submittal. This does not prevent technical staff from requesting additional information as a result of their technical review.
2. Quality Check. The next step in the process is a quality check to make sure that the application is reviewable and free
from substantive flaws that would prevent technical staff from completing the technical review once it is started. When
this step is complete, your application will be routed to the appropriate staff and remain in their review queue until it
comes up for review.
3. Technical Compliance. Once an application is administratively complete, it is routed to technical staff for compliance
review. Depending on the type of project, technical staff may include multiple reviewers. You should be contacted by
phone,fax, email,or mail by your TARGET DATE once the initial technical compliance review is complete.
4. Permit Issuance. When the technical compliance review of the application is complete, including any subsequent re-
submittals, each reviewer will approve their section of the application and route it to the Permit Center. When all sections
of the application are received, a Permit Specialist will process the application and contact the person specified on your
application for permit pick-up. Information regarding fees and pre-construction meetings (if required) will be provided by
( the Permit Specialist at that time.
WHITE-APPLICANT PINK-BUILDING FILE REV 9/07
v 11.11
11111111-174 \
•
rAil
i
DATE: ' - p _
(--- ---
ss
0
■ ■
- ■ — .
___=.1111111eri
,
I
Mit s�
1 'i
-- tam
I __-1 III■■ --t --
4- 5 P
1,...=M
- ■
' d1,______4_ I , `ti.r' •
dis7111;
.21111111111hk II �., . t I --
M
Anl MAk7--6 12 P. Ti4