Loading...
2012, 08-20 Permit: SW-12002026 Sewer SPOKANE COUNTY BUILDING AND PLANNING PERMIT Permit Issued Date: Application Number: SW-12002026 08/20/2012 Expiration Date: Project Description: SEWER CONNECTION Primary Contact: COMAN CONSTRUCTION Project Name: W PONDEROSA II Applicant: COMAN CONSTRUCTION Permit Type: SEWER Address: 4820 S WOODRUFF RD SPOKANE VALLEY,WA 99206 Phone: 208-640-0282 Email: SITE INFORMATION: Site Address: 5110 S VAN MARTER RD Owner: JOHNSON LIVING TRUST,ERIC& SUZANNE Parcel Number: 44051.1610 Address: 5110 S VAN MARTER RD SPOKANE,WA 99206-9205 Subdivision: ILLER FIRST ADDITION Phone: 509-850-5140 Assessor's Description: ILLER FIRST ADD L10 B2 Email: Inspection Area: Water District:Spokane Fire District: Fire District 8 County Water District#3 Zoning: Land Area:43065 Square Feet CONTRACTOR INFORMATION: General Contractor COMANCE898RZ COMAN CONST&EXCAVATION INC 4820 S WOODRUFF DR SPOKANE,WA 99206 509-990-5053 DETAILS: Class Type Quantity Unit Charge Value SEWER SEWER CONNECTION 1 $125.00 $125.00 $125.00 FEE DETAIL: Processing-Utilities $25.94 Utilities Permit $125.00 Total Fee: $150.94 CONDITIONS: Inside Public Transit Benefit Area CALL 1-800-424-5555 BEFORE YOU DIG--AT LEAST 2 WORKING DAYS IN ADVANCE.SPOKANE COUNTY CODE REQUIRES THE INSTALLER COMPLY WITH ALL REQUIREMENTS OF THE WA STATE DEPT OF LABOR&INDUSTRIES, INCLUDING THOSE RELATED TO TRENCH SAFETY. FOR SEWER INSPECTIONS CALL THE UTILITIES DEPT AT(509)477-3604 FROM 8:30-5:00 MONDAY-FRIDAY PRIOR TO COVER. ONE WORKING DAY NOTICE REQUIRED.PERMIT ALLOWS FOR A 30-MINUTE INSPECTION.ADDITIONAL INSPECTION FEES APPLY AFTER 30 MINUTES. Date Printed:08/20/2012 13:52:54 Printed by:IIS APPPOOL\ASP.NET v4.0 SPOKANE COUNTY BUILDING AND PLANNING PERMIT Permit Issued Date: Application Number:SW-12002026 08/20/2012 Expiration Date: INSTALLER IS RESPONSIBLE TO INSURE ALL WASTEWATER DRAINS ARE CONNECTED TO THE SEWER AND MAY BE REQUIRED TO PERFORM TESTS FOR VERIFICATION.INSTALLER IS TO FIELD LOCATE AND CONFIRM THE ELEVATION AND POSITION OF SEWER STUB PRIOR TO ANY OTHER EXCAVATION. SEWER STUBS AND DRY SIDE SEWERS ARE TO BE CHECKED PRIOR TO CONNECTION TO ENSURE THAT THEY HAVE ACCEPTABLE GRADE AND ARE CLEAR AND UNOBSTRUCTED.SEWER LINES SHOULD BE CONSTRUCTED TO ALLOW FOR GRAVITY FLOW FROM THE LOWEST LEVEL OF THE STRUCTURE. THE INSTALLER AND THIS PERMIT MUST BE PRESENT AT THE JOB SITE AT THE SCHEDULED INSPECTION TIME.BOTH STATE LAW RCW 19.122 AND COUNTY CODE REQUIRES THE INSTALLER TO GIVE NOTICE OF EXCAVATION TO OWNERS OF UNDERGROUND FACILITIES. Date Printed:08/20/2012 13:52:54 Printed by:IIS APPPOOL\ASP.NET v4.0