Loading...
2011, 08-26 Permit App: 11002575 Pole Bldg Project Number: 11002575 Inv: 1 Application Date: 8/26/2011 Page 1 of 2 THIS IS NOT A PERMIT Penalties will be assessed for commencing work without a permit Project Information: Permit Use: 36 X 40 POLE BLDG Contact: PACIFIC METAL BUILDINGS INC. Address: 101 N STONE RD C- S-Z: SPOKANE,WA.99202 Setbacks: Front Left: Right: Rear: Phone: (509)534-4304 Group Name: Project Name: Site Information: Plat Key: 001297 Name: ILLER 01ST ADD(FEES) District: Sout Parcel Number: 44051.1609 Block: Lot: SiteAddress: 5014 S VAN MARTER RD Owner:Name: MIETHE,CHRIS Address: 5014 S VAN MARTER Location::CSV SPOKANE VALLEY WA 99206 Zoning: R-1 SF Res Estate District Water District: 098 SPO CO WATER DIST#1 Hold: ❑ Area: 43,065 Sq Ft Width: 135 Depth: 319 Right Of Way(ft): 60 Nbr of Bldgs: 1 Nbr of Dwellings: 1 Review Information: Review Building Plan Review Released By: Originally Released: 8/25/2011 By: tmelbourn Landuse/Zoning/HE Conditions Released By: Originally Released: 8/24/2011 By: tschmidt Driveway/Approach Released By: Originally Released: 8/26/2011 By: WMCGAV Permits: Operator: JD Printed By: JD Print Date: 8/26/2011 Project Number: 11002575 Inv: 1 Application Date: 8/26/2011 Page 2 of 2 THIS IS NOT A PERMIT Penalties will be assessed for commencing work without a permit Approach Contractor: FIVE STAR CONCRETE INC Firm: FIVE STAR CONCRETE INC Address: 6225 N MALVERN RD Phone: (509)226-1189 OTIS ORCHARDS WA 99027 Item Description Units Unit Desc Fee Amount APPROACH-CONST IN ROW 1 NUMBER OF $52.00 Permit Total Fees: $52.00 Building Permit Contractor: PACIFIC METAL BUILDINGS INC. Firm: PACIFIC METAL BUILDINGS INC. Address: 101 N STONE ST Phone: (509)534-4304 SPOKANE,WA.99202 This Application: Total Project: Description Grp Type Notes Sq Ft Valuation Sq Ft Valuation POLE BDLG U-1 VB 1,440 $27,360.00 1,440 $27,360.00 Totals: 1,440 $27,360.00 1,440 $27,360.00 Item Description Units Unit Desc Fee Amount RESIDENTIAL PERMIT FEE 1 SELECT $421.55 ACCESSORY PLANS REVIEW 1 SELECT $105.39 WSBCC SURCHARGE 1 SELECT $4.50 Permit Total Fees: $531.44 Notes: Pursuant to SVMC 19.40.020(B)"All residential driveways and off-street parking areas shall be paved...With an approved hard surface material." Notes: Saw cutting of existing curb to create an approach is not allowed within the City's jurisdiction. Driveway is to be inspected by the City's ROW Inspector prior to concrete placement. Driveway to have concrete approach per City's Standard Plan R-112. Payment Summary: Permit Type Fee Amount Invoice Amount Amount Paid Amount Owing Approach $52.00 $52.00 $0.00 $52.00 Building Permit $531.44 $531.44 $0.00 $531.44 $583.44 $583.44 $0.00 $583.44 Disclaimer: Submittal of this application certifies the owner(or person(s)authorized by the owner)has both examined and finds the information contained within to be true and correct,and agrees that all provisions of laws and/or regulations governing this type of work will be complied with. Subsequent issuance of a permit shall not be construed to be a permit for,or an approval of,any violation of any of the provisions of the code or of any other state or local laws or ordinances. Signature: Operator: JD Printed By: JD Print Date: 8/26/2011 Community Development Department (Staff Use Only) Permit Center -. �•< 11703 East Sprague Avenue, Suite B-3 PERMIT NUMBER: S ITY COF 'J Spokane Valley, WA 99206 okane Tel: (509) 688-0036 PERMIT FEE: Valley Fax: (509)itcen 688-0037 permer@spokanevallev.orq RESIDENTIAL CONSTRUCTION PERMIT APPLICATION 0! NEW CONSTRUCTION 0 ADDITION/REMODEL a ACCESSORY BUILDING [( DECK El OTHER 'ISNIMMINIMatritO CCP I 5 - Jt•--v \tet-ci-c-C. r • RECEIVED ASSESSORS PARCEL NO.: LEGAL DESCRIPTI•N: CSV PEWIT CENTER BUILDING OWNER NAME: i G 2 itl ''jS Project# NAME: G-1%ri4 1%.411.C1+0 ADDRESS: Salt' 5• 4.44 tl.r sgiimai #_ -- CITY: SPok '411 7 STATE: L&.)/\ 912-0(P ZIP: PHONE: FAX: jtd$'- O car. CELL: gall-•4,7/2- CONTACT NAME: .c.1ot Z•s "‘ PHONE: FAX: CELL: C061).41 3 `I" O(oo CONTRACTOR NAME: .4Pr14- '`-/ $vl Ides • MAILING ADDRESS: /0 i N J 1'r-e- `v/r— CITY: SpflkAyLG STATE: LA` ' ZIP: 11 24,4- PHONE: CS07)( _ g-3+ /3°1/ • FAX: CELL: CONTRACTOR LICENSE No.: ?per-1 FMj3o I api4 EXPIRES: 41 il.Jz.e13 / CITY BUSINESS LICENSE NO.: 0 j g 2. Z1 Z. DESCRIBE THE SCOPE OF WORK IN DETAIL AND INDICATE USE & PROPOSED USE: ,,i )d 340 X '40 $. i N Pols '&vi loit, ,, 4 A7 . c� U ****YOU MUST COMPLETE THE FOLLOWING**** MARK N/A IF NOT APPLICABLE Height to Peak:. i Dimensions: No. of Stories: Total Habitable 20 3W( 110)414 I Space: Main Floor SQ FTSFloor SQ Upper FT: Unfinished Base ent SQ Finished Basem nt SQ +fi FT: Q/A' FT: N�/I ' Garage SQ FT: Deck/Covered Patio SQ Impervious Surface 30% Slopes on ,K yD , FT: NI/P Area: Property: No. of Bedrooms: NO' Construction Tyne:`)off Heat Source: Sewer or Septic: ld'^3 TOTAL COST OF PROJECT: $ ��, oS'I DISCLAIMER The permitted verifies, acknowledges and agrees by their signature that: 1) if this permit is for construction or on a dwelling,the dwelling is/will be served by potable water. 2) Ownership of this City of Spokane Valley permit inure to the property owner. 3) The signatory is the property owner or has permission to represent the property owner in this transaction. 4) All construction is to be done in full compliance with the City of Spokane Valley Development code. Referenced codes are available for review at the City of Spokane Valley Permit Center. 5) The City of Spokane Valley permit is not a permit or approval for any violation of federal, state or local laws, codes or ordinances. 6) Plans or additional li,i.)ela t,e) information may be required to be submitted and subsequently approved before this application can be processed.)4--t-- • ���� Signature rs. Date: �°,� l�/", 1 1 Updated 1-11-11 Page 1 of 1 http://www.spokanevalley.org/filestorage/124/938/210/948/1496/Building_Permit__Residential_11-11-11.doc RESIDENTIAL CHECK LIST DIRECTIONS: Place a check mark in box next to each document required for complete submittal. ❑ SITE PLAN ❑ Property lines and dimensions ❑ Setbacks to property lines ❑ Direction arrow pointing North and orientation to streets ❑ Distance between buildings ❑ Proposed/existing buildings (footprint and dimensions) ❑ Right of way/easement location &sizes ❑ Utilities, septic tank/drain field locations and distances ❑ Driveway approach size and location BUILDING PLANS (3 SETS) (minimum 1/8 inch scale or completely dimensioned) ❑ Elevations (Front/Rear/Sides)with roof peak and wall height including basement: ❑ Foundation Plan (crawlspace, basement or slab on grade): ❑ Footing sizes and locations ❑ Supporting wood cripple walls or beams ❑ Perimeter concrete foundation wall sizes ❑ Thickened concrete pads supporting ❑ Crawlspace ventilation beams or girder trusses ❑ Floor Plan of each level (finished or unfinished)with dimensions: ❑ Floor Joist direction, size and spacing ❑Window and door location and sizes ❑ Header, beam or concrete lintel sizes ❑Window well locations if applicable ❑ Brace wall panel locations ❑ Room usage labels ❑ Water heater and furnace locations ❑ Smoke detector locations ❑ Exhaust fan locations ❑ Attic and crawl space access locations ❑ Deck or concrete patio sizes and locations ❑ Fire Wall construction ❑ Roof Plan: ❑ Engineered truss direction and spacing ❑ Ridge, eave and valley lines ❑ Rafter and over frame direction, size and spacing ❑ Beam and girder size and location ❑ Wall Section Detail including: Roof ❑ Slope/roofing material/underlayment/ice dam protection ❑ Truss or rafter size, spacing &connection ❑ Sheathing size and type ❑Attic insulation/air space baffle/ventilation Ceiling ❑ Joist size and spacing ❑ Size of ceiling gypsum wall board Wall ❑ Height/top plate/stud size and spacing/sole plate ❑ Siding/exterior house wrap/anchor bolts ❑ Exterior sheathing size and type ,❑ Insulation,vapor barrier, gypsum wall board Floor ❑ Joist size and spacing ❑ Sheathing or concrete floor size/insulation Foundation Wall ❑ Concrete or Masonry unit width ❑ Footing bottom to finished ground level depth ❑ Earth to wood separation distance ❑ Horizontal &vertical reinforcement if any Footing ❑ Size ❑ Reinforcement if any Radon ❑ Passive system with 6mil vapor barrier ❑Active system with 6 mil vapor barrier Miscellaneous Construction Details ❑ Deck: ❑ Floor plan/side view/dimensions ❑ Footings/post/and beam size and locations ❑ Floor Joist/decking direction, size and spacing ❑ Stairway tread rise &run and nosing ❑ Handrail/Guard height&spacing Community Development Department (Staff Use Only) Permit Center ��2� SCPPV OF 11703 East Sprague Avenue, Suite B 3 pokane PERMIT NUMBER:Spokane Valley, WA 99206 Valley Tel: (509) 688-0036 PERMIT FEE: Fax: (509) 688-0037 410, x permitcenter@spokanevallev.orq APPROACH PERMIT APPLICATION PROJECT ADDRESS: 5 i. If e- _11 . ,* 6 I , a-' START DATE: ANTICIPATED COMPLETION DA E: BUILDING OWNER NAME: C V\N---S 1 to-Ai/1-e, MAILING V1- -- MAILING ADDRESS:1 ,L S- `,(,L i/ N/\Gr ` z-c d .,� CITY:,c 2 a.■vC v()L.I(e \( STATE: Vi IA ZIP: pI ib CONTACT PERSON NAME: lck PHONE: f)9- &- („--7 ( L_ FA `I--t(0 0 f--W,) CELL: ,T P� CONTRACTOR NAME: i' 1 V'.e., Si-a -- C 6'1/10-Ire_ Ra V K7� C y MAILING ADDRESS: 62:2_5 1 C, ( IMal VQ-" CITY: 041S Orcl1df4S STATE: VN1 \ ZIP: c ©` Tl PHONE:C5 9—1212— i' FAX: CELL: CONTRACTOR LICENSE No.: EXPIRES: CITY BUSINESS LICENSE NO.: PROJECT DESCRIPTION (Please Provide Site Sketch) Q Residential Driveway 0 Commercial/Industrial Driveway Existing Curb &GutterEl , Rural Road Section Culvert Installation 0 Sidewalk Repair/Construction kill Other Conditions: Se r bock(y ar'k Ja IN Ck Bond Insurance certificatin must be on file with the City. DISCLAIMER The permitted verifies,acknowledges and agrees by their signature that: 1) if this permit is for construction or on a dwelling,the dwelling is/will be served by potable water. 2) Ownership of this City of Spokane Valley permit inure to the property owner. 3) The signatory is the property owner or has permission to represent the property owner in this transaction. 4) All construction is to be done in full compliance with the City of Spokane Valley Development code. Referenced codes are available for review at the City of Spokane Valley Permit Center. 5) The City of Spokane Valley permit is not a permit or approval for any violation of federal, state or local laws, codes or ordinances. 6) Plans or additional information may be required to be submitted and subsequently approved before this application can be processed. / Signature �iA.,, .apDate: /' 2�n_ /t Updated 1-11-11 Page 1 of 1 http://www.spoka neva)ley.org/fi lestorage/124/938/210/948/1496/Approach_Permit_1-11-11.doc APPROACH PERMIT APPLICATION REQUIRED SKETCH INFORMATION (Revised 1/25/10) Provide required measurements (in sketch boxes), and include street name. Check all existing conditions that apply: ❑ Sidewalk 0 Drainage Ditch ft wide ❑ Drywell (show location on sketch) ft from back of curb ❑ Other (please describe below) ❑ Streetside Swale w i DISTANCE FROM Z� I NEAREST PROPERTY LINE i (MAY BE LEFT OR RIGHT SIDE) Li FT(SEE TABLE) w! d� / \ CL IX 1 ' CONCRETE iiCEUTRuEIRNAPPROACHR ' THROA EETABIDTHI�FT--•I— CURB WING WING IF CORNER LOT, DISTANCE FROM STREET NAME CURB RETURN n FT(SEE TABLE) STREET WITH CURB LL,I DISTANCE FROM Z —NEAREST PROPERTY LINE MAY BE LEFT OR RIGHT SIDE) cr FT(SEE TABLE) a.i � i ASPHALT 15'RADIUS RADIUS al APPROACH RETURN EDGE OF [—THROAT WIDTH nFT--] ASPHALT (SEE TABLE) NIF CORNER LOT, DISTANCE FROM STREET NAME UaN (Al. N.-- y_a . RADIUS RETURN ®FT(SEE TABLE) STREET WITH ASPHALT EDGE Approach Requirements: • Maximum 2 approaches per property frontage; one on arterials. • Total width of approaches not to exceed 50% of frontage width. Residential Approaches Commercial Approaches Distance from Curb/Radius Return 15'minimum 75'minimum Separation between Approaches (measured See Page 7-27 from centerline to centerline of each None specified in City Street Standards approach) Throat Width (flat portion) 16'min., 30'max. 30'min., 40'max. Wing Width (at curb line) 4 feet typical 4 feet typical Minimum Distance from Side Property Line (@ r/w) 5.0' 5.0' Minimum Distance from Crosswalk 5' 5' CITY OF Development Engineering galley 11707 E Sprague Ave Suite 106 ♦ Spokane Valley WA 99206 509.921.1000 ♦ Fax: 509.921.1008 ♦ cityhall@spokanevalley.org Approach Permit Application Review TO: Building Department Site Address: 5014 S. Van Marter Rd. Project No: 11-2575 Accepted Not Accepted Approach *X Building Location Paved Access Notes: Saw cutting of existing curb to create an approach is not allowed within the City's jurisdiction. Driveway is to be inspected by the City's ROW Inspector prior to concrete placement. *Driveway to have concrete approach per City's Standard Plan R-112. Reviewed By: 07i-f-C, . ,/& Date: 9/7/ii Community Development Department (Staff Use Only) Permit Center !I x S`pOk�1 11703 East Sprague Avenue,Suite B-3 PERMIT NUMBER: r Spokane Valley,WA 99206 Valley Tel: (509)688-0036 PERMIT FEB: 3 Fax: (509)688-0037 4gOO pe rmitcenter(i sookaneva Ilev.orq APPROACH PERMIT APPLICATION PROSECT ADDRESS: 56 e— A! OA , ' START DATE: ANTICIPATED COMPLETION DA E: BUILDING OWNER NAME: Ch(}s MAILING ADDRESS: � S \)(11,1 KJ`Gr - r� �<,� CITY:� ..Itvte. U L'LU e\ STATE: � V\ ZIP: 01_r r61e . CONTACT PERSON NAME: MCI S t PHONE: 41 ( 2 FAX.'-V !q-`'((0 7SC�, - ©L- CELL: R/it,I 1 P1 CONTRACTOR NAME: F Sk-d r C e t e cC +e_- (Randy-) MAILING ADDRESS: (e 2_22—S 1N-.( �pMNlVLrf • CITY:©Jc O�(11/1t cJ �STATE: N.p S"� ZIP: �9o2:7 7 PHONE:6C LG-(0r' 1_1.5n FAX: CPW • CONTRACTOR LICENSE No.: EXPIRES: CITY BUSINESS LICENSE NO.: . PROTECT DESCRIPTION (Please Provide Site Sketch) Residential Driveway Commercial/Industrial Driveway et Existing Curb &Gutter El Rural Road Section • Culvert Installation Sidewalk Repair/Construction • Other Conditions: bv' (k 'y CX't I tNi ay Band/Insulance certiflcaticn must be on file with the City. DISCLAIM The permitted verifies,acknowledges and agrees by their signature that: 1)If this permit Is for construction or on a dwelling,the dwelling Is/will be served by potable water. 2)Ownership of this City of Spokane Valley permit Inure to the property owner.3) The signatory is the property owner or has permission to represent the property owner in this transaction. 4) All construction is to be done In full compliance with the City of Spokane Valley Development code. Referenced codes are available for review at the City of Spokane Valley Permit Center. 5) The City of Spokane Valley permit is not a permit or approval for any violation of federal,state or local laws,codes or ordinances. 6) Plans or additional Information may be required to be submitted and subsequently approved before this application can be processed. Signature Date: 9-26 Updated 1-11-11 Page 1 of 1 http://www.spokanevalley.org/filestorage/124/938/210/948/1496/Approach_Permlt 1-11-11.doc APPROACH PERMIT APPLICATION REQUIRED SKETCH INFORMATION (Revised 1/25/10) Provide required measurements (in sketch boxes), and Include street name. Check all existing conditions that apply; ❑ Sidewalk a Drainage Ditch _ft wide ❑ Drywell (show location on sketch) •_-ft from back of curb a Other (please describe below) ❑ Streetside Swale T) DISTANCE FROM NEAREST PROPERTY LINE I`71% s�j.�� �C$ K (MAY,BE LEFT OR RIGHT SIDE) ea rh �� -0 'k. 1 FT(SEE TABLE) Wi a hen a al CONCRETE APPROACH CURBRETURN CURB" 1--4` THROAT WIDTH®FT----I--4' WING (SEE TABLE) WING iF CORNER LOT, DISTANCE FROM STREETNAME J/,f.-,'(, MAie II, RETURN I I FT(SEE TABLE) STREET WITH CURB - DISTANCE FROM zuji. - NEAREST PROPERTY LINE AY BE LEFT OR RIGHT SIDE) RAFT(SEE TABLE) o /%i5'RADIUS RADIUS ASPHALT ••PROACH RETURN I �// I /_.-------------- EDGE OF �THROATWI ABL=2 1 1 T� ASPHALT IF CORNER LOT, DISTANCE FROM STREET , V .♦ t• fi41V . RADIUS RETURN al FT(SEE TABLE) STREET WITH ASPHALT EDGE Approach Requirements: • Maximum 2 approaches per property frontage;one on arterials. • Total width of approaches not to exceed 50%of frontage width. Residential Approaches Commercial Approaches Distance from Curb/Radius Return 15'minimum 75'minimum Separation between Approaches(measured See Page 7-27 from centerline to centerline of each None specified in City Street Standards approach) Throat Width (flat portion) 16'min.,30'max. 30'min.,40'max. Wing Width(at curb line) 4 feet typical 4 feet typical Minimum Distance from Side Property Line (@ r/w) 5.0' 5.0' Minimum Distance from Crosswalk 5' 5' Target Date sheet For City Use Only SCITY PLUS Project 1 )i O 2S j pOkane Project Address ilv L "MI cf\ IT air Valley 11703 E Sprague Ave Suite B-3 • Spokane Valley WA 99206 509.720-5240♦ Fax: 509.688.0037♦ permitcenter@spokanevattey.org As part of our on-going commitment to customer service during the review process of your project application,we are providing you with a TARGET DATE for the initial technical application review. If for any reason we cannot meet this date,we will contact you with a revised target date. Your application review TARGET DATE is k } I I The TARGET DATE is the date we estimate your project applilation will have had its initial technical review.It is not the date for approval or permit issuance. Tips for a Smoother Project Application Review ➢ Submit complete,accurate plans and documents. Extra time may be required for re-submittals as project application reviewers work on multiple applications and it may be several days before they can look at your new or revised information. ➢ Designate a specific contact person to communicate with the City. While the person designated as the applicant's contact person with the City can be changed, one individual with the expertise for dealing with reviewer comments would be the best choice for the entire review process. ➢ Call staff regarding the status of your project only after the target date shown at the top of the page. Although you should be contacted on or by the target date,please feel free to contact us if you haven't heard from us by your target date.Staff may contact you before the target date if the initial review is complete.By following this procedure,you will save time and allow the reviewers to complete the work more expeditiously. Steps in the Permit Process 1. Counter Complete. Your application has been accepted as counter complete. This means all of the required documents, as indicated on your Pre-Application Checklist have been submitted or have been approved for deferred submittal. This does not prevent technical staff from requesting additional information as a result of their technical review. 2. Quality Check. The next step in the process is a quality check to make sure that the application is reviewable and free from substantive flaws that would prevent technical staff from completing the technical review once it is started. When this step is complete,your application will be routed to the appropriate staff and remain in their review queue until it comes up for review. 3.Technical Compliance.Once an application is administratively complete,it is routed to technical staff for compliance review. Depending on the type of project, technical staff may include multiple reviewers. You should be contacted by phone,fax, email, or mail by your TARGET DATE once the initial technical compliance review is complete. 4. Permit Issuance. When the technical compliance review of the application is complete, including any subsequent re- submittals,each reviewer will approve their section of the application and route it to the Permit Center.When all sections of the application are received,a Permit Specialist will process the application and contact the person specified on your application for permit pick-up.Information regarding fees and pre-construction meetings(if required)will be provided by the Permit Specialist at that time. CD-003 V-7/06-21-11 Page 1 of 1 tin LU 6 Pursuant to SVMC 19 40.020(B)"All residential driveways and off-street parking areas shall be ita.c„.. paved with asphalt, Portland cement, grasscrete paver blocks or other equivalent hard surface I—: • Q.. --... material ---• - LILI i \ I TAX PAROM 4O1169I , = uj „,- = i_ 0 zi.., ,...., , , a, ..tc - . T < In In aCO CI • a 1 ; , • • -- a PROPERTY LINE - Nita - • - I - • n1 t 1 co • Elm i ak... 1 4 =ME 4 ... la aim/ HE04001.1 cr HOME I 0,- AfeAd4. .1•.‘ , ,..... i , 1 ,. &•-s x : z —___ 1 .,..• iv k;Lf(;-----›,/, , ,. .co.." . 10 10 40 1-4 a .171 t I , I 0 ti a -n•-_, ! .....----- ' ''sf•-----, saz.r Et •ovl& ____ _________ `',$.1 -,.... ______• .__ _ _ ___ ._._ — • . , ' I rmetnoritE i . 1 ce I Li_ • rm en 5 . ...., d.i. . n cc . . •