HomeMy WebLinkAbout28267 DRAINAGE REVIEW FILES 3 OF 3 DISHMAN COMMONS
~
S P O K A N E ''J C O U N T Y
DNISION OF ENGWEERING r1ND ROADS A D[VISION OF THE PUB[.IC WORKS DEPARTMENT
William A. Johns, P.E., County Engineer
October 1 l , 2000 Tim Schwab, P.E.
CLC Associates,lnc.
707 West 70' Avenue, Suite 200
Spokane, WA 22904
SUBJECT: P1859 - Dishman Commoos
Submittal Acceptance
Gentlemen:
We have conducted a general evaluation of your recent submittal for this project, and we find that this submittal appears
to meet the minimum standards of the Spokane County Stcrndards for Road and Seiver Construction ("SCRS"). We are,
therefore, able to accept your approval of the plans and calculations for this project.
In accordance with Section 5.02.D of the SCRS, this plan acceptance is valid until October 11, 2002. If the
facilities are not constructed by then, you may request an extension of the acceptance for an additional two years;
however, the plans may need to be revised to reflect current standards prior to granting the extension
Please note:
1. The County's acceptance of this submittal does not relieve the sponsor or his agents from any
liability related to portions of the design that are not in conformance with the SCRS, or which do not
follow good engineering practice;
2. All permits and notifications necessary prior to construction are the responsibility of the project
Sponsor and/or his assigned agents; and
3. The Sponsor's Engineer is required to conduct inspection and testing work and submit Record
Drawings and inspection reports in accordance with the SCRS.
4. Final coordination regarding the County Road Project for 16`h between Dishman-Mica Road and
University Road needs to be completed, and the project plans adjusted accordingly prior to the release of a
permit for the 16`h Avenue improvements for this project.
5. Plans for the offsite pedestrian pathway (along 16`h from Felts to University) were not included
in this submittal, and are still needed prior to the start of any construction on the pathway.
A set of stamped mylars and a copy of the accepted design documents are enclosed.
Sincerely,
William A. Johns, P.E.
Spokane County Engineer
9Pa~P.E.
Plan Review Engineer
~
cc: Project Sponsor
Reviewer
groject File
~
1026 W. Broadway Ave. • Spokane, WA 99260-0170 •(509) 477-3600 FA 477-7133
1~
! I
TO' d %L6 , bb89 8Str 60S ZE: bt 000
Qctober 13, 2600
1VIx. Bill Hemrt, ings
Spokane Coun$y Engineers
Developer Ser~ices
1426 West Braadway Avenue
Spokane, WA : 99260
RE: Dishmap Corumons
CLC #90353
Dear Mr. Henunings:
T"his fax should show you the pedestrian path cross section and a map showing the
approxinaate location of the path.
Sincerely, ,
CI,C Associa#ts, Inc.
Doug J. Desmond
Project Managqr
DJD/cf
Enclasures
T00 O •onI •saisToossd 013 tt89 85t 609 Xd3 TZ:£T 00/£t/OT
N
, (S)
a
,.r. . ~ . . . r.. . ~
0
N
O ~
O
~
A. SC
PEoesIMAN pATM ro sruRT ax TME EAST sOE aF FELrs " y ~
RoaD TO txE wESr SIDE OF aMLJN Raw, APPRox. 840
UWAt FEET. INE EAst sIDE oF oeERuN aaAc uND IeTM
AvENtIE is wPaoVED wrtN W SDEwax eoPd"M IsTM
Avaue. ~
-o
2295 6
s1aNal
EXWRES 981/ ~
. . . . .
~ ~ . ROW ~
~ F.XM6 30' RiGHT-OF-YVAY
~ 4 I 29
~ aPPROx. 18.5' APPROx. 3.5' 6' WlDE PED. PAtH MIN c
° w
~
a ~
U ~
U ~
E%IS11N6 ASPHALT EXI5TING GROUND
~ 2" CLASS 'B' ASPN/ILT
w ON NAitYE S4iL
Go
a
TYPicAL RoAD SECMoN To aBIEIM RD.
~
0
Nor Ta scnLE I N
,,e ~ i i ' ~ ~ ~ ■ i ~ ~~w ~ r ~ V
- PEDESTRIAN PATH
" ~ - CROSS SECTION ~
~
CC: ba
; ,
a* 4be ~
. . . . s . J y
Nam=
o ~'1
o
~ I
~
o '
.
~
a
. ,r ' ~ . . .
R_ ~ , •t • , . . , . . ' ~ •
~ ' ' ~ • , .
. r' „ ' _ , ` • V•
, • 1
f
. ~ ~
~a. 4 . • a ~ , ~
. . 5
. ~ e,a= Zr
L. 2 . di► ~ . ; ~ • ,
SCpI„E ~53 -,A A s~ , a s + a ~ • „.f ~1 it . ~ ° ~
ir~ 1, } Q /o
~ , w S . . • ` ~ 7 i ,
lk
b ~ ~ t _ ' : 4 i ' . • ' ~ o ~i rt ~a ~ Z ~
~y, ~ , ~
,~W r/ rj~,t ~ ~ i. ~S d E " ' ~ 'd'
` ~i i► , ~ , ~ 0 ~ r rl , . li
e ~ ~
. ,
~ : ~ , ~ ' z p,~~►~ ~ 7 . . ; ~ '
~
.~i +4„^t • NG ~63"6~'~, , . , ~ Ml"'~~, • X.
. UO ♦ w ~ ~
^ p ~04 . ~ 6. /0 .1 • i ► I~TI
` !I ~ /d ~
9,' $
8 1-+ a
~ ~ ~«•~I l ~ ~ . . T~`1 . t 1 ~ ~ Ck ~ ~ ~o2i ;a
i
zd ~ ~ . ~ 1 ~ ~ . A`4►!/ ~
~ ~ ~ l!~ 'r ~ ' . r7 ~ r ~ • " , ~ ; ~ ; { tMv
,3
~ 1/ ~ . , ~ ~ •
rp
.
~ ~ i o• ~ ~
c ~ . ` ~ 1 ~ r rZ 't' ' , p ` ~ ~ • '
~ \ ' / ' ► ; , s ~ 2 R' N
~
1 ~ ~
~ '
f , i
~ .
~ ~I t ~ , « `t M ¢ ~ O ~ ' • ~
~ ` . ~ ~ ' d N~ ' •'i'° e ~
a~,r ' . t~o . ~ s ,4 9 7
cv ~~f ~ , . t 2 ~ S ~ ~ ~ W ~ ~ . ~j • lo ~
N • ` ' ~ ~ ~ ~ .
. . • tw g 000,
'
~
: ► . ~ r~~ ~
° 1 ~
■
~ ~ ~
~ -
~ ~ ~ + 7+ Qp ~ ao ~p A.' S~
~ , ~ T ` _ ~ o~ - ! - , _ ~ ° I- ~ ~ All W q Sf/~
, i , ~ ~ 4 ~ ~YP~ ~ cuRa s~oKAr~E ~
~ 'S, b PLAN A-3 ~`YPE A L~RB P~R S~OKAN~ . COUI~TY STAN~AR , ~ :5 ~ ~ ~ ;i 4A:
~ ~ N~Y TANGARD ~LAN A~~~ ~ ~ ~ C~ S _ ~ ~ . ~ ~ ~ fti ~ :
~ ~ , i ~ . ~ Q~,, 2~~~ e _ ' " ~`C
~ t , t r51 ~ ~ ~ ~ ~ 'til ~ ~ ~ ~ - ~ , _ . . ~ _ . ...r ~ ri~~~ . ~ ff~ I M1 ~ xY ~ h ~J~r+ ~ ti ~ . ~ m ~ "
~ 1 _w..~,c_.~ NA ~l . ~.r u._ T , __._.~_~W~.~~. ~ : ~ ~ - - - .
~ k" - _ w ~ s . _ - - k ~ t 4 4 r ~ _ . ; ~ ~ '~r ~ ~ f
~ ~ ~ 3 ~ i ~ E~fPiRES 9 2 ~ ~ , r r I ' ~ 1° ~
~ ~ ; ~ r ; i i , , 1, ~ ~ ti ~ ~ f i i r -,,,.~r'." ~ ,c < ;C, °'~:r. ~Fi a~'Sr ''ro'~£,.»-.~~.. ' , . ` ''~r',~" °a 4a" d4 ~:1y ^,r f
ok n.. e~, C{~~j A, 4°~s~. ~i,;` - .~''±~,E,yf ; 1 - r a• ~ ~~x~~";'~ ' s~' ~ c '4~ , n ~ ,~"ASi:;M1 ~z ~ . ~v 4~ ~ „"kG,< i •'s' • ,t~Y'k . - . { t y ~ ,~1 Y , , a: ~ :x z~ µ i ~'i' d- ~ro, ,r> .c; ~i, . , ~ • ~a~~ , : ~ . e ~ D C,1(Y`/i~ -,os ~ n ~b`, r.rs `c, x. ' a ,~r~, p w . F-z-?~ p~ f,~..,..'~:o~A~:: ~ ~M. ~~'~e'.'..._'~" ~V {~•~k d" \x~~, waa.~ 3 ..~ki~~...,.~ ,s • 4+h~F,',~ ,r` , -
~ , 'x~ ~ j;.. e_, ~ •~,.3 ~ ,.t _ ,s _xs, . * . . ~.~..y • . ~ ~ , • I . y4ti-;_ , aK.~':,~-~.~ ».-s.~..,:.~~:_..,;..:, ° ^ ~::.a „~:~:,,~~,,,aa'-... q ~ . _,_,'~z, ,.sra,. : ...r,.,c:.,=s,.~ ~j~ , .r, , 'h~s ~ •..;~~1•.m~"~e~"~.~~ ~x. ~ : ~ I w.a,..,- xar ~ c~.._~ r~.~__~ . ,.a..,,..,.: _ _ F , f ~ I a - - ; k~~ ~ ~ r I " F F '
~ ~ ~ ~ ~ ~ ~ ~ c~ ~ ~ I , I .
' ~ ' f , ~ ~ ~ ~ 3 ~ I ~ ~ 1 ~ d ■ ~ N- -
~ I ~s 1 ; I 4 1 ~ a I ~
`ti ~ ~k1 4 ~ ~ ; ~~k I a ~ YY~~ 3 ~ ~ ~~G ~ . ~ 4 ~ , ~ ft~~~lR~. A. Q~FSITI~I~ b ~ i L•F -
~ ~1 ` I y j } ~ ~ k . 1 , 1 1 ` ; 1 ~ l ~ -
~ N CQ~JNTY S`~AND►4RQ r P~KA E , ~a. .5 ~ F ` ~ ~ ~ 1
~ C~ T INL.~T TYp~ ~ 1N ~ f `<< i _ ~ N E E 1 ~ 3 l Y ~ ^4 4 ~ ~ Y ' ~ % ~
~ I P ~IETA~ ~RAME 8c ~ ~ ; ~ 1 ~ ~ , , ~ ~7 9 y~ r 4 ~ xf 1~~~ L ~l~l.. l]~~t~~, ~ t t; Y'~~,, ~ ~
~ w* ~t ~ ~ ~ p ~ ~ ~ °ti,4 5J' ~ ~ STA; `~~-17 4B, RT F i ti ~ ~ W 1Lir-
~ ~ . ~ .1 ~ V.~~ ~ 00.~7 ' ~ ~ ~a~l~~~ r i~ I ~ ~ ~ ~h ~
~ " r ~ I f • , t~ ~ l~} k ft ~ ~ r. e -
~ { ~ F 't ~ ~ 1 f' { ~ ~ ~ , ' ` f ~ , i i 1 ~ ~ t ~ ~ i
p E ~ y ' + ! } ~ ~ ~ 1 ' ` ~1 I f 1 f i : ~ s - 1
~ r ° } r 's 1 [ j~ ~ , r , . ~ ~ } F ~ ~ ~ ( # I~ I ~ 4 s 1 , r
{V l~'y ~ ' ~ r ~ r ~q ~ J k p ? ~ ~ r~~' ~i"! xy ~ j 7 I' . ! ,~„r a . a =;1
. ~ 1~ ? ~ 4 f, , r fr j f J ~l ~ ~ ~ Y ~ ~ r' ~ ~ ~ I / . ~ } ~ ~ J, •n
T j~ J ~ ~ ~ w W_ . ~T ~ , r / r ~ ~ ~ , ~a. ~ ~ i- ,Tl~'r► , ~ ~ , ~ ~ ~ - ~ , . i ~ ! ~ f . , 1 ~ 1 ~ ~
4 ~ ~ f F ~ r ~ - 1~ 1~`fILITY ~ ~ ~ ~ ~ I h[* 1,~T r f f ~ ~ ~
' ~ pY 1 ' r~ ~ r f ~ ` " ` E#4J ~ . r { { ~ 5 ~ f << GE EASE~I~N~ 1 kmd
; o ; ~ . ~]f~A~N~► ~ , ~ . f ; a f . ~ i ~ ~ ~ e r ~ } ~ ' ~ f-
j } ~ i ; . ~ ,f y 1 ; ~ ! J ~ ~ i r ll 1 1 a ~ ~ s ~ 6 t : • 5A4f(.~l~~ GOl1 ~
k 5 L P f ~f ~ p , ~ ~ . r ~l ~~t 1 } i ~ 1 ' : f ! 41 r~ 1
134 l ~ ; } f f ~ L M1 y. ~ r° '(~1 ~ 5 ~ 7 { ~r ~ , 4` ~ 4: ~i ( /'4 L f_ ~1 : ~ ' ~ Y ~ 4 ~M1 f t~ 1
t ' i ' ; l N k ; , ~ --V ~ o r x ~ ~ , t ` 1 7 . ,
~ ~ ~ ~ ~ ~ _ , ~ ~ ~ ~ ~ r ~ 4,~ ~ ~ t 3 ~ ? 1
~ i q ti d ~ ~ f i F l I' ~ ~ f P T'Y.{ 1 , ~ 4 i r . , P~Q ER , ~ ; ~ ~ ( ~ f ; , -
I s i i ~ ~ ~ ~ : BQUr~Q'AR ~ rYP 4 ~ ~ ~ ! 1 1 ! 1 ! i ~ ' ~ i t~
~ ~ ~ ~ t E , • ~ ' ~ ~ 4 ~ 1 5 f i j i~ ~ t i } ~ l , , , r - ~
I~ ~ ! ~ ~ E ~ ~~$.3~} ~ ~ - ~ ! i ; i r ~ ~ ~ , ~ ' ~ r r I {
, ; ~ 3 f ~ ' • , ~ I } ~ ~ ~ i ~ t ~r F ~ ~ ~ i ~ ~ ~ , ~ • i i ,
~ ~ 9 ~ t ~ , .
~
~ - r.~ _ , ~ ~ ~ ~ ~ a f ,
~ ~ ~ ~ ~ ~ ~ ~
~ i~.
~18~4Ctfl~~B, It~~. ~ s~~~we. ~a - o~~u~. ~
~n~ west ~th . su~~~ zon {5a~} ~s8-~8aa ' Spakans, v1n 99z0+ FAk; f5Q91 4S6-fiA44 ~ '
I
+ .
~ ~
I
.
,
~ ~ ~ p 9 } ~ - ~
~ ~
~ ~ EASEMEN~ " OR R,0.1N. ~ ~
~ dRAINAGE fASEMENT AS 5PEC3FIE~ ON PLAN f ~
I I e 5 ~
, Q ,p 2291 f • ?4P DF 9ER~S ~l,EV,= ~ I ~1$T~ ~ r I
TQp OF CURB ~L~V, ~ + .za ~S' 1,5" SOD ON TO'?5~11„ ~QQ ~ 0 I
A~ ~ ~ ~ INSTALLW CD~CURREN~ WITH ~CCUPAHCY OF A'pJAC~NT HOLISE
~ ~nx, EXP~RES 9 2 . ~:1 ~n~) ! , f ~
~ GRA LEVATION . • - . . , . T£ E • ~ , . ~ ~
.5 . , . .w ~ RAINAGE 3.• ~ ~ ' . F ~
S1RI1 TURE '~x - - 4y, i , 4 ~ M , , II- I • ' f~ ~I
` ~ „ ~ _ ' ~ ~ ' `S~~~4~RIREa~ s r'~ _ ~ r„ y a ~i x~.. ~i 3'~ u~~. . ~ ~ ~
~ ` ' ~ - ' ~ ~ ' °RIP°RAR . _ ~ ' _ ~ PR~VIDE FIL,~ER FABRfC ~AMOCO 454a ~R EQIJAL~ BE~lEEN P
I TNE NATiVE 501L AMp ?HE WASHEa ~RAIN R4C~( AN~ 6~TWEEN ~ T 1 "-3° TQPSDIL QN THE WA5li~a aRA1N ROCK ANa YFif DRYW~LL BARR€L.
GRADE~ POND BOTT~I~ , I
~ GRRaEp P~iNa BOTTQM 1.11'-1.2$' BELOW
~CTIONAL VIEW EQGE OF A5P~~~T 4- _
1
_ , , ~ . - , ~ , ~ a.
MOT TO SCALE . • ~I,
_--1~ a . '
~ ~ . ~ . . ~ . ~ ' . . ~ : ' Y a`!'.~ :'r ~ . r - ~
, - -
~ ~T
I ~ ~ ~ ~ ~ 1 rw
' o ■ ~f~~L 'L~~! 1 ~i!'V ■ w n
' ~ ~y Y~~~ ~LC Aeeocietee,~h►c. ¢+n~wq u . ~na !af 7rt 7u !1b 10C (E0~ 4'iEEtE - ~
~ rx pOYM r~ IYI~~ ~
'
r -
i IT ~ -
. i ~ -
a s e z
~ ~il• ~ - - ~ ~ i -
RES 9 12~1'~~
_ _ °
s. r.. V
e r - _ _ '
, )
■ - ~ ~ r - - ~ -
I . a ~ 7
I II
j~ II
~ , ~ A ' ~ ~ ~~Soy .
i ~r~ Q~ ~ ~ 4 ~ ~
I ~ ~ . ~ 7
~ ~ ' ~ . ! ~ i er 11 -
t r.~, i . ~ -
f ~ ~ 2, i , " ~ ~~i
~ ~ ~ ~ ~ {s ~ r ~ ~ . ~ J~ . 3 a~
~ ~
~
~ ~ EXPI~ES 9
~ ~ : r ~ a I r ~ 1~ ' s ~ ~ ! I ~ f t ; ~ j ~ f ~ ~ r r ~
y ~ ~ ; ! t P ~ ! ~ 1 ~ ~ ~ t ~ 5 ~ ~ 1 ~ r• i ! ! i i
. ~ , 3 ~ i ; f ~ ~ 1 t t ~ t ; ~ f ~ l !
~ ~ j ~ ~ ~ b k ~ ~ ~ 10 ~ t s 1 ~ ~ r ~ i ~ r nl
~ _ i ~ ~ i q f F ~ r i~ ~ t t ~ y ~ r ~ , ~r ~ ~
U~ILI~'Y ~A~~MEh1T ~ ~ , ~ , ~ 4 , ~ ~ t ~ ; ~ ~ r ~ ~ ~
~ ~u~y , ~ ; E ? + ~ r ~ 1.~~ ' ~ 1 1~ RA~NA~E ~A EMENTi ~ i ~ t ~ ~ 4 1 l i ~ • ~ !
1 ~ s , ~ , ~ ; p,~~oP~~rY , r' ~''7 1 4 y i ~ ! , r r f ~ 5 G } ~ F { ~ f ni
. , ~ 0 ~ ~ , , ,~OUNdARY~ ~TYP } ~ 103.47 ~ - ~ ~ ~ t ~ ~ ~ ~ , { r Ifi {f ~ 1 ~ ~ ~ r f k I~
~ ~ 1 1 t f a f ~ , ~ f ~ ~ i 1 4 1 3 ~ ~ I~,~ ~ . ~ ~ 1 ~ 1 ~ ~ 1 ~ 1 ~ ~'~t~~' ~ r ~ ~ , . } ~70RM pRAIN MR~NI~J,OLE 1 , r L~ `k- 1
~ -1994 ~ ~ ~ ~ + ~ ti ~ l ~ r . .u , ~y,,. ~ p , 1 1 's i ~ ' f ~ ~ . ~~JIJ~~J~ ~ ~ ~ ~ ~ t
IO ~ ~ _ ' , y ~ ~ y 4 1 E 4 ' ~ ~ ~ , 1~~t4 ~ ~ ~ ~ z ; ~ ~ ~ ~ ~ ~ ~ 1 ' ~ ~ i , ~ !
~ p~ p~s~a ca r~uR , ~ d ~ ; , } , 3 r E ~ t ~
~ { } } t ~ ~ , ~ ~ ~ ~ ; ~ i ; f ~ { ~ « ~ , ~ > > ! ~ a t t ~ i ~ ~ r ~ ~ ~ ti Y ~ ~ l l ~ , ' , ~ ~
~ I 1 E I t . ~ ~ ~ 1D.~ UTI~ITY EASE ENT ~ ~ 3 ~ SPO AN~ ~QIiN~'sl' ST~IDARD ~ ~ I I z
. ~ ~ 3 ~ ~ ~ ~ . . ~ . ~ t s s ; } ~ ; ; ! , ; ~ f" ~ ~ ~ ~CONC ETE ~NL~T,TYPE,~ W TYP~~ , ~ r ti ~ ~ . 4 . l ~ 4 ~
~ ~ 4~ s 5 } ,„y , q ~ ~ ~ ~ 41 MET L ~ ME TY~E ME~AL s ~ TYP~ ~R ~U~B ~-~R SPOK~iI~ ► ~ ~P ~ ~ , ~
~ ,n, , , , 3 ~ ~ ~ ~ 3 . ~ , ~ ~ ~ ~ ' I c~ , j ~OUN~Y SrANDA D PLAN ~4-3 s ~ , R~r~ sr ~ ~ ~ ~ z.~~ ~r. ~ , ~ ~ i ~ ~1 ~ 1 ~ ~ p` ~ . i , l 3 F J
~ ~ ~I ' ~RA~ 'ELE'~.F199 ~ ; ! , . „ { ~ ~ s f I ~ ~ ~ k : ~ E , 1 ~ ~ / 1 , q + ; ~ i
, . ~ ~ ~y~~ ti i ~ ~ F . p f ~ 1 ~ ~ • ~ ! s~.~~_..~.t _ .`f ~
P ~1 h~ TY ~pl~N AR ~ a 1 ~ ~ ~ ~ : ~ I ' ~ ` ti~ ~ O~CA ~ CDU ~ D D ~ , ~ ~ ; . ~ ~ ~ ~ : ~n t~ r ~ , t ! T i n u _ ~ i } ~ f ~ ~ ~ l . ,
TYPE ~ DRYVYELL WITFG Tl`P~ - , ~ } , ~ + ~ ~ ~ i : , 3 ~ ► t ~ , _ , _ . ~ ~ . . ` ~ _ ~ r ? 4 ~l~FAL ~RATE ~Na FRAME r 'S t y : ~ y ~ . ` ; ~ ~ i r_ ~
r L ~ ` t f y' ~ ~ + ~ ; $ ~ 4 3 , } ,r 1 1 t STA 1a~48,~~3 ~~.o~ ~r. ~ < < 4 , ; , . ; ; i i . , I
~ 11~~~ ti a ~ ~ ; ~ y ~s ~ ; i i ; f ~ , f ~ , , ~ ~'+aQO ~ 3~ 0 ~ ~RATE ELEV. W 1932.80 ~ ~ ~ _ ~ ~ k { , ~ z Q ~ r , 1 ~ , , t . ~ • ~ ~ i a
ti " 4 1 1 1 ! i - ~ } . I ~ ~ - . ~ ~fr ~ t ~ ~ ~ i i i t ~ ; i I ~
L ~ s ~ ~ ~ 3 i t I , ; F ~ s'
~POKANE CDU~VTY STANDARa ~P~l~ANE COIJN~Y ~~ANDAR~ ~ ~ v;~ ~ ~ EXPIRES 9/21~pf ~
~E 4 u a , •Y ~_~~-~L.. ~ L- ~~NCRET~ I~II,ET TYFE ~ W TYPE ~YPE B DRYINE~.L WIT'H ~'Y~E ~ , ~ 11 ~ ~
~ T 4 I~ TA RAT A~I FRAM N~ETAL FR~ME & TYPE 2 ME AL E L G E a E , 11 !
~ ~ ~RA~'~. ~TA 10~6~4, 1~.33' ~T. STA 10~~fi.D~, ~i.~9' LT. . . 1~ ~ I
~~~fi~ E~~v.-~s~~.a~ c~~~~ ~~~v.=~~~~.s~ ~ ~ ~ ~ ~ , , ~ s~a~~~~o~~~~~,~~~~~~~~
. . ~ ~
, ~ , ; . , ~ I r` ~
. , ~ {
~ , . ~ ~ ` ~ ~ ~ ~ ~ i~ ~ ~ ' r ~ }
■ r~ ~ _ ~ ~ a~. ~
~ . . i~ f ~ ~ ~884CI8~~8, I1i~. ~ ~ I
sFac,er+E, wA - oF~~Ert, co 70~ Weat P!~ -~uitd 2~ (~s) ase-s~~v F ~ /
3payane~ WA 9970~ Fk1R: (509} 458-6a+! .
t ~ f
!L +76 DRA` 1NA~7 I f~r i E
~ ' _ EASEME,NT ~
~r
~ ~ i ~ .
s
M. S~
W ASyI~~
~ EASEMENT OR R.O.W.
DRAINAGE EASfMENT AS SpECiFIED QN PLAM
~ TOP Of BERM ELEV.= ~e` 6
~ TOP aF CiJR6 ELEV. ~
~+.2a FT. 1.5" 50D ON TOP50aL, S0D ~ ~Y
~ 1N5t,ALLED CONCURRENT VN'~i
~ QCCUPANCY QF ADJACENT HOUSE
3 MAX. EXPIRES 912VO/ ~
3:1 ~T1'P)
GRATE ELEVATI4N ~
~ ^
RAINAGE 3, t Mqx.
STRUf TURE
S~I PIPE
~ ;TOR
.
PROVIDE FiLTER FABRIC (R~IOCO 4545 QR E0l1AL) BETWEEN ~iP RAP p " ` " ° . ' , •,w
THE NAT1VE SOIL RiJD THE WASHEp RRAIN ROCK AND 9ETWEEN
THE WASHEp QRAIN ROCK AND THE QRY4VELL 9AftREL 1*-3" TOPSOlL pIV ~
GR,4QEQ POND BOTTOM
. ac
CRA4ED PQND BOTTOM LU
1.11'-1.28' BELQW
SECTIOryAL MEW , EocE o€ AsPHALT
LU
TYRICAL POND CROSS-SEC110N WTW STORM QRAIN - PIPE
NOT TO SCALE . . • . , . , o
' • . , ' ~hr ~ v'.' ' ' . ~ ~ 14-..,.~_r ~
' i , u o,s ' h . "~kM ~ ~ C-
- TYPccAL `208' POND
• CRoss sEC11oNs
cx.c asooaetm7=-
.vum n .~,,m
'm ,go. ~ (K*) A56-mm
~ri r~ wJa r .
~R
~ '
I, ` .
i
j ~ ~ ~ A' S~ -
, ~ ~ , ~ , ~ ~ ~ , ~ d ~ 1 , ~ 4 ~ ~ ~ ~ ~ 0~ ~ ~s
~ 1~' ~ s ~ J; . ~ , , , ~ ~ 2a.ao ; ~ ~ ~ ~ ~ t ~ AV~~ ' - - -E
~ ` ~ ~ . f ~ 1 I « f i I ~ ~ , ~ t + R~ ! . 'y . ~ , , E` ' ~ , , ~ ~ + _
~ ~ , ~ i ~ s _ ~ , , i ~ , ; -
I ~ ~ ~ ~ ~ r ; ` '1 E ; ' f . , ~ ~ ~ Ft~7 ~ ~ ~
~ ; ~ ~ p ~2s ~ ~ ~ , ti / ~ ; ~f , I = I , I G ti. ~ ~ ~ i ~ , . r~ •ip i ra1 • r
~ i ~ a 1,Y - PR~P~R~~Y ~ ~ f a f~ 's ~ ' ' ~ ,S~ , ~ f ~ ~ ~ ~ ~I~~ •l 1 ~ I
~ I . ~ , ~ BOU~IDARIF TYP ~ ~ ~ ~ , ~ i ~ , , , ~ I . ~ - -~T+
A ~ r ~ ~ ~ ~ w ~ ~ ~ ~ , I c~ ~ ~ ~ I " _ EXPIRES 9 ~ q I f 1- .
1 ~ ~ ~ ~ ~ ~ , r°, ~ ~ ~ , # r, I ~ A u 1r
~ P N~ ` 1~ r ~ ! ~ ~4 O~ED CO O~R~ - k ,~,I ~ ~ I ~ , . L1 1 - r ima - i. ~vx•
~ ~ ~ ~ t l~ ' ~ ~ i ~ ~ , ~ r y ~ ~ F j J I r
k 1D ti ~ . ` ~ ~ ~ ~ ti ~
~L \ ~ ~I 1 ~ f ~ ~ ~ ~ 1 ti ~ ~ Di S Q~ f i N J _
, r E ~ ! 4 RO 4 ~ 1 J a I P t o ~ • I 2~4.00 ~ t ~ I ~ ~ ~ I~ ~ l~ !
~ ~ ~ r i ~i r ~YPE B CURB P~R SPQKAN~ ti I f !r r W 1 ~ 6 ~ , A r ~ ~l r i CU~l~~Y STAN~ARD ~LAN A-3
~ , ~ 34.~4 ~ , I a ~ ~ , ~ 1 r ~ ~ ~ ~ ~ T _
~ 4 r ~ + ~ ~ ~ ~ ~ . ~ ~ ~ r ~ b ~ ► i •-~1~ , -
~ ~ ~ f ~ . ; ~ . ~ ~ ; ~ ,~r 1 ~ 5 ~ ~ ! 1 ii
i qf~ } ~ ~ ~ I ~ {5J. (7 l I ~ ; ~ i I _ I ~ ~ ~ ~ . I
d ~ 1 . ~ I I f 1 ~ q E ~ i I , 1 ~ , 7 ~.7 _ F.~•,
, ! 1 f , ~ ~ I ~ ~ ~ ~ f ~ ~ ; - ~ 0 DRAIIV AGE ; ~ Y - ir aaaaaaaamms_
F : 1 I ~ ~ 4 s , ~ ~ J E ~ASEMEN T
~ e ~ } W ~ ~ ~ ~ .a , ~ ~ , a T
~ ~ z~ z~. ~1 ~ T ~ ~ ~ . ~ E ~ ~ , t ~ ~•p t ' f ~
~ l; r--1D,5 UTILI ~ ~ ~ , ~ . ~T. I
~ ~ ERSEMENT ~ , f , `R~ ~ - . ~ . ~ ~s:so ~ ~ ~ i ~ . - ~L 1 ~ _ -
` ' m_~-~ f ~ ~ 7 , _ _ _ _ _ , ~ r. , 7 5 . ~ ~ , , ~ ~POKA~NE COUN~Y STA~lDARD , ~ - . ~
` ~ - - f~ , T I T f YP 1 W TYf . ; , ~ G~~V~R~ E NLE E 1
~ ~ ~ ~ I , , ~ a , ~ M~~AL FRAME & TYPE 2 M~TAL ~ ~ r ~ - ' - ~ ~ ~ ~ ' t ~7j ti . _ ~
. ~ G~ATE. STA 10+35.54 i 4.33 1 ~ ; , . , ~ ~ n . I
° ~ s = " , ~ i GRAfiE ELEV.=2Q1~.97 ~ , , ~ , s ~ ; + . ~
: ` ~ r ~ ; 3 ~ ' ~ o - 11
~ ' + , ~ r ~ Q } ~ 7+
~ ► ~ , fl~ . o , ~ ~ Ga ~ o a, ~ . r _ ~ , a ; F ~ , ~ ~ S
. , , r: ~ ~ ,
P KAN ~ N1'Y ~ANDA~ SP~KANE COUNTY ~~ANQARa S 0 E COU 5 ~ ~
n n ~ r~ ~,B ~ TYPE B pRYWELL WITH TY~~ ~ ~YPE ~ ~RYWEI.~ Wf~H TYPE 4 :XPIRES 9 f 21 /v1
~ , TA T AN FR►~M ' , METAL GRATE AhJD F~A~1E ~ ME L~R,~ E U_ ~ ~ ~
, ~ ~ ~ S~A 16f5~,64, 23.5~' LT. ~ STA 96+81, 23:~(~ ~LT.- ~ .rr
RAT V = 1 GRAT~ ~~,€V.=.~~0~.15- , : G E ELE .~009. 5 , SP~lLA~~ C~iJt~TY ~~IGI~VEER
~ , ~
~ , .
~ ~ . )KANE
~ ~ _ , - - ~ ~ ~ AN A-3
~ ~ ~ ~ ~ , ~ . ~ ~ , c
~ i ~ 1 ~ ~ ' ~a
~ ~ ~ ~~80~ISt~9, ~C1~.
saoK+a+E, wa - pExvCA. co 7{y7 Weai 7th , Sui1e 20G ~5~9} 456-6840 , ~
SpoMann, WA 99284 fAX~ f544! 45B~68a4 ~
6 •
, 1
NDARD i tiar ! rvn~ ~
wA$
~
EASEMENT ~
` 4R R.O.W.
~ aRAINAGE EASEMENt A5 SPECIFIED °'4N PLAN
tTOp OF BERM ELEV.= , ~~91 fi
i T4P OF ClfR6 ELEV, C~+ p1 SIlL9.
I+.20 FT. 1.5" SQ[? QN TOPSOIL, S40 ~ SMA1.11
~ INSTALLED CONCIJRRENT WITH
OGCUPANCY 4F ADJACENT HOUSE
3 M AJ(. EXPIRES 912Vat
3;1 (1'fP) J '
~
- GRAT£ EI,EVAT10N I 7STORMP]PE
~n~ RAINAG~ 3: t
STRU~TURE L1f.1Jrs
PROVIDE FILTER FABRIC (A~lOCO 4545 OR EQUAL) BETWEEN 'f~EE NATIVE 501L ANa THE WAS~IED DRAIN R4C}( AND BETWEEN
TF3E WASHEp DRAlN ROCK AND THE DR'lWELL BARREL 01L ON
GRApEa POND BOTTOM
\GRADED POHO BOTTOM
. <s~___ t , . = • ~ ~
h Np:-.. SECTIONAL MEw EQGE 0F$ASPHALT
• ,
.n,.
TYPICAL~~P4ND-CR0SS--~-SECTIQNlMTH STORM DRAIN PIPE
NOT TO SCALE•
- ,
TYPICJ4L '208' POND
= - - CR4SS SECTIONS
cLC rsaoaateaW~.
•oormk t , • an
~.s°ua s
_ ~w~w~ .
II
r- III I
L II ~
I
A. S ~ .
1 ~ L ~ u M1~ G u w Asy~~•~,
~G r' •
I ~ ,
F ~ 1
SP~KANE COUNTY ST~►N~~RD , 1i+~a t ~ I , ~~NCR~TE ~~LE~ TYPE 1 VY ~YPE ' - _ ► ~ . ~ , ~ - ~ _ 40
~ ` r . ,e' ~f ~ 1 ~IE~AL ~RA~E ~ TYPE ~ M~TAL ~ ~ ~ ~ ~ ~ a ~ ~0 ~ p 22916 ~ ~ • ~
~ 1 ~ 4 ~ RT ~ ~RATE. STA ~ ~ , 2,33 ~ONAt ~
~ GRAT~ EL~V.=199~.03 ; „ -
I 6 . ' XPIRES E EXPIRES 9 f21
~ • _ ~ - ~ ~r~' 4 5 ~I ~ , ~Q.Q~~ s ~ IVE D
~ ` I ~ ~ I ! Y +rN r1 , ' l
~ ` ~ ~ xr~ ~ ~---~-~e~.,i~
~ ~ / : ~ ;
~ , ~ . ~ T ~ 10 U~1LfTY AS~h~~N _ TYPE R R P R SPOKAI~ ~ ~ CU B E E
I + ~ t t P - ~ , . CQlJNTY ~~ANDARD ~AN A a
2~ ~R.S. t ` ~ ~ i T' "
' ' 1 e.. ~ ~ ►
, • ~ ~ ~ ~ ~ ~ 1
• t~ I 1 ~ : t ~
i I 5 t i ~ • : ~ ` ,
~ 5 ~ ~
§ 4 ~ i ~ . I S '
: ~
~ti ~ ~ I ; t"" O I ~ ; i ~
, °n I • ~ ~ ~
~ ~ : 9 + ~ C0 ~ t t
. . ~ ~ ; Q ~ ~ ~ } ,
p? ~ S > ' ~ ~ l . ~ c~ ; - ~
. : , ~ ~ ,
~ ~ ~ z~ . ~ ~ I }
, I ~ ; ` ~
~ ; ~ . , ; PROP~RTY
I ' i I ~ ; BOUNpA~Y TYP - ! ~ ~
~ ~ ' ~ ,
~ . ' ~ , . • ~ r ~ ,
~ ~ ~
CQU4V i Y E~VGiNE~ ~ Sp04(ANE JN:-l Y ENGiNEER -
, i.~ ~ _ :
SCALE; 1 "_20'
,
, , r r i ~ ~
L i ~ ~ '
i i ~ ~ ~ i ~ ^ ~ , `
v ~i ~ ~ . ~ ~ r ~ ~ ~ ~
~ ~ , . C~~ Associaies, Inc.
SPOKAkE. WA - GENVEIi~~CC ry, 7qT Wefl lkh, ~Ittr ~GU (5~9) ~--5Sa0 k , DATE. 1 D/04 f40
*~pa~ana, WA 99204 FA7L• E509} 456-6Baa ,
A. S
wAs
.-.,F-4SEMENT .
' Ok R,O.W. . , ~ .
FIED dN PLAN ~
~ DRAINAGE EASE+NENT A5 SPECI
~ ° ~Gr p 2291 B ~J4i
TOP QF BER~d ELEV._ - ~ e
~ rap oF cuRg ELEv. 1 STV~~
C~
;+.2Q FT. 1.5" S0D ON FOPSOIL, 54a S,I~~~~
~ dr~sr►~Q cONcuRR~r W~
4CCUPANCY OF A'DJACENF H0USE
3 M AX. EXPIRfS g~'2~/pt 1 (t~) , .
GRAI'E ELEYAl10N ~
RAINAGE 3: t ~Ax "
STRUIT4JRE
~ STQRM PIPE
PRUVlDE FlLTER FA6RIC (AMGCO 4545 OR EQUAL) B€TWEEM RIP RAP
THE NAT1VE S41L ANa TliE WASHEQ DRAIN ftOCK AND 9EFWEEN ~
TF1E WASNED pRAIN ROCi( AhID THE DRYWELl. BARRfI, 1*-3" 74PSOIL ON LU
GRADED P4ND BOTTOM 0 ~
~
GRADEd P4N
8ELOW D BOTrOM u-E
SECTIONAL VIEW EaGE OF$ASPHALT ~
~
TYPICAL POND CRO55-SECTION IMTH STORM DRAIN PIPE
N4T TO SCALE :4
~ U ~
a
~
r ii lYilY , - TYPICAL '208' P,QND
.
~ CROSS 5EC110NS
cl-c amuniatei~ rw-
~ - ~
. ~ , , ~
~ ~ ~ t , 1 Q+DD , t •
~ ~ _ ~ m 1~~DQ I~ , ~ _ ~ A.
~ ~ ~ _ ~ i - ~ ~ C w n S,y~,
, ~ titi ' , ~RB ~~i~SP~~~~~- t ~ ~ , fi"~'PE A ~URB P~R SP~ICA~P~~ ~ ` ~ ~ .
~ ~ C UNTY STANDARb PLAI~ A-3 ~ , C~EJNT~' STAN~~' D P~AN A,~ , ~ ~
, , ~ , . Ct I
~ ~ ~ . a 'a y ~ ~ ~ ~ ~ ~ ~ ~ _ . . , ~ ti ~ ~ _ ~ _ - ~ ` Y E ~0,p 2916
~ ~ ~ _ ~ ~ , . ~ ~ c~ ',I ms k O
r~ ~ . ~ 4 ~ ~ ti~t ~ NAL
~ r i ~ ~ ~ „ ~ _ , ~ ~ f ~ r
~ ~ ~ ~ ` ~ , i . EXPIR~S - ~ ~ - EXPIR~~ 9/2yv(
~ 6 I~~ ~ ~ ~ ~
r Y y . ~ ~ f ~ ~
, ~ ~ ~ ~ ~ { ~ ! ~ ~ ~
~ `s 1 1 ~ " ~ ~ , 1 ~ ! ~ ~ ~ ~5.95~ ! - ..r. . ~ ~
~ t ~ r t i ~ ~ ~ , ~ ~
, ~ ~ , ~ , ~ ~ ~ , r , ~ r~
ti ~ ' ` FU~UR ' ' ~ ~ a ~ ACQU~S~~ID~ ~ r ~ I ~ 1 ~ I t t 1
, I 1 1 ~ ~ 1 x ~ ~ ~ , ~ , t t
1 I 4 1 l ~ 1 I l I
. , ~ ~ l ~ ~ r i < < ~ , ~ x i i I ~
~ ~ ti ~ ~ ~ ~ ~ ~ ~ ~ ► 4 ~ ~ ~
~ I 1 1 ~ ~ l ~ , ~ ~ 1 d ~ 1+ ~ I w t ~ ~ . tN
1 I 4 ti ~ ~1 ~ 4 1 1 4 t ~
~ 1 l l i I~ ~ ~ 1 t 1 ~ ~
~ 1 i t ti ~ ~ - ~ 1 `ti 1 1 1 S ps ~
~ l 4 1 ~ ~ ~ •I ~ ~ l ~ 1 ~ ~ 1 E
~ 1 ~1 1 ~I 1 ~ . • ~ ~ -"--`1--_65.00 4 1 ~ i
~ _ ► J ~ . ~ t ~ ~ ~ . ► ~I ~
~ r v ~ ~ ~ < < ~ . ~ ~ E ~ , ~ ~ , , ~ • r' ~ ~ l ~ ~ ~ , . ~ ~ 1 ~ ~ . h t ~ ~ RECE.
~ 24.0 ► I ~ . ~ ~ J ~ t ~ t ~ ~ - ~ ~ ~ ~ ~ OC T 0
- ~ ► ~ Q ~ ! . ~ ~ y . E 4~ , l ~ , , ~ 6.$$ ~ ~ D . i ,
. ~ w ► ~ I , Q~ ~ ~ ti ~ { 4 ,1 ~ _ ~ ~ t~~(Ah~E sPOKANE cOUtuT~ ENGMER
ti ~ r ~ ~ , i ~ t ~ ti ~n t
`4 I ~ ~ ~ ~ • ~ ~ ~ _ ~ ti ~ ~P4I~ANE C~UNTY 'STA~NDARD ~ " ~ ~ I ~ 1 ~ '
I ~ a a~ ~Na~e ~ co~c~~r~ IN~ET '~E ~ w rr~E ~ ~ , ~ I t P~OP~~Ea C~NTOI~RS ~ ~ ' EASE~ME T ti META~ FRAM
~,I ~ } E ~t TY'PE 2 META~ ~ 1 f ~ ~u? ~ ~ ! 1 , ~ f ~
, I ~ ~ 24,ao ~ ~RATE. STA 11+3~.36, ~2.~~ LT. ~ ~ ~ - ~ _ ~J ~ ~ ~ . ~ ~ GRAT~ ~LEV,=~O~ 1.94
~ ~I ~ ~ , , } ~ , , 1=
PR~P~RTY = ~ , ~ ~ ~ ' ~ ' ~
I ~ A BD~NDARY TY~' ~ , 4 + z4.~a .~1 1 ~ ~ . ~ 0 , I , , .
. ~ ~ ~ ~ ~ . . ~ ~ ~ ~
~ , ~i ~ ~ , ~ . , ~ ~ ~ ~ ~ .
, . ~ . ~4 ~ ti ~ A' ~ , i ,
~ fj ! , r ~ /1 ~ ( . ~ SCALE: 1 20'
~ ~ ~ - r ~
~ ~r i ~ ~ ~ - ~ ~~r~~~ ~ ~ ~L ~ 'r,s:
~ S ' . . 1 . r•' 4 " • ~ ~ ~ $ ' . s: ; . -
~ ~ ~ ~ t ~ f~ : 2 f i+l r -i 1 I ! 1 r fll
4i CL~ A8$OCIB~BS, 1~1C. ~ w,~ - o~~x co . . _ ~
307 Yk.il 7th • Sulte 20p (~j, }~-fi81~ Spokcne. IYA 992~1 FA%: (5091 ~58~5944
~
. .0.
. ~ • ~ ,
• N
! i
A...-S
'EASEMENT
OR R,O,W:
~ DRAlNAGE EASEMENT AS SPECIFIEQ 0N PLAN ' -0 QLZ
'roP aF eERM E~v.= p~.~ 2916~~q
~ TOP pF CUR6 ELEV.
i + .20 FT. 1,5~ SOp ON TOPSOil., sOa
~ INSTALLEQ C4NCl1RRENT WlTH
~ QCCUPANCY 0F AOJACENI HQiJSE ,
3 MAx, EXPIRES - 912Vdj . ~ ~ 3:1 (Tl'P) : ~ .
• GRATE ELEVATION L~
i 5,
RAINAGE 3: r l~qx "T
STRU TURE NO-TE: SrtbRM PIPE
PROVEaE FELTER FABRIC (AMDCO 4545 QR EQUAL) B€TW€EIV RIP RAP
THE NAi1VE S41L A#JQ THE WASHM QRAIiJ RQCK AND BETWEEN
THE WASHED QRAIEI ROLK AIVO i71E pRl'INEU. BARREL 1"-3" FOpSQ1L 01~
GRAOEa POND BOTfQM ~
w
\GRADED RQND BOTTOM ~ ~ ~
~C~dNAL ~Ew WGE 4F8A~5PHA~ u~i
~RAIN Pl~~ > m
TYPICAL P~DND CROS5-SECTION WITH STORM LW C= ~
~
NOT TO SCALE ~
~
~ 0
CL
~
- TYPicAl 0208' PoND
- - ^ . CRQSa SECTIONS
~ W.1 rn, a~ Z* a)
~
~
' .
'
1
STORM DRAINAGE ANALYSIS
OFFfr"iAL Flt3+ ti, DO(Cl1'a;ENT FOR
SPOK,NNE COUNrf E;vuiN~ERS OFFlCE REC=~-IVED
• q,.~ v
~ Rq
r~~~c:E~,T G•~t:►~ 0CT 11 2000
aiiB.IirTI'Al 4 • tJ"9C
. j,~n, ~ ~U~~ D~~A N CO M M~ dUNTY ENGINEER
vG~~~TY EPSIVE R
SPOKANE COUNTY - w w W }
,
LL-Z Q)--
t. ~
o~ 51~ 80
October 2000 RO a~~, r
W
~ W Z ~
-
0 2 Q ~ QdZ o
CLC ASSOCIATES I NC. w v?~o a-. ~
~oC) v~z~s.~
707 West 7`h Avenue Suite 200 ~ v°-C ~ Jg ~ G~
' 0~ ~i ~55Q y.' r'
v
~ ~ Spokane, Wa 99204 U~ F.. w w W§
W ~~~aW Z Z
(509)-458-6840 z I- w z~ go 3 Q`
~ ji ~ ZUvQE-E-~~
OV WV UU~o~ ~
CL ~ ~~Q~WW~ca:~ . ~
,
T his repo rt has been prepare d by t he s ta f f o f C L C Associa tes I`.'~,,m dptg~
q~
undersigned professional engineer whose seal and signature a ears her9ocn --4 ii cr ~
drainage analysis has been completed in with the
for Stormwater Management. F wASy,~'
~
~
~o
~ 9 22916 S~ONAI. EN
EXPIRES: Zl
CLC Associates Inc. Dishman Commotls
'
~
,
PURPOSE
, The purpose of this report is to determine the extent of storm drainage facilities,
which will be required to dispose of stormwater runoff created by the improvements of
the proposed project. In accordance with the Spokane County Guidelines for
Stormwater Management, the storm drainage facilities on this project will be designed
to dispose of runoff from a ten-year design storm and the first one-half inch of runoff
from all road impervious surfaces will be treated in grass infiltration areas (`208'
swales).
ANALYSIS METHODOLOGY
The Rational Method, which is recommended, for basins less than ten acres in
size, will be used to determine the peak discharges and runoff volumes. The Bowstring
Method will be used to evaluate the adequacy of the drywells and storage capacities.
All relevant calculations have been included in the appendix of this report.
PROJECT DESCRIPTION
~
Dishman Commons is a 30-lot subdivision (on 10.3 acres) located in Section 29,
T 25 N, R 45 E W.M. in Spokane County. The proposed improvements include the
necessary sanitary sewer, water, road and storm drainage facilities. The storm drainage
disposal and treatment is being accomplished in grassy swales that are located on
either private property or within the public right of way. The topography on the site
slopes moderately from east to west.
~ Sheet 75 of the Soil Survev of Spokane County Wa. shows that the soil type for
the area of the proposed project is: McB - Marble sandy loam, 0 to 8% slopes: This soil is a somewhat excessively
~ drained soil. Surface runoff is slow, and there is little or no hazard to erosion.
This soil type is pre-approved for the use of drywells in accordance with
the Spokane County Guidelines for Stormwater Manaqement.
CLC Associates Inc. Dishman Commons
,
~
CALCULATIONS
~ The 10-year peak flows for the individuai basins on the project were calculated
using the Rational Method and the Intensity-Duration-Frequency curves for Spokane,
Medical Lake, Reardon, Cheney and Rockford areas.
Tabulated in the appendix is the total area, road impervious area, runoff
coefficient, peak flow, `208' swale volume requirement, Bowstring volume requirement,
and number and type of drywells required for each of the basins. It is assumed for the
purposes of the swale design that a double-depth drywell has a capacity of 1.0 cfs and
a single-depth drywell has a capacity of 0.3 cfs.
' Grate Calculations
The inlets shown for basin A, C3, C6 & C7 are in a sump condition.
Spokane County Type 1
From 4-1.1 of Guidelines,
Q= CPH3/2 , where C= 3.0, P= perimeter of grate, and H= depth of water.
Perimeter of grate = 6.13 ft, P/2=3.065ft.
Q= 3(3.065)(.50) 3/2 = 3.25 CFS .
From the Basin Summary Table in the appendix of this report these grate capacities are adequate for the peak flow in each basin. The catch basins in a sump
condition have been sized to accommodate by-pass flow from the catch basins on a
continuous grade.
The rest of the inlets shown on the plans and Basin Map are on a continuous
grade, the grate capacity calculations have been included in the appendix of this report.
STORMWATER DISPOSAL
~
The stormwater generated by the project will be disposed of in the `208' swales
areas and drywells as indicated on the improvement plans and basin map. The
1stormwater alon9 16th Avenue will be collected and PiPed to Pond B, it should be noted
that the actual crown on 16th Avenue is actually 5-6' south of the existing painted
1 centerline stripe which drastically reduces the actual basin size so that the amount of
stormwater in that basin will be much less than shown in this report. The stormwater for
the rest of the basins will be routed to ponds either in a piping system or by curb drops.
The `208' swale volume as indicated on the Basin Summary Table is provided at a
depth of six inches for all ponds.
CLCAssociules Inc. Dishman Commons
~ i
Appendl*x
1
1
1
~
Dishman Commons
CLC Associates Inc. .
J:1Land Projects1993531dwg1COVER.dwg, 06/06/2000 02:50:47 PM, DJD
/ - !
~
N ^
dw o
~w
. c~
~ - JN
C)
o ~
-1 ~ > c-
--A m ~
OWWD T~ .
Ctj
00 ~
P D (
-D \ -
E .
TIN p
CY)
~
.
~ •
{9,~ ~aays su~af} ~ ~ k+ ~i,+ ~ ' A~~~S f 7~ ~ r~ u!~4
! io- ' ` ' " y `"'r.a,n~' g a o . ' ' ~Y ~ rr ~ ',,y J q3 ~A ~ ~ 9i ~,L1i~.9''or .~g ~
~ i ~ ~ "i ~ . + 6 , . V~ y 1+ , ~ 4 A~1}I ~ : , rf ' ~ xS' ~ Ni ~ I [ " ~~r I ~ 1f ~ ~ , ~ .
.~~h ' ~ '3' I~ ! r ~tl'W~'~~ . f r n~ ~ 16 ~ J~ y ~A ~ ~F 7 ti~n ~ r ~ i r ~ + ~ r n ' ~ !L I 6 ~p~s' : a, ; ~ p~ ~ y , ; ~i~ ~ R ~ t~• , .
~ : n, w ~ h N j ~'~.k~~. ~ h ~ a• a,~ ' s~ k ~ri o" i r .5Y 4d' ,a. i+ i Y~L t I i ~ r~, 'F „ t ~ v~~{
~ " s~~T+".r,yW',~"'~~,~^~Z, , T€''s ~r~~~~n,r~~ s. i~ ~ I h ~ ~ * ~~~~~~~r.:l~~~n 'y't~ ~g i' F ~ ^ i ~ 4 ~ .'i'ie;WyFY f i, i~, b~t~ ~ + 4 ' ~J
~ - s Yp:~ ~ r, a g~i N~ ~}j~ •dL~~ i, ti i i ~ t a. ,,y d 4} ¢ p~ ` `,~a ~ ~ 1~ , ~
~ ~ 'w i , A ~ ~ t N M4 ~ ~ ,~n ~ _C
~ ~ ~ ' d a 1! u~ v ~ ~
~ i~ ~ ~.•'I ~ ' ' r Ii ~I 'Q k i ~
C~y - ` 1 v~ ~ ~ v + ~
V I ~ ~ J M1 rJ~ f V y ~ I A ! L i ~I ~ ' I ~ ~ ti.
4. S 1-~~ki ~ I •p' '~~1~~~ ~ ~ I~ ~
I~ N r 7 i~ ~ r ~ I ~ 1 ~ 'hy '~'e ~ ~ ~ 4
5 i=-i
~Q ",n ~ ~ ~,1 ~ x~ i ' r :r~ •~~'~S '.r,a4 -
II~ ~ + , d, !4 ! ~ F I,~f^ y ~ I ~ ~1~~~ ! 1
._d',yI V ~ G . . ..i.Y ~a ~ ~w:{~~ i p ~ ,i ! ~IP '~'1' ~~b li ~ ` Iy'
1 s ~ i~ ~ ~1~
}1 ~ . ~ , r.~ , ~ ~ ~
S'~ ;s~: ~ ,s I ~ ! , - ~ ~d !A ~
. , ~,n f f 1 ~ p r i ~ 9 u ] J's.' ~ 1.~ ~ r R ~
~ ' ~ ~ ~4tii' 1 , ~ t ~ _ ' ` ,~1. ~ k `'t
~ • ' ~ i ~ { ~ ~ ` ' ,~,~~`'1~` ' 4, ~ 1y ~ ~ ~ h~ + ` i ~ ' ~ ,ba~ .
~ ~ , + .r; '~ilk ' +~7i,,_ " ~C. ;+r ~ ~ ' ~ ~ ~ r' f ~,~i , ~~'~u~ ' ~
~ ~ ry~~ ~ `A Y 1•B ~~,~;yr,! f~ ,a~.. _ ` ~ L.~:.f!l.._ ' P ~v r 1 ' f . ~ ~ ` i ~ ~ "~r Y 7 7 n i ~f~~, ~S t' ~ I f ~ "C i.
. 7' ~I~ •r 4i ; c' , ~ S . ~ y~ " d
~ n' ~ ~J i a L6J ' a ~ i' ~ ~ w ~ W d ~s. , s ti
~ ~ ~5 ~ ~ I r~ ' V/ ~ W y ~ C ',f , rI I `i
4 ~ I ~ L ~ ~ ~ ~ 0
~ s j Q a e ~ " ;I ~ ,
~ ~ ~ { r { ~ > N
~ I + '±;71~ , ,~r ~ ..s ~ V1 ~ ~ ~ Y ~ y ' ~
.y ~ i'ti ~ 4
l~ r ~ ~S r y/ r f 5. ~ u N _ I ~ ~ r
~ 1 k i d ' ~ ~ ` t i y ! ~ _
f y ~ ~ J[ ~ I ' ti q ~ ~d
~ ~ ~ F 1 ~ ~ F `1 ~ ~ I t'
..d ~ ` ~ , ~ ,J 1 ' 4s~ ~i' •II
I ~ ~ M I~ f V ` 1 I
~ ~ ~ ~ ' 4 i' ' ~ ~C~s . ~ r,. - ~ y „ f m
I f 1 ' ''a s I
~ ~ ~ r F~ ' ,1 ~ ~ ti LL I ' ~ ~ !a ~ f' r M~' A K I j 1 P~ ~
(f~ ' • , • ' d ' 1~ ' , ~ h ,a IYa t .r , yv v ` ' il 1~ ' 'I i. . ~ ~,'f~ q''' r ' y > ; 4 ~ _ ~ . ~I ~ 1 p~+ ! r if ~ 9 ~ ^i ~ - 4 q ~ ~ , ~k s
~ I ~ i ~ y' I ~ a' ~ ~ ~
l~ r~~` M1 ~ ~ ~ o- V+ ~ rl.'~~ ~ ' y, i r ~ ~ ~ 7Q^, t ~f ~ ~ ~ . _ I _I r ` I + ~ ~v~
V ~ F ~ 3i `i u a~ r~' + h ,Ji _i ~ y
~ ' ~ W ~ r ~ ~ ~ ~ r , y ; ' i +
~ ~ d ^
! f liL r ~ • i ~ y ' r~ f
" ~a F
•rr ~ IY h ~ _ I r~ I ~ d r~ ` ~ i
~'A i ~ j r i , A i + ~ '~y'~ ♦ s qJ ~Y ~ ~
•s~~ ~ 1
~1r„"I,I;~f J~ ~~'~Y~ ~ y s i , ~;~'',~y a ~1 a ~m` - ' X':]} i.P'~`~ - t`~ ~ f A, `iF + R I,~ G-r ' r I.
~5n ~i~ f e r 5
'u~?lrk~~~.~~ Y ~ r~ J ~
Y c ~ , ~ ' ~ ~ a ° A~
' , ° q a, ~ { I i
~;s`~ F , ~ I + ' + f.
, ~ `•st. ' ~~yf'L j ~M ' r L 1 y2 ~ x~. {
- A ta r ' . Ir I~• F ' Mi~ ~f k ~
s ` : p ~ 4 ~ ~ " *r ~ ~a~ I ~ . a ~ a ~ ~ e w fi~' 4 „ ~ h { , ' • , 'h , '4 , ~ ' 4, r , a 3 i ~ ~ ' •1 ~p5 P .R~ ~ {F p i ~
' ; '{i; 1 t W } 7 s ~ a '~t ~~N . ~ #u~ • ~ h ' ;
1 ~ ~ r~~ ~v,,;i ~3 ~ ' M ' i~ ' J a ~ l~r;.~ 'i , ,#'P ry~ ~5 4... Ln ~ •V~ i ~~7+^~ ~~~i ,~i., Y w ' N ~z 1 'tv '1 ~d;~-- ~ ~ , ~~l ~aa~{s ru~o~) ~
, ~ ~ ,
: ~ • , , , ~ ~ ~ , rrr y~ ~ ~ ~ ~ , , ~~r:.~2':~ i~~'~ , : ~ . _ , , . . = , ~1~ rc,~.~'~x~;~,~,~'^~, ~~i :"u;,,y'
' ~ ~ . ,i~ ~:~~-~f. iw~-sC7::,N+;~.,~ . ~i3~~:L:}'1{;.~ . r},^.'F „'~.r! f'~YC v'`r~i~ , , . : , , , ..:~'Gr.~' ~ r$",,:i'~"I••~•~fv!'' ~ ~ ' ' '`-i.z ; ~r~;' Y {;~{~r"•.,yn~ I;~,~~;5: . ' . ; • - :,~.ti , ' ' • ' r'' u5~~ r ~~t~!~ aJ~ '~~~'..N~`,~:Y `hi rr~ p'}~" r,~~i;`~iyz:;,':'{ •r~.. F,~7~S' 'd.'+u ~v.v.'~yt
- i"-'n ~;a. ~,+i" 'PS~a,.S~l„~ J'R~'~ f !•q-' " , ' ' '.h,,~•.~' . ~f~~t~',~f.; ` ~ ~~n.~ ~ 3~kL t' S q i .T ~4@ r t_ ,4 ~Y r ~ . ''rv ~ E ~ . , t~ ~r',a''~. ,l~i. 7,, ~~~.r 5~~~'~ ` ~-1 ~ 1 ,1~ ~1~ ~j, 'N ~ - ' ' ~ '~'r . ; ~ y'. .~r ':ii', y .~,1~~ ~e:,,''1~~'• ..S' P ' ~M+.• ~ ~'~Y ~ , . - ' 1~~~,~, i". ,F'M1~"rf~~'^`~::,'n'n7y~~~~'~jp~'-r~~M.'i.~.~'y~~_'-~a. l,.e _ - ~S~ ~'§1';:1 S:S ~a., ~ 1~~` i * ~~~(,~7, G:' ,~.n~.t9' e 2~. ~,~a;~ 'r :.L, ,.r~ ~~'G I { s, H ~
} : l ~~:T, • i : .w: ~ ~ ,~"1:~''`fi''',~;~,. ,ti,_F,.~,S,hi;y. t_r ~ ~'~.v~rys~~n t.,~ a:;~..' ; p',~,e~ ( .,s, ~r~' : ,C ';a•: °;h~~e•dt~`,'.4 , ~,y,'. 'G'~- ' ~ r ~ - „r.5' • - : ~^~i, i a .ai "~l~~A' .MSl~~~, f, ~ +.ii !f~'n.~ . ~~i•; ~ ~,5✓r..r r} "t~J~..; k 1 6 ii~','~~ _~.r~'~`~.:{e'''%'e ,rr5~r~yfi'i ~'~Il~; '~~t~c~ Y~ 5 F ~,,i q:5~,r•, wr•:veE~+r~i:sZ'.•,vs'~~~A.tr, ,'.,i~,t~~~ n- ~~~r'~iY1~lR~~~, ~IF,~'~,.~ ,.ea' drh~ , 1~ u it' a G. ;~cL,;ifs, ~;',',I,",-' ,,'.~f, •~•~~6=,'Ll`~,,,,~ a~'~~;; • ~rr• i :i v ~t m~,~ y,~ti:;:l~~`,;d~tr,. n ~,1 a ,~l ar r,• ~ a 11=~ ~w r.; w ~ `~'eY;' r,i ~ a
rf~ ~rh~i;Nr~ `~•"Y r'tii''c~ ~~.Y~~x.- ~V'~ Y ~~~~~~~`',~..;l~+<~',;^~ y s~~~~~ r.~,,, ~ ~ ~.5'~y`~; ~ ~ i~ ~ ~,~y~~~ # F , ~ " i ~ , ti ~'a~ y I~ 7 ~y, ~ , ' ~ ~ ~ if ~ ~i
i i
, ,
M '
~1' i~~ x ' ' ' , • ~ , e ~ ~'=~~A!Y y~ ~ _t$ ~ I ` ' . ' ~ ' . . ti i f p~ ~.,~~r:r, s ~y'~f ~ ' H,{~' ~ ° L ,!ww'•, . - ' n ~ E ~ ~ t, ~i .n._a r 'FuL._ .1 ..~,ne ~ , , aa •Y . 'a,':i ~r Y,' a~~nJ_.~ ~il"~:,'rs, A o~,.~ ~ ri4l~tiR~ . ' .Ks ss„ ~ ~ , . '
_ _ _ -
~
rr m~mm rr r
DISHMAN COMMONS 99353
Spokane County, Washington 08/47/00
10-Year Design Storm Engineer; DJD
, GRATE 1NLE1' CALCULATIONS
' on Gontinuous Grade
Inlet Basin Gutter Cross- Grate Depth of Gutter Gutter Flow ByPass
Basin Street and Peak flow 'Slope Slope Width Flow Flow Width Velocity Received Flow
Area Station (cfs) (ftlft) l/Z (ft) (ft) (ft) (fps) (cfs) (cfs)
.
16TH AVENUE
Bl STA 5+17,5 RT. 1.17 0.0330 0:020 4,00 0.12 5.986 2.317 1.1l 0.06
HERALD LANE
C. 4 STA 11+36.36 RT. 1.33 0.0075 0.024 4,00 0.18 . 7,399 1.639 1.16 0.17
ALLEY
CS . 1,64 0.0200 0,020 2.00 0.15 7.463 3.106 0.93 0,71
HERALD LANE
C2 STA 11+36.36 LT. 0.15 . 0.0075 0.024 2.00 0.08 3.264 0.882 O.14 0.01
17TH LANE B4 _ STA 12+28,48 RT. 1.25 0.0600 0.024 2.00 0.12 4.895 4.014 0.94 0,31
17TH LANE B4 STA 11+51.90 RT. 0.31 0.0600 0,024 2.00 0.01 2.902 2.130 0.30 0.01
17TH LANE
B3 STA 11 +51.90 LT. 0,38 0,0600 0,024 2,00 ,0.08 3.132 2.363 0.35 0.03
This fonn is in accordance with the WSDOT Hydraulic Manual Grate Widths
Section 5-5.1, Capacity of Inlets on a Continuous Grade Herringboile =1.67'
Vaned =1.67'
, w/ 2" sump = 2.00'
InletC
rr ~r ~ ~r rr r ~ ~r ~r ~r rr ~ ~r ~r r ~ r rr ~
Dishman Commons 5990353
Spokane County, Washington 08107/00
10-Year Strom Event Engineer; DJD
INLET FLOW CAPACITIES
in Sump Conditians
1- - _--o•_ ..r - -
, Inlet., Basin Basin + Inlet Maximum Inlet . By-Pass
Basin Street and , . In1et;Type' , Peak:Flow- By-Pass Perimeter , Flaw Depth** Discharge*** Flow Station . . ' (cfs) Q P H Qa Q-Qa _
17th Lane ~ TYPE 1
A1 ~ STA 11+51,40RT. GRATE ~ 0,51 0.51 ~ 3.67 ~ 0,33 ~ 2,09 ~ -1,58
17th Lane TYPE 1
A2 STA 11+51.90 LT. ~ GRATE ~ 0.26 0.26 ~ 3.67 ~ 0.33 ~ 2,09 ~ -1.83
Herald Lane - ~TYPE 1 ~ ~ • ~ ~ ~ ~
C6 ~ STA 10+36,88 RT. ~ GRATE 2.13 ~ 2.13 ~ 5,91 ~ 0,33 ~ 3,36 ~ -1.23
~ 17TH LANE ~ TYPE 1 I • ~ I I I
~ C7 ~ STA 17+21,89 RT. ~ GRATE ~ 2,24 2.24 ~ 5.91 ~ 0,33 ~ 3.36 ~ -1.12
I I HERALD LANE ~ TYPE l ~ -I I I I
~ C3 ~ STA 10+36.88 LT, ~ GRATE ~ 0,35 ~ 0.35 ~ 3.67 ~ 0,33 ~ 2,09 ~ -1.74
Grate Perimeters* Qa = C* P* H^ 1,5
Herringbone = 3.67' Where; C= 3.0, P= Perimeter, H= Elow Depth
Vaned = 3.67',
WSDOT= 5.91' ~ Grate Perimeter = Available PerimeterDivided by a Safety Factor of 2,
Maximum Flow Depth is based on curb crest above inlet,
Calculated in accordance with Spokane County Guidelines for
Stormwater Management, Section 4-1.
InletSmp
rr rr ~r r~r ~ r~r r~r ~■~r r~r ir ~ rr rr r~
DISHMAN COMMONS
Basin Summary Table
Road Imp. House Area Driveway Total Peak 208' Vol. Bowstring 208' Vol,
Total Area Area 1800SFILot Area Imp. Area Runoff Flow 1 Req'd Vol. Req'd Prov'd Outflow Number & Type
Basin (SF) (Acres) (SF) Houses (SF) (SF) (SF) Coeff, (cfs) (cu.ft) ' (cu.ft) (cu.ft) (cfs) of Drywells
A1 17,455 0.40 3,992 1,0 1,800 750 6,542 0,40 0.51
A2 3,993 0.09 3,993 0.0 0 0 3,993 0,90 0.26
A 21,448 0.49 7,985 1.0 1,800 750 10,535 0.49 0.76 333 217 355 0.3 1 Sinale
B1 31,212 0.72 17,766 0.0 0 0 17,766 0.56 1.17
B2 56,881 1.31 0 0.0 0 0 0 0.10 0,42
83 5,723 0.13 5,723 0.0 0 0 5,723 0.90 0,38
64 42,983 0.99 5,745 4.0 7,200 3,000 15,945 0.40 1.25
B 171,987 3.9 29,234 4.0 7,200 3,000 39,434 0.28 3,25 1218 708 2143 2.0 2 Doubles
C1 39,974 0.92 0 0.0 0 0 0 0.10 0.25
C2 2,675 0.06 2,266 0.0 0 0 2,266 0.78 0.15
C3 5,261 0.12 5,261 0.0 0 0 5,261 0.90 0.35
C4 34,933 0.80 20,236 0.0 0 0 20,236 0.56 1.33
C5 58,780 1.35 8,800 6.0 10,800 4,500 24,100 0.43 1.64
C6 64,684 1.48 11,624 6.0 10,800 4,500 26,924 0.43 1.76
C7 89,442 2,05 12,531 9.0 16,200 6,750 35,481 0.42 224
C 296,123 6.80 60,718 21,0 37,800 15,750 114,268 0,41 7.92 2530 3328 2832 2.0 2 Doubles
D 10,719 0.25 4,993 0.0 0 0 4,993 0.47 0.37 208 57 312 0.3 1 Single
E 4,706 0.11 2,271 6.0 0 0 2,271 0.49 0.17 95 0 186 0,3 1 Sinqle
NOTE: C=[0.9'(IMPERVIOUS AREA) + 0.1 "(PERVIOUS AREA)]ITOTAL AREA
, WHERE C = RUNOFF COEFF,
99353 . CLC ASSOCIATES, INC. . 911112000
, '
Weighted Runoff Coefficient Calculation
, Pro1'ect: DISHMAN COMMONS .
Basin: A1 CLC Job S990353
Total Area (SF): 17455 Designer: DJD
Imp. Area (SF): 6542 Date: 8/7/2000
Grass Area (SF): 10913
Imp. Area "C": 0.90
Grass Area "C": 0.10
(Imp. Area)#(Imp. "C")= 5888 . ~
(Grass Area)*(Grass "C")= 1091
TOTAL 6979
6979
Weighted "C"= 0.40 -
17455
~
Weighted Runoff Coefficient Calculation
' Project: DISHMAN COMMONS
Basin: A2 CLC Job S990353
Total Area (SF): 3993 Designer: DJD
Imp. Area (SF): 3993 Date: 7/18/2000
Grass Area (SF): 0 .
Imp. Area "C": 0.90
Grass Area "C": 0.10
(Imp. Area)'(Imp. "C")= 3594
(Grass Area)"(Grass "C")= 0
TOTAL 3594
3594
Weighted "C"= 0.90
3993
,
Weighted Runoff Coefficient Caiculation
Project: DISHMAN COMMONS
Basin: A CLC Job # S990353
Total Area (SF): 21448 Designer: DJD
Imp. Area (SF): 10535 Date: 8/7/2000
Grass Area (SF): 10913
Imp. Area "C": 0.90
Grass Area "C": 0.10
(Imp. Area)*(Imp. "C")= 9482
(Grass Area)}(Grass °C")= 1091
TOTAL 10573 -
10573
W eighted "C„= 0.49
. 21448
,
Weighted Runoff Coefficient Caiculation -
Project: DISHMAN COMMONS
Basin: B1 CLC Job # S990353
Total Area (SF): 31212 Designer: DJD
Imp. Area (SF): 17766 Date: 7/18/2000
Grass Area (SF): 13446
Imp. Area "C": ,0.90
Grass Area "C": 0.10
(Imp. Area)'(Imp. "C")= 15989
(Grass Area)*(Grass "C")= 1345
TOTAL 17334
17334
W eighted "C"= 0.56
31212
' ' -
Weighted Runoff Coefficient Calculation
Project: DISHMAN COMMONS
Basin: 132 CLC Job # S990353
Total Area (SF): 56881 Designer: DJD
Imp. Area (SF): 0 Date: 7/18/2000
Grass Area (SF): 56881
Imp. Area "C": 0.90
Grass Area "C": 0.10
(Imp. Area)'(Imp. "C")= . 0
(Grass Area)'(Grass "C")= 5688
TOTAL 5688
5688
W eighted "C"= 0.10
56881
'
Weighted Runoff Coefficient Calculation
Project: DISHMAN COMMONS
Basin: B3 CLC Job # S990353
_ Total Area (SF): 9647 Designer: DJD
Imp. Area (SF): 9647 Date: 8/7/2000
Grass Area (SF): 0 ,
Imp. Area "C": - 0.90
Grass Area "C": 0.10
(Imp. Area)*(Imp. "C")= 8682
(Grass Area)*(Grass "C")= 0
TOTAL 8682
8682
Weighted "C"= 0.90
9647
Weighted Runoff Coefficient Calculation
Project: DISHMAN COMMONS
Basin: 64 CLC Job # S990353
Total Area (SF): 42983 Designer: DJD
Imp. Area (SF): 15945 Date: 8/7/2000
Grass Area (SF): 27038
Imp. Area "C": 0.90
Grass Area "C": 0.10
(Imp. Area)*(Imp. "C")= 14351
(Grass Area)i(Grass "C")= 2704
TOTAL 17054
17054
Weighted "C"= 0.40
42983
1
'
~
Weighted Runoff Coefficient Calculation
Project: DISHMAN COMMONS
Basin: B CLC Job # S990353
Total Area (SF): . 171987 Designer: DJD
Imp. Area (SF): 39434 Date: 9/11/2000
Grass Area (SF): 132553
' Imp. Area "C": 0.90
Grass Area "C": 0.10
(Imp. Area)*(Imp. "C")= 35491
(Grass Area)*(Grass "C")= 13255
TOTAL - 48746
48746
. Weighted "C"= 0.28
171987
'
'
'
Weighted Runoff Coefficient Calculation
Project: DISHMAN COMMONS
Basin: C1 CLC Job S990353
Total Area (SF): 39974 Designer: DJD Imp. Area (SF): 0 Date: 7/18/2000
Grass Area (SF): 39974
imp. Area "C": 0.90
Grass Area "C": 0.10
~
(Imp. Area)*(lmp. "C")= 0
(Grass Area)'`(Grass "C")= 3997
TOTAL 3997
'
3997
Weighted "C"= 0.10
, 39974
'
'
Weighted Runoff Coefficient Calculation
Project: DISHMAN COMMONS
Basin: C2 CLC Job # S990353
Total Area (SF): 2675 Designer: DJD
Imp. Area (SF): 2266 Date: 7/18/2000
Grass Area (SF): 409
imp. Area "C": 0.90
Grass Area "C": 0.10
(Imp. Area)*(Imp. "C")= 2039
(Grass Area)*(Grass "C")= 41
TOTAL 2080
2080
Weighted "C"= 0.78
2675
' - -
~
'
'
Weighted Runoff Coefficient Calculation
Project: DISHMAN COMMONS
Basin: C3 CLC Job # S990353
'Total Area (SF): - 5261 Designer: DJD
Imp. Area (SF): 5261 Date: 8/7/2000
Grass Area (SF): 0
1 Imp. Area "C": 0.90
Grass Area "C": 0.10
(Imp. Area)*(imp. "C")= 4735 (Grass Area)'(Grass "C")= 0
TOTAL 4735
4735 Weighted "C"= 0.90
5261 ~
' .
~ .
' -
'
Weighied Runoff Coefficient Calculation
' Project: DISHMAN COMMONS
Basin: C4 CLC Job # S990353
Total Area (SF): 34933 Designer: DJD
Imp. Area (SF): 20236 Date: 7/18/2000
Grass Area (SF): 14697
Imp. Area "C": 0.90
Grass Area "C": • 0.10
~ (Imp. Area)''(imp. "C")= 18212
(Grass Area) (Grass C„)- - . 1470
TOTAL 19682
19682
Weighted "C"= 0.56
34933
1 - -
1
1
1 .
~ .
Weighted Runoff Coefficient Calculation
' Project: DISHMAN COMMONS
Basin: C5 - CLC Job # S990353
' Total Area (SF): 58780 Designer: DJD
Imp. Area (SF): 24100 Date: 7/18/2000
Grass Area (SF): 34680
, Imp. Area "C": 0.90
Grass Area "C": 0.10
(Imp. Area)*(Imp. "C")= 21690
(Grass Area)'(Grass "C")= 3468
TOTAL 25158
25158
Weighted "C"= 0.43
58780
1 . .
'
1
Weighted Runoff Coefficient Calculation
Project: DISHMAN COMMONS
Basin: C6 CLC Job # S990353
Total Area (SF): 64684 Designer: DJD
Imp. Area (SF): 26924 Date: 7/18/2000
Grass Area (SF): 37760
Imp. Area "C": 0.90
Grass Area "C": 0.10
(Imp. Area)"(Imp. "C")= -24232
(Grass Area)'(Grass "C")= 3776
TOTAL 28008 .
28008
Weighted "C"= 0.43
64684
,
'
'
Weighted Runoff Coefficient Calculation
Project: DISHMAN COMMONS
Basin: C7 CLC Job #S990353
Total Area (SF): 89442 Designer: DJD
Imp. Area (SF): 35481 Date: 8/7/2000
Grass Area (SF): 53961
Imp. Area "C": 0.90
Grass Area "C": 0.10
(Imp. Area)'(Imp. "C")= 31933
(Grass Area)*(Grass "C")= 5396
TOTAL 37329 .
37329
Weighted "C"= 0.42
89442
1
' -
,
'
Weighted Runoff Coefficient Calculation
' Project: DISHMAN COMMONS
Basin: C CLC Job S990353
Total Area (SF): 296123 Designer: DJD
Imp. Area (SF): 114268 Date: 9/11/2000
Grass Area (SF): 181855
Imp. Area "C": 0.90
Grass Area "C": 0.10
(Imp. Area)*(Imp. "C")= 102841
(Grass Area)*(Grass "C")= 18186
TOTAL ' 121027
121027
Weighted "C"= 0.41
296123
,
,
Weighted Runoff Coefficient Calculation Project: DISHMAN COMMONS
Basin: D CLC Job S990353
Total Area (SF): 10719 Designer: DJD
Imp. Area (SF): 4993 Date: 9/11/2000
Grass Area (SF): 5726
Imp. Area "C": 0.90
Grass Area "C": 0.10
(Imp. Area)*(Imp. "C")= 4494
(Grass Area)*(Grass "C")= 573
TOTAL 5066
5066
Weighted "C"= 0.47 10719
r
1
Weighted Runoff Coefficient Calculation
Project: DISHMAN COMMONS
Basin: E CLC Job S990353
Total Area (SF): 4706 Designer: DJO
Imp. Area (SF): 2271 Date: 7/18/2000
Grass Area (SF): 2435
Imp. Area "C": . 0.90
Grass Area "C": 0.10
(Imp. Area)*(Imp. "C")= 2044
(Grass Area)#(Grass "C")= 244
TOTAL 2287
2287
Weighted "C"= 0.49
4706 ~
Weighted Runoff Coefficient Calculation
Project: DISHMAN COMMONS
Basin: F CLC Job # S990353
Total Area (SF): 35545 Designer: DJD
Imp. Area (SF): 4858 Date: 7/18/2000
Grass Area (SF): 30687
Imp. Area "C": 0.90
Grass Area "C": . 0.10 (Imp. Area)*(imp. "C")= 4372
(Grass Area)'(Grass "C")= 3069
TOTAL 7441
7441
Weighted "C"= 0.21
35545
, .
' .
PEAK FLOW CALCULATION PROJECT: DISHMAN COMMONS
~ . BASIN: A1
Tot. Area = 0.40 Acres
Imp. Area = 3,992 SF.
C = 0.40
CASE 1
50 ft. Overiand Flow Ct = 0.15
L = 50 ft.
n = 0.400
- S = 0.010
Tc = 3.60 min., by Equation 3-2 of Guidelines
86 ft. Gutter flow .
Z1 = 50.0
Z2 = 3.50
n = 0.016
S = 0.0314 d = 0.095 ft.
A R Q Tc Tc total I Qc
0.24 0.05 0.52 0.66 5.00 3.18 0.51
Qpeak for Case 1= 0.51 cfs - CASE 2
Case 2 assumes a Time of Concentration less than 5 minutes so that the
' peak flow =.90(3.18)(Imp. Area) = 0.26 cfs
So, the Peak flow for the Basin is the greater of the two flows, 0.51 cfs 99353 BASIN.xIs CLC ASSOCIATES, INC. 7/25/2000
PEAK FLOW CALCULATION PROJECT: DISHMAN COMMONS
• - BASIN: A2 Tot. Area = 0.09 Acres
' Imp. Area = 3,993 SF
C = 0.90 CASE 1
0 ft. Overland Flow
Ct= 0.15
L = 0 ft.
n = 0.400
S = 0.010
Tc = 0.00 min., by Equation 3-2 of Guidelines
86 ft. Gutter flow
Z1 = 50.0
Z2 = 3.50
n = 0.016
' S = 0.0314
d = 0.073 ft. A R Q Tc Tc total I Qc
0.14' 0.04 0.26 0.79 5.00 3.18 0,26
~ Qpeak for Case 1= 0.26 cfs
' CASE 2
Case 2 assumes a Time of Concentration less than 5 minutes so that the
' peak flow =.90(3.18)(Imp. Area) = 0.26 cfs So, the Peak flow for the Basin is the greater of the two flows, 0.26 cfs 99353 BASIN.xIs • CLC ASSOCIATES, INC. 7/25/2000
1 .
PEAK FLOW CALCULATION PROJECT: DISHMAN COMMONS
BASIN: A
Tot. Area = 0.49 Acres
Imp. Area = 7,985 SF
C = 0.49
' CASE 1
50 ft. Overland Flow
Ct = 0.15
L = 50 ft.
n = 0.400
S = 0.010
Tc = 3.60 min., by Equation 3-2 of Guidelines
86 ft. Gutter flow Z1 = 50.0 '
Z2 = 3.50
n = 0.016
S = 0.0314
d = 0.110 ft.
A R Q Tc Tc total I Qc
0.32 0.05 0.77 0.60 5.00 3.18 0.76
' Qpeak for Case 1= 0.76 cfs CASE 2 .
Case 2 assumes a Time of Concentration less than 5 minutes so that the
' peak flow =.90(3.18)(Imp. Area) = 0.52 cfs So, the Peak flow for the Basin is the greater of the two flows, 0.76 cfs -
99353 BASIN.xIs CLC ASSOCIATES, INC. 7/25/2000
'
BOWSTRING METHOD PROJECT: DISHMAN COMMONS
' DETENTION BASIN DESIGN BASIN: A
DESIGNER: DJD
DATE: 07/25/00 '
Time Increment (min) 5
Time of Conc. (min) 5.00
Outflow (cfs) 0.3
Design Year Flow 10 - Area (acres) 0.49
impervious Area (sq ft) 7985
'C' Factor 0.49
, '208' Volume Provided 355
Area * C 0.240
'
Time Time inc. Intens. Q Devel. Vol.ln Vol.Out Storage
(min) (sec) (in/hr) (cfs) (cu ft) (cu ft) (cu ft)
5.00 300 3.18 0.76 307 90 217
5 300 3.18 0.76 307 90 217
10 600 2.24 0.54 378 180 198
15 900 1.77 0.42 426 270 156
~ 20 1200 1.45 0.35 453 360 .93
25 1500 1.21 0.29 465 450 15
30 1800 1.04 0.25 475 540 0
35 2100 0.91 0.22 481 630 0
40 2400 0.82 0.20 493 720 0
45 2700 0.74 0.18 498 810 0
50 3000 0.68 0.16 506 900 0
208' DRAINAGE POND CALCULATIONS , - Required '208' Storage Volume
= Impervious Area x.5 in / 12 in/ft 332.7 cu ft
208' Storage Volume Provided 355 cu ft DRYINELL REQUIREMENTS - 10 YEAR DESIGN STORM Maximum Storage Required by Bowstring , 217 cu ft .
Provided Storage Volume 355 cu ft @ 6" depth -
Number and Type of Drywefls Required 1 Single
0 Double
99353 CLC ASSOCIATES 7/25/2000
PEAK FLOW CALCULATION PROJECT: DISHMAN COMMONS .
BASIN: B1
Tot. Area = 0.72 Acres
t Imp. Area = 17,766 SF C = 0.56
' CASE 1
0 ft. Overland Fiow
Ct = 0.15
L = 0 ft.
n = 0.400
S = 0.010
~ Tc = 0.00 min., by Equation 3-2 of Guidetines
595 ft. Gutter flow
Z1 = 50.0
Z2 = 1.00
n = 0.016
~ S= 0.0080
d = 0.168 ft.
A R Q Tc Tc total I Qc
i 0.72 0.08 1.14 6.24 6.24 2.83 1.14
' Qpeak for Case 1= 1.14 cfs _
~ CASE 2
Case 2 assumes a Time of Concentration less than 5 minutes so that the peak flow =.90(3.18)(Imp. Area) = 1.17 cfs So, the Peak flow for the Basin is the greater of the two flows, 1.17 cfs
99353 BASIN.xIs CLC ASSOCIATES, INC. 7/25/2000
PEAK FLOW CALCULATION PROJECT: DISHMAN CONiMONS
, . . BASIN: B2
Tot. Area = 1.31 Acres
, Imp. Area = 0 SF
C = 0.10
CASE 1 365 ft. Overland Flow
Ct = 0.15
1 L = 365 ft.
n = 0.040
S = 0.010
Tc = 2.97 min., by Equation 3-2 of Guidefines
0 ft. Gutter flow
' Z1 = 50.0
Z2 - 1.00
n = 0.016
S = 0.0080
d = 0.115 ft.
A R Q Tc Tc total i Qc
0.34 0.06 0.42 0.00 5.00 3.18 0.42
Qpeak for Case 1= 0.42 cfs
'
CASE 2
Case 2 assumes a Time of Concentration less than 5 minutes so that the
' peak flow =.90(3.18)(lmp. Area) = 0.00 cfs
So, the Peak flow for the 6asin is the greater of the two flows, 0.42 cfs 99353 BASIN.xIs CLC ASSOCIATES, INC. 7/25/2000
PEAK FLOW CALCULATION PROJECT: DISHMAN COMMONS
BASIN: B3
, Tot. Area = 0.13 Acres
Imp. Area = 5,723 SF .
C = 0.90
CASE 1 0 ft. Overland Flow
Ct = 0.15
L = 0 ft.
n = 0.400
S = 0.010
Tc = 0.00 min., by Equation 3-2 of Guidelines
370 ft. Gutter flow
Z1 = 50.0
Z2 = 3.50 n = 0.016
S = 0.0300
d = 0.084 ft.
A R Q Tc Tc total I . Qc
0.1.9 0.04 0.37 3.17 5.00 3.18 0.37 .
Qpeak for Case 1= 0.37 cfs -
'
CASE 2
~ Case 2 assumes a Time of Concentration less than 5 minutes so that the
peak flow =.90(3.18)(Imp. Area) = 0.38 cfs
So, the Peak flow for the Basin is the greater of the two flows, 0.38 cfs
99353 BASIN.xIs CLC ASSOCIATES, INC. 7/26/2000
'
PEAK FLOW CALCULATION PR4JECT: DISHMAN COMMONS .
' BASIN: B4
' Tot. Area _ 0.99 Acres
Imp. Area - 5,745 SF
C = 0.41
CASE 1
50 ft. Overiand Flow
Ct = 0.15 .
L = 50 ft.
n = 0.400
S = 0.010
Tc = 3.60 min., by Equation 3-2 of Guidelines
370 ft. Gutter flow
Z1 = 50.0
Z2 = 3.50
n = 0.016
S = 0.0600
d = 0.117 ft.
A R Q Tc Tc total I Qc
0.37 0.06 1.26 1.80 5.40 3.08 1.25
Qpeak for Case 1= 1.25 cfs
' CASE 2 .
1 Case 2 assumes a Time of Concentration less than 5 minutes so that the .
peak flow =.90(3.18)(Imp. Area) = 0.38 cfs
So, the Peak flow for the Basin is the greater of the two flows, 1.25 cfs
99353 BASIN.xIs CLC ASSOCIATES, INC. 7/26/2000
PEAK FLOW CALCULATION PROJECT: DISHMAN COMMONS .
BASIN: B
~ Tot. Area = 3.90 Acres
Imp. Area = 29,234 SF
C = 0.28
CASE 1
50 ft. Overland Flow
Ct = 0.15
L = 50 ft.
n = 0.400
S = 0.010
Tc = 3.60 min., by Equation 3-2 of Guidelines
370 ft. Gutter flow
Z1 = 50.0
Z2 = 3.50
' n = 0.016
S 0.0600
. d = 0.171 ft.
A R Q Tc Tc total I Qc
0.78 0.09 3.46 1.40 5.00 3.18 3.47
Qpeak for Case 1= 3.47 cfs CASE 2
1 Case 2 assumes a Time of Concentration less than 5 minutes so that the
peak flow =.90(3.18)(Imp. Area) = 1.92 cfs
So, the Peak flow for the Basin is the greater of the two flows, 3.47 cfs
99353 BASIN.xIs CLC ASSOCIATES, INC. 9/11/2000
BOWSTRING METHOD PROJECT: DISHMAN COMMONS
DETENTtON BASIN DESIGN BASIN: B
DESIGNER: DJD
, DATE: 07/26/00
Time lncrement (min) 5
Time of Conc. (min) 5.02
Outflow (cfs) _ 2
Design Year Flow 10
Area (acres) 3.10
Impervious Area (sq ft) 29234
'C' Factor 0.33
'208' Volume Provided 2143
Area * C - 1.023
Time Time Inc. Intens. Q Devel. Vol.ln Vol.Out Storage
(min) (sec) (in/hr) (cfs) (cu ft) (cu ft) (cu ft)
5.02 301 3.17 3.25 1311 603 708
5 300 3.18 3.25 1308 600 708
10 600 2.24 2.29 1610 1200 410 -
15 900 1.77 1.81 1815 1800 15
20 1200 1.45 1.48 1932 2400 0
25 1500 1.21 1.24 1984 3000 0
30 1800 1.04 1.06 2024 3600 0
35 2100 0.91 0.93 2050 4200 0
40 2400 0.82 0.84 2099 4800 0
45 2700 0.74 0.76 2121 5400 0
50 3000 0.68 0.70 2158 6000 0
' -
208.DRAINAGE POND CALCULATIONS
Required '208' Storage Volume
= Impervious Area x.5 in / 12 in/ft 1218.1 cu ft -208' Storage Volume Provided . 2143 cu ft
DRYWELL REQUIREMENTS - 10 YEAR DESIGN STORM
Maximum Storage Required by Bowstring 708 cu ft
Provided Storage Volume 2143 cu ft @ 6" depth
'Number and Type of Drywells Required 0 Single
. 2 Double
99353 CLC ASSOCIATES 7/26/2000
PEAK FLOW CALCULATION PROJECT: DISHMAN COMMONS
BASIN: C1
Tot. Area = 0.92 Acres
Imp. Area = 0 SF
C = 0.10
CASE 1
170 ft. Overland Flow
Ct = 0.15
L = 170 ft.
n = 0.400
S = 0.015
Tc = 6.65 min., by Equation 3-2 of Guidelines
0 ft. Gutter flow
Z1 = 50.0
Z2 = 1.00
n = 0.016
S = 0.0080
d = 0.095 ft.
A R Q Tc Tc total I Qc
0.23 0.05 0.25 0.00 6.65 2.74 0.25
Qpeak for Case 1= 0.25 cfs
CASE 2
Case 2 assumes a Time of Concentration less than 5 minutes so that the
peak flow =.90(3.18)(Imp. Area) = 0.00 cfs
So, the Peak flow for the Basin is the greater of the finro flows, 0.25 cfs
99353 BASIN.xIs CLC ASSOCIATES, INC. 7/25/2000
'
PEAK FLOW CALCULATION PROJECT: DISHMAN COMMONS
BASIN: C2
Tot. Area = 0.06 Acres
Imp. Area = 2,266 SF -
C = 0.78
CASE 1
20 ft. Overland Flow
Ct = 0.15 ,
L = 20 ft.
n = 0.400 '
S = 0.010
Tc = 2.08 min., by Equation 3-2 of Guidelines
150 ft. Gutter flow
Z1 = 50.0
Z2 = 3.50 -
n = 0.016 S = 0.0080
d = 0.076 ft.
A R Q Tc Tc total I Qc
0.15 0.04 0.15 2.66 5.00 3.18 0.15
- Qpeak for Case 1= 0.15 cfs
CASE 2 Case 2 assumes a Time of Concentration less than 5 minutes so that the
peak flow =.90(3.18)(Imp. Area) = 0.15 cfs
So, the Peak flow for the Basin is the greater of the two flows, 0.15 cfs 99353 BASIN.xis CLC ASSOCIATES, INC. 7/25/2000
PEAK FLOW CALCULATION PROJECT: DISHMAN COMMONS
BASIN: C3 ,
Tot. Area = 0.12 Acres
Imp. Area = 5,261 SF
C = 0.90
CASE 1
0 ft. Overland Flow -
Ct = 0.15
L = 0 ft.
n = 0.400 -
S = 0.020
Tc = 0.00 min., by Equation 3-2 of Guidelines
95 ft. Gutter flow
Z1 = 50.0
Z2 = 3.50 .
n = 0.016
S = 0.0080
d = 0.105 ft.
A R Q Tc Tc total I Qc
0.29 0.05 0.34 1.36 5.00 3.18 0.34 Qpeak for Case 1= 0.34 cfs . - ,
CASE 2
Case 2 assumes a Time of Concentration less than 5 minutes so that the
peak flow =.90(3.18)(Imp. Area) = 0.35 cfs
So, the Peak flow for the Basin is the greater of the two flows, 0.35 cfs . .
99353 BASIN.xis CLC ASSOCIATES, INC. 7/26/2000
'
PEAK FLOW CALCULATION PROJECT: DISHMAN COMMONS
BASIN: C4
Tot. Area = 0.80 Acres
imp. Area = 20,236 SF ,
C = 0.56
CASE 1
20 ft. Overland Fiow
Ct = 0.15
L = 20 ft.
n = 0.400
S = 0.010
Tc = 2.08 min., by Equation 3-2 of Guidelines
715 ft. Gutter flow
Z1 = 50.0 -
Z2 = 1.00
n = 0.016
S = 0.0300
d = 0.135 ft. .
A R Q Tc Tc total I Qc
0.46 0.07 1.24 4.48 6.56 2.76 1.24
Qpeak for Case 1= 1.24 cfs
CASE 2
Case 2 assumes a Time of Concentration less than 5 minutes so that the
peak flow =.90(3.18)(Imp. Area) = 1.33 cfs . So, the Peak flow for the Basin is the greater of the two flows, . 1.33 cfs
99353 BASIN.xIs CLC ASSOCIATES, INC. , 7125/2000
PEAK FLOW CALCULATION PROJECT: DISHMAN COMMONS
BASIN: C5
Tot. Area = 1.35 Acres
imp. Area = 8,800 SF
C = 0.43
CASE 1 -
50 ft. Overland Flow
Ct = 0.15
L = 50 ft.
n = 0.400
S = 0.020
Tc = 2.93 min., by Equation 3-2 of Guidelines
510 ft. Gutter flow
Z1 = 50.0
Z2 = 50.00
n = 0.016
- S = 0.0341
d = 0.114 ft.
A R Q Tc Tc total I Qc
0.65 0.06 1.65 3.34 6.26 2.83 1.64
' Qpeak for Case 1= 1.64 cfs
CASE 2 .
Case 2 assumes a Time of Concentration less than 5 minutes so that the
peak flow =.90(3.18)(Imp. Area) = 0.58 - cfs _
So, the Peak flow for the Basin is the greater of ihe two flows, 1.64 cfs
99353 BASIN.xIs CLC ASSOCIATES, INC. 7/25/2000
~
~ PEAK FLOW CALCULATION PROJECT: DISHMAN COMMONS
BASIN: C6
Tot. Area = 1.48 Acres
Imp. Area = 11,624 SF
C = 0.43
CASE 1
50 ft. Overland Flow
'
Ct = 0.15
L = 50 ft.
n = 0.400
S = 0.020
Tc = 2.93 min., by Equation 3-2 of Guidelines
i
610 ft. Gutter flow
Z1 = 50.0
Z2 = 3.50
n = 0.016
S = 0.0276
1 d = 0.154 ft.
A R Q Tc Tc total I Qc
0.63 0.08 ' 1.77 3.64 6.56 2.76 1.76
1
Qpeak for Case 1= 1.76 cfs .
'
. CASE 2
' Case 2 assumes a Time of Concentration less than 5 minutes so that the
peak flow =.90(3.18)(1mp. Area) = 0.76 cfs
So, the Peak flow for the Basin is the greater of the two flows, 1.76 cfs
99353 BASIN.xIs CLC ASSOCIATES, INC. 7/25/2000
' PEAK FLOW CALCULATION PROJECT: DISHMAN COMMONS
BASIN: C7
' .
Tot. Area _ 2.05 Acres
Imp. Area = 12,531 SF ' C = 0.42
CASE 1
50 ft. Overland Flow
Ct = 0.15
L = 50 ft.
n = 0.400
S = 0.020
Tc = 2.93 min., by Equation 3-2 of Guidelines
810 ft. Gutter flow
Z1 = 50.0
Z2 = 3.50
n = 0.016
S = 0.0276
d = 0.168 ft.
A R Q Tc Tc total I Qc
0.75 0.08 2.24 4.56 7.48 2.60 2.24
Qpeak for Case 1= 2.24 cfs
'
CASE 2
Case 2 assumes a Time of Concentration less than 5 minutes so that the
peak flow =.90(3.18)(Imp. Area) = 0.82 cfs
' So, the Peak flow for the Basin is the greater of the two flows, 2.24 cfs
99353 BASIN.xls CLC ASSOCIATES, INC. 7/26/2000
1
PEAK FLOW CALCULATION PROJECT: DISHMAN COMMONS
'
BASIN•
. C
' Tot. Area _ 6.80 Acres
Imp. Area - 60,718 SF
C = 0.41'
CASE 1
' - 50 ft. Overland Flow
Ct = 0.15
L = 50 ft.
n = 0.400 S = 0.010
Tc = 3.60 min., by Equation 3-2 of Guidelines .
,
650 ft. Gutter flow
Z1 = 50.0
Z2 = 3.50
n = 0.016
S = 0.0300
, d = 0.266 ft.
A R Q Tc Tc total I Qc
1.89 0.13 7.94 2.58 6.19 2.85 7.93
Qpeak for Case 1= 7.93 cfs
CASE 2
' Case 2 assumes a Time of Concentration less than 5 minutes so that the
peak flow =.90(3.18)(Imp. Area) = 3.99 cfs
So, the Peak flow for the Basin is the greater of the two flows, 7.93 cfs
99353 BASIN.xIs CLC ASSOCIATES, INC. 9/11/2000
'
BOWSTRING METHOD PROJECT: DISHMAN COMMONS
I DETENTlON BASIN DESIGN BASIN: C
DESIGNER: DJD
DATE: 08/07/00
'
Time Increment (min) 5
Time of Conc. (min) 6.19
Outflow (cfs) 2
, Design Year Flow 10
Area (acres) 6.79
Impervious Area (sq ft) 60718
' 'C' Factor 0.41
'208' Volume Provided 2581
Area C 2.784
Time Time Inc. Intens. Q Devel. Vol.ln Vol.Out Storage
(min) (sec) (in/hr) (cfs) (cu ft) (cu ft) (cu ft)
6.19 371 2.85 7.92 3940 742 3197
5 300 3.18 8.85 3559 600 2959
10 600 2.24 6.24 4528 1200 3328
15 900 1.77 4.93 5057 1800 3257
20 1200 1.45 4.04 5353 2400 2953
25 1500 1.21 3.37 5478 3000 2478
30 1800 1.04 2.90 5577 3600 1977
35 2100 0.91 2.53 5640 4200 1440
. 40 2400 0.82 2.28 5767 4800 967
' 45 2700 0.74 2.06 5822 5400 422
50 3000 0.68 1.89 5918 6000 0
' 208' DRAINAGE POND CALCULATIONS Required '208' Storage Volume
= Impervious Area x.5 in / 12 in/ft 2529.9 cu ft
' .
208, Storage Volume Provided 2832 cu ft
' DRYWELL REQUIREMENTS - 10 YEAR DESIGN STORM
Maximum Storage Required by Bowstring 3328 cu ft
Provided Storage Volume 3599 cu ft @ 8" depth
Number and Type of Drywells Required 0 Single
2 Double 99353 CLC ASSOCIATES 8/7/2000
'
PEAK FLOW CALCULATION PROJECT: DISHMAN COMMONS
I BASIN: D
' Tot. Area _ 0.25 Acres
Imp. Area - 4,993 SF
C = 0.47
CASE 1 20 ft. Overland Flow
Ct = 0.15
L = 20 ft.
n = 0.400
S = 0.010
Tc = 2.08 min., by Equation 3-2 of Guidelines
250 ft. Gutter flow
Z1 = 50.0 Z2 = 1.00
n = 0.016
S = 0.0168 .
d = 0.096 ft.
A R Q Tc Tc total I Qc
0.24 0.05 0.37 2.63 5.00 3.18 0.37
Qpeak for Case 1= 0.37 cfs
~
CASE 2
' Case 2 assumes a Time of Concentration less than 5 minutes so that the
peak flow -.90(3.18)(Imp. Area) - 0.33 cfs
So, the Peak flow for the Basin is the greater of the two flows, 0.37 cfs
99353 BASIN.xIs CLC ASSOCIATES, INC. 9/11/2000
,
BOWSTRING METHOD PROJECT: DISHMAN COMMONS
I
DETENTION BASIN DESiGN BASIN: D
DESIGNER: DJD
' DATE: 07/25/00
Time Increment (min) 5 Time of Conc. (min) 5.00
Outflow (cfs) 0.3
Design Year Flow 10
Area (acres) 0.25
Impervious Area (sq ft) 4993
'C' Factor 0.46
'208' Volume Provided 312
Area * C 0.115 -
Time Time Inc. lntens. Q Devel. Vol.ln Vol.Out Storage
(min) (sec) (in/hr) (cfs) (cu ft) (cu ft) (cu ft)
5.00 300 3_18 0.37 147 90 57
5 300 3.18 0.37 147 90 57
10 600 2.24 0.26 181 180 1
15 900 1.77 0.20 204 270 0
20 1200 1.45 0.17 217 360 0
. 25 1500 1.21 0.14 223 450 .0
30 1800 1.04 0.12 227 540 0
35 2100 0.91 0.10 230 630 0
40 2400 0.82 0.09 236 720 0
45 - 2700 0.74 0.09 238 810 0
50 3000 0.68 0.08 243 900 0
~ - 208' DRAINAGE POND CALCULATIONS _
Required '208' Storage Volume
= Impervious Area x.5 in / 12 in/ft 208.0 cu ft
208 Storage Volume Provided 312 cu ft .
DRYWELL REQUIREMENTS - 10 YEAR DESIGN STORM Maximum Storage Required by Bowstring 57 cu ft
Provided Storage Volume 312 cu ft @ 6" depth
Number and Type of Drywells Required 1 Single
0 Double
99353 CLC ASSOCIATES 7/25/2000
'
PEAK FLOW CALCULATION PROJECT: DISHMAN COMMONS .
I BASIN: E
Tot. Area = 0.11 Acres
Imp. Area = 2,271 SF
C = 0.49
CASE 1
20 ft. Overland Flow
Ct = 0.15
L = 20 ft.
n = 0.400
S = 0.010 -
Tc = 2.08 min., by Equation 3-2 of Guidelines
110 ft. Gutter flow
Z1 = 50.0
Z2 = 1.00
n = 0.016
S = 0.0120 d = 0.076 ft.
A R Q Tc Tc total I Qc
0.15 0.04 0.17 1.60 5.00 3.18 0.17
Qpeak for Case 1= 0.17 cfs
CASE 2
, Case 2 assumes a Time of Concentration less than 5 minutes so that the
peak flow =.90(3.18)(Imp. Area) = 0.15 cfs .
So, the Peak flow for the Basin is the greater of the two flows, 0.17 cfs 99353 BASIN.xIs CLC ASSOCIATES, INC. 7/25/2000
BOWSTRING METHOD PROJECT: DISHMAN COMMONS
DETENTION BASIN DES(GN BASf N: E DESIGNER: DJD
' DATE: 07/25/00
Time Increment (min) 5
Time of Conc. (min) 5.00
Outflow (cfs) 0.3 _
Design Year Flow 10 Area (acres) 0.11 .
Impervious Area (sq ft) 2271
'C' Factor 0.49
'208' Volume Provided 186
Area * C 0.054
Time Time Inc. Intens. Q Devel. Vol.ln Vol.Out Storage
(min) (sec) _ (in/hr) (cfs) . (cu ft) (cu ft) (cu ft)
5.00 300 3.18 0.17 69 90 0<__
5 300 3.18 0.17 69 90 0<__
10 600 2.24 0.12 85 180 0<__
15 900 1.77 0.10 96 270 0<__
20 1200 1.45 0.08 102 360 0<__
25 1500 1.21 0.07 104 450 0<__
30 1800 1.04 0.06 107 540 0<__
35 2100 0.91 0.05 108 630 0<__
40 2400 0.82 0.04 111 720 0<__
45 2700 0.74 0.04 112 810 0<__
50 3000 0.68 0.04 114 900 0<__
~ 208' DRAINAGE POND CALCULATIONS
Required '208' Storage Volume = Impervious Area x.5 in / 12 iri/ft 94.6 cu ft
,
208' Storage Volume Provided 186 cu ft
DRYWELL REQUIREMENTS - 10 YEAR DESIGN STORM
Maximum Storage Required by Bowstring 0 cu ft
Provided Storage Volume 186 cu ft @ 6" depth
Number and Type of Drywells Required 1 Single
0 Double
99353 CLC ASSOCIATES 7/25/2000
'
PEAK FLOW CALCULATION PROJECT: DISHMAN COMMONS
BASIN: F
Tot. Area = 0.82 Acres
Imp. Area = 4,858 SF C = 0.21
CASE 1
145 ft. Overland Fiow
Ct = 0.15 L = 145 ft.
n = 0.400
S = 0.020
Tc = 5.54 min., by Equation 3-2 of Guidelines
205 ft. Gutter flow
Z1 = 50.0
Z2 = 3.50
n = 0.016
S = 0.0169
d = 0.100 ft.
A R Q Tc Tc totai I Qc
0.27 0.05 0.44 2.08 7.63 2.58 0.44
Qpeak for Case 1= 0.44 cfs
CASE 2
, Case 2 assumes a Time of Concentration less than 5 minutes so that the
peak flow =.90(3.18)(Imp. Area) = 0.32 cfs
So, the Peak flow for the Basin is the greater of the two flows, 0.44 cfs
99353 BASIN.xIs CLC ASSOCIATES, INC. 7/25/2000
BOWSTRING METHOD PROJECT: DISHMAN COMMONS
DETENTION BASIN DESIGN BASIN: F
DESIGNER: DJD
' DATE: 07/25/00
Time Increment (min) 5
Time of Conc. (min) 7.63
Outflow (cfs) 0.3
Design Year Flow - 10
Area (acres) 0.82
Impervious Area (sq ft) 4858
'C' Factor 0.21
'208' Volume Provided 209
Area * C 0.172
Time Time Inc. Intens. Q Devel. Vol.ln Vol.Out Storage
(min) (sec) (in/hr) (cfs) (cu ft) (cu ft) (cu ft)
7.63 458 2.58 0.44 272 137 135
5 300 3.18 0.55 220 90 130
10 600 2.24 0.39 291 180 111
15 900 1.77 0.30 322 270 52
20 1200 1.45 0.25 338 360 0
25 1500 1.21 0.21 345 450 0
30 1800 1.04 0.18 350 540 0
35 2100 0.91 0.16 353 630 0
40 2400 0.82 0.14 361 720 0
45 2700 0.74 0.13 364 810 0
50 3000 0.68 0.12 370 900 0
208' DRAINAGE POND CALCULATIONS -
Required '208' Storage Volume
= Impervious Area x.5 in / 12 in/ft 202.4 cu ft
208' Storage Volume Provided 209 cu ft
DRYWELL REQUIREMENTS - 10 YEAR DESIGN STORM
Maximum Storage Required by Bowstring 135 cu ft
_ Provided Storage Volume 209 cu ft @ 6" depth
Number and Type of Drywells Required 1 Single
0 Double
99353 CLC ASSOCIATES 7/25/2000
B-1
P-1
STORMLIN~ A
J-1
P-2
POND B
Project Title: DISHMAN COMMONS Project Engineer: CLC ASSOCIATES INC.
J:Idocument1993531dishman4.stm Inland Pacific Engineering Co. StormCAO v1.0
10/05J00 12:59:26 PM 0 Haestad Methods, Inc. 37 Brookside Road Waterbury, CT 06708 USA (203) 755-1666 Page 1 of 1
Combined PipelNode Report
Pipe Up Dn _engtl-i Size Up Dn S Up Q Up Dn Dn Rim
Node Node (ft) Invert Inverl (fUft) HGL (cfs) EGL EGL Rim (ft)
(ft) (ft) (ft) (ft) (ft) (ft) P-1 B•1 J-1 69,00 12 inch 1,997.45 1,992.60 0.028698 1,997.91 1.17 1,998.08 1,993.23 1,998.00 2,000.37
P-2 J-1 POND B 30.00 12 inch 1,992.60 1,992.30 0.010000 1,993.06 1,17 1,993,23 1,993.00 1,993.30 1,998.00
N/A N/A N/A N/A N/A N/A N/A N/A N/A N/A N/A N/A 1,993.30
Project Title: DISHMAN COMMONS Project Engineer: CLC ASSOCIATES INC.
j:ldocument1993531dishman4.stm Inland Pacific Engineering Co. StormCAO v1.0
10106/00 02:46:50 PM 0 Haestad Methods, Inc, 37 Brookside Road Waterbury, CT 06708 USA (203) 755-1666 Page 1 of 1
A2
STORMLINI- B P-2
A1
~
-3
utlet
Project Title: DISHMAN COMMONS BASIN A Project Engineer. CLC ASSOCIATES, INC.
j:ldocument1993531dishman.stm Inland Pacific Englneering Co. StormCAD v1.0
10/05/00 02:54:39 PM (D Haestad Methods, Inc. 37 Brookside Road Watefiury, CT 06708 USA (203) 755-1666 Page 1 of 1
Combined PipelNode Report
Pipe Up Dn Length Size Up Dn S Up Q Up Dn Dn Rim
Node Node (ft) Invert Invert ((Uft) HGL (cfs) EGL EGL Rim (ft)
(ft) (ft) (ft) (ft) (ft) (ft)
P-2 A2 A1 24.67 12 inch 1,991.20 1,991.05 0.006080 1,991,41 0.26 1,991.48 1,991.43 1,993.03 1,993.03
P•3 A1 Outlet 68.00 12 inch 1,991.05 1,990.70 0.005147 1,991.42 0.77 1,991.55 1,991.20 1,990.70 1,993.03
N/A N/A N/A N/A N/A N/A N/A N/A N/A N/A N/A N/A 1,990.70
ProJect Tifle: DISHMAN COMMONS BASIN A Project Engineer: CLC ASSOCIATES, INC.
j:ldocument1993531dishman.stm Inland Paciflc Englneering Co. StormCAD v1.0
10/05/00 02;55:04 PM 0 Haestad Methods, Inc. 37 Brookside Road Waterbury, CT 06708 USA (203) 755-1666 Page 1 of 1
'
'
Outlet
n -
STORMLINI C&D
P-4
1
B3
~
P-3
P-2
1 _
1
134-1 B4-2
Project Title: DISHMAN COMMONS Project Engineer. CLC ASSOCIATES, INC.
j:ldocument1993531dishman1.stm Inland Pacific Engineering Co. StormCAD v1.0
10/05/00 03:10:35 PM O Haestad Methods, Inc. 37 Brookside Road Waterbury, CT 06708 USA (203) 755-1666 Page 1 of 1
~ r ~ ~ ~ ~ ~ ~ ~ ~ ~ ~ ~ ~ ~
Combined PipelNode Report
Pipe Up Dn Length Size Up Dn S Up Q Up Dn . Dn Rim
Node Node (ft) Invert Invert (ftlft) HGL (cfs) EGL EGL Rim (ft)
(ft) (ft) (ft) (ft) (ft) (ft)
P-2 64-2 64-1 15.00 12 inch 1,993.78 1,992.90 0.058667 1,994.19 0,94 1,994.34 1,993.57 1,995.82 1,996.72
P-3 64-1 63 24.67 12 inch 1,992.90 1,992.60 0.012161 1,993.37 1.25 1,993.55 1,993.27 1,995.82 1,995,82
P-4 B3 Outlet 24.40 12 inch 1,992.50 1,992.30 0.008197 1,993.04 1.63 1,993.26 1,993.06 1,993.30 1,995.82
N/A N/A N/A N/A N/A N/A N/A N/A N/A N/A N/A N/A 1,993.30
Projeci Title: DISHMAN COMMONS Project Engineer: CLC ASSOCIATES, INC,
j:ldocument1993531dishmanl.stm Inland Paciflc Engineering Co. StormCAD v1.0
10/05/00 03:11:11 PM 0 Haestad Methods, Inc. 37 Brookside Road Waterbury, CT 06708 USA (203) 755-1666 Page 1 of 1
Out et ~
n
P-3
STORML NE E C2
P-2
C4
,
-1
5
~
Project Title: DISHMAN COMMONS Project Engineer. CLC ASSOCIATES, INC.
j;ldocument1993531dishman3,stm Inland Paciflc Engineering Co. StormCAD v1.0
10/05l00 03:39:25 PM (D Haestad Methods, Inc. 37 Brookside Road Waterbury, CT 06708 USA (203) 755-1666 Page 1 of 1
~r r ■i ~ ~■r ~ ~ ~r ~ m m m m m m
Combined PipelNode Report
Pipe Up Dn Length Size Up Dn S Up Q Up Dn Dn Rim
Node Node (ft) InveR Invert (fUft) HGL (cfs) EGL EGL Rim (ft)
(ft) (fl) (it) (ft) (ft) (ft)
P-1 C5 C4 27.50 10 inch 2,009.54 2,009.40 0.005091 2,010.43 1,64 2,010.57 2,010.48 2,011.94 2,011.29
P-2 C4 C2 24.70 12 inch 2,009.40 2,008.40 0.040486 2,010.19 2.88 2,010.48 2,010.39 2,011.94 2,011.94
P-3 C2 Outlet 48.60 12 inch 2,009.25 2,009.00 0.405144 2,010.00 3.03 2,014.36 2,010.11 2,010.00 2,011,94
N/A N/A N/A N/A N/A N/A N/A N/A N/A N/A N/A N/A 2,010.00
Project Title: OISHMAN COMMONS Project Engineer: CLC ASSOCIATES, INC.
j:ldocument1993531dishman3.stm Inland Paclflc Engineering Co. StormCAD v1.0
10105100 03:38:59 PM 0 Haestad Methods, Inc. 37 Brookside Road Waterbury, C7 06708 USA (203) 755-1666 Page 1 of 1
Outlet
A
STORMLINF F&G
P-2
C7 P-1 C3 ~ F-
I L_
P-3
C6
Project Title: DISHMAN COMMONS Project Engineer: CLC ASSOCIATES INC.
j;ldocument1993531dishman2.stm Inland Pacific Engineering Co. StormCAD v1,0
10l06/00 02:42;50 PM p Haestad Methods, Inc. 37 Brookside Road Waterbury, CT 06708 USA (203) 755-1666 Page 1 of 1
Combined PipelNode Report
,
Pipe Up Dn LengtP Size Up Dn S Up Q Up On On Rim
Node Node (ft) Invert Invert (ftlft) HGL (cfs) EGL EGL Rim (ff)
(ft) (ft) (ft) (ft) (ft) (ft)
P-3 C6 C3 25.00 12 inch 2,008.97 2,008.85 0.004800 2,009,70 1.76 2,009.83 2,009.79 2,010.97 2,010.97
P-1 C7 C3 48.00 12 inch 2,009.17 2,008.85 0.006667 2,009.81 2.24 2,010.09 2,009,85 2,010.97 2,011,17
P•2 C3 Outiet 43.50 15 inch 2,008.85 2,008.65 0.004598 2,009.70 4.35 2,010.07 2,009.87 2,010.00 2,010.97
N/A N/A N/A N/A N/A N/A N/A N/A N/A N/A N/A N/A 2,010,00
Project Title: DISHMAN COMMONS Project Engineer; CLC ASSOCIATES INC.
j:ldocument1993531dishman2.stm Inland Pacific Engineering Co. StormCAD 0.0
10/06/00 02:41:42 PM (D Haestad Methods, Inc. 37 Brookside Road Waterbury, CT 06708 USA (203) 755-1666 Page 1 of 1
BASIN A2
' Worksheet for Circular Channel
' Project Description
Project File j:ldocument199353199353.fm2
Worksheet DISHMAN COMMONS PIPING CALCULATIONS
Flow Element Circular Channel
Method Manning's Formula
Solve For Channel Depth
Input Data
' Mannings CoeNicient 0.009
Channel Slope 0.005000 fVft
Diameter 12.00 in
Discharge 0.26 cfs
Results
Depth 0.18 ft Flow Area 0.10 ft2
' Wetted Perimeter 0.88 ft
Top Widih 0.77 ft
Critical Depth 0.21 ft
Percent Full 18.10
Critical Slope • 0.002752 fUft
Velocity 2.68 fVs
Velocity Head 0.11 ft
Specific Energy 0.29 ft
Froude Number 1.33
Maximum Discharge 3.91 cfs
Full Flow Capacity 3.64 cfs
Full Flow Slope 0.000026 fUft
Flow is supercritical. .
' -
' -
, -
08/08/00 Academic Edition FlowMaster v5.17
08:26:12 AM Haestad Methods, lnc. 37 Brookside Road Waterbury, CT 06708 (203) 755-1666 Page 1 of 1
'
BASiN A2&A1 .
Worksheet for Circular Channel
Project Description Project File j:ldocument199353199353.fm2
Worksheet DISHMAN COMMONS PIPING CALCULATIONS
Flow Element Circular Channei
Meihod Manning's Formula
Solve For Channel Depth
input Data Mannings Coefficient 0.009
Channel Slope 0.005000 fUft
Diameter 12.00 in
Discharge 0.77 cfs
Results
Depih 0.31 ft
Flow Area 0.21 ftZ
Wetted Perimeter 1.19 ft
Top Width 0.93 ft
Critical Depth 0.37 ft
Percent Full 31.23
Critical Slope 0.002721 fUft
Velocity 3.68 fUs
Velocity Head 0.21 ft
Specific Energy 0.52 ft
Froude Number 1.36
Maximum Discharge 3.91 cfs
Full Flow Capacity 3.64 cfs
Full Flow Slope 0.000224 fUft
Flow is supercritical.
1
08/08/00 Academic Edition FlowMaster v5.17
08:27:14 AM Haestad Methods, Inc. 37 Brookside Road Waterbury, CT 06708 (203) 755-1666 Page 1 oi 1
BASIN 61
Worksheet for Circular Channel
, Project Description
Project File j:ldocument199353199353.fm2
Worksheet DISHMAN COMMONS PIPING CALCULATIONS
Flow Element Circular Channel
Method Manning's Formula
Solve For Channel Depth
Input Data
Mannings CoeKicient 0.009
Channel Slope 0.030000 fUft
Diameter 12.00 in
Discharge 1.17 cfs
Results •
Depih 0.24 it
Flow Area 0.15 itz
Weited Perimeter 1.03 ft
Top Width 0_86 ft
Critical Depih 0.46 ft
Percent Full 24.47
Critical Slope 0.002846 fUft
Velocity 7.85 fUs
Velocity Head 0.96 ft
Specific Energy 1.20 ft
Froude Number 3.33
Maximum Discharge 9.59 cfs
Full Flow Capacity 8.91 cfs
Full Flow Slope 0.000517 fUft
Flow is supercritical. .
,
08/08l00 Academic Edition • FlowMaster v5.17
08_28:22 AM Haestad Methods, Inc. 37 Brookside Road Waterbury, CT 06708 (203) 755-1666 Page 1 of 1
. BAS1N 134
' Worksheet for Circular Channel
Project Description
Project File j:\document199353\99353.fm2
Worksheet DISHMAN COMMONS PIPING CALCULATIONS
Flow Element Circular Channel
Method Manning's Formula
Soive For Channei Depth
Input Data
Mannings Coefficient 0.009
Channel Slope 0.010000 fUft .
Diameter 12.00 in
Discharge 1.25 cfs
Results
Depth 0.34 ft
Flow Area 0.23 ftZ
Wetted Perimeier 1.24 ft
Top Width 0.94 ft
Critical Depth 0.47 ft Percent Full 33.56
Critical Slope 0.002878 fUft .
Velociiy 5.40 fVs Velocity Head 0.45 ft
Specific Energy 0.79 ft
Froude Number 1.92
Maximum Discharge . 5.54 cfs
Full Flow Capaciiy 5.15 cfs .
Full Flow Slope 0.000590 fUft
Flow is supercritical. ' -
08/08/00 Academic Edition FlowMaster v5.17 .
08:28:56 AM Haestad Methods, Inc. 37 Brookside Road Waterbury, CT 06708 (203) 755-1666 Page 1 of 1
BASIN B3&B4
Worksheet for Circular Channel
' Project Description ~
Project File j:ldocument\99353199353.fm2
Worksheet DISHMAN COMMONS PIPING CALCULATIONS .
Flow Element Circular Channel
Method Manning's Formula Solve For Channel Depth ,
Input Data Mannings Coefficieni 0_009
Channel Slope 0.008000 fUft Diameter 12.00 in
Discharge 1.63 cfs .
Results
Depth 0.41 ft
Flow Area 0.30 ft2
Wetted Perimeter 1.39 ft Top Width 0.98 ft
Critical Depth 0.54 ft
Percent Full 41,10
Critical Slope 0.003062 fUft _
Velocity 5.36 fUs
Velocity Head 0.45 ft
Specific Energy 0.86 ft
Froude Number 1.70
Maximum Discharge 4.95 cfs
Full Flow Capacity 4.60 cfs
Full Flow Slope 0.001003 fUft
Flow is supercritical.
'
08/08/00 Academic Edition FlowMaster v5.17
08:29:39 AM Haestad Methods. Inc. 37 Brookside Road Waterbury, CT 06708 (203) 755-1666 Page 1 of 1
BASIN C4 ~ Worksheet for Circular Channel
' Project Description
Project File j:ldocument199353\99353.fm2 .
Worksheet DISHMAN COMMONS PIPING CALCULATIONS
Flow Element Circular Channel
Method Manning's Formula
Solve For Channel Depth
Input Data
Mannings Coefficient 0.009
Channel Slope 0.010000 fUft
Diameter 12.00 in
Discharge 1.33 cfs
Results
Depth 0.35 it
Flow Area 0.24 ft2
, Wetted Perimeter 1.26 ft
Top Width 0.95 ft
Critical Depth 0.49 ft
Percent Full 34.68
Critical Slope 0.002913 fUft
Velocity 5.50 fUs
Velocity Head 0.47 ft
Specific Energy 0.82 ft
Froude Number 1.92
Maximum Discharge 5.54 cfs
' Full Flow Capacity 5.15 cfs
Full Flow Slope 0.000668 ft/ft
Flow is supercritical. .
'
t . .
08/08I00 Academic Edition FlowMaster v5_ 17
08:30:04 AM Haestad Methods, Inc. 37 Brookside Road Waterbury, CT 06708 (203) 755-1666 Page 1 of 1
'
BASIN C5
' Worksheet for Circular Channel
, Project Description . ,
Project File j:ldocumen1199353199353.fm2
Worksheet DISHMAN COMMONS PIPING CALCULATIONS
' Flow Element Circular Channel
Method Manning's Formula
Solve For Channel Depth
,
Input Data
Mannings Coefficient 0.009
Channel Slope 0.010000 fUft
Diameter 10.00 in
' Discharge 1.64 cfs
Results
Depth 0.43 ft Flow Area 0.28 ft2
Wetted Perimeter 1.33 ft
Top Width 0.83 ft
Critical Depth 0.57 ft
Percent Full 51.07
Critical Slope 0.003990 ft/ft ,
Velocity 5.85 fUs
Velocity Head 0.53 ft
' Specific Energy 0.96 ft Froude Number 1.78 Maximum Discharge 3.40 cfs
Full Flow Capacity 3.16 cfs .
Full Flow Slope 0.002686 fUft
Flow is supercritical. .
'
' ' -
08/08/00 Academic Edition - FlowMaster v5.17
08:30:31 AM Haestad Methods. Inc_ 37 Brookside Road Waterbury, CT 06708 (203) 755-1666 Page 1 of 1
BASIN C6 ' Worksheet for Circular Channei
, Project Description
Project File j:\document199353199353.fm2
Worksheet DISHMAN COMMONS PIPING CALCULATIONS Flow Element Circular Channel
Meihod Manning's Formula Solve For Channel Depth
Input Data
' Mannings Coefficient 0.009
Channel Slope 0.005000 fUft
Diameter 12.00 in
Discharge 1.76 cfs
Results
Depth 0.49 ft
Flow Area 0.38 ft2 .
~ Wetted Perimeter 1.55 ft
Top Widih 1.00 ft
Critical Depth - 0.56 ft
Percent Full 49.04
Critical Slope 0.003136 fUft
Velocity 4.59 fUs
Velocity Head 0.33 ft -
Specific E_nergy 0.82 ft
Froude Number 1.31
Maximum Discharge 3.91 cfs
~ Full Flow Capacity 3.64 cfs
Full Flow Slope 0.001170 fUft
Flow is supercritical.
' - .
~
08108l00 Academic Edition FlowMaster v5.17
08:31:00 AM Haestad Methods. Inc. 37 Brookside Road Waterbury. CT 06708 (203) 755-1666 Page 1 of 1
'
BASIN C7
~ Worksheet for Circular Channel
' Project Description
Project File j:ldocument\99353199353.fm2
Worksheet DISHMAN COMMONS PIPING CALCULATIONS
Flow Element Circular Channel
Method Manning's Formula
Solve For Channel Depth
Input Data
Mannings Coefficient 0.009
Channel Slope 0_005000 fUft
Diameter 12.00 in
~ Discharge 2.24 cfs
Results
Depth 0.57 ft
Flow Area 0.46 ft2
Weited Perimeter 1.71 ft
Top Width 0.99 ft
Critical Depth 0.64 ft
Percent Full 56.73
Critical Slope 0.003461 fUft
Velocity 4.87 fUs
Velocity Head 0.37 ft
Specific Energy 0.94 ft
Froude Number 1.26
Maximum Discharge 3.91 cfs
Full Flow Capacity 3.64 cfs
Full Flow Slope 0.001895 fUft Flow is supercritical. .
I 08I08/00 Academic Edition FlowMaster v5.17
08:31:16 AM Haestad Methods, Inc. 37 Brookside Road Waterbury, CT 06708 (203) 755-1666 Page 1 of 1
~
BASIN C6&C7
, Worksheet for Circular Channel
' Project Description
Project File j:ldocument199353199353.fm2
Worksheet DISHMAN COMMONS PIPING CALCULATIONS
Flow Element Circular Channel
Method Manning's Formula
Solve For Channel Depth
~
Input Data
' Mannings Coefficient 0.009
Channel Slope 0.010000 fUft
Diameter 12.00 in
Discharge 4.00 cfs
Results
Depth 0.66 ft - Flow Area 0.55 ft2
Wetted Perimeter 1.90 ft
Top Width 0.95 ft
Critical Depth 0.85 ft
Percent Full 66.27
~ Critical Slope 0.005715 ft/ft
Velocity 7.24 fUs
Velocity Head 0.81 ft
Specific Energy 1.48 ft
Froude Number 1.67
Maximum Discharge 5.54 cfs
Full Flow Capacity 5.15 cfs
Full Flow Slope 0.006042 fUft
Flow is supercritical.
'
i _
t
08/08/00 Academic Edition FtowMaster v5.17
08:32:42 AM Haestad Methods, Inc. 37 Brookside Road Waterbury, CT 06708 (203) 755-1666 Page 1 of 1
' .
BASIN C2&C4&C5 '
' Worksheet for Circular Channel
, Project Description
Project File j:ldocument199353\99353.fm2
Worksheet DISHMAN COMMONS PIPING CALCULATI4NS Flow Elerrtent Circular Channel
Method Manning's Formula
Solve For Channel Depth
,
input Data
Mannings Coefficient 0.009
Channel Slope 0.010000 fUft
Diameter 12.00 in
Discharge 3.12 cfs
Results
Depth 0.56 ft -
Flow Area 0.45 ftZ
Wetted Perimeter 1.69 ft
Top Width 0.99 ft
Critical Depth 0.76 ft
Percent Full 56.19 .
Critical Slope 0.004327 fUft _
Velocity 6.87 fUs
Velocity Head 0.73 ft
Specific Energy 1.29 ft
Froude Number 1.79
Maximum Discharge 5.54 cfs
Full Flow Capacity 5.15 cfs
Full Flow Slope 0.003676 ftlft
Flow is supercritical.
~
08/08/00 Academic Edition FlowMaster v5.17
08:33:54 AM Haestad Methods, Inc. 37 Brookside Road Waterbury. CT 06708 (203) 755-1666 Page 1 of 1
, , .
BASIN C6&C7&C3
' Worksheet for Circular Channel
Project Description
Project File j:ldocument199353199353.fm2 ,
Worksheet DISHMAN COMMONS PIPING CALCULATIONS
Flow Element Circular Channel
Method Manning's Formula
Solve For Channel Depth
Input Data
Mannings Coefficient 0.009
Channel Slope 0.010000 fUfi
Diameter 12.00 in
Discharge 4.35 cfs
Resulis
Depth 0.71 ft Flow Area 0.59 ft2
Wetied Perimeter 1.99 ft
Top Width 0.91 ft
Critical Depth 0.88 ft
Percent Full 70_52
Critical Slope 0.006465 fUft
Velocity 7.35 fUs
Velocity Head 0.84 ft
Specific Energy 1.54 ft
Froude Number 1.61
Maximum Discharge 5.54 cfs
Full Flow Capacity 5.15 cfs
Full Flow Slope 0:007146 fVft
Flow is supercritical. .
'
08/08100 Academic Edition FlowMaster v5.17
08:33:06 AM Haestad Methods, Inc. 37 Brookside Road Waterbury. CT 06708 (203) 755-1666 Page 1 of 1
Cj,C 707 West 7th Ave. Planning
Associates, Inc. Suite 200 Engincering
Spokane, R'A 99204 Architecture
' (509) 458-6840 Iandscape Architecture
(509) 458-6844 FAX Land Surveying
ol Ck-& Lmd C-Wmm,Em -
PfOJEBT 0151HvIAvt.) 66M0,1)<,, Em jV/s/00
80BdFBT Q) ,Q_~P ~.r l!~'~'I h1S IY d0t flD. g~.3 S3
j_.
~~.~~cv_t~''1(yu~._~l~n.~.._•~'~%J~ Di~-~~/.~"(;~",~Cf ~:~s~~_y%(_-~~f9(~3/~~"~./~1'_
1 • ~ r ' ~ ' ~ • . ~ ~ I i ' i ~
. i=f~~~._~ ~ .y., . ~ ~ ° -Z- ,-T-!---"-"-i' • y--: . .~.~....~...~..i...~. ~ i~ ~ •..1 ~ ~..T_ .,.a.•-'~~.._~ -L'~•~^'T' ~~i^-'
-~--i +-7'' 1- - - @ . 'a - - - - • r - ~ r' - -i•"~~.-+-j---:-' --5--..~ ..L.. . ,..J }
. i • 7 0 ~ 1-
_~V,L I ~%l:= ~ ~~/,L4 11 [ . C ~ ~4 r ~J • ~ 1 a L~~t/ t /-r~ Jji ~-s -b`~
•"r//-vJ:~/~Ii~i~-'-~l.~~~.Y'_l-!_•__L~~~~ ' i`-
4 ~ ~e I 1 . ~ . ♦ . t ' ~ i ~ 7 " _ - _ ' ~ '~._~;~j : .L1_„ ~ -`--4-'~_ - ~ ; ._i f'_.! 1 k~Y_'L~
~
. V/_1 ~ .~t2y~~F lO% i;.U&
~Q 'J: ;f l`/ L~~~ ~ E , R ~ ~,...f.,_,,__►
1~7;
I a~ ~ ~ 1 i~ • t E
~
~r~_.~{ ~--i-.~. a ~-.~.t._• _ i _ • - ~ ~ - i ~ . . ~ .T a • ~ ~_~i ' _ i- _ • -~-i_•_.~_ rt--~
l~...,..~~,~ ~..~-y,.. ~ ....~...b- - ~ j' ~ ~ ~-i r,.1.'~ ~ ! 1 ~ i 1" } S-~T- ~ -~i-
± , ~ ~ ~ ~ ' ~ } ~T~`~6 ~
~ i• t ' ' I j ! i ~.1_.~ ; ~ ~ ~ ^r ~ 5. ~A
~j~/ 1i( ~ly- ~
~l,i'/l~~
~L- M • _ a~ ~ ~ T L _ ~.~1 _A~ i ~ I ! • lY ~ ~ ~ ~ r T
~.63
~-C -
• r - 1 , . K- ' r z- - W r
~ ~ '-`I^, y ~--j --_t-, ~ , .D i_.~~ r, -d •i i- ~--~-.Y•~ + ,'~;f.i:_.. 'o i., ~ ` .3 .r • .p ~ ~ _e
0
_ -4--+-'_ _ . * r t` 4 ' ~ ' ' - - y / } ' ~ f - ' ' - + ' ~ I i S i c+ 1 ~ ~ ~ V ` ~ ~ ._I_Z--+ ~ ~ 1 t I
,..~...+r 6 • ' .,.~...,v _.._~..},...t~.}~_;
~..~...4..,.-.,..r.-...~...-~..../».~ t
~i~.*...
.
i
- 7 - - < , . , , . __a_~~_ ' _ a-, D- - .n.; f_ ;
~ ' 'a- - . , - ' - ` - - ; ~g~~_ ~ _ a_ ~ ~ ° ~ ~ ~ M_i. . : _ . .3_ ~ - " ~ ~
: _ , - • r... . , , ' f - 1~-1--~--±• G- - -t-- r_ . , ~..J . ..1...: ~ rs 4...+..
~ ' • _a_ . J
t. _ ♦ s. e-.y .,n < -r - ° --'j - ~ - - ~ ' ' , 1y „ _ . _ Y~....1_.~,...».~.L..
E ~ Aa _ da_ . ♦ f ~ -F~~ ~ ~ _~~.~I . } _ ~ i ~ 1 7~...-{~ Y ~ . . ! t ! i'~r..y
t.r 1 . ` ~r~ ..~_~~~~.-r~ . }~.1..r.v , ' ~ rir~4.~4...~ ~ . y r.~ ~.n.~p~T~.~ ' ~w.#~.- ..e, t
' `'2 - . ~ - _ ._r i ~ _ ~ ~ _ . _ ~ ` ' " S =..~F.~ J .s..~~~ E~. . : . " q ~ i i o-
Y -~r ' ~ J_ e V„_ _i ' OV_ _~,-~-l~19__ . P ~ ~ ~ • ~ t y. • # ~ ~ ~~..y. y_J ; ~ ,
~
~ s a ~
> _.-'-_a---- ( ~ . _ _ _ ~ . _ Y . 1 ,~,,3/ : . ~ 1 L~.`
,f~~-~--;--~ ~
~ t'-E ~ TF
4-
1 j ~ q w-': ~ . . ..t. . . . - .~-.._-.-..~_i F . ( ~ 3_..{~ ~ ~ ~ i i ~ ! ~ j _ !
~..~~A_..J~~_, ~_-.~.._i_.~ ~ i.. i i ~ T ~ 1~...•_ ~ _ ` 1 _ g ~ E f ` i~ , _i i ~ ~ ` S
....1 ~ ~t _i _ ' J_ • ~ ~ _ ^ ~ i ~ ~ ` - ; ' i- ~ ~--{--i--.;~-• --F ' - ~ •-:__l. _ } ~ Z ~
' , ' ~ ~ 1 -r.,._._ ~ ~_.i,_.~ ~ , ~ i--~
-'t'Y,-.~_ , i~ --+~__..4~._~.. fa. 9';..~--~..1-.b~-~....-d..-.._-;- -^~-.s• ...~_-•-~-~-~-;~r~_..~
~ ~ .1 4 ~ i . ....7... _ .a _ ; - --i-i~~ ---s-'r-• , 1 ~ = ~ ~ ~ 5 ..e~ 4 I ~ ~ v.
~
_;-_3.~~+~.:~~ 3 ~ .1 e'_.{ ' ~._L 1 T. .s_.'-.- ~ - r-~ . 6--~--j.~~._.~.~._~_.i.~ ,~...~.T._ . ~ ..j i ~
f
~__1_ 1.._ ~F- J ~ .l~-•-Y..~( ""J~~~ ~ ' . ' 1 " ~.d,. ' ~
~ ~ _r..~.~,_.~„~_.~..1._
T.
T
4 ~ -~-~--~-~~k__
°F-~-~--~-T - , . . ~ : --f--- +
~l_~ ~ ' ' 1 ; s T I
-°9-
[ + .i~
-i ._•._i -;._.i_~-~,,~ i~~~ rt--i-~-~,~,_,~ i i~9 j. ;a,.~_ !~i 1 j w i i~~C`Q 0'I Lfz;
'~f_
1 ~ -f
I
~
~
^i ~ .i. y i ? ~ .,~j ti ~
` ~ ` t
-5-~-~- - , -~--~-,--a- -q--1- ; .
~ ~ ' ' _
y ~ 1-T.~'j ~ ~ 1--~'° 7~~^' -~--r ~ ~ i...f _ ~ _ ~ ~ ~...-~•r 4 'I ~ ~ ~ j ~ ' ~ ~ i~ ~ E ~ , __j___~_.i,~, ~ !
, + r
~ + -t-.~._~___~ _.1 _ _ I R , _ , ~ ~ ; _ ~E ~ ~ ~ ~ _
~ tg' ~ _.e... ~ ~T ~ ~ ~ ~ _~-._t._., ~ ! ~~.y_ ~ i .~.r~., . ~ ..~....1. ~ ._.i.~~.._.k_.~.__~ ~ ~ ~
F I
_~...r..}_• L...__-~~~ _.~._L_ ~._..~r_ ' ~_t~ ~ _•..~i 1 ~ i ~,i 1 ` € I I s ~ ' { ~
1-~ f'~ ; ~ ~ i 1 1 f _•.-3-1-~ 3 ~ ~ ~ ~ ~ 1.~. C.
t,__~-_.,~E-t
-1
~ ' _.~~.a
~
f
k '
t^
~
1. t ---r-+- ; `T`
{ j t.~l r_~.~...i..~ t ; J_ ~,r a f~ l~~. E ~ i~ ~ ti` I 3 i ~ 'Y i i i s? i t t+,~~
; z
..1..1J..._i_...~~~_.s.. .1..~. ~ . I i_ _ ~t~_~_ ¢ > -L.~ ! 4_.S_bj...f~- ~ e_~~, ~.-.l~_~,_•.[
~ r • ' ..a.y ' f ` ~ ~ i ~ i , ~ ~ _ ~ ~ 'r ~ -c 1 ~ ~ i ~ '_1
_.f~..! ~-..1_.,._.~..._.. ~...i._.~ j- ' -,----r t : . - Y- • ~1- ~ -t^i-,~ '~;--._..L_, _ " _ i !
-t-+ e ~i_' ..-..t .a.~_ Y„ .~.4..-• ~ = -5..-i- i~,,_._i_ ~ ~ ` ~ ' ~T ~ j- ~ ~ I ~ !
~ ' ` i i°' r-. -i _ ' , ' • € _ `~F . i ` _ ` ~ . ~ ; 1- - ' , ~ -T'~~" , ` ' ' . 9 i~~^- 1 - , ~ --r- ;
-0t--~~_a..."jr
...~q
! ~ 4~ k ` •'•-~_t_~1--.-._J,.~__
~ j ~ ~ -~--~-~i- ,•~-T_--o~-r.- ~ 4 ' t _ i ~l._.. ~ ~1__f ~ ~ t ; ~ j~~~_ ~ . j ~ J. .i~.. . ~;.~,._A_)
L-
~
.
J t. ' ..~.~3L.. • J i i t . 1..~4...~_ T _ 1.~..~ ~ W' t 1 ~
~ f
1111 W16f / If
CLC 707 West 7th Ave. Planning
Associates, Inc. Suite 200 Engineering
Spokane, WA 99204 Architecture
' (509) 458-6840 Landscape Architecture
(509) 458-6844 PAX Land Survey2ng
Am .~lim af Colovft lmd Co..aftan. lw-
PROdM LISHOM) IAiE
snBJECr kiP er doLo No. 99. 35, 3
t ~ V~ : ~ ( ~ : .~,.{....1_ ~ ~ A s~ 'a q-_' __j ~ ..~~.!__~_1__I_...i..: •~Yi t E-F_.j
i,.. -j-
_~.s_ i ' ~ i : ~ k ! -,.'pi.~ ' t ~ i 1 ' _ ~ ~ 1 ~ N ~ i 1 i _ i ~ ~ ~ E ~ 1
A....v.
~ ~ i 1 , ~ „ [%~V„~~l•_ ~ ~ ~.l''- ^ l..~ ~t~~ s _~_J _ _i...-~ ' ~-.'..y.. 1._ ~ ~ . - E -f-~~~-- .-c_.~~+
~ ` ~ ' • ' • ' q ' , „ • ~ i~ f ~
~ ~ C ~ -~iii
~ _
~ . - ~D~'~_.
..j.. : ~--~--I -7 - -T . . A ~ ~ - ` -y~ 1 t . a - ` ~ • m~ _ - ~ ~_.-°3.'°~--• ...e- :._T...~ + _ 4 - -~-1 _ ~ '....s
~_,j ~ ~ •j~- ~ ~ ~ :
nl ~ ~ ~ : _,-:..~,_.....1 _ ; = - - - ; ; - 3/--~---;--1- - -c , - . . ; .i - --~--~-n-- _ e.~._ i- I ~ i
_4. _ - . ~ i _ - , • - - : _ ~ ~ ! f _ ~ . _ _A _ _ _ ~ i ~ = ~ ; _
M.~.... ' ~ ~ • i ' I + ~ ! L.1.-,.«._.;..1»,. «e.w....,..}....{ ° ~ ~ j ~.L..1.,.:~...,..,.~~..~ , ' ~..iA..~....~..,~...,' - .,.1 ~ ~
( , • t 4 , ; , : ~ + . ~ ; ' ; ' ' ~ _ ~ . ; ; ~ ~ ~ ~ ~ : ; ~ E
4 v. _a a i 4 _ ~ . . "f' . _ t _ 4 - _ _ . _ _ _ F ~ C--••- ~ - - ~ - -
~ ~ ! -s_._~_.+----+-}--~•-~- j -'-~i - ' ~ . :~.-~~~.~~a i_ _ /<:l Z . z-4 . -_.-~V . •-~r-~ J_._.y~.j -s -
~ ~ ~ . ~ ; . ! .i...~ , ` . , t ! : _ _T 3/Z~, , , ! __i__--- _e,~ _ . . - - r - , ~ - - - , , , ,--t---- ~ ~ ~ -i
_ ~ T' ~ E-.-i....~_ ...J ' < . . a' 'E - ^~---_.'_r - - ~ - - 12..j-a..1.,?~,_-:.. ~ ...3...r-'-..:~ :
T'
Y, ~-.~~..._.._.~e.y~..~~_ _ ~ 1. ~ . _ a _ _ . _a~'.~..
-y ! 3 _-F C~:y~a;.. _T-
d.~. ~ S e-"' ~ t' ~ ~ ~ i (-~1'-~ •i -•--s---~--.--' ~ , - ' . z _ ~'-:--5• ~ + ~
'
"t~ iT_
< < . ~ ~ ~ ~ i . ~ , ~,-~.F~. . • ~ ~ .
1.~.~~.~ltJ~Vt.._a ~~'.D~j._p:^~..-'f~='!rs _ ~~,f•t~_~•^:.ri..~;.~_. J~--~-~~.r~.`_~._.- 4
._1 .J u. ♦ - J .....~--l~-t~- e.. . g - ~J--• - • ~ - T-~ _ , . [ _ ` ~ r ~ _ » r)_. s_.~ _ c-~-.- -
. :.-i._r..'_._.' } " ~ __~~~~'7,_~-.,~-.-.f-.-~ - r i . i.-. _i.~..' r-L.. _..Y ~ F- . ' - -I ,i _ . n . ~~Y~--....~~.~•
~ i G . L~ . ( ~ 3 ~ i_~ 1 _r. ~ r _ . -
L; ~G~j__?_~~»~5~~---i-,_•_--~_..~,.!!' ,_!ti._
/
. 1 t ' ^ . ~ ~ ` ' . ~ :_.-A .i_ s r ....i. N
u
~7-~--~___
, ' , - -•1-.~.~ ._.a-_~.....t--;--i-
-.----~,.y?.l - i _F~•_ _ ~ _ - p ~ - ~ •-3.~-~'.'.~.a...~ 't
,USE-ef /0 ;i7-,_..1~Y=~7
Z~~!~.~L~~..,G__~.~....;.~.:..
,
_ 1__~._~..a_~ ; -f- . • ~ ----E-, .__.f_. ~ , - , ; • ; , -;--~--~---Y- _i-~__.,_..__,_..._~.._., -l-~-~
L.i
• ; - --t...~~...,e~R a_.
. ~ ~ . i-:--~~.~~; _ . F_ . - r - - . ° - - - - ~ - ~ 4
r!
K ♦ • ' 4 -a-~--••_ '-s' v' _ i .F~ `i' i'... I ' ` ' y~ ~E ~ ~ t ~ ~ j '
~ i._• _~--}-_~--~~~,._i.._.}._! ..~..-'~---~--i -r . --F---~ 1..J. .r y. _ .L
~ ~4._.. ~ ~ - ' ~_..t....~ ..e . ' . : - . i _ i_J~_....~F.._( .0' r • t ` -jT , _ } . ~ . ~ i . ~ ~ ~ ' .-"t - {
; J; ~ _/_fr'-. ~.r.~. ~-Y-j- ; -F-t-~--=-y--~_ ' -:._.~.j~l ~ . . _ A t ~ t - j ~ ;--1`
_ :....~._..r j i - 4 - ; " ..f"^1-•.~--~--~--T -f°-,.j...•~
i-~
Rl_,y.~ -:-`_..,a~~~_ ~.~_..1..+.~..~~ • f J..~ { ~ .1 l '~---?--j.._..~.~.~---♦ ~ ~ _L__s> . _--v.-1_ t_.i--r-_:_j_ ~-{f.~.~~~i._..i...}..~
. ~V 4
~T i
!
_~`/l ~'w..:.--'--. r~ ~ ~ ~ S.r ~ t _s _ . 1 . _ - ~-~~-Y , . _ _..J' ' ; l ' -~--a
4 i. E t t~
. i 7 ~ ~ ' ~ . ~1. i ~ . E ....t...-.....i~~ E.~..~' i ,.a
Lr~
~ -s. e- j o--j-~ 5 -t--i ~ ",'l~~~ J
~
T ~ ~ i .~}~~~.~.,1~ ~ '-•I--1~ « a : -rl ~ ~ 1 ~ 1 ~ ~ ~~`Ll~
E_._~_1_-L-t-~._
T ~
i ' ~ 9 { ~ ~ ( ! ~ f~-~ c~ ; , _ ; , ~ ' • i ....~_.L~~
'
~ ~ ' ' 1.~,; " ~ ~ f~_ ~ + : ~ ~1-{--~-T-..~", ~ ~ • T~--; ~ ; ~ .c~ ~ ~i , T" ~I
0~~ ~ ~ - ~ • ~ r rr ~ ~ j S--~- +-d ,..7 ; ~ ~
j_.s • ~ ' i ~ ~ .1._~ ~ ; ~ _~t--..._~ ~ -b-
E-4
~,._~{._.Y~.-
'i' -y
r i ~ '~1~ ~.L + _ ~ ~t~,.~ y- F 1 ! 1 ^~i zs 1 ~t f
j T
t 1 .i } ' -r"-. ' . _ i ~r - ~ ~ f
L
,
i
T
. ~ _ s t~! _i .1.._;_, ._.1~..~.,' 3~._ 4_ .i_.~ ; ~ -i --t--~ A ' ' , ~ T'• '
~
~
~
~G-
i...~
i-~--
~ , ~ ~ : . ~ ~T~ j ~ ~ p 1 i ~ j _ _s~._. F_ [_......~r i a ! •..{.~i 'T'~' i' i ~~1-~_}.~:~F~
+
, ~ • ~--j- , ~ 4-~--{ ~ ~ ~ 1- ~ t f ; ~ • . ,''k { , . t , f `
~ ~~..i...~)t~~(!.}.
~y//.~//./ _~-~II -.-^~i~+ -1-~~'~'r-; ~-Y~9~~_VG.%- .,~0 ..~.~.i
,~ei~ • i ! -'~--~--i~-~
~ _ -t-~-~~--P-'~'f ~ •".i -.'°-t~ ="T^~ ~ 1 ` ~
i 0 ~ t ~ t
! ~-a ~ ' ~ ~ ~ , ~ ~ - ; _ . ~ j ~ r_.~~. p.._5'_.T^t._ ~..._i _ ~ ~ .e.'y ! - } . _ "f-- `.ry- ~S i.....1. ..:_--J{- --'--f-° j' - r • T~ i
-j__.r.j_~_; _1 ~-i ~~_+...i_L...t...~~. _~._~-----i-= , -•--`T -e--~- ' -i...i. ' ..l f_~ ^i
'"~'~'t ' f t-.-. ~i_°~ ! f~-6--~--~~-~ •-+-~--d--t~-- --~--•---1~ -~~--I ~ i ?--~i-~' ~'-3-- ~--}--J-pr;^~; °a--~- -'--t--~ , ` ~
~--h--- -+~-~--r-
- ~-r-h ~ t--~--t- k ~ ~~-'~.'-~...•~.-~_}~,~_....._u.{-• ~ r--~ i ~ ~ ,-~-~-~r-~~--~ ; ; =-.-}-^^-T-"'~'--T-^{~• i T -
~
....a...o~.:,~.»a.~.:~ s.~
111 p PAR 2 of .3
CI,C 707 West 7th Ave. Planning
Associates, Inc. Suite 200 Engineering
Spokane, WA 99204 Architecture
(509) 458-6840 Landscape Architecture
(509) 458-6844 PAX Land Surveying
,lp!M11dt p((AipI9ft Lad (,m;Oeil1. IOL
PRaafn _Q►i 5 Hr✓1/ti~ em
896dEeT I~ 1e chP~d BY dUB N0. 99 3 5"3
~ ~ ~ t ~ L1 ~ ~ ~ ~ ~ ; ~ ~ ~ ~ s , , ; • ~ ;~'j'""~" ; : " . ql ; =
; ~ ~ ~ .,1..,.t..,~-r_.} • !_a-----5- ' •r • ! ; ~';--t ,
-:'_'"dal~'. .--i~jr'~~ .I sv~c-..5~.~~ 1 ! -T.-z,- ` Y' ~..J'~•'t.,-~ i..) • # • ' - • i__Z.' . .-f._~_-a._ ~ . :.._-1 -~..._'--~-•i t
4t ~ - . ~ t . _ ~ . . . ' • i S- -Y • . r 'r'- i -i~ ~
~....i-...-r---a--1" _1 -~-~•-r-- } ~ . " i ~ ~'--i ' ~ -
_ ~ri~: • 1 I ~ ~ , . ` ~ : t ~ j t ~ 1 1~
f ; ~ j....._e -i- ~ °-~w- OZ " ~ T
_,--L -~=-~y~_,..
-t-.~_ : _ ~ • . : , _ _{_}~y_ ~ . r-~.- ~
-{_.1--..•_-~_ ~.--r..i-_ ~
,--i--~! -a i-..l-1_i ; .T_~1 ~ .r, _ _ , -$-f-
~q. ,
` i
4 D~_ y. . i . - - - - • ^ ^ - - ~ L ......r. . _ . . < - : t
,V
. . ~ ~.r ~ ' f ~ 1.~_.- ,._i... - - •---T------~ - 3-~ ~ - -
.a„T~t_.~~~.' --4-' ~ Y - ~Y i •Y- ~ ' . ~ -i }
~-~:~__12~: _~S F 1.
~ . ~'~1--'~. .a ~~-..3._~ _ ~ {~t_ r„p.-:._i_~- 5 ' i S~?i r-'~ ~ . • • 7.~-f--^-~--! _ a i_ 1 . ~ , '•---r--+ 3_.~, m. „ , . ~ , y i
' ' ~ -~----~^-~--•t---r--~-, ; i - E i- -r-~-T r' ' ~ - i y -j_: : : r ; ; .i_-,---~ ~ -i • i , ' - . ~ ~ - i ~
'~r-~. ~ , _ ~ ~~'-j~'`1._.}_.~..~._s_.~}. _4.. _r_!! ~ --t--i-{-;-- - '---i- • - ' . ` - { _ . s ~ •-s--=--~- - . - . . - - - --a-- y--- - j T . ~
~ l.,.Q_;__^")
/3/
n .t.....,.....
; ....._.a....a---t.....,~ a mm}~ "V - t O _ _t l./ '1
-~i^r f~" j' .-k-- . ~ . _ i
. -1 ~.-j - ~ - ~ - '_c-^r-•i".~-~.'_1'_r'- - -+-.i_._; ~-s ..L ..y ~ __._J~ ~ . ~ ' ~ 4.~ ~ ♦
' .o~lr C ' ~ e ~ `~,S. , ' • ` ~ J/ ' , ~/y
~Q...~ ~ _ao:•.. I ~ __f ~ ~ ¢ ~ 1 ~ . ~ 4 - ' _ . _
-~~-t-"•" 1
r-,-L
M :."-~-4-. .7_...__!_..a.. ~t..... ' . T-~-j--Y-' ~ •....1 . ! - - - ~....j ~
_ ~ i . , , , ; ~"-r- ~"`~-P- ~ ~ _ ►r,r_._ _ -_-~-~y . ? ' ,
~ 4 ~ ~~r. 12 - a 1 - 1 ~ - ♦ ~ T;- j ~ . ~~-.~.~.~..~.~.~.q~~ ~ .
-~-1
~ ~ _ ` E' 6 .f-•-' ~ ~ j , . , • ' . ~ ~ - ,
i-rt-,
~ s ~►~ru~- D~,p~r~1~-.- ; , - , b . nv. p _ ~ ~ ~ _
-,..~.~i,~....~.. Y~ : o ~ ; , . . . . ~ . ~ -
i
`f• - _.i ' .Ir~...±._. : .~.y
C....t.~~_~.,~.-. i--~-~--~-~••*-ti . - -
~ . ~1r - -z-~--~~'t ~ i ~ i-'~ 4 ~ - ~ _._~_--F. _ , ~ _i •,-~~---~-.---a
-
~ ' y1
'A
~....L..._'~i T` ~`1 . l'~- ~~~i~~et ,.~i...' ' ' •
...J~-_I
`
-1-' i
4.. j . . ' ~ ~ i ~ -i-- • - y -F--~'-~-~--~-1 ~ .s...~ ^ y_"h . e~ - ~-a' _I ~ _ _ a~-~-- ~ ~ ti~ ~ -j r . .y ~
_j
~f -L l ~ 'i ~"~'l .i ~ i f .y.--~_ ~1~.~ ' ..q...~ ~ ~ 1 t_.~_._! - ) • + i. ..d ~--z-'._..i~.t ~
' ~ ~ ~ ~-i_.~' t.. l . . ~ ~w a_` -r -f f _t_ i_ • ~ S~ ~ _.4„ .j l~i ~ j !
~"~i`TDZ,~'✓~L',a~l'~1F~ ; , ~ f, ~ ~__i._ ! ~ . ~ ` ~ ; ~ t.r....1...
~
~TT t ~ I f ~ I i M~ C- . 2 t~~J i i i j i t + i~~~~-i t....'
~ e...~ ~ ' ~`"M ~ ~ i`~~`~.._: ~ ~ ' ~ i ~ ~ r ~ I -s~ ..~-_-j- ~1.~,_i_.~,~~•.._.~._'~_.~ ~...J__t_..
A
0! ~ w+...~~-:'-j~-J,-• ---r-j-~-~ . ~ °~,.1_ i ! _!._..L....a....' • ~ ' ~
t-~-i-- - ~ ~~j--`• ' _f J_
_
~ --i fs..! ! _E
~.~t
~ i a 1 ' ' ~ f i ~ ~ ~ W ~ , . ~9 _1 I 1__.a__i_,s s !
-:._.~._.t 7 ' ~ L~ ~ I ~ i f ~ k~, ~ ~ ,•.~I ~i ~ i ~ ' ....t~~ ~ ~
-t-_~ ~ < i ~ ; ~ r(_ ~i-~-~--►
•-.-~1-S.~.j ~.-I--. l_,~~ i ( I~~ ~'"~"-f"'r -?,-,~'~~--G-...L.--~-~-~~
~ r r ~ ~ ' ~ ~i _ ° ~ 3 _ ~ ~~l ' k ! t ! 1 1 ` E ~ 1
T_,
1._ ~
`.~.~i.
'i
P
t ' 1
_i • ; ~ ~ -~-t ~ ; [ -~-i-~--~--~- ~ ~
rL
~ • ! yr..._,~~ ~ `1 Jr~ ~ I~~~~O*~_ ~SF~r I~J~ : ~ i r T a~-t i
.:~t~ ~ ~ , ~ .3 1 ' ~ i S-. =tl^: ~ i _l ~L,~_ ~ r ~r.~~ ~-~i,~ .~]__e-T-_i
_r.~ 4- _
y7 ! a ' ~_i.w _ < _ I ^_i~~~l..~,,-•- d i i--Y
~1 } c ` ~ ; ~t 4
d'...~_S
! { ~ ~ ~ ~ ~ ' t ~ ( ~ t f ~ ~ p ~ 4- ~ ' T
~ ~-'T r I w ~,..,,1 ~ ! • .l~ i E _ --~-.a- t ~ "t -'~°~i ~l.._..,-:._-.~ ' ' _i ..i,I _i .
r -T- --~M--~ 3 -4...
f~
3
v~o PaU 3 N
.
. - • • -
~ -
~
- ~ f . .
. ~ . < o` T?d2 ' .
+ IDO . . - ~ .
3n ,
Do .
DJZ
' ~OT .
.
. . + 7~O
zz 3,Q
I.a .
. .
~ D° velt Vndth. -
. Wh~~_ ~ ~de cul
D4
discharF'e' ~
- T3i1Vrater dc^
_ 1ti p~ le~►8~ t ~eU~efncd,
p w~~ ts r►o
p~ ~d b .
at StSS~3 tpr
. rlou- S'cc -
~....--30o . ~
~-„v~ 1
~
~
. 0.1
'
► . .
_ • ~ ~
r . ~
1 ~
.
~ ~
~
1 . , yy _ 31) o' 0 4
~ ~5~~~`+''atet c O•5 oo)
~
4 ~
_ w=Jo0 °°L'
. {~~4twatet 2~•S _ .
R
. . ~ evetw'~nt at
~ ' R1Pra~' alt
pipe ~'~~'f emen~ . ~ GC
S 199g
~ Stormwater I~an g
G~de~e foc ~eb~arY
. . Addend P' ~-.$2
. g
. ~46
: . .,a ~ ~ ..M a , i• ~ ,n ' '
, ' ~ f, C ~~~~li'1'il;;',',•/~~1.)~V~SIC~1~~~ c ~~.~I~I'"~VVi~~i ~ , '
~ ! _ ~ . . , , _ . . .
, ~ ~ . ~ ir_~ w r _ . ,
v w ~
I ~ „ . _ . - j~, .._.i Y--. ~ I 'i ' ' • '
'~,~1'~ . ~ . , ~ . ~ . 1~~ ( ' ' . ~ , . ~ i ~ ~ , .
~ ~ ~ ~ ` I ~ V~
' ~ .
~ • LA
I'~..1........~~ , '~'~"1~ . ' "r • ~ ^
._1~.I. . p . . ri. ~1 i . , c,
'
CD'__~°.-_-
, _~;i.. _ • . . ~ ~ ~ , ~ ~ .
oj
~ a !r ~ ~ l n • O ~ 4 ~1. . , '
~f l . . ~ t►~, ~ ~ , ~r'~' . c>
`ir~ i ,.i~ I.._ ~ ....1~~..~..,I_, ,I...O' ' i ~ I __'7.. r~ I I__._~~~.' _ ('a~.~'~,..... ,.,.p ~ I f~~ ' , .
~LA N
i~ 0 ~ . ~ . ~r' ~ . ~ ..U ~ _.l._. , , ~ ~ =
~ ~ + ~ , ~ v~ ' ~ • ~ • ~ _ _4,w~ I_..~ II _ ~.:.~~._..~;,r..y~ , ~ •I
r) .,~.._o~ _ _ ~ - - - --;,~i ,F. ' . ,
~ ~ - , ~ . o - - • ~..,.k_._.~._ _
C4~
~ ~ o~ ~ ! ! , u~._ I r I _ ~7° ~ I . ~ ~ -
-LZ
~ . _ ~ . ( _ . ~ -•Q-- ' ~ -~ll~.. ~ , '
~.rl.+r...~~. ~ I. ~r W ~I~~ ~ I r.M~~ •ww '1 '
~1 ' . , ..,_1,,... p~l~ - l_,..
. _ , ~
_ , „ . ' ~ < < ~ _ ~ .
i; -~-i--. L4
• ~ _ ~ _ ~ . . . ,
. . I . . ...1 _.I,_ _ _4._..L. r-- ,
F
. - ~ . _ . - . . - - .
- . . . - .
. 0
J
- • ' ' 30
'
. . . . - a .
- -
F 10
~
LS?
~r . , O • • IVVcLS(
~ / ~ • • ~
' . ! - .
~ • ~ ~ . . V~a_~ ' "
~
~ . ~ ~ ~ ~ ' . . •
i ~ ~ -:c.~~`z'r~.....~~~ , ' , ~~~~"';~`~~'r1 •~G'- i~ ' -
t ~ PLAN
- O
- o -
. - -L ♦ ` , _ : • - .
" ~ r ~ ~ . ; • . •
~ - _ • 2 d
. ,
; . ~ ~ . . • _ .
; . . ' - • EL=VA : iON
- - - - - ~ -
RECOyfiV1ENDED C4iVFIGURA i lCN
- • ~ . - OF R l ARAP BLANKt i FGR
_ IW tNt M U M TA1 LW Ai E R .
. , . .
_ b . . . . . _ ..ol..~ i I S '
. ; • ,
M -
I
CLC - ~ _
~ Associates, Inc.
Ao Afslaft ot ColonEO latM C., AYiG
~ .
707 w. Th Ave., Ste. 200 October 6, 2000
Spokane, WA 99204
(509) 458-6840
(509) 458-6844 Fax
Spokane, WA - Denver, CO
Mr. Ed Parry
Spokane County Engineers
Developer Services
1026 West Broadway Avenue
Spokane, WA 99260
RE: Dishman Commons
, CLC #99353
~
Dear Mr. Parry:
I
~
;
' The area bordering Dishman Commons is a fully developed residential subdivision
! f
whose lots bordering our plat are kept in lawn. It is my opinion that any contributing
stormwater flow into our basins from these areas will be negligible to our storm
i i
drainage calculations.
~ E
Sincerely,
' CLC Asso ' t nc.
~
A. s~
O F ~A3y, ~ ~
~
22g1e SPpKANE COUNTY ENGIN
EER
S~oNAL~
i ~ EXPIaES:
~ Timothy A. Schwab, P.E.
' DJD/cf
i
~ Enclosures
Planning
Engineering
~ Architecture
; Landscape Architecture ~
~ Land Surveying '
i
~ j
I
-
~
INAGE PONDS
OFF!CIAL PUBLt~ E
SPO~;.ANE rOUNTY ENGiNEtA'S GFFtCE qND
ORG"i&INAGE FACILITMS PR4sECr 4 SU`~'.NI(Ii-THl n SPOKANE COUNTY ENGINEER
. `0
OTO'i~ & MAINTENANCE
MANUAL
~r
v~ w
W
n- G
Dishman COMM ~ u ~ ~
O "
O""
cn ~ pc 0 QL ~ r
W !j ~
z t,►-_~n w
Z W•o LLJ¢Ctl
. ~
~ j w Q ~ a
tz
CL CL
o a. U C'i ~ .
CLC No. 599353 z °nC, -
2~~ ~ w 0 ~ ~
Dated . D ~ ~ w ww Z
3 ~ Z w_~..
t1 W z
, July 2000 t~l z j~F...
w r-
~ Q~ U
vUoWcUC~UU~~ZQiiZ
~ ~
0 0 wwm ° UD
G~=
aXQUWO ~ C.C.~
~
By
CLC Associates, Inc.
707 W. 7`h Avenue, Suite 200
Spokane, WA 99204
' .
1
DRAINAGE PONDS & OTHER DRAINAGE FACILITIES
OPERATION & MAINTENANCE MANUAL
1
1
1.00 PURPOSE
This plan is intended to provide general operations and maintenance guidelines for the
~
drainage ponds and other drainage facilities located in the Dishman Commons single family
residential neighborhood (Dishman Commons, P1859). All facilities discussed are located
outside of the County road rights-of-way. Implementation of these guidelines will insure that
the drainage facilities installed will function as designed, and continue to discharge
stormwater at the design rates to underlying soils.
2.00 INTRODUCTION
Generally, the drainage system is intended to treat and dispose of the increase in water runoff
generated on-site, by routing the stormwater through a series of drainage ponds, and
discharging the stormwater downstream at specified rates. The drainage facilities in this plat
consist primarily of a series of drainage ponds and drywells. It is therefore of the utmost
importance to provide adequate operations and maintenance activities to insure that the
drainage ponds and drywells remain silt or dirt free, as free flowing silt or dirt will affect the
pond storage volume as well as the ability of the drywells to discharge stormwater. Should
these facilities fill up or become clogged, the only remedy would be to completely reconstruct
the site drainage facilities. Therefore, periodic maintenance is a must. A full set of engineering
drawings will be available for review at Spokane County Public Works.
3.00 GENERAL OPERATIONAL CHARACTERISTICS -
The drainage facilities for Dishman Commons are generallyvery simple, functional, and have
' low maintenance requirements. A periodic visual inspection of the facilities will usually identify
any required maintenance. Most maintenance will consist of keeping the ponds and drywells
free of deleterious debris and sediment. However, a specific inspection schedule should be
' followed to insure proper and safe operating conditions. See Section 4.0 for recommended
maintenance schedules.
3.10 Drainaqe Ponds
Runoff from the streets and lots will go into the ponds via either inlets or curb drops.
The ponds will store six inches and then overflow into the metal drywell grate, as shown
in the plans. Forthis plat, there are four pond and drywell systems for runoff, storage
CLC Associates, Inc. Page 1 of 5 Dishman Commons O&M Manual
,
'
DRAINAGE PONDS & OTHER DRAINAGE FACILITIES
OPERATION & MAINTENANCE MANUAL
'
and discharge, which require maintenance. A sketch of their locations is provided in
Exhibit `A', attached to this document. The pond elevation information is provided in
Table 3.10A. The purpose of this table is to provide a quick reference for the
maintenance personnel. More detailed pre- and post-construction information for each
' pond will be provided in the engineering plans at Spokane County Public Works.
Table No. 3.10A - Relative Dimensions*
Pond Pond Bottom Height of Height of Drywell Type Responsible
Label Elev. Berm grate Party
from Bottom above
bottom
`A' 1990.71 ft. 1.43' 0.5' 1- Shallow Homeowners
minimum Drywell Association
`B' 1992.30 ft. 1.43' 0.5' 2- Deep Homeowners
minimum Drywell Association
`C' 2009.00 ft. 1.43' 0.5' 2- Deep Homeowners
minimum Drywell Association
`F' 2004.20 ft. 1.43' 0.5' 1- Deep Homeowners
minimum Drywell Association
' * .
Specific Engineering construction criteria can be found in the appendix where 20
scale pond drawings are provided.
~
3.20 Outflow Structures (Pond Drywells)
The pond drywells are used to regulate pond depth and to discharge stormwater runoff
discharge to the underlying soils. The outflow structure types are: Type `A' &`B'
- drywells as identified by Spokane County Standards Detail 61 a, B-14 & B-15
3.30 Convevance Ditches & Storm Svstem Pipes
Within this development, the street gutters function as storm pipes, conveyance
facilities, directing stormwater to the pond locations. The concrete inlet captures the
gutter flow and transfers this flow to the pond locations via CMP & PVC pipe.
CLC Associates, lnc. Page 2 of 5 Dishman Commons O&M Manual
1 DRAINAGE PONDS & OTHER DRAINAGE FACILITIES
OPERATION & MAINTENANCE MANUAL
'
4.00 MAINTENANCE REQUIREMENTS AND SCHEDULES
Below is a maintenance description for each of the drainage system elements contained within
the Dishman Commons development, including the ponds and drywells. All drainagefacilities
located outside of County road rights-of-way and within tracts are expected to be maintained
by the homeowners association; any drainage facilities located on individual residential lots
via easement are to be maintained by the respective homeowners. Should the homeowners
association be terminated for any reason, the maintenance responsibilities will become that
of the individual homeowners, located within the Dishman Commons plat.
, General
Proper maintenance procedures are a necessity forthe continued functioning of the drainage
facilities. Improper maintenance, or lack of attentive maintenance measures, may result in
substantial on-site and downstream impacts. It is strongly recommended thatthe homeowners
association designate an individual who will be responsible for making sure the maintenance
' measures are implemented.
Generally, maintenance personnel are to conduct a visual inspection of the drainage facilities
' immediately following a substantial rainfall or snowmelt event. This could be that it rained
noticeably hard for a short period (30 minutes or more) or that it rained steadily for a long
period (6 hours or more) or if a significant rainfall and then snow melt event, associated with
a"Chinook" melt were to occur in January, February or March when the ground is frozen. For
long duration storms, greater than 24 hours, maintenance personnel are to inspect the
drainage facilities during the storm event to identify any developing problems and correct them
before they become major problems. Generally, due to the underlying spoils, an inspection is
recommended anytime that standing water is noticed in a pond.
'
1. Inspect all ponds, gutters and drywell grate appurtenances, making sure thatthey
are clear of debris and obstructions.
~
2. Inspect the pond berms, making sure there are no breaches or breaks in the
berm. Immediately repair any breaches or breaks, with a sandy loess soil,
compacted in place.
3. Check for any erosion at the pipe discharge points or at the inlets. Temporary
repairs should be made immediately if further rainfall or snow melt is anticipated
in the nearfuture. Temporary repairs may include installing rock riprap, installing
CLC Associates, Inc. Page 3 of 5 Dishman Commons O&M Manua!
DRAINAGE PONDS & OTHER DRAINAGE FACILITIES
OPERATION & MAINTENANCE MANUAL
geotextile fabric, and/or reconstructing the channel. An engineer should be
consulted for any permanent repairs where major erosion has occurred. The
design engineers at CLC Associates, Inc. can be reached at (509) 458-6840,
in Spokane,* Washington.
These above noted storm event related visual inspections (no. 1, 2, and 3) are in addition to
the maintenance schedules noted for each item.
4.10 Drainaqe Ponds
Freauencv Of Inspection: Every 3 months, or after every storm event and/or snow melt
event, whichever is more frequent. Two drainage ponds are to be maintained by the
homeowners association, as summarized in Table 3.10A, and Exhibit `A'. The ponds
consist of a bermed depression constructed,from native soils. This depression should
be sodded and/or hydro-seeded with a dryland grass mixture, at a minimum. A lawn
sod can be used if regular irrigating is implemented. Monthly maintenance and
inspections of the pond will include removal of any accumulated debris, such as leaves,
weeds and trash. Any obstructions which would not allow waterto flow freely from the
ponds via the discharge structures should be removed or repaired. Additionally, the
berms of the ponds should be inspected to insure that they are in good repair and
structurally sound, and that no outflow has occurred other than through the drywell.
4.20 Drvwells
' The drywells for each of the drainage ponds are listed in table 3.10A. Inspections and
maintenance of the drywells should be done during inspections of the ponds, making
sure that each of these drywells is clear of obstructions and debris, and in good
condition. If there is any obstruction present, it should be removed immediately.
!
5.00 Recommended Set-Aside Funds
for Maintenance & Future Replacement Costs
There will be annual costs to all homeowners to maintain the drainage facilities. In tracts,
however, there will be shared costs for ponds on easements. Similarly, there will be
replacement costs and major renovation costs of all drainage facilities, which will occur in the
future. These replacement costs are the responsibility of the homeowners association or
CLC Associafes, Inc. Page 4 of 5 Dishman Commons O&M Manual
DRAINAGE PONDS & OTHER DRAINAGE FACILITIES
OPERATION & MAINTENANCE MANUAL
successors in interest. Future repiacement and major renovation costs have been converted
to annual costs, in the form of recommended set-aside funds.
The estimated annual maintenance costs and recommended annual set-aside costs are listed
in Table S.OOA. It is recommended the homeowners association set-aside these amount of
funds annually, to ensure that adequate maintenance and replacement measures of the '
drainage facilities will be implemented.
Drainage Facility Annual Maintenance Annual Set-Aside Funds for
Costs Future Replacement or Major
Renovation
Drainage Ponds $ 725 -
Drainage Ditches & Pipes $ - $ 300
Flow Control Structures & $ 300 $ 238
Drainage Appurtenances
Sub-total Annual Costs = $ 1025 $ 538
Note: (1) Any renovation costs for ponds are included in the annual maintenance costs.
Table 5.OOA
Grand Total/year = $1025
Cost per lot/year = $12 (87 lots)
CLC Associates, Inc. Page 5 of 5 Dishman Commons 08M Manual
Cj,C 707 West 7th Ave. Planning
Associates, inc. Suite 200 Engineering
Spohane, RA 99204 Mchitecture
(549) 458-6840 l.andscape Architecture
(509) 458-6844 PAX iand Sarveyring
PAQdFCi -D I 5 HfvlAilv (n WifvY(y-0-5 QATE -7/ 7/ d0
Wn1U W lY1Gi (A4P&Q4y_e_ LfLS D11 .l/~/S'i D/J dDl M0. S"~9,'~ S?
SOBJKT -A
. ; ~ w+ ; : i....5,..: i-a j- ~ ~ ~ ; . ,.i..,~...~...~,'......~.~..o..-.~.i.-.~...~,- . ~
~,~_;.~i_.._E._,~,+_-1-- ~ y ~ --'r-_._ . , ..--•--i- ' • ~ ~ - - . - . ; ~ . - : . ! .d,..i._,--~- Y_~_-~__~1 ~ LL ~
~s
t , `fi t ~ ~ ~ , ` -1 • ' ~ . . , , : - x , : , t , : • ~ ~ , a
- - ~
T_ r. ~ ~ ; ~ t_,1'_•._~.~y..F--} l_~_.~ ~
' _t~,. '_.1_-'-'-• _ . _ ,L • - • • ' - :_-Y~-=r ,_+_-•-~--:..T.q.. _.L
• ~ _r-'_.;_-'- t J--I- , . • _ . . . -~--i---r •
~
' 3-•i~ ' , ~ ~ , , ~ ; -4--: . . . . . ~ . . _ t. . , . ~ 1-
~.w~r~ .j R;~.~ `~~S~W.Lr~1.~US.~~G..'F.7bN~_:.,_b-~.-.,' :2.X25-j~~_~--~--,
r.L . __i-f.._~ ~ . ~ ~ . ~ ~t_ • ; - - - . ~ . _ . ~ ' ' ' ~ . i r 1..-,. ~P.. , -x.. a....: ~ I~ I F I I
5 - ;p
S - ! •~f '--1- j t ~ - ~ " • • ' - : . , . ~ . ' G . - - , t_ `---4
2F^SEEOI~~J~`. ~~~O2Y~~~_ ` : • ' ' . . • _ . ~ ' . . _a t ~ . : ! T.~ ~_.,i..',
; ~ ~ -r : - - ; G124+55,65-Crr?t & - i~av~S
' 14'- i ~ . ' ' . ~ ~ ~ , ' ~ ~ I • ~ ~-g - ' ~ , y Y
`...r j "F. 4.- .i . .~t~~'s.. f.y}.'~..• ~ • t ~...i«~ ~ 'y,..~, . _ • . « . . . _ . . . ~ 1~ „t.. _s.. i. -~.`..`_Y% ~ -~OU-~..-.r..~~
.
~ ~ -.'=4' _ _ • _ 7`-~ ~ ' : _ _ ^ ^ ' - . _ ' ' ' _ , ' . ' . ` . , ' ` "w~~'
.
r. MZ nY~ ' ; ' ~ • : ' , • _g , p, ~ r_ ~ i . ° ~ ; ~
\~-rlvk ' /J ,
* . - i• ' . , • - -i- #--l-iIL,
? -e-- • t - ' . _,_i_ r--• - - ~ - ~ • - ~t - ` • -r- - ~ a ; p__~-'_j L '3~-~!S~
t } Y~ ~ 't ~ ' 1 { r ' ~ r . • ~ .s . . . . A ~ _ t ' ~ k_
t• ~ - _ _-._...r.-~-. • , ~ ' . ~ ; _ ' . _ ' , . , ~ • > ~ t i~
4_~ _i-.... o J. _ ..._.--~-5-~-:- . . . . - . . ' _ , ' " ' ' . _ ' ~ ' • ' y
' r _A ~ , ~ ' ' - -1 . _-Y. 'r.. ~-~Y ~ i
yy -4. . -r - ~ . , ~ ~ . _ " , _ " . ~ . _ ' - ~ z {....i. •
, Sf3Y _ ~-2~
i - ~ -t . - ' . , . . - ; ' • - ' - - - . - - - - , - ~ - - , ~ ~ ; _
j ~~~.»i~.~~.-.t~. ~..~,b~,~-~e -r...`°F~.~~~~~•~'T~._y ^1-' ~ _ _i_ ..r. -5....: -.~_~.-....._t_~~:.*.I~_.'..,.~ M~
r .~i.~. •-__~1- , ; ' -~r ~ a -4 ` . ' r-~! - ~ ;
, ; ~ ; ; - _.-j_ ! ~'~-~.T~_i_-~--_~_.~ ~ s.-A--~ ! • _ ' . 4 _ _ . i~.~ -I
.~...1r-U 1VP;E' ' je.FPL1~£ YY► Nfi~'~GQ sTj;~ - - 1 . ~ d . ~ , . . ' r ~ - . _ ' ~ .~Y e
, . ""t . -f ' t ~ S ! • T t • , , • , - , ~ , ^ ~ ' " • + ~ ~ ; ~ ; ; -
'--j_1--' -3--I-
=f~~fr~y3Gl~~;z~SIviTU~--S~ Z;_~rJ-~?p iT5J. dBC7T~_~_._~ ~
~ • ~ ~ ; ~ - - t~ ; , - ~ , , , . , ' - - - - . ' , - . . - ` ` - , . . ; . . ~ ~ ~
~.~.L~:__~'.~.~ ~'~~=~TP.t%_C~F/p °~7•~ ?a~~~-~'= ~ ~ - 1~.•
i_-L-1_ y ~ y.l...~ -I ~ rr' ° -r'-'^'-`;
7
' ~.i-~„-~ i ; .1~_.!.,-.s._~_~.. ._i._~~_.i~~._'l---~--''-- - ; - i f ~ < i --.5._ _ ,-/;~3,-~Gl~~V ~-•i-~ , ` '~""i
Us-.-,- T-~
-'-'~--r~ ~.....L1 ~;...rt --r- ~ _ c. e.. ~S---Y - • v'-~---_!.~_.~__f_t~ , f •
~L
4 1~..~ ..a,_ ~ ~ L ' _ _ " Y" . _ ' • _ _ ...i.9. ,.~_.Y _t'~. .j.._...
6- j~
1T 7 ' '.i
i- - - _ ~ ' _ - . 1-_,__:.. 1--,• -
;~.%~;,~~-~S:Fr; ~s►oEr - j_Fv~ ~C: ~/F; "6~~~
i R~ t , I ~ ~.!Ui_
,-j--~_~ a
4_3
-E- ~
r_
~.s ~ ....o..-L-~-~.~:.,~.~ p . rb, ~j~ t~.~~__7-~ .~1...,~Al_! y.. ..-1._L r T. ~.-3- 3--•0_-•--a- ~--(~-~"~s~' ,-.i- 1 ' {
i i ~•.,.,..~~.~_~~1...E i-.~ -t ~ ~ `f ~ ~ ' i ~ ' ~ ~Y j 1 t_._t. ~ ` 7 _,..`1 ~ ~.r..-~._. ~ k-..._~•--~ .A...'~,..,t,..
,-__a~_P. , ~ - ~ --r-~ , ..._,_r_ _ . 's~ -.-•L i - , A' ~ r ~
t r
_.'3_ ~ L-L--~'-:~ r • ! ~ a..,-.~.--~--' ~ ~ ~~i.~,..~.._S_.f F 1 ~ ~ f ~-}--4 ~ ~ t-`i- S ~ 3_~ ~ I ~ l r^~-^~' - ~ 'P 1--"~~'^e . .
4~oF:-x~T:.~ -l,j7P' I2~'Y -4:.;~__ k-: _s~. _
J
~ It~P~s~:~=~
T
,..~..tib.~._:.,;.~.c..~,_,r ' ` ' # - _~.~.y,,.~.~'~,.' ~.~~,.._s....•..;._:;.,~_,~_a'r' ~~~~~.,4' _~_~fi
5 1 ~ ' C , ' , ~ ` ~.~_F`~"' } ~ t" , ~ • _ ~ I ~ . j ' • .
~e'11a.~ t i
~I i~
~ T*-~ 7 . 1 ( I ' . f ~ • y r * ~ ~ ~ r. _ _ ~ ~ / ( ` • ~
F,-
i.:_ _'~'S'~~.~36 ,~Z•1q . . - , ' . ` ~ y
!
J_-A
1--'~°-~• t } L r ~ ~ i : i i 1 t~.1~.~ ~ ' _i i 1 i_`i- r- ~ n j i - - ~ , , • ._.r } ' _
IL ..L-..~~.-..}-~- ~ ~ ~-•~-,.~~~.~~1
. ~,j,,...t-~i--.t._•}. ~~-I_...~ * ~+_.r_ , s~, /~-~~3 ~ "-b ~ ' 3 ' ' - - ~ - - ~ I - _ . ~ _ , ~
s.-~~- r- f - ~ ; . ~ r r . i ~ :
4_1
--.s..
, ~ r ~ E f.-i. ~ j-.-;-.y.,...y~..~I '-~.._r...l~,. Y. .~.n_,.g,w+a~-.-..~-• -eu..~. 7_,t-.~r..,.~
~ ~ ! a 1 7 7 - y -4--j _ .
F'` . ~ jj~ t . - ; s . ~ _ • ' ' ' ' .
f
i ~ . ~ { v • y - . iL T~ j.w.~.._
F...' 1 ..>>1'YL.-...~.~,.. ._'a.._ ~ r- 0. j ±-i-..v "r._~._ ~ ~ ;~~'r_ j
Wf p. " , ' i I 1 I~~~~`'~.^! ~0 i. j ♦"~--1' ~ ~ t'}_-; ~ .-^.b- . i < ~ ~ L(-~_ ~t~ •j_.
1 *`'f~ ' ' " " . ( i • • I ~ f 1 s i^j^! 1 1 ~ ' ~ 1 ~ ~ I ' • _ ~ . ~ ~ _t I i '~J.`.. , ~ f
:'-4'^L ° j ,J z. ~ . i. ~ ~ F - ' 1 ° _ ~ t i I i ~t l .
~~..1
t -t- --j--~ ° ~ ~ i.~~- -t -._.t. T..._J.----`r t : v . ~ '~•'^^-t`-~--- . ` ` A'--9--i--~- --r-~-i--~- ' ~ 9
I ~--t 1-
j _+__L_x ~ } _ . _ I ,..b. _ , ~ _ _ _ _ ._..r.._ • ~ -r- , - ~-a- r : }
~ --F ~ --i- $ ~ ~ ~ ~ i ' ~ , ~ ~ i ► ~ ~ ~
--,-;._i._ ~ 1 J ' - i ~ ' " i --N• 1 r _ , ~ _ ~ . _ _ : _ ~ , ~ t _ _ ' N~' ~ ` - i , . ~ . ' • °
~ ..l ~ i . Y<.f ' ^ ~._i_ - _ • t_ _r ,
i~ I f i r . ' Q ~.,.-.d..~..,' ~ ~ ' • ~1...~•t....~.J,.l.~ > ~ -!,..1. ~ _2~i,._.~._.-_.».}_~.µ~F ak ~ 1..~..~~+,~,,._, _.t.:..~....!
~ne P~sE at
~
R
PAVEMENT.DESIGN
OFFICIAL PUBl.EC DOCUW-NT
SPQ}CANF CGUNTY ENGINEEA's oFqM 0 C T 0 9 2000
O for
RG 'qAj• SPOKANE COUNTY ENGINEER
PROJECT #
SUBMITTAL # 4' ~ro cau~v~2ashman Commo ; .
~~n~ W ~ CC w .i ~
V~ 4 p. , ~~Z W~:'~.. '
. O~g~~`~ ~Q .
~ o o.~-~-~-
September, 2000 W ~
z W Z
:3 QQ
C7 g ~ oD Z z ~ ° ~ '
W.O. No. 99353 W v F•• Qn„ a°
~$tJ W~~
.......E
Z oo
0m~ W~WW~~';1`~-' y'...
§Z;-, - ~ ,Z.~.~~%WWVZZ
5:5oZ,- G :
~ Q ~UV~HH~C , T r
Prepared by: R ~~~QWW~ . z
, ~ o W ~ a a`~
o~
Inland Pacific Engineering Comp y0 a 0 Q a~~ ¢ v
707 West 7`'' Avenue Suite 200
Spokane, WA 99204 .
(509) 458-6840
. .
' - ♦
~ .
S P O K A N E C O U N T Y
DMSION OF ENGINEERING AND ROADS A DMSION OP THE PUBLIC WORKS DEPARTMENT
William A. Johns, P.E., County Engineer ~1;~O
PM J03#
September 8, 2000 ~G OQD Q~ 773 S.3 ,
CC:
Tim Schwab, P.E.
CLC Associates, Inc. G. S (
707 West 7`hAvenue
Spokane, WA 99204
SUBJECT: P1859 - Dishman Commoas
Design Deviation Approval
CBR to Mr Conversion
Gentlemen:
We have approved this request, with these conditions:
The County Engineer does not accept this correlation metliod as a matter of standard practice, and
the approval is based solely on the coincidence of the design value with the data on file at the County
for this area and the similarity between the test sample soil and the 16'h Avenue test pit soils. 2. Future Mr values, where required, are to be determined either by testing of soil samples, or back-
calculation of non-destructive deflection testing data. Private consultants are locally available to
provide non-destructive deflection testing and back-calculation services.
3. The County Engineer does not accept the procedure used to develop design data for the 16`h Avenue
pavement section. Although the requirements for soil testing for use in pavement design may not be
explicitly spelled out in the Standards, it is rational to expect that the most reliable data for pavement
design would be derived from soil samples taken within, or very near to the proposed roadway
- alignment. Design data on any future projects shall be based on the characteristics of soil samples
obtained within or along the road aligiment in question.
We are enclosing a copy of the approved Deviation Request. Please call Ed Parry ((509)477-3600) if t6ere
are any questions.
Sincerely, .
William A. Johns, P.E.
Spokane County Engineer
!'G• ' - .
Edward J. a, Jr., P.E. -
Plan Review Engineer CC: Project File ' .
1026 W. Broadway Ave. • Spokane, WA 99260-0170 •(509) 477-3600 FAX: (509) 477-7655 (2nd Floor) 477-7478 (3rd Floor) • TDD: (509) 477-7133
. • , . ' ' .
RECEiVED REQITEST FOR DESIGN DEVIA`.CI4N AUG 2 9 2000 $30.00
.
. SPOKANE COUNTY ErJGINEER
DATE August 29, 2000
ROAD NAME 16th Avenue CRP/RID• #
NAME OF PLAT Dishman Cammon$ P1at # P1859
ADDRESS OF BLDG NAME OF BLDG PROIECT BLDG# B9 S 29 T 25 R 45
FEDERAL/STATE PROTECT # PROJECT LIMITS West of Felts Road, just ves.t
of Balnut Road.
EXISTIlVG CONDITIONS: PROPOSED JMPROVEMENTS:
ROAD WIDTH 30' + ' gaved width, curb and
gutter
ROAD SURFACE - ACP AVG. DAILY TRAFFIC. .
Current Traffic Count Design Year Traffic Count
PROJECT DESCRIP"TION Single £amily~esidential sub-division.. . .
PROPOSED DESIGN DEVIATION Dse CBR value to estimate tbe resilient modulus for pavement
design instead of using a resilient modulus test on representative subgrade soil samples
knovn to consist of silty medium (5l1) and slightly silty, medium sand (SP-SM).
TUSTMCATION: - The resilient modulus test cannot be qufckly conducted and there are very few laboratories in
the northwest that perform this testing. CBR value has been established, and enclosed
reference material relates CBR value to resilient modulus value for pavement design. Table
2.4 and Appendig DD of AASHTO. ,
3UBMTTITD BY - CLC Associates, Inc. (Doug Desmond) DATE- August 29, 2000
ADDRESS 707 W. 7th Ave., Ste. 20U; - Spokane, WA •'t~-'4: ZIP CODE 99204
?HONE # (509) 458-6840 (509) 458-6844 (fax). ' .
ADMIlYISTRATTVE VARIANCE FEE OF $30.00 PAID i O SPOKANE COUNTy
1026 W BROADWAY, SPOKANE WA 99260-0170 PHONE (509)456-3600 FAX (509)324-3478
-REQUESX WILL NOT BE REVIEWID Wl?NOUT FUNDS-
,
..AS C~ # RECEIVED BY ~ DATE 7-IM4 41
Vknamg, e~ .
. , . .
, DESIGN DEVIATION ,
;TAFF RECOMMENDATIONS . Wproved Approved w/conditions Not Apptoved
Project Manager . Date
cu~~N~ ~thS /Y1C~N~0 O~UGy ~v~ C ~i~ ,O~~zT. ~ •
e__i1 ~
,pproved Approved w/conditions Not Approved 9' 7 ) ~ )
s . ' , . -
Planning & Traffic EZgineer Date
~ . •
.pproved Approved w/conditions Not A,p ved
) ( } Project Management Engine Date
r ~ . .
~ / . - .
. / ,
pproved A,pproved wlcondicions Not Approved
Opera ions Engineer DatE
POKANE COUNTY ET1G;IlqEER'S '
ETERNIINATION: .
pproved w/no vonditions Approved as recommended above Not Approved
Spokane Coun Engineer ( Dal
1 .
. .
Memorandum
I?ate: September 7, 2400
To: Bill Hemmings, P.E.
From: Ed Parry.E!
~
Subject: P1859 - Dis6m2n Commons
Design Deviation
Use Eqaation to CorreEate CBR to Mr valnes in Favement Design
This preject is laated east of Dishman Mica Read, along the souih line of 1e Avenue, west of Felts
Road. 16`b Avenue is a Principal Arterial (3-lane) at this location. The Sponsor's Engineer is proposing
that an equation in the AASHTO Manuat be used to correlate CBR test resulis to an K value for the
pavement section design of 16" Avenue.
The CBR test used to develop the design data for the 16'h Avenue pavement section was canducted on a
soil sample taken approximately 200' south of the ] 6d' Avenue road alignment.
The recommended design K vatue of 11,004 is on the high end of the index rangc for the soil type (SM
and SP-SM soils). CBR test was conducted on a soil sample from the approximate mid-point of 17`h Lane,
some 200' south of the 16m Avenue alignment (See attached map). The soils along 16'h Avenue appear to
be reasonably similar to the soils from the CBR test location (See attached graph).
The Pavement Management Section indicates that the recommended design Mr value is in line with data
about that area. However,
1. Discussioans with ttie Pavement Management Sedion indicates that the County's previous studies of a CBR M, correlatian found a highly variable range of CBR values for sinlilar soil types, and a highly
variable range of Mt values within soil types. There does ❑ot appear to be a reasonable c+ai-relation
between CBR and K values, at least for the soils in this area.
2. The CBR test was conducted on a soil sample from the southerly portion of the projeci site, not on a
sample in or very near to the 16'h Avenue alignment. Testing is customarily performed on soil
samptes fram within or along the road alignment in question.
If this U~tviation is apg: oved:
l. The Engineer sbould be plaoed on notice that
1.1. The County Engineer does not accept this correlation method as a matter of stamdard praetice,
and that the approval is based solely on the coincidence of their design value with the data an
6Ie at the County far this area and ttze similarity between the test sample soil and the 16`h
Avenue test pit soils.
1.2. Future K values, where required, are to be determined either by testing of soil samples, or back-
calcularion of non-destructive deflection testing data. Private consultants are tocally available to
provide nan-destructive deflection testing and back-calculation services.
1.3. The County Enguweer dces not accept the procedure used to develop design data for the 16`b
Avenue pavement sedion. Although the requirements for soil testing for use in pavement design
may not be expIicitly spelled out in the Startdards, it is rational to expect that the most reliable
data far pavement design would be derived from soil samples taken within, or very near to the
proposed roadway alignment. Design data on any future pro,Jects shall be based on the .
characteristics of soil samples obtained within or along the raad alignment in question.
!
1
PAVE-MENT DESIGN REPORT
1
for the
Dishman Commons
t Spokane County, Washington
~ September 2000
l:IiYV • ,s ' _ ~f
e des-ign irnpovements sh~own in this set o~ plans and ~alculati~.ons~:co;n orm to the a~p li~a ~ le
• f
ed~i'ons otbe Sp ae Cou~n~ty Stan a ds for ' oa and Sewe ~Gonrstru.ction a~nd t~he Spoka~ne ...~t
. 4~~~: Cou u'del~'ines or Stormwa~ter a~ age: ent. il desgn de~viat~ons have beenapprove _
by t~he Spo ane Cou ng~inee . ani p ove , 11ese .lans (c-alcul ~ons for co st~ru~tion.
T'his report has been prepared by Doug Desmond of CLC Associates, Inc. in accordance with the
AASHTO Pavement design procedure for flexible pavements.
~
'
A'
O ~oF sy,~Q ~
i
Mi8 ~
FQ/STE~tip
SS~O~AL~N4 .
~r~s:
Timothy A. Schwab, P.E.
~
Dishman Commons
'
PROJECT DESCRIPTI0IV Dishman Commons is a 301ot sub-division (on 10.3 acres) located in Section 29, T25 n., R45 E., W.M.
in Spokane County. The proposed i.mprovements include the necessary sanitary sewer, water, road and
storm drainage facilities. See the vicinity map provided in Appendix A. Half-sfireet improvements will be
provided along the north side of 16`h Avenue and the east side of Felts Road.
SUMMARY OF DESIGN
The purpose of this report is to summarized the results of the structural pavement design. The arterial
design was performed in accordance with the requirements ofthe draft Technical ReferenceB Structural
Aavement Design of Flexible Pavements by Spokane County. The analysis was performed using the
AASHTO "Design of Pavement Structures" 1993, and it is a stress-loading design approach. The
AASHTO computer soflware, DARWin 2.0, was used to perform the calculations. The results from this
calculation for 16" Avenue are summarized in this report and included in the appendix. The private roads
(17" Lane and Herald Lane) and Felts Road will utilize Table 3.16 ofthe Spokane County Standards per
the pre-design meeting with Spokane County Engineers. This means 2 inches/7 inches for tlie private roads
and 3 inches/6 inches for Felts Road.
The SCS soils map shows the proj ect limits to be located within a Marble sandy loam soil. (See Appendix
A). Six soil samples were obtained within the proj ect limits, and were classified in accordance with the
Unified Soil Classification (USC) system (ASTM D-2487). The results are summarized in Table 1. The
lab results are provided in Appendix B-2.
In addition to the soil classification a CBR test was conducted on a representative subgrade sample taken
~ from the approximate center of the site at a depth of 2 to 3 feet. The testing indicated a CBR ranging from
11 to 17, varyingwith compaction for the sample. Using the low CBR of 11 and converting this value to
Resilient Modulus, a Resilient Modulus of 16,500 psi was obtained. To account for potential variability of
the subgrade soils (using a safety factor of 1.5), the Resilient Modulus was determined to be 11,000 psi.
The CBR test results are included in the appendix. This method was approved by design deviation fx-om
Spokane County Engineering. CLC Associates, lnc. D 1 Dishman commons Pavement Design Report
'
Table 1 - Soil Samples
TEST Sample Location USC Designation MR Range
PIT road station, offset (percent fines, passing (psi)
#200 sieve) per Tech. Ref. B
1 STA 16+53, 26' Rt. SP-SM 5,000 - 10,000
16TM Ave. (10.6%)
2 STA 22+14, 7' Rt. SM 5,000 - 10,000
Felts Rd. (16.3%)
3 STA 11+09, 24' Rt. SM 5,000 - 10,000
161-HAve. (19.2%)
~
4 STA 17+45, 7'Lt. SM 5,000 - 10,000
Felts Rd. (18.5%)
5 STA 5+75, 26' Rt. SM 5,000 - 10,000
16`h Ave. (17.6%) '
6 STA 12+09, 6' Lt. SM 51,000 - 103,000 Felts Rd. (18.5%)
'
Table 2: Structural Pavement Section for 16t'' Ave.
Asphalt Concrete Pavement, Class A: 2" thick
, AsPhalt Concrete Pavement, Class E: 2" thick
Crushed Surfacing Base Course: 9.5" thick
CLC Associates, Inc. D 2 Dishman commons Pavement Design Report
;
APPENDIX ,
A: MAP5 -
Y IC'~~Y MA .
scs, sox~~ NIAP
+ .
~ Al PEND;I,X B: RE, SXL.IE NT MO~~ULTTS ~ - .
ROAD ~ATER DATA ,
- StJ~~~R-FA~E fNVE5TxGA,TI(~N REPQRT RANGE OF MODULUS VALUES PER USC SOIL CRQUP .
(5:~OKA.NE CO' ' NTY TECH. R-E~'.~RENCE B) . ~ .
'~'END~~, ~ . .
DARWin INpUT AND OUTPL T -
~ .
D3
r.:i _ - , , . . . - . - ' r . . . _ . . .r~_ ~ 1,ti'~t~ ~ . • <
J:1Land Projects199353\dwg1COVER.dwg, 06/06/2000 02:50:47 PM, DJD ~
I
~
N ~
CO
NS N
d 0
-
I w
d
14
C)
D c-
~ ~ ~
00 ~ . ~ _
WD
. ~ ~ . .
00
- _ PTN E
~
~
~
~
- - - - • , - -
' i ~3Caie 1.'~~{~VV ,L ~ i , , 50~L-. ,_!y';s, wi~,~~j.`1~"" ~'f~- l? - ' ` ~ • . ~ ~~':e :..j,'_ " : ' V', ~.I~I ~~~.~i ~ ~ ~ a' I '~I ;1~°~Y ~""r, •L~~'l~...y'• : r2~ 1 ~!w'e ' _ 'r'1` 'y'~,~ ~i. } 1 ~r:\4
~.~~i r~ ~i''~ :~'~1~~.~''r,x. ~t. ~ . , . ~V?t•..` .'r~ 1~. `'':Z. . ':x~.," . s,, ' ~ ~ 1~; .fi .a~,.-.~u^~dyic: . ~'~,n ~L'. ~~Tvi,4,~N. ..n~.,~i,';,; .~,~r7'";~t"~i~'~r~.r~':iv" °~br ~ ~'av~' t.' ~:F,. 'I,~,, ri~''i~.~J`~'~~~V~~~~r~~~`~+ ~ ~k ~k'f y ,~k._ .f~~f. : ~,y. ,.~r,i. .~ij~ly.r~5. `l~~ nI;F'M~';'~ R~ " - 1 , < ar ~Y ~ ' ~f ~ ~ _ ~y ,a : . `'9"~~. Y L `~4 ~.m~ : ~a, ' s~';d P ~!,y ,~t''~ ,~w'~ ~,f~~ ~r;uj:,~~~,;"` ,+,~'v{,`~ .'~d,. ;,y'~ ~'i^,1`~;~I',~, „'a"~Zf.,~~~~d~.,d, rtl• ~`~Vi,.t ~~,j,~ ,f4 ` ~ ~,a~„ ^,~,e'k, Y f~~' ~yM, 1.,~.-?°~~ ~~+ap ` t' ')x a...3r,_ ~u <<~E.~o '.5i'~r . „r;~ , e J ~i~ _!i4'~' ~ ti `l~„ Ph.'..,, ~l"" t~ 'f x. •f, 'x' ~'4, ' r 3+ ' .~b„''"~~ ',~+r'; , ; .r~ ` ~ t~~~,~ w ~ 1. "1`~~; ~c^. ~1~ ~ ~,..,,~r • ~a~'1, +f k xn,~ ~7•"~ ~~~'t} ~ .~~x~r~,'M14f~4,~ ~rr;v,. ,i_ nM-•~fiF i r ,~fSrt i 7dei~rYJi }~+.:,~r~'i:.
i .f• J ~"k~. 1'~ rl~ #1 Pr Ni~~n' i~; ~`~,4 , x F ~ }~Y' i ~ r. 'i f 7{~Y:~~~ W,. Y ~ .S~ 1 { ~Y ~ nt ~ ' 'y W e ~,I Y~ .
I
-
P
i I I '~1 ' fi ~ 1 . i ~ ~ . A 1 ~ ~ , F . ~ I . ~F } . 4 .i r
~ ~ r .h '4 ~ 0'~"y~ .~Y~ r A' ~ ~ •i,;~'.nxf.d. ~`~J~ i"~'a~ u ~,7 i4°~ Y'_ ~ ~ aVµ~ IgJ~~~~`?»~ fi'`r~~~ ~ a E ~ ' .}°F, 1' 14 - Ji ~ ~`'A~ t~~g ~~~~6:r~!' 'b .~.W'i r ~l~°. "~~.+u,~ l~ "r+ I ' ix . N l ,aV`-~~'-~~ ~:r~^,~~~i'N ~x4!'I!~~~~, ",~'li}i ~:;4§~.,~'~'i ~}',~;''St~~.~:~~''`yk~~T'~~s~w'~~ 5'~~~:j~~~",,.~{~` ~ ~ 4~ ~ ~ ~~,r''k.~ a~y+~' 4 ~~la§~~~. y4.,ti i ;r ~ ~ ~ 4'~Fll r, ~ka,',~..~ , ~.57~I.t~M y4io; ~:~i~,! h~4,~:.~,t~~r•~JSv~tf ~~..Ai~~;R Y,,r4 '~t ~~in': ~ ~ ~ ~;,~ny s~ ~Y. a , 5.~1, ;f,
, r''t ~,s~ k~%, a^~,~ a.'~~~~,~~ ~ ~ ~C'`r-., . . ,;,r ~_r r~~~3,~~ , ,r. r_4. ~ ,,r,:k, ~ '~,n~~r; ~ ~,a; °,~A ` ' ~~~,~iA`~'::_••~ 1~ 4ry,~" ,.r a'~,P~`~' ^;ia,.~ ~ ;'p:la'~~5.";,_j~~a~,E.;, ~ ,ki~~ , s f~ nf,i„~}., .~t : ~ ~,i1' ~t f.;l., 3~ir .,..aY~"f~~`~''~+ +y,, lw,, iA~~f,~ w, ,:•Z'~;P ~.,~^_~",'F~~~.*.~~`~;S~~r~Wy:' ~r,y,. :~.`~r'~1 s ~ '`i~, ,n 'w,~ .~,'1~5}:;~;,'i";. i.l:~~!r%~S~,s.w'",~~''',~ 'w'',~.'•,.pi..~"}, ,"S~,~F,"~o, 11~,, , ~y~ ,r'.~iF{;udi~l„ • 4~=.`-~ i -~,e +~~~.f~~~~', _ , . i~ . r'' '~l.'r ~ I~, T ;~..3; y r-~..~ ~ ,t~ 'S5 ~,i , ~ , L •~~`f~~n Y r~~S4r.3 •~F. ,~+d,"~~T , . , ~ ~ ~ i,o i .;s "t~ ^ir "b ~i,l. , ~ , , Y ~IS~ /j~,,; - ' }.;i~k ~ ~ .~~'!''~L . , - ~ i i ~ ~ 4• .i 1 i i .1 ~J. . ~ ~ ~ i T' ~ . ~ ~S ~~Jlv' ~i~ ~ ~ ~
I ~ i,l~. ,~,~ry i 'i 1^: ' Y~~t . ~ ~ ~ ~ Yk i, ~t"~ ~t , n . . . , ~~~5~ , . rt~wo-i -pi „~,I`~'",+ _ r,n'y'.:'!w~"i. ~~~„a..i~'."'1`~. ~ . ~ , . : . , , ~ ~ i , C+~, ~.k ~,N}~~rii 'y~,,,,~,,,;::;_ ~~5~.;, . - , , , ~ , , .~`ti~~ ,~„~,vJ~,~~'-',~~,e4,~~i'~~ , - . . ~ ' . ~ ` , . ` ' '
~'~,~'~•'.+~u .1 , . . . " ' , . , ~ • ' .
I
7. 2A N. ~ T, 2~ N, (l~irts s6~eef 7~~ T1"' .'_e..
9 ~'r •,r. ~ ~ A
!
i ~
1
~
1 f
y' m, ~
i ' 4 1C S~ ~ ~i~ ~s /4 ~i
- ~ }1. ~I'
4 ' I k r~
! k~ I
f L
I] !M1 ~ ! i
` ~ h S~r_~,. ~
' ~ i~ li
i t ~ ~ ~ ~ .r ~ , . I
~ ; I A t. ' i F~ - t t l
•S 1 I+~~f} ~ 4l+' ~ ' '1 ~ ~ i~ ~ ~ v ~ ~
'"'1 'i~ ~ ~1~~oi ~ ~ r ~y j ~s+ , i' ,~5' ~ +i I ~ y A , _ ~ , ~ ' 1 ~ ~ ' ~ ~ P~~ Z ' p - p Y y. j y , m
L f ~ I. y~ i I ~ ~ ~ ~ ~ _ - ~
J - d I' i i ~ ~ 1 f-y I ~ ~ 1' T , f ~ ' ~ ^ ~
~ ti.. ~ ~ f, 'a i. ~ ~ , ~
I•y` ~ ~ ~ s ~ . A~7 n ¢ ~ 1 ~
~ 4 !9^. _ ~ ~ ' ~ i ~ q •
4{}~i f ~
~n i ~ i ~ ~
~ ~
0 1 1 ~ ~ o r
~ ~ ~ ~ G I 7 51 ~r
~ ~ ~ A , ~ ~ 1 R Y # ~
~ F # ~ ' ~ 1 ~
4 ~ ~ i ~
~ ` ~ r r ~ ,~~8r~~+'" ~r , ~ . ~ ~ k ~ fli• t ~ ~ 1{' s ' ~Sj ` „A ~ ~ I F I'iiTV~~3 ~ . .I ~ ~ _
1 ~r, •~~p r' 7' af' ~ui t • ~ dY~ri%n.~+'~~ ~M1T Y,~r~~~";. - _ ~ ; 1... ~ ~(F '~S I' P • 4 4 f~~ I~~!~ ~ ~ t q i W
b t yy
y ~i "q i A1 L _ ~ ~ i~4' P ' ~ d ~ r r +lA1 '
~ r~ ~ ' ~ ~ yyl I~J Ir` I .r ~ ~ l I '
i1 ~ ~ i
, _ 6 ' y _ A f,yi~ y }Ili ; , ~/i
G ~J a r ~y 1 f ~i ~ 7 ~ F • I h' Fr nL F~ ~ ,M ~ .M1
- ~ r } p'. ~~~i~ ~ ~ ~ - - ~ -
~~`'~y~'~ '~~~s~~~f~ 'i~y ~'~~z ~s~}, ~ . r L~. ~y~ ' ~ i
` '~r x „ ~ ~ a. • ~ " . ~r ~ ' ~ ~ r , - ~ . r ~ ~ • ~ , » ' y. yl , " ' r 9~I II I~
~ A ~ R, ~ S sJ~~, i k t' i ry I L
TV i r •0' yf ~ . a ,e ~i ,
a ' ! ~ ,
~ N~~i 7r° ~ ~ I. I C ~"t I
~f , i 4 f p
4 7 , ~ ~ p ~ yi q "a S { • N ~
41 q 3 ~ u~ ~ ~ I ' ,r f• 1 ~1 ~ . ~ ~
~ I i~ ~ -F 9_ '
i f. ~ r r/ ;y, N 'r G ~
ti~.- ~ ti~ K ~ 'F i qi , r I r ,i; 4 . ~~a, -r' ' ~ i
- S ' ' . ' _1 ' L ' ' sq7; - F- - 1 vt ~
~ ~ ~ ~ ~ ~ ~
~ r - , d. ~ _ . _ _ . . . . t. ~ ~ _ _ _ . . .
` •:i yN,
I h~ ~ I
•In ~ ~A. ` ~Y _ ~ ~ ` ~f I f e (Joins sheef 76)
~
~r.~. - - - -
1
. 1993 AASHTO Pavement Design -
1
DARWin T"" Pavement Design System
' A Proprietary AASHTOWARET""
Computer Software Product
CLC Associates, Inc.
707 W. 7th Ave, Suite 200
Spokane, WA 99204
Doug Desmond
Flexible Structural Design Module
i DISHMAN COMMONS
Flexible Structural Design Module Data
18-kip ESALs Over
Initial Performance Period: 863,451
Initial Serviceability: 4.2
Terminal Serviceability: 2.5
Reliability Level 90 .
Overall Standard Deviation: .45
' Roadbed Soil Resilient Modulus (PSI): 11,000
Stage Construction: 1
' Calculated Design Structural Number: 2.93
Specified Layer Design
Struct. Drain.
Coef. Coef. Thickness Width Calculated
Layer Material Description (Ai) (Mi) (Di) (in) (ft) SN
, 1 ACP-CLASS A .42 1 2 - .84
2 ACP-CLASS E .42 1 2 - .84
3 CSBC .14 .95 9.5 - 1.26
' Total - - - 13.50 - 2.94
~ Simple ESAL Calculation
Performance Period (years): 20
' Two-Way Daily Traffic (ADT): 7,880
Percent Heavy Trucks (of ADT) FHWA
Class 5 or Greater: 2
Number of Lanes In Design Direction: 1
Percent of All Trucks In Design Lane 100
Percent Trucks In Design Direction 50 Average Initial Truck Factor (ESALs/truck): 1.5
Annual Truck Factor Growth Rate 0
Annual Truck Volume Growth Rate 0
Growth: Simple
Page 1
NORTHWEST -
~
June 15,2000 SOIZS, *rEsTrnrG & INSPECr~ON
STI W,O. # 5000198
~ C'i,C Assaciates
707 'West 7" Avenue, Suite 200
Spokane, Washington 99204
~
Attention: Mr. Doug Desmond
Re: Addendum #o 5oi1 Classifica#ion far Pavement Design Recommendations
1Gth Avenue Residential Develapment Pavement I)esign
Spokane County, Washingt-nn
Dear l3aug:
STI Narthwest f s pleased to submit this revised soil classification for pavement design purpases for the
propased residentaal development to be loca#ed southwest of 1 bth Avenue and Felts Raad in Spvkane Countya
Washington. This revision is based on additionat labnratory tesfing conducted on a represerYtative subgxade
soil sample.
The soil classification, as described in our rune fi~ 2000 letter, consists of SIL7'Y MEDIUM SANZ] (SM) and
~ SLTGHTLY SILTY, MEDIUIVi SAND (SP-SM). ACBR test was conductecl on a representative subgrade
sa.mple taken from the approx'mate si#e center at a dept.h of2 t0 3feet. 'Fhe testing indicated a CBR ranging
from 11 #o 17, varying with compaction, for the sample. Using the low CBR of 11 and convort-ing this va[ue
~ t~o Resilient Modulus, we calculate a,Resilient Modulus of 153500 psi. To account for potential variability
of the subgrrade soils (using a saf`ety factor of 1.5), we recammend using a Resilient Modulus of 11,000 Rsi
for pavement design purposes. CBR test results are attac.hed.
~ . .
7'he cr~nclusians and recorr~mendatinns presented in 1:his r~evised let#er ~.xe b~.sed, iz~ part, on the e~cplorataons
that we perFnrmed for this study and our a.dditiana1 iaboratary testi.ng. Therefore, if variations in the
~ subgracie conditiors are o6served at a.later time, we may need to modify this ]etter ta reflect thase chan,ges.
We appreciate the opportunity to be of service on this praj'ect. If you have any questinns regarding this letter
or any aspects of the project, please feel free ta cantact our office. ~
SincerelY, 11• L
STI Northwest
.
dw
~
~1~.►
J
Jay W. Logan, P.E.
Gea1echnical Engineer
~
3625 E. Ferry • Spokane, WA 99202 • Phone (509) 534-9711 • Fax (509) 534-9755
CBR Test @ 136.3 pcf - Site Center @ 2 to 3 feet
16th & Felts Residentiai Development - STI # S000198 jVrff NORTHWEST
roo 600 *
500
H a 400
L
~
N •
ayi 300
L
a
200
100 '
0
0 50 100 150 200 250 300 350 400 450 500 550 600 650
Penetration - inches x 0,001
CBR Test @ 121.2 pcf - Site Center @ 2 to 3 feet
16th & Felts Residential Development - STI # SOOO198 ~ _
. . ~~rjf NORTHWES.T
900 '
800
700
600 . ~
a
500
N ~ 400
~
a
300
200
100 0
0 50 100 150 200 250 300 350 400 450 500 550 600
Penetration - inches x 0.001
. . > . ,
~ ~ ~ r■~ ~ ~ ~ ~ ~ ~ ~ ~ r r ~ ~ ~ ~ ~
CBR Test @ 144.0 pcf - Site Center @ 2 to 3 feet
16th & Felts Residential Development - STI # S000198
jVr,ff NORTHWEST 900 800
700
~
600 . ~
'a i. ~
500
~
~ 400 ~
~
a
300
zloe
~ 200
~ 100 J
O . ~ r
0 50 100 150 204 250 300 350 400 450 500 550
Penetration - inche,s x 0.001
INITIAL DRY DENSITY VERSUS CBR - Site Center @ 2 to 3 feei
16th & Felts Residential Development - STI # S000198 jVrff NORTHINEST
50 45 40
35
30 -
~ .
m 25
v
20 . .
15
10 ' 5 O 120 125 130 135 140 145 150'
Dry Density - pcf
r
TEST PIT LOGS
STI W.O. # 5000198
16'" & Felts Pavement Design .
'
(See 16" & Felts Site Plan for test pit locations)
TP-1 (excavated May 8, 2000)
Depth Interval (feet) Description
0.0 to 8.0 feet Medium dense, moist, brown, Slightly Silty Sand: SP-SM
(Alluvium). Changes to slightly moist at 3.5 feet.
TS-1 @ 1.5 feet: (see attached Sieve Analysis results)
Bottom of test pit at 8 feet.
No groundwater seepage observed.
Slight caving at 0 to 2 feet
TP-2 (excavated May 8, 2000)
Depth Interval (feet) Description
' 0.0 to 9.0 feet Medium dense, moist, brown, Silty Sand with minor organic
content (due to yard waste) SM (Alluvium).
Changes to slightly moist and without organics at 1.5 feet.
' TS-1 @ 1.5 feet: (see attached sieve test results)
9.0 to 10.0 feet Medium dense, slightly moist, grayish brown, medium to coarse,
, Silty Sand - SM (Alluvium)
Bottom of-test pit at 10 feet.
' No groundwater seepage observed.
Slight caving from 0 to 3 feet.
'
C . .
t
CLC Associates, lnc. STl W.O. 45000198
16`h & Felts - Soil Classification June 2, 2000
S?I Northwest Test Pit Logs Page 2
TP-3 (excavated May 8, 2000)
Depth Interval (feet) Description
0.0 to 9.0 foot Medium dense, moist, brown, Silty Sand - SM (Alluvium).
Changes to slightly moist below 2.0 feet.
TS-1 @ 1.5 feet: (see attached sieve test results)
Bottom of test pit at 9 feet.
No groundwater seepage.
Slight caving from 0 to 3 feet.
TP-4 (excavated May 8, 2000)
Depth Interval (feet) Description
0.0 to 9.0 feet Medium dense, moist, brown, Silty Sand - SM (Alluvium).
Changes to slightly moist at 1.5 feet.
TS-1 @ 1.5 feet: (see attached sieve test results)
9.0 to 10.0 feet Medium dense, slightly moist, grayish brown, medium to coarse,
Silty Sand - SM (Alluvium)
Bottom of test pit at 10 feet.
No groundwater seepage observed.
' Slight caving from 0 to 3 feet.
'
'
y
CLC Associates, Inc. STI W.O. #S000198
161° & Felts - Soil Classification June 2, 2000
STI Northwest Test Pit Logs Page 3
TP-5 (excavated May 8, 2000)
Depth Interval (feet) Description
0.0 to 8.0 foot Medium dense, moist, brown, Silty Sand with occasional cobbles -
SM (Alluvium).
Changes to slightly moist below 2.5 feet.
TS-1 @ 1.5 feet: (see attached sieve test results)
Bottom of test pit at 8 feet.
No groundwater seepage.
Slight caving from 0 to 2 feet.
TP-6 (excavated May 8, 2000)
Depth Interval (feet) Description
0.0 to 8.0 foot Medium dense, moist, brown, Silty Sand with roots - SM
(Alluvium).
Changes to slightly moist below 2.0 feet.
TS-1 @ 1. 5 feet: (see attached sieve a.nalysis results)
,
Bottom of test pit at 8.0 feet.
Slight caving from 0 to 2 feet
No groundwater seepage
Abundant roots due to test pit located among trees.
LABORATDR3~ ~PORT PROJEC
SWNOFiTHWEST GRAM 5IZE ,4NA LYSILS PROJECTNuMBER.
3628 EAST ' AS~M017 DA~ RACaD ,
R:10~:N,G~11-RTMRVAL W1~ • ~SHrO ~'1 I ~7 DJ~~ ~~i~'d.
)971i 1a7C (5 09)5 34-975 5
_ LOCA'TION DEFTH-j , F-V , SAWL,E LQG
, . 5
~REWASH ~ • POSTWASH-.-
TARE I.D. ' ~ . T14RE I.D. ET TARE' DI~Y ~ TARE S~ ~ ~
I~ ~
- DRY - TARE ~ 4e -71 ~ b T~~E -ozi fb
VATER,. 'W~, DRY SciIL ~ 17Z-
TARE WASHOUT.
~
DRY 5~IL ~ 40. z
. MOISTIlRE 'CONTENT
~ .
WMff WTAHM CUMLILATIVE % RETAMM %PASM *ICATM:
. . WEDU
r
. s
~ . _
• q
. 1~
` . ' 6" SM V ARE + ' -
' • ~A ~ ' _ •
-3L SQUARE
~ .
~ . ~
~ I d'r _ S m1 IA R E
3oW_~E 82, 2, -
~o~ -
~ ~
~
4c-u~
~ ~ .
S. N 0. 6 ao
~ + - - -
U.S. N13a 100 . ~ I ~ ~ ► ~ ~ f ~ i..er ~ ` .
U.S. NQ. 200 P2 E)
PAN
AN & 1 CD, 0 l 0, 0 ~ - .
~
SAMPLED E3Y: ~ L S TES3F-I} 8Y._y ~ ~i~E~I~E17 BY:,~~ ~ RE~EWEI] B~:
3" 314" #4 #10 #20 #A0 #1 pQ #ZQO
140 . . . ~ . . . . ~ ~ ~ ~ ~ „ ,
Q
90 - - 7 10
so ~ ~ ! , ~
~ zo
I p
P
70
e i ~ 30 $
~ r
~
60
40
R
n I t
t ~
50 ' 50
~
P
a e
~ . . . . __i _ r 60
40 ~ ~ W~- - t
a
s
,
i i
n 30 - -i r - n
~ Tl 70 g
9 ~ ~ I d
20 - a,.._ T ~ $0
10 T - - ~ $D
0 ~ ~ r----- ~ 100
140 10 1 0.1 0.01 0.001 ~
GRAIN SIZE (mm)
UN1FaED 3OIL COARSE FINE I COARSE MEDIUM FINE
CLASSlFICATION GRAVEL GRAVEL SANd ~ SAND SAND FINES
SYST5M
r Sample Identificatian: Sample Descriptian; ; l,ab
TP-1, TS-1 @ 1.5 feet Slightly silty sand (SP-SM) - Alluvium No 393 TP91S1
GRAIN * ~ , r
Praject: 16th Ave, & Fefts Pavement Design
SIZE ~ocaxiQn:
' REPORT S,~okane,l~ashingtor~ ~
~~1 ~ NORT~~,EST . Jnb No.: Qate:
S000') 9$ 5~26/00
~ ~ ~
LABORATORY REPORT , PROJECT-j
N o RTH W EST GRA IN SIZE ANAL- YSIS' PROJECT NUMBER: s oo o)q,f ~
3629 EAST FERRY ASTM C117 DAM REC'D
SPOKANE, WA 99202 DATE TESTED
(509)534-9711 fax (509)534-9755 ~S~O Tll & T77
BORING / IN'TERVAL -jcf r Q: t 2 I:OCATION ' DEPTH 1• S` { SAMPLE I.OG # 3 9 3 ~
PREWASH POSTWASH.
TARE I.D. TARE I.D. ~
WET - TARE' t~ 5.6 ~ DRY - tARE
.DRY - TARE TARE
VATER DRY SOII
TARE 212, 7 - WASHOUT
DRY SDIL 1-0
. MQIST L t[7NTENT
. ~ . s~
WBGtff FVAM QU"TIVE
SEW , % AHM %PASM M ~~TIONj
WEM
' r • .
' • , •
~ . 6' SQUARE
. ~ . , ~
-SGIUAR%E- UP
C) .
- j C) RE 8)77
~ (p . t~RE4 b l
(o ~ ~ • ~
' ~ .
' ' . . .
--7 45~
'2en
U.S. ND. 60
U.S. NEI. 100 ~-'2
~C7
-lJ:S. N0, 200
PAN ~54~~ -7 =
~ AN &
CHECKED BY: ~ LS REVIEWED BY
~
SAMPLED BY: 3 L TESTED BY:_kLF
V:1 1-26-00 ~
3" 314" #4 #10 #20 #40 #100 #200
100 I I ,
0
90 10
80 - - 20
P
P 70 - ~ 30 e
e r
r c
e 60 - 40 e
. n
n t
t
50 - 50 R
P 1 e
a
S 40 gp t
a
S
i
i
n
n 30 - 70 e
9 d
' 20 - L--•--- 80
-~F
10 90
0 . . . , ~ 100
100 10 1 0,1 0.01 ~ 0.001 ~
GRAIN SIZE (mm)
UNIFIED SOIL COARSE FINE COARSE MEDIUM FINE
CLASSIFICATION GRAVEL GRAVEL SAND SAND SAND FINES
SYSTEM
~ Sample Identification: Sample Description: Lab
TP-2, TS-1 @ 1.5 feet Silty Sand (SM) - Alluvium No 393 TP21S1
~
GRAIN SIZE Project: 16th Ave. & Felts Pavement Design
Location:
Spokane, Washington
REPORT Job No.: oate:
~'Tj NORTHWEST S000198 5126140
- ~
LABORATORY ~tEPORT PROJECT: 16 & } Pe1 rs
~~~I Y NORTHWEST GRAIN SIZE ANALYSIS PROJECT NiJMBER: S o 0 0 1 R~' ~
3628- EAST FERRY ASTM C117 DATE REC'D ~
SPOK:ANE, WA 99202
(509)534-971 l fax (509)534-9755 ~ Af1SHT0 Tll & 727 DATE TESTED
kORING / INTERVAL-Tet S LOCATION DEP'TH~ ~ SAMPLE LOG q~
PREWASH . - . - ~ . ~
. PaSIWASH..
_ -
TARE I.D. TARE I.D. ~ .
~ .WET - TAPE * 610.0 ~ DRY - tARE E511
DRY - TARE ~ TARE 2~"~ ~-~I- - ~
WATER ~r DaY SOrL - ~ ~
TARE ~ i z s 2 23 ~ WASHOUT ~ I. . .
IIRY SOIL -
. MDISTURE CONTENT . , ~
. L
SiE1rE WEOi1'tiUNt!RED %MAM %P&"M SPEqFiGATtON,
. ~ ,
- ~
6' SQUARE
•i ~ -3SQUARE
4
~ ~,~sett~a~~ 1• ~ , 3 ~ , ~ ~ - ~ Z - ~ ~ - .
3oM' =W?Z,~
~ • • ~ ~2~1 ~~...t.~ , ~ ~ -
. .
~ . .
':z5 .
1 . - ~ -
55-~
'277. 0
- U.S. Np. 60
U.S. No: ioo 'Z--T ~ . ~ . -7 St Al . ~ i . . Cn
U.S. No. zoo
paN
~ AM &
At%LlMt ~'72
SAMPLED BY: Jl) TESTED BY: D L~ CHECKED BY: ~ LJ' R.EVIEWED BY:
V:11-26-00
,j `y;:
m m m m m m m m m ! m m m m m m r
3" 3I4" #4 #10 #20 #40 #100 #200
100 ----4._
0
90 10
1
so - - Zo
P
P 70 30 e
e r
r c
e 40 e
c 60 -
n
n ~ t
t .
50 - - 50 R
P e
a t
s 40 - gp a .
s i
~ n
n 30 - , 70 e
9 d
20 - 80
10 - gp '
0 100
100 10 1 0.1 0.01 0.001 ~
GRAIN SIZE (mm)
UNIFIED SOIL COARSE FINE coaRSE MEDIUM FINE
CIASSIFICATION FINES
SYSTEM GRAVEL GRAVEL SAND SAND SAND '
~ Sample Identification: Sample Description: ~ Lab
TP-3, TS-1 @ 1.5 feet Silty Sand (SM) - Alluvium Na 393 TP31S1
P16th Ave. & Feits Pavement Design GRAIN SIZE Location:
Spokane, Washington
R E P 0R Job No.: Date:
JV71 NORTHWEST S000198 5126100
,
LABORATORY REPORT PROJECT: ~b ~r ► }s
N 4 RTH W EST GRAIN SIZE ANALYSIS PROJECT NiJMBER:110 a oLV ~
3629 EAST FERRY ASTM Cll7 DATE REC'D
SPOKANE, WA 99202 ~
(509)534-971 t fax (509)534•9755 ~ AASHTO TIl & T77 DATE TESTED ~
BORiNG / INTERVAL LOCA,TION DEPTH,j. 5~ SAMPLE LOG 4 3 ~
,
PREWASH r PaSTWASH .
TARE I,D. - A
TARE I.D.
WET - TARE ' DRY tARE
DRY - TARE TARE
WATER DRY SOIL
TARE 2-2`~ • Z ~ WASHOUT
DRY SDIL ~ 3--? n , I . ~
. MQIStURE -CONTENTS,
S~EVE W~CHi"FiE?N(~ x RffMM xPAS.M SPEqFlC~AT~ON. .
~ ~
~ -
. ~
. ,
6' SQUARE
. , ,
4 •o
15 ~ . ~ , - ~ ~ ~~d ~ e ~ ~
Ia '
- , ' 441.1 , 12~0
. ~ . .
i!O SYeSe 1 -7
~ ,.4z
U-Z t I ~ ~ w S..t~-~..r' • .
::~b U.S. N11.4e- L5-pi .7
~ . ~ . .
v.s. rvo. ;.60 "IAL5 ?I . . - ~ -
U.S. No. ioo
U:s. No. 200 2
PAN
~ AM & T Z .
SAMPLED BY: )0 . TESTED BY:-PL{-'* CHECKED BY: ~ LS REVIEWED BY:
V:1 1•26-40
•
3" 3!4" #4 #10 #20 #40 #100 #200
100
0
90 - 10
80 - 20
1
P
P 70 - 30 e
e ~ r
r c
c 60 - e
e 40
n
n t
t
50 50 R
P 1 • e
a t
S 40 ~ gp a
S ~ i
i n
n 30 70 8
9 ~ d
20 - 80
10 - 90
p - - - - - - - . . 100
100 10 1 0.1 0.01 0.001
GRAIN SIZE (mm)
UNIFIED SOIL COARSE FINE COARSE MEDIUM FINE
CIASSIFICATION GRAVEL GRAVEL SAND SAND SAND FINES
SYSTEM
' Sample Identification: Sample Description: Lab
TP-4, TS-1 @ 1.5 feet Silty Sand (SM) - Alluvium No 393 TP41S1
10 GRAIN SIZE Project: 16th Ave. &,Felts-Pavement Design
Location:
, Spokane, Washington
~ Job No.: Date:
fi~ NORTHWEST REPORT S000198 5/26100
5 "
LABORA.TORY YtEPORT PROJECT:_JL tk I tr ~
SvI 7NORTHWEST GRAINSIZEANALYSIS PROJECT NUMBER :S o ov
3628 EAST FERRY ASTM CI17 DATE REC'D
Y SPOKANE, WA 99242 AASHTO Tll & 727 DATE TESTED ~
k~OZIGIINTERVAL-'&c~- 5534-9711 fax (509)534-9755 ~
P; 5' LOCATION DEPTH ~ r SAMPLE LOG #
PREWASK . . r POSTWASH. -
TARE I.D. TARE I.D. ~
WET - TARE' b4S` ° DRY - tARE
DRY TARE -(:~..11,D TARE
WATER DRY SOII
TARE WASHOUT
DRY SOIL -
. M[]ISTURE CEINTENT
. . . ~
~ CUl1~It.AT111E l t l . - '
$V& rVBMRETNM waw % Rffl1M 'GP~tO ~ S~PI:CtF1Ca~T~ON,
,
. ,
~ 6' SQUARE
4-rV "s f!)
'
g I-xq?"QL%K1 -N co -
, .
, r~ ;
~~s-tedAR
L e> t , cc, ~ .
~ ~ . ~~d Co~~ ~
N8to
o
• ~I `2~~~ I -7 . , .
. ~
U.S. NO. 60'
4-o Lj
.
U.S. N0, 100 -77
U.S. N0. 200 94
. PAN
~ AN & UT 3A► ~ ~ ~ . .
~ -7
SAMPLED BY: ) L S TESTED BY:__p L~ CHECKED BY: J LJ REYIEWED BY:
V:1 1•26-00
. • . . ,
~ ~ ~ ~ ~ ~ ~ ~ ~ ~ ~ ~ ~ ~ ~ M EML
3" 3/4" #4 #10 #20 #40 #100 #200
100
0
90 - 10
80 20
~ p
P 70 - ~
e ~ 30 e
r
r
c
c 60 -
e 40 e
n
n t
t
50 - 50 R
P
e
a t
g 40 - . 60 a
s
i
i
n 30 n
70 e
9 d
20 - - 80
10 90
0 - - r-~-~--r , , 100
100 10 1 0.1 0.01 0.001 ~
GRAIN SIZE (mm)
UNIFIED SOIL COARSE FINE COARSE MEDIUM FINE
CLASSIFICATION GRAVEL GRAVEL SAND SAND SAND FINES
SYSTEM
~ Sample Identification: Sample Description: ~ Lab
TP-5, TS-1 @ 1.5 feet Silty Sand (SM) - Alluvium No 393 TP5IS1
~
~
10 GRAIN SIZE Nroject: 16th Ave. & Felts Pavement Design
Locatian:
. REPORT Spokane, Washington
NQRTH*VIIEST Job No.:
~ ~ S000198 oate: 5126/00
LABORATORY REPORT ~ pROJECT:
NORTHWEST GRAINSIZEANALYSIS PROJECT NUMBER: So o a
3628 EAST FERRY ASTM C117 DATE REC'D
SPOKANE, WA 99202 ~
~(S09)534-9711 fax (509)534-9755 ~ .~4SHT0 Tll ~ 777 DATE TESTED
BORIIN(3 / INT'ERVAL~s S
LOCATTON DEPTH,~. ' SAMPLE LOG #
. ~
,
~ PREWASH POSTWASH.
TARE I.D. ' '7~ TARE I.D. -Wi7`
WET - TARE • ~ DRY - 'CARE
DRY - TARE ~ TARE '2-Z-~ • 0 ~ . - ~
WATER DRY SOi~L
TARE ?2). 0 ~ WASHOUT
DRY S13IL
. Mt]ISTURE ~CONTENT
t l l t ~ ~
CUMUL
~ ~ % RETAHM %PASSNO M E/MTMNw .
~ i .
~ 6' SQUARE
. , ;
Lj, ~ L+ , 4
~
Qlb Z_ , 4
s
~ 3 . L~
U3
L,>
~ ' , .
Z 2~iI2 , l ~ Co ,P-, .50. Z . . ~ .
07, o ~'2o,1
u.s. No. 60
U.S. No, ioo . 2 ~ ~ „ ~ ~.o • ~ .
u:s, No. zoo , ~ ~ • , ~I ~ ~ I ~ o r..,
~ -
PAN C) ~ • ~ ~ ~
U AN &
SHOUT
SAMPLED BY: J LS TESTED BY: DLF CHECKED BY: J 1-S REVIEWED BrY: 1.41-
v:i i-26-o0
~ d
3" 314" #4 #10 #20 #40 #100 #200 .
100 I ~ ~ I ~ ,
~
90
10
80
1 20
P 70 ' P
e 30 e
r
'
r
c c e 60 - - 40 e
n
n
t t
50 - 50 R
P ~
e
a
S 40
t
60 a
s
i
i
n
n 30
. 70 e
9 d
20 80
10 - 90
p - ~ - r-------- ~ 100
100 10 1 0.1 0.01 0,001
GRAIN SIZE (mm)
UNIFIED SOIL COARSE - FINE COARSE MEDIUM FINE
CIASSIFICATION GRqVEL GRAVEL SAND SAND SAND FINES
SYSTEM
' Sample Identification: Sample Description: Lab
TP-6, TS-1 @ 1.5 feet Silty Sand (SM) - Alluvium No 393 TP6lS1
,
, , .
GRAIN SIZE Project: ~ 16th Ave. & Felts Pavement Design
Location:
~ REPORT Spokane, Washington
NORTHVIIEST Job No.: oate:
~T~ S000198 5126100
.
oy
' ' "0 6~~c 9
- ~ ~
~ o
NORTHWEST
)une 152 2000 SO/LS, TEST/NG & lNSPECT/ON
~ STI W.O. # S000198 .
CLC Associates .
707 West 7' Avenue, Suite 200
Spokane, Washington 99204
Attention: Mr. Doug Desmond Re: Addendum to Soil Classification for Pavement Design Recommendations
16* Avenue Residential Development Pavement Design
Spokane County, Washington Dear poug: STI Northwest is pleased to submit this revised soil- classification for pavement design purposes for the proposed residential development to be located southwest of 16th Avenue and Felts Road in Spokane County,— Washington. This revi.sion is based on additional laboratory testing conducted on a representative subgrade soil sample.
The soil classification, as described in our June 6, 20001euer, consists of SILTY MEDIIIM SAND (S11) and
SLIGHTLY SILTY, MEDIUM SAND (SP-S11). A CBR test was conducted on a representative subgrade
sample taken from the approximate site ceirter at a depth of 2 to 3 feet. The testing mdicated a CBR ranging
from 11 to 17, varying with compaction, for the sample. Using the low CBR of 11 and converting this value
to Resilient Modulus, we calculate a Resilient Modutus of 16,500 psi. To account for poterrtial variability
of the subgrade soils (using a safety factor of 1.5), we recommend using a Resilient Modulus of 11,000 psi 'for pavement design purposes. CBR test resuhs are attached.
The conclusions and recommendations presented in this revised letter aze based, in part, on the explorations
that we performed for this study and our additional laboratory testing. Therefore, if variations in the ' subgrade conditions are observed at a later time, we may need to modify this letter to reflect those changes.
We appreciate the opportunity to be of service on this-project. If you have any questions regarding this letter .
or any aspects of the projed, please feel free to contact our office.
~
Sincerely, ~ Q~aLpc -
STI Northwest ,~Q►~p4 ~~,o'~
y • ~ .
i
.
/ s900e
EmRES 061141 01 1
Jay W. Logan, P.E. -
Geotechnical Engineer 3628 E. Ferry • Spokane, WA 99202 • Phone (509) 534-9711 • Fax (509) 534-9755
~r ~ ~ ~ r ~ ~w r~rr ~ r■r ~ ~r ~ ~r r r ~ ~
CBR Test @ 121.2 pcf - Site Center @ 2 to 3 feet
16th & Felts Residential Development - STI # S000198 jVrj NORTHWEST
900 800 -
700
600 ` .
a
500
d
~ .
~ N •
~ 400 I
L
a 300 /
. ~ zao r I I ~ _ io~ I~~~~f_ S . .
.
100
0 ' .
0 50 100 150 200 250 300 350 400 450 500 550 600
Penetration - inches x 0.001
~r r ~ r r ~ r~ ~ r■r ~ ~ ~ ~■r ~ ~ ~ ~■ir ~ ~
CBR Test @136.3 pcf - Site Center @ 2 to 3 feet
16th & Felts Residential Development - STI # S000198
N'ORTHINES.T
700 600 .
500
N . '
a 400
m ~ .
~
N
d 300 0.00~
L
a
200 , .
C~~.~
~
100'
o , 0 50 100 150 200 250 300 350 400 450 500 550 600 650
. Penetration - inches.x 0.001
~r ~ ~ ~ ~ ~r ~ . ~r r ~■r ~ r r■r ~ r ~ ~ ~ ~
CBR Test @ 144.0 pcf - Site Center @ 2 to 3 feet. . 16th & Felts Residential Development - STI # S0.00198
NORTHWEST
900 800 700
600 ~
y I
~ 500
a~
~
~
~ 400 ~
~
a
300
200 I I
~~K - 1 DO x I1d ~s' ~
. /
100 /0 o0 ; = I / . ~
0 z . . . . . . . . . . . . . . .
0 50 100 150 200 250 300 350 400 450 500 550
Penetration - inche.s x 0.001
. -Y
16-22 CNIL ENGINEERING REFERENCE MANUAL ~~F I
;
~
alent. Therefore, the gravel equivalent thick- step 4: Choose the base and subbas
ness of the subbase is Emulsified asphalt base mixtur,e~s .
into three types. Type
3.6 - 2.0 =1. 6 f t base ma de wit h processed deris'-g~ ,
gregates. Type II bases are mad'e 2!' I
The subbase thickness is processed, crusher-run, pit-run,;o
1.6 aggregates. Type III bases are_ ,
t3 f - 1.6 ft sands or silty sands. Both type~~ ,
1•0 III can be either plant or roa,d '
.
Untreated aggregate subbase mat~ .
asphalt concrete o.56' also be used. Special quality a~
mum strength requirements a 1
29 PP Y:
base ~ 1.0instances.
r~`~~,• .=~-•s
ste 5: Use table 16.22 or table 16.23
P to des~
~.so` Pavement. If the EAL or approximat subbase ~
ber of trucks places the design betwee
fic classes, interpolation between thickn
in the tables is allowed. • a'~" basement soit "
/ a ~ ~~~k.."t^•Y~ tS' tn !
24 DESIGNING PORTLAND CEMENT '
CONCRETE PAVEMENT
23 FULL-DEPTH ASPHALT PAVEMENTS-
SIMPLIFIED ASPHALT INSTITUTE On projects with three or more lanes in one directi.~, METHOD27 separate designs usually are made for the inside a.,
outside lanes. This results in steps at the bottoms ~ pavement and base. It is cheaper to construct steppe step 1: Determine the 20-year, 18-kip equivalent
r' aacle loading (EAL) for the pavement. sections than uniform or tapered sections, which resu~
in increased soil removal. However, in order to provide
step Z: Use table 16.20 to convert EAL to a traffic a uniform grading plane, it is permissible to increase t
class. thickness of the subbase under the inside lanes.30 This
;total thickness of subbase should be used to design th~
step 3: Use table 16.21 to classify the subgrade soil
into poor, medium, or good-taexcellent cat- pavement for the inside lanes.
egories.
cement
concrete .
pavement
Table 16.21 1 subbase asphalt
ncrete Subgrade Soil Categories . •o • , _ 1 , ~
E
~ w;~.~;~' ' •'r-• . . , . l s~,
typiCal values a g eg te
t• resilient baser~~
u..,;..
=d °w. ~^~:a ;r>,~•:M'tes; z::
categorY modulus28 CBR Rvalue
basement so~l.._ . r'•.:>:.
treated~...x~;Y~W
4os~'
. : . ' •
~ poor 4500 psi 3 6 k:s~ ~
z.r „ ' 0. 4 :.....n.}v .
'..Q.A{`n%eL~ti~...i.-?T~YV Ai.r 44 .r ~ri.pi•ir1:J:v1i L"J
ti... __J_.OGW}...•.s.Ln ~.:C:^. r.w ._...~r$L~rv4>': .^{'v~ ~
- medium 12,000 8 20
good-to-excellent 25,000 17 43 Figure 16.13 Typical Portland Cement
Concrete Section
. 27 This method cannot be used to design pavement sections with
asphalt concrete directly over untreated aggregate bases. 29 Specifically, untreated aggregate must have a minimum CBR
of 20 or a minimum R-value of 55 to be used as a subbase. It
28 The resilient modulus is the same as the modulus of elasticity must have a minimum CBR of 80 of a minimum R-value of 78 to
of the soil. It is not the same as the modulus of subgrade reac- be used •as a base. Other requirements exist also. .
tion, k, although the two are related. For positive values of the
resilient modulus, MR ~ k X 19.4. The resilient modulus is also 30 If the subbase is omitted, as it is in many rigid pavement
approximately 1500 times the California Bearing R,atio (CBR). designs, increase the thickness of the base.
Plan~~ ' -
10' ~tlh hvc- Enoee&ll .
~ce =
Ar ~ -
~
~ = = .
, r..
CLC S~ ~,9,~n~ZO4
~,~ates7 ~ (5~)
45~ ~ tP►x ~d . _
tSa91'~5$"6 W."`
~000198 -
v, d!b ►y
ex~ - CoKv~n5
~ - } -
ti
E t
► << ~ ~ -
~ ; t ~ ^ t ~
1 ti
t
1
i ~ ~ ► ~
ti ~ - '
1
i
1 ~
t {
►
,
►
~
a--~ ► ~
4 4
"1~
~
~
T
to
# I-s
- ► ~ ; l
'
1
' STORM DRAINAGE ANALYSIS
FOR
V C D
0 C T 09 Z~0O
DISHMANCOMMQNSJIqIE GI
NEER
SPOKANE COUNTY
S~ •
~
September 2000
CLC ASSOCIATES INC.
707 West 7`" Avenue Suite 200
Spokane, Wa 99204
1
(509)-458-6840
1 -
This report has.been prepared by the staff of CLC Associates Inc. under the direction of the
- undersigned professional engineer whose seal and signature appears hereon. This storm
drainage analysis has been completed in co~ ~ ith the Spokane County Guidelines for Stormwater Management.
WASy~ O
22916 Q
~~0 9F413TE~~0
~
NA1.
~ EXPiaES:
CLC Associates Inc. Dishman Con:mons
'
'
,
PURPOSE .
' The purpose of this report is to determine the extent of storm drainage facilities,
which will be required to dispose of stormwater runoff created by the improvements of
the proposed project. In accordance with the Spokane County Guidelines for
Stormwater Management, the storm drainage facilities on this project will be designed
to dispose of runoff from a ten-year design storm and the first one-half inch of runoff
from all road impervious surfaces will be treated in grass infiltration areas (`208'
swales).
' ANALYSIS METHODOLOGY
The Rational Method, which is recommended, for basins less than ten acres in
size, will be used to determine the peak discharges and runoff volumes. The Bowstring
Method will be used to evaluate the adequacy of the drywells and storage capacities.
All relevant calculations have been included in the appendix of this report.
PROJECT DESCRIPTION
Dishman Commons is a 30-lot subdivision (on 10.3 acres) located in Section 29,
T 25 N, R 45 E W.M. in Spokane County. The proposed improvements include the
necessary sanitary sewer, water, road and storm drainage facilities. The storm drainage
disposal and treatment is being accomplished in grassy swales that are located on
either private property or within the public right of way. The topography on the site
, slopes moderately from east to west.
Sheet 75 of the Soil Survey of Spokane Countv Wa. shows that the soil type for
the area of the proposed project is: McB - Marble sandy loam, 0 to 8% slopes: This soil is a somewhat excessively
' drained soil. Surface runoff is slow, and there is little or no hazard to erosion.
This soil type is pre-approved for the use of drywells in accordance with
the Spokane Countv Guidelines for Stormwater Manaaement.
CLC Associates Inc. Dishman Commons
I CALCULATIONS
' The 10-year peak flows for the individual basins on the project were calculated
using the Rational Method and the Intensity Duration Frequency curves for Spokane,
Medical Lake, Reardon, Cheney and Rockford areas.
Tabulated in the appendix is the total area, road impervious area, runoff
coefficient, peak flow, `208' swale volume requirement, Bowstring volume requirement,
and number and type of drywells required for each of the basins. It is assumed for the
purposes of the swale design that a double-depth drywell has a capacity of 1.0 cfs and
a single-depth drywell has a capacity of 0.3 cfs.
Grate Calculations
The inlets shown for basin A, C3, C6 & C7 are in a sump condition.
Spokane County Type 1
From 4-1.1 of Guidelines,
Q= CPH312 , where C= 3.0, P= perimeter of grate, and H= depth of water.
Perimeter of grate = 6.13 ft, P/2=3.065ft.
Q= 3(3.065)(.50) 3/2 = 3.25 CFS
From the Basin Summary Table in the appendix of this report these grate capacities are adequate for the peak flow in each basin. The catch basins in a sump
condition have been sized to accommodate by-pass flow from the catch basins on a
continuous grade.
The rest of the inlets shown on the plans and Basin Map are on a continuous
grade, the grate capacity calculations have been included in the appendix of this report.
STORMWATER DISPOSAL
The stormwater generated by the project will be disposed of in the `208' swales
areas and drywells as indicated on the improvement plans and basin map. The
stormwater along 16th Avenue will be collected and piped to pond B, it should be noted
that the actual crown on 16th Avenue is actually 5-6' south of the existing painted
centerline stripe which drastically reduces the actual basin size so that the amount of
' stormwater in that basin will be much less than shown in this report. The stormwater for
the rest of the basins will be routed to ponds either in a piping system or by curb drops.
The `208' swale volume as indicated on the Basin Summary Table is provided at a
depth of six inches for all ponds.
CLCAssociates lnc. Dishman Comn:ons
~ -
. Sediment Yield, Ffaxman Method
Project Name: DisTh''m"~an Co~n
IPE Project No. 9935
Engirieer: Tim Schwab
Trap ID Trap w! Largest Subbasin USC Soil Classification: P Variable
Data Input: Avg. Annual Precip., P= inches
Avg. Annual Temp., T= 48 Degrees Fahrenheit
Avg. Watshed Slope, X2 = 4 percent X2
Particles Courser than 1 mm = 30 Percent/72 = X3
Percent Clay in Soil = 10 percent
2-yr Storm, Square mi., Q= 143 cfs X5
Basin Size, A= 10.3 a c r e s
Time Period, T = months
pH of soil = 8<-- assume worse case
(P/T)/1.43 = 0.31 X1
110 X4
SQRT(Y) = 40.90
Y= 1672.70 tons/square mile per year
Y' = 0.218 tons/(acre*month)
Y' for Basin = 4.49 tons/(basin*T)
Volume of Sediment, D= 75 cubic Ft.
a'-IO' x io' 7-omPo2*y Pp.ud ro2 seV,,y,--r,c,T C,v/GG HOGD 7-OVe
voL,veyre oF sEO'/ytfA? /LE0vlIL,054 hi f} DEPT~/ of l,05S 77~/i~it1
a' S
WASy~ti
~sS~4NAL
EXPIRES: 9/~ /o/ ~
r f
99353 CLC Associates, Inc. 6/16/2000
CLC ASSOCIATES, INC. ~
.
PROJECT INfORMATION TYPICAL SECTION DATA
Project: DISHMAN COMMONS Roadway half wrdth ENTER-> 20' PAVED WIDTH
Job No.: 99353 Road Name ENTER-> FELTS ROAD
Disc.No.: Lefr or Right ENTER-> LEFT
Fife Name: FELTS.PVMTDES.WB2 Edge Type TYPE'B' CURB & GUTTER
Calculated By: EMT Station Intervaf ENTER-> 50
I I MlNIMUM MAXlMUM OIST. ~ DlST FROM ~ E.P. ELEV. E.P. ELEV.
C/t TO SLOPE EDGE CENTERLlNE 1(•4.5% from (•2% from SEIECTED Edge Pave.
C/L % SLOPE SAWCUT SAWCUT ~ C/L TO PAVEMENT TO EOP ~ sawcut to sawcut to E.O.P. to Gutter Edge of Pv. TOP OF
STATION ELEVATION C/L ELEVATfON (fEET) ~ SAWCUT % SLOPE ( FEEn ~ ed.qe of Pv) edge of pv) ELEV. % GRADE %GRADE CURB EL.
I I I I I I I I I I I I I
500.00 1 2028.78 1 ERR 1 2028.72 ~ 2.00 ~ -3.00 1 ERR 1 18.50 ~ 2027,98 ~ 2028.39 ~ 2028.20 ~ •3.15 ~ ERR ~ 2028 59
550.00 ~ 2029.18 ~ 0.84 ~ 2029.13 ~ 2.00 ~ •2.50 i 0.82 ~ 18.50 ~ 2028.39 ~ 2028.80 ~ 2028.78 ~ •2.12 ~ 1.16 ~ 2029.17
600.00 ~ 2029.66 ~ 0.96 ~ 2029,63 ~ 2.00 ~ •1.50 ~ 1.00 ~ 18.50 ~ 2028.89 ~ 2029.30 ~ 2029.08 ~ •3.33 ~ 0.60 ~ 2029,47
654.00 ~ 2030.16 ~ 1.00 ~ 2030.13 ~ 2,00 ~ -1.50 ~ 1.00 ~ 18.50 ~ 2029.39 ~ 2029.80 ~ 2029.48 ~ -3.94 ~ 0.80 ~ 2029.87
700,00 ~ 2030.63 ~ 0.94 ~ 2030.54 ~ 2.00 ~ -4.50 ~ 0.82 ~ 18.50 ~ 2029.80 ~ 2030.21 ~ 2029.88 ~ -4,00 ~ 0.80 ~ 2030.27
750.00 ~ 2030.67 ~ 0.08 ~ 2030.63 ~ 2,00 ~ -2.00 ~ 0.18 ~ 18.50 ~ 2029.89 ~ 2030.30 ~ 2030.28 ~ -2.12 ~ 0.80 ~ 2030.67
800.00 ~ 2031.50 ~ 1.66 ~ 2031.47 ~ 2.00 ~ -1.50 ~ 1.68 ~ 18.50 ~ 2030.73 ~ 2031.14 ~ 2031.12 ~ •2.12 ~ 1.68 ~ 2031.51
I I I I I I I ( I I I I I
J:IDOCUMENT1993531FELTS,PVMTDES.QPW 1 ' 05103100
CLC ASSOCIATES, INC. ~
PROJECT lNFORMA TION TYPICAL SECTION DATA
Project: OISHMAN COMMONS Roadway half width ENTER-> 19.5' PAVED WIDTH
Job No.; 99353 Road Name ENTER-> 16TH AVENUE
Disc.No,: Leff or Right ENTER-> RIGHT
File Name: 16THS.PVMTDES.W82 Edge Type TOP OF CURB
Calculated By: EMT Station Interval ENTER-> 50
MINIMUM MAXIMUM
DIST. DISTFROM E.P. ELEV. E.P. ELEV.
SECIL TO % SLOPE EDGE SECTIONLINE (4.5% from (•2% from SELECTED Edge Pave.
SECIL % SLOPE SAWCUT SAWCUT SECIL TO PAVEMENT TO EOP sawcut to sawcut to E.O.P. to Gutter Edge of Pv. TOP OF
STATION ELEVATION SECIL ELEVATION (fEET) SAWCUT % SLOPE (FEET) edge of pvJ edge of pv) ELEV. % GRADE %GRADE CURB EL.
500.00 , 2000.32 ' ERR ~ 2000,09 ~ 17.00 ~ •1.35 ~ ERR ~ iBAO ~ 2000A5 ~ 2000.07 ~ 2000.07 ~ •2.00 ~ ERR ~ 2000.46
550.00 ~ 2001.65 ~ 2.66 ~ 2001.46 ~ 17.00 ~ •1.12 ~ 2.74 ~ 18.00 ~ 2001.42 ~ 2001.44 ~ 2001,44 ~ -2.00 ~ 2.74 ~ 2001.83
600.00 ~ 2002.69 ~ 2.48 ~ 2002.80 ~ 17.00 + -0.53 I 2,68 ~ 18.00 ~ 2002,78 ~ 2002.78 ~ 2002.78 ~ -2.00 ~ 2,68 ~ 2003.17
650.00 ~ 2003.69 ~ 2.00 ~ 2003,69 ~ 17.00 ~ •1.18 ~ 1.78 ~ 18.00 ~ 2003.65 ~ 2003.67 ~ 2003.87 ~ •2.00 ~ 1.78 ~ 2004.06
700.00 ~ 2004.36 ~ 0.94 ~ 2004.22 ~ 17.00 I -0.82 ~ 1.06 ~ 18,00 ~ 2004.18 ~ 2004.20 ~ 2004.20 ~ •2.00 ~ 1,06 ~ 2004.59
750.00 ~ 2005.00 ~ 1.28 ~ 2004.79 ~ 17.00 ~.-1.24 ~ 1.14 ~ 18,00 ~ 2004,75 ~ 2004,77 ~ 2004.77 ~ •2.00 ~ 1.14 ~ 2005.16
800.00 ~ 2005.85 ~ 1.70 ~ 2005.67 i 17.00 ~ •1.06 ~ 1,76 ~ 18,00 ~ 2005.63 ~ 2005.65 ~ 2005.65 ~ -2,00 ~ 1.76 ~ 2006.04
850.00 I 2006.85 I 2.00 I 2008,60 I 17.00 ~ •1.47 I 1,86 ~ 18.00 I 2006.56 I 2006.58 ~ 2006.58 ~ -2.00 ~ 1.86 I 2006.97
900.00 I 2007.94 I 2.18 I 2007.73 ~ 17,00 I -1.24 ~ 2 26 ~ 18.00 I 2007.69 I 2007.71 ~ 2007 71 I -2.00 ( 2.26 ~ 2008,10
950.00 I 2009.24 ~ 2.60 ~ 2009.05 I 17.00 I •1•12 ~ 2.64 I 18,00 I 2009.01 I 2009.03 ~ 2009.03 I -2.00 I 2.64 ~ 2009.42
1000.00 I 2010.63 I 2.78 ~ 2010,46 I 17.00 I -1,00 I 2.82 I 18.00 I 2010.42 I 2010.44 I 2010,44 I •2.00 I 2.82 I 2010.83
1050,00 I 2012.06 1 2.86 I 2011.87 ~ 17.00 I •1.12 ~ 2.82 I 18 00 I 2011,83 I 2011.85 I 201185 I •2 00 I 2.82 ~ 1012.24
1100,00 I 2013.46 I 2.80 ~ 2013.20 I 11.00 ~ -1.53 I 2,66 I 18.00 I 2013,16 I 2013.18 12013.18 1 •2.00 I 266 ~ 2013.57
1150.00 I 2014.96 I 3.00 I 2014.74 I 17,00 ~ -1.29 I 3.08 I 18.00 I 2014.70 I 2014.72 I 2014.72 I •2 00 I 3,08 1 2015.11
1200.00 ~ 2016 59 ~ 3.26 I 2016,44 ~ 17.00 I -0.86 1 3.40 ~ 18,00 I 2016.40 1 2016.42 I 2016.42 I -2.00 I 3.40 1 2016.81
1250,00 I 2018.39 I 3,60 I 2018,28 ~ 17.00 I -0.65 I 3.68 I 18,00 I 2018,24 I 2018.26 I 2018.26 I •2.00 I 3.68 I 2018.65
1300.00 I 2020 29 ~ 3.80 I 2020.13 I 17.00 ~ •0 94 I 3.70 I 18,00 1 2020.09 I 2020.11 ~ 2020.11 I •2.00 I 3.70 1 2020.50
1350.00 I 2022.19 I 3,80 I 2022.01 I 11.00 I -1.06 ~ 3.76 I 18.00 I 2021.97 ~ 2021.99 I 2021.99 I •2.00 I 3.76 I 2022.38
1400.00 I 2024,11 j 3.84 I 2023.94 1 17.00 I •1,00 ~ 3.86 I 18.00 I 2023.90 ~ 2023.92 I 2023.92 I -2,00 I 3.86 I 2024.31
1450.00 ~ 2026,02 ~ 3.82 1 2025.85 I 17,00 I -1.00 I 3.82 I 18.00 1 2025.81 I 2025.83 I 2025.83 I •2•00 I 3.82 1 2026.22
1500.00 1 1027,81 ~ 3.58 I 2027.60 I 17.00 I •1.24 I 3.50 I 18.00 I 2027.56 ~ 2027.58 I 2027.58 I •2.00 I 3.50 1 2027.97
1550,00 I 2029.46 I 3,30 I 2029.23 I 17.00 I -1.35 I 3.26 I 18.00 1 2029.19 ~ 2029.21 I 2029.21 I -2.00 I 3.26 I 2029.60
1600.00 I 2030,91 I 2.90 I 2030.64 I 17.00 I -159 I 2,82 I 18.00 I 2030.60 ~ 2030.62 I 2030.62 I •2.00 I 2.82 2031.01
1650.00 I 2032.31 ~ 2.80 I 2032.02 I 17.00 I -1.71 I 2.76 1 18.00 I 2031,98 ~ 2032.00 I 2032 I •200 I 2.76 2032.39
I I I I I I I ~ I 1 I I I
J:IDOCUMENT199353116THS,PVMTOES.QPW 1 05l03100
GtC ASSOCIA TES, lNC. ~
PROJECT INFORMA TlON TYPICAL SECTION DATA
Projecf: DISHMAN COMMONS Roadway hafi wrdth ENTER••> 14' PAVED WIDTH
Job No.: 99353 Road Name ENTER--> 16TH AVENUE
Disc.No.; Left or Right ENTER- LEFT
File Name: 16THN.PVMTDES.WB2 Edge Type EDGE OF PAVEMENT
Cafculated By: EMT Station lnterva! ENTER- 50
I I MlNIMUM MAXIMUM DIST. ~ DfST fROM ~ E.P. ELEV. E.P. ELEV. C/L TO SLOPF EDGE CENTERLlNE 1(-4.5% from irom SELECTED Edge Pave.
C/t % SLOPE SAWCUT SAWCUT ~ C/L TO PAVEMENT TO EOP ~ sawcuf to sawcut to E.O.P. to Gutter Edge of Pv. TOP Of
STATJON ELEVATION C/L ELEVATION (FEEn ISAWCUT % SLOPE (FEE7) ~ edge of pv) edqe of pv) ELEV. % GRADE %GRADE CURB EL.
400.00 ~ 1998.30 ~ ERR ~ 1998.19 ~ 6,00 1 -1.83 ~ ERR ~ 14.00 ~ 1997.83 ~ 1998.03 1998.05 ~ •1.75 ~ ERR ~ 1998.44
450.00 ~ 1999.15 ~ 1.70 1999.11 ~ 6,00 I •0.67 ~ 1.84 ~ 14,00 ~ 1998.75 ~ 1998,95 ~ 1998.95 ~ •2.00 ~ 1.80 I 1999.34
500.00 ~ 2000.30 ~ 2.30 2000.34 ~ 6.00 ~ 0.67 ~ 2.46 ~ 14.00 ~ 1999.98 ~ 2000.18 ~ 2000.18 ~ -2.00 ~ 2.46 2000.57
550.00 ~ 2001,63 ~ 2.66 ~ 2001,59 ~ 6,00 ~ -0,67 ~ 1.50 ~ 14,00 ~ 2001.23 ~ 2001,43 ~ 2001.43 ~ •2.00 ~ 2.50 2001.82
600.00 ~ 2002.65 ~ 2.44 ~ 2002.62 ~ 6,00 ~ •3.83 ~ 2,06 ~ 14.00 ~ 2002.26 ~ 2002,46 ~ 2002.46 ~ •2.00 ~ 2.06 ~ 2002.85
650.00 ~ 2003.67 ~ 2,04 ~ 2003.56 ~ 6.00 ~ -4.83 ~ 1.92 ~ 14,00 ~ 2003.22 ~ 2003,42 ~ 2003.42 ~ -2.00 ~ 1.92 ~ 2003.81
700.00 ~ 2004.34 ~ 0.94 ~ 2004.14 ~ 6.00 ~ •3.33 ~ 1.12 ~ 14,00 ~ 2003.78 ~ 2003.98 ~ 2003.98 ~ •2.00 ~ 1.12 ~ 2004.37
750.00 ~ 2004.96 ~ 1.24 ~ 2004.79 8,00 I •2.83 I 1.30 I 14,00 I 2004.43 I 2004,63 2004.63 I •2.00 ( 1.30 ~ 2005.02
800.00 I 2005.82 I 1.72 I 2005.78 8.00 I -0.87 I 1,98 14.00 I 2005.42 I 2005.62 2005.62 -2.00 ~ 1.98 ~ 2006.01
850.00 I 2006.83 I 2.02 I 2006.84 I 6.00 I 0,17 I 2.12 14.00 I 2006.48 I 2006.68 1 2006.66 •2.00 I 2,12 I 2007.07
900.00 ~ 2007.94 I 2•22 I 2008.01 I 6,00 I 1,17 1 2.34 ~ 14.00 I 2007.65 1 2007.85 1 2007.85 ~ •2,00 ~ 2,34 ~ 2008.24
950.00 ~ 2009,24 1 2.60 1 2009.19 1 6.00 I -0.83 I 2.36 I 14.00 I 2008.83 1 2009.03 I 2009.03 I •2.00 ~ 2.36 ~ 2009.42
1000.00 I 2010,59 1 2,70 1 2010.50 1 6.00 I •1.50 I 2.62 I 14.00 I 2010.14 I 2010.34 I 2010.34 I •2.00 I 2.62 I 2010.73
1056.00 I 2011.99 I 2,80 I 2011.81 I 6.00 I -3.00 I 2.62 I 14.00 I 2011.45 I 2011.65 I 2011.65 I -2.00 I 2•62 I 2012.04
1100.00 I 2013.40 I 2,82 I 2013.23 I 6.00 I -2.83 I 2,84 I 14.00 I 2012.87 I 2013.07 I 2013,07 I -2 00 I 2.84 I 2013.46
1150.00 ~ 2014.80 I 2.80 I 2014.72 I 6.00 I •1.33 I 2.98 I 14.00 I 2014.36 I 2014.56 I 2014,56 I -2,00 I 2•98 1 2014.95
1200.00 I 201655 I 3.50 I 2018.43 I 6.00 I •2.00 I 3.42 I 14.00 ~ 2016.07 I 2016.27 I 2016,27 I •2.00 I 342 I 2016.66
1250,00 I 2018.35 1 3.60 I 2018.25 I 6.00 I •1.67 3.64 I 14.00 I 2017.89 I 2018,09 I 2018,09 I -2,00 I 3.64 1 2018.48
1300.00 I 2020.23 I 3.78 I 2020.09 I 6.00 I •2.33 3.68 I 14.00 I 2019,13 I 2019,93 I 2019.93 I •2,00 I 3.68 I 2020.32
1350,00 I 2022.13 I 3.80 I 2021.99 I 6.00 I -1.33 I 3.80 I 14.00 I 202163 I 2021.83 I 2021.83 I •2,00 I 3.80 I 2022.22
1400.00 I 2024.05 I 3.84 1 2024,01 I 8.00 I -0.67 I 4.04 I 14,00 I 2023,65 I 2023.85 I 2023,65 I -2,00 I 4.04 1 2024,24
1450.00 I 2025.99 I 3.86 I 2025.91 I 6.00 I •1.33 I 3.80 I 14,00 I 2025.55 I 2025.75 I 2025 75 I -2,00 I 3.80 I 2026,14
1500,60 I 2027,76 I 3.54 1 2027.71 I 6.00 1 •0.83 1 3.60 1 14,00 1 2021,35 1 2027.55 1 2027.55 1 •2.00 1 3.60 1 2027.94
1550.00 I 2029,35 I 3.18 I 2029.10 I 6.00 I -4.17 I 2•78 I 14,00 I 2028.74 I 2028.94 I 2028.94 I •2.00 1 2.78 1 2029 33
1600.00 I 2030,80 I 2.90 I 2030.49 I 6.00 I -5.17 I 2•78 I 14,00 I 2030.13 I 2030.33 I 2030.33 I •2•00 1 2.78 1 1030.72
1650.00 I 2032,20 I 2.80 I 2031.88 I 6.00 I •5.33 I 2.78 I 14,00 I 2031.52 I 2031.72 I 203172 I •2,00 I 2.78 1 2032.11
1700.00 I 2033,38 ~ 2.36 1 2033.28 1 6.00 I -1.87 I 2.80 I 12,10 I 2033.01 1 2033.18 I 2033.16 I •1.97 1 2,88 1 2033.55
1750.00 I 2033.84 I 0,92 I 2033.85 I 600 I 0.17 I 1•14 I 7.33 I 2033.79 I 2033.82 I 2033.63 I -1,50 1 1,34 1 2034,22
J:IDOCUMENT199353116THN.PVMTDES.QPW 1 05I03100
~ -
~ . -
~
~ •
' • ~ ~ ~
' . . i
~ Ll I Nid ~ - - - _
co,
am ~
~ ~ - - - ~
jj~
- - ~ ~ ~
CD
i
CL
CD
cq
~ (IrO +w~ IVOG-zO oOaZ/90190~6mP-ZJ3no~~6NLPkES~6skslO@fOld ~~e-IN{r
r
w,u. -~.J,..re~w~ ~n+rw.u ~•LVVei ~~..v~ir~.e~~! . +n7uuitin-:'o- Yf: 4,~..~ iee ¢~i~,r.:•iF,.w.~~: Nfi' cl"y..1 .n.:w~jta'n ~~~r:' r~ i l4 x* - K ley t e i
~ 1? ~ { ~ •~ry~ n,~ ~ _ ~ v~" 1~' J lPSaYA ~ 1l4.r..W:ld°n3'°" v~~6"e'9'Y~ '.`fl'~N'.d}5'$ t,,~Sit ~:S4MTr.r'PYfiY~l'itlvnS•nqC.l4Yq: Y~+'y~~~~.-'~^~~~1 y ~ ~ H 1.~ ,~r~ ; ~ t ''I ,~<<, ' ~ ~i ~~k'~ I I ' ` ~ ~ - ' ~ - ~ y ~ ~ g . .~4 ia ' il
i _ n
I~ l ' ~ I ~a ; ~ ~ i , l . , "
,Y, ~ I~ J' ~;F~''~~P:. H~ a~,' •,i ; 1~' +1 y i Y I. M1 '1Y' J~ I .I~ir ^7'r~r`~~t"~I ~'fI 4J ~Yli~ vr h~ a , •r W„ ~ , k ! ~ XY ~ .n 4 ;'~r.. , ~''~t~ - 4d S,. 1. ~ ~ i ~~1'~. ~~i.. `.t~ ~l .R 4 .a6 ~Y... ~~f ' j 1
~s! ~ y~'~~ t j r~~, ' • ~w,, i, ''F e~ ~.s:;,.,,~~;,1~ ~ c~ k rs"}w,, ~ ~W ~ ~ MI n!... 1 : i R~': t'i'•f"1 L ~1~ ~ f~v{ IaN~ ~ ♦ 1 7~ 5~°i f ~fkli ' r••`+S u u~ ' 4~~.a„'~ , e. ..~,a.,.. "`,'r.'~;~:'.'.r1:~{n~ v , bn' ,~p a' r~;..°.~ A, ~'~"v~.,Cn.- ,:,'''r'~ +.7;u. ~~5.;k~~'~L:,,, ,i. r ~_;r,+r,~: ~ f ~ ~Y~ .w.~~1~ ;~W~. I ~ Fi'r l 'y ~j ~.t r .i • ~ i - h p••~~4~~~~[,i i`;~;,{?,~~y.," y -ir:[`~rP.~ ~~4~ .y~'~ ~r"'`~ i ~~,~pi. ~ l. Yil i.'~~.]R' 'J.. 4a .ff:,.: ~ i~ ~.J ' R' .i.~y l~d~ A~.~ -7''~4: ,.R.r f., ~ } r~~f y~ 1'~ ' o v'~'+I '.k; ~i r:. , .-n .d q'' 'k I~` , wxJ .I; i r !?r ~ 4ti~ - ' ~1~ , - : y,' . ~ n ~n 4:~.~}~,h,4;ti~. ~.744~ d 4~ a:,t, i ,;~:s,A'-:.Z ,4~,.i~~ :",'M , r : !i ~ ~ 1r ~ q 1..,~ p,,, ^ i~y/I-0°l.., li'u,+_.'.~~~~.,:5',`. i.~~' _i',; ~ ~,~^'~L~'~~~vl; , L~,..'y,Yt,µ ! ~",:4-~`-.~~:,C...i~, ~ • 3; : i'''' .d"A ~ • : J " .s;. 7 ~4 . ~ r~ . •SZ~' ~ , _.h'4 - . r .y,, ' ~ .,r ~ ` .
i ~ 7 ;l'. ~ , ~ ' i T.- a: P;; ' 'r ~irti f?~ ~ 'r"~~~ 9 .~1~.~1~ e ~.,r,i'vy7.r',+'^!~~~ ~,Eil~ ~.~J~ - . , ,.:i '-ti:,{:i, ~.lFi~4\,~ '~ti` 'i"~irS,-:,:.'~ ' . ' . ~ ' , a{.Ln ,s~ ~Y~,~~~'~,~[.`~~r~,.~ ~ ,u'~ .i"~~,J{ ;..u~- I ~s~,.'~~~;~AN , , ,,,~.r,~, ,P'~ ;r;•,'~,~",i:,:T. , . 4i h4 e,J"r; i ^f'M ~Y,'~V~ ~'~y,~ J .9'~'~$~'1'~~r -v'f}~✓ '.Y~. i ~t ~ ♦ . .~f` ~a~~ S~I.~ ,~~..j ( i.. ~ . . ~ ~F I 1 ~~~Z. ~L~{.~~41 hia ;1~4i~~~r !.7~. ~".l~~.n'4.f'f•I~~p~ 'P - 5~^~'' ~ i . 1~ 'r _i ~ ' ~ 1 7~ 'i~yx6rri'F J~_ ,9r.ix~~i~~r~~y1':t n.~~Rl•: ':abl ~IT ~`r''. ~ • . ' , , ' . " .,~F~yX~~,4~~, c+1~+ 'hf~syi} ~n,~.'~`~~~i f ;~F,''~~16±4„L~;e~7r~~'"k•_~"Yl=::ti;_rm~c~, •'~T:r'~. . - ~ . ' , . . .
~,~.$eZ"~d „1~~.{~p"d' 1 , r,~ ~ ^':~'.~~`''~!~',6Y. - ti ~'r ~~1 . _ . , • ' •~77-~'1.}r~, Yi1~w{A.'4r~re~~4`~rl'r~Y~~!r~r; `t~: ~ . .~k . ~ , . '`~'1.:'}7'P;ti±• ;~~,_,i.~' ~'.J:~ifL'..a~ 'i ~ ~ ' , . _ .
' ~'i,'+~4:~~: ~M - V ~ `ki"3' ' " ' ~ , _ ~s-"~~#'~ ' ~ . ~.i~l ~ ; , ~ ,
(Joins ~hePt 74) r, 24~ N. I 25 N. _ _ ,~,r,, , ,r~~
r e 3 YI 1 r P 7_" ~ ~ T"r,'~ ~M .,`'N.'' d + ~ „ y ~°I ~'a,~~- ` :A . r~~~dy+# +f~~,~ ~ s~'+ iti + ` ` r, ~ ~~i'~~ ~;$7~~~[~ ~ u ~s i ~r„~k qq .
~ i ' ~ !~iri'', ' ~ , '1~ 'i" ~ ,~k.L I ~ k ~ . at: i r , {'~i~ , ~ } 9~ . $ 4 ~ J„s} A~~~I + f'+7J ~ ~ I
~ ~ ,r ~ ~~a.~" ~ ~~Y! i I~, ~ ' .y~ 4 ~u 4 L , ~ r n A p i? AM~ ti ' ~7y Y~a ~ ~ ~j~ r .
1 ,5 - -l, ' ~ ' ' ~ '7~ ^ il I . 1. +~i~ ~ ~ ni
~ ~ ~ y ~ ~ ~ ~ ~ ~ ~ ` ~ ~ ~ ¢ ~ ~ i~
'y' 4 ~~5 1,~ Ilh -i F 'kf ~7 ~i ! ~ ~ ~ b 'V 1~ ^ ~ Y.} i f ^b ;
I j. ~ i I Y~ I ! ~ _ ~ t - i 1 F~ b
e_ '~'i I 7 a ~ i ~~~l r ~ ;'Y~~~~f
~ ~ r y yu 7 7 ~ ' ~`4i I k~ i; K j~~
~ n r i. i `J, ~ ~ ~ i ~ ~ ~ ~ ~ ~5 " ~r+= I'
N• n,' ~yCW a a '.r~}~ ~F.i~'~~~ ~ p i -t f 1~a'~~ _ •e~ LaM~Y;`,~ W'f.7~'' ,
} 1~'~1 L~• 4 ~ ~ ~ ~~ii 7, * ' W { I`` ` ~ '~A~I ~ q ~j 2• ^4. 4' ,R • ~ I~~~jt~ i
~ ~ r I I ' ~ ~ i ~I ~{I WI ; I~ ' r y ~yJ ~1 - f
~ I , ~ y.
• ' S ' L i. k _ _ ,r
I ~ p a S ~ ~yFu ~ ~ ' ~ 'q, ,
~ r ~ ~ ~ I ~ J ~ N ~ i ' i
i' ~ ~ y„ ~ 4 a ~ tl ~ cy I ~f ~F ~
f ~ . ` ~y ~ ` ~ ' /i ~fi , R q I ~F C ~l ` % p 1~ • ~ ,~I• , '~T~LM1*~ + 1 ' Y :f • ~I ' ~ F l~ i `
S E,:d : a]'~,1,'~ } } ~tTS, ~ l - ! 4i q~ ` ~ ~ , ,y' {I ~ h l I 1' 7 i '4
'i, ~ ' i ~ y~ ~ ' ~ ~ . ~ ~r r 4 h~, ~ F,'~ i ~ ° ~ , ,:r,
~5 ~ x y, . t' f~ ` ~ ~F I i ~ ~ S ,'`r , . ' q , . , /~~a, , ~ •~i ~i , i ~ ~J i: ~ i
I ~ ' f tl~ ~ ~h~ ~ i•i ~ ' t ~ ~ti r a; :yi; r ~ r M'q
y h,. ! w t ~ ~ ~i I ~ ~ ~~P~~' , 1 y, ~ ~ ' t '4 ~ h , f _C~_ ~ y , ~ 7 I i ~
~n~ v ' 4 ~ ~ I ~ ~ N ' ~ - { x ~
~ ~ ~ ~ ~
~ ~ ~ F'~ 'T~ ~ ~ -~l
a ~ .ti ~ 1i r ~ , , ~
_ H„ ~ p { J r . , 9 y i I I
~ E ~ ~ 1 ' ' #f' ~ ' f ~ ~ ~ ~ } r ~ ~ 4 ~ ~1 r
~ f~ ~ ~ i / . y I . ~
~ ~ r, ~9/ `I L+ fA ~ ~ I yF n ~I,h I r` '~t,' , k' ~
~ ~ ~ Fr 0 i ~ ~ ~ ~ i ~ ~I , ~ I I ~ 4I ~ ` ~ I ~ ,3 '
r~,w ` ° ` F ~ I ~ o ~ ~ ~ ~ ~
~ ~ ~ ` f ~ a a ; '.,P q ~
7 t~ J .N~
~ ~ i_ I ' ~ ~ 1 ' ~ ~e~ ` ! ' S r ~~1 Z ! ~ ~ $ ri~.4 ~ :l'~ ~t+ i,~•~~`~ ~ ~ ~ ~ ITI
~ ~ p i ~ ' ' ~ ~ r 4~ dP ~ r ~ ~ ` ,~°F , , 4 ~
f ' _~r'',' r' d+ ~ r k ~~gC4~~,~I~ ~ ` ~p i - ~ r e,ai I`5~~,~.~~ wrS~~i~~.v ~ 1 ~~~J ~ ti -r { a ~
,q . A r '='~.i~~y'~71`1~~~~ ~ ~1L § L F X A1~;~,Rqy~~~ ''i5u,,"~ ~ i~~+ r ' J _ W
1 .~~?j ~~7"< 1h`"v'~~'r ~ I I ~ j"~. i~'~ . ~ f m 1~ '~~4'' J S „ ~ , 1 I ~ ~ ~i~YL~„ ~~j t~ I ~1 ± ,/u~ 'il ~ ~ r ~ j r,Y~ ~i~ h`.1' ~ I Y ~k .~i~ i~A`'S~`~ '7+i~;^'~I ~ ~ r~
1 p § ' 7 4~~ Y~~,~ iL~.~ ~ _ (L } ` i ~ ~ ~ . ' r w " ¢~S?r `w'~, 'h?~~~~ ~ a1. i ~ , ~ , r ''h i iV' . TV'' u$~ p J} ` q ~h r ~ , i^ ~i ~~n
u~ 5 ' it ~ ~ 7 ! ~ ~l~nr n~ J ~ ~ ~ * V ~ ~Y ~ q 'I ` 1; r. ti ' f , + ,
, ' ,i a u4 • 6 ~ ~ I; ~ ~ 4 ,~G ~ ~r ~ L I~ " ~ ~ ` 'F'E~-+ i ' 1 ~
_ ~ ' r ~ s ~ ~ sY~ rl,~' , . ~ I~ ~f •s~- .w"•f 1; ' _ ' ~ .d ~
~ F ~ 1 ~ ~ ~ 1 ~i I r, r ~ ; a~,n 4~ ~ ~f 'I
i ~ .i ~ ~ ~z i ~A~ ~ ~ll ~ ~Ps ~ ' . , „ ~ " V
' ~ry ' y 1 , "~r.. a1 ~ 'ir n,r"i5~ e ~ r - ' ~ ~ . . s~ ~ d,' ~P`~~ ~~~,k'' - r' , ~ ~ Y~. _ ~ , ~ ~ , , ~ j,~ ~ ~ i ~ : ;i, * ~ ~
4. t:~ ~ ~ ' + ~ q~'~ ~ i~;,~ ~ ; s' 4 . ` ~ ~ p ~ti'~; . ~ r, SY n
" ~ 1., , i ~7 ~ ~ , ~ tr'. r ~E T .4~ •r ~ ~ '~U ~ II ~ I ~ ~ F ' ~ Z~ ~ . ~ ~y ~ , • ~ ~ ~ ~I' ~ I •'~~y ,
~ u+ i ti . fi :V~~.
~ Q ~ ~ i. d ~ ' i. ~ ~ C? , ' ~ ' ~ . , . ~ ; ~ ~ , _ , ~ ~ ~ . Fh f~ ~'-F~,,W ~~,fs;, i ~ ~ tl' , 'r , r~ . ~ ~ ~ y~~ ati ~a`rYa~ . . , ~
m 'A . , ~T. ~ t t di +~I,W,` ~ S~C~ ;`N . I j ~•~-y h u .1 ~ ~ ~ d + , ~
~,i~ ~ ~ 4 o i` - ~ ~ ~ j~ iP ' _ i~~ 1" y Y~ ~ 5~ 3 ,n i' h 1 V~
Q ` ` ~ { l'~r~.a}, , ' r ~ ~ ~
q ,~I r~' ~ i r, ~ rj ~J'~I~~` ` f ~ ~ tR ~JV, ~ ~ , t `t YV 51~~1:.• ' w °r :SI ~ ~ ~ - f~~ ~ L;,~~. ~ ~ywr,'; ~ . N ~ t, . R . ~ u ~ ' ~ ~ `
~ ti '4~ ,r,~ , r~ { ~ ' ' f ~ I ~ ~ ' ~Q i ~~F • `i~, L~ j N~~~ j 1 I ;P N-• . i ~ ~ ~ w ~ {TC i~~'
•~j, i I} ~~~R r~. i~~~~'•M1 ~+',I ~i ~~~~j~~~i• ~u~~ry~~.~i~,'~'~~ySf~,,i~"i•7~a~~t 3 I ~ ~ r 1~' $ . ~ r,.~„'~f~+5-41 ,~~',',Il~ tiS~YF~.L'~'I~' '~~"lh?y'~.~~:p~~''Y~.~~r~~, ' '
~i I .~1 ~ f~ 1Y' 9 ~ ~7'-' arr•r } 4f ' 7 ~ F~, ~1. s. ~ ~r ~ ry , ~4, u {:p;1. ~~.l,~ ~N hw:~,;il 1 ~ i ~ ~ ~IR n[~. 'Il~ i '~;~7 ~..r~+~~, s'~~~5 'af~~~~~ 'f~h~"'4,p' '~4t7~~~:7~'yl'~ r~'~.!r- ~'~f,~s4 t yry~ F ~ Q~-ryh y4 r~ ~
~ ' A a n 4~ ~ . ~ . ~ A ,~~L4° . i,. ~ n•~ ,r, yi _ i' ri~,:~~~~Jf:a:r,~t~~...'.,~a'A'~?"AY~~4ui~J~l~~~~~ 6~T~-"~''i~~i~ci?'o~7~,~'~~.,~ ~s,s~~~°.'~~}~re'#a. . I.d~ '~d'w: _ ~ . . N6F , ~ . . ,a. ~~~~v.....~w d~ . ~i~~d~F4!'/~i
~~~~1~~..w'..'h'ji~L?iE.1!i', L ; ~~Y +N '~(~h~t'~F,1~-0Lf~~U~S'~'4•Ta7v h~SY:..r wt~7+I4E~a ~ il1 ~~A,r~,,.o-
' v ~lp ~ AN . i ~ A " ~+L~'.. ~ ~7"1 I~~~.(I~,~~h,l r~ ~ ~~i ~ ~l~yx~~•~ ti ~ 1~ ~}h ~ ~ ;ti1.~i`''~q4.~fl; L i~l 1 ,
. ~ h'. ' •'v .'r.~r5nd r, ~ ~ Sl~ - . ~ ~ F r ~ _ ~ ~ -au~ , ~ , '!1 . ~k , ~,r~' r ~~,y fl•' s's~:~' ~ • ' r i'~'
'~J~~I~~a~~+❑rr.i' M
't J . J L~ ~
i ~ ~JQ~~$ ~Fi~.~'.~ f 6}
_ J
m m m m m m m m m r ~ ~ ~ ~ m m m ■r m
DISHMAN COMMONS . 99353
Spokane County, Washington 08107/00
10-Year Design Storm Engineer; DJD
, GRATE INLET CALCULATIONS ,
on Continuous Grade ,
. Inlet Basin Gutter Cross- Grate Depth of Gutter Gutter Flow By-Pass
Basin Street and Peak Flow Slope Slope Width Flow Flow Width Velocity Received Flo.w.
Area Station (cfs) (ft/ft) 1/Z (ft) (ft) (ft) (fps) (cfs) (cfs)
16TH AVENUE
Bl STA 5+17.5 RT. 1.17 0.0330 0.020 4.00 0.12 5.986 2.317 1.1l 0.06
HERALD LANE
C4 STA 11+36.36 RT. 1.33 0.0075 0.024 4.00 0.18 . 7.399 1,639 1.16 0.17
ALLEY CS . 1.64 0.0200 0,020 2.00 0.15 7.463 , 3.106 0.93 0.71
HERALD LANE
C2 . STA 11+36.36 LT: 0.15 0.0075 0.024 2.00 0.08 3.264 0.882' 0.14 0.01
17TH LANE ,
134 STA 12+28,48 RT. 1.25 0.0600 0.024 2.00 0.12 4,895 4,014 0.94 0.31.
17TH LANE B4 STA l l+S 1.90 RT. 0.31 0.0600 0.024 2.00 0.07 2.902 2,130 0.30 0.01
17TH LANE
B3 STA l 1+5190 GT. 0.38 0.0600 0.024 2.00 0.08 3.132 2.363 0.35 0.03
This fonn is in accordance with tlie WSDOT Hydraulic Manual Grate Widths
Section 5-5. l, Capacity of Inlets on a Continuous Grade Herringbone = 1.67'
Vailed = 1,67'
W/ 2" SUlllp = 2,00'
InletC
Dishman Commons S990353
Spokane County, Washington 08107/00
10-Year Strom Event Engineer: DJD
INLET FLOW CAPACITIES
. in Sump Conditions
. Inlet, . . ' Basin . Basin + Inlet, , Maximum Inlet By-Pass
Basin Street and.- : Inlet Type-., Peak Flow ny-Pass Perimeter Plow Depth** . Discharge*** Flow ,
Station • . : . (cfs) Q P _ H Qa- Q-Qa 17th Lane ~ TYPE l
A1 ~ STA 11 +51.90 RT. N GRATE ~ 0.51 ~ 0.51 ~ 3.67 ~ 0.33 ~ 2•09 ~ -1.58
~ 17th Lane ~ TYPE 1
A2 ~ STA 11+51,90 LT. ~ GRATE ~ 0.26 ~ 0,26 ~ 3.67 ~ 0.33 ~ 2.09 ~ -1,83 Herald Lane - ~ TYPE 1 ~ ~ • ~ ~ ~ ~
C6 STA 10+36,88 RT, ~ GRATE ~ 2.13 2,13 ~ 5.91 ~ 0.33 ~ 3,36 ~ -1.23
~ 17TH LANE ~ TYPE 1 ~ - I I I I I
C7 ~ STA 17+21.89 RT, ~ GR.ATE ~ 2.24 ~ 2,24 ~ 5.91 ~ 0.33 ~ 3.36 ~ -1.12 ~
I I HERALD LANE TYPE 1 ~ I - I I I I I
~ C3 ~ STA 10+36.88 LT. ~ GRATE ~ 0.35 ~ 0.35 ~ 3.67 ~ 0.33 ~ 2.09 ~ -1.74
Grate Perimeters* Qa = C* P* H^ 1.5 ' Hemngbone = 3.67' Where; C= 3,0, P= Perimeter, H= Flow Depth
Vaned = 3.67'
WSDOT= 5.91' . * Grate Perimeter = Available Perimeter Divided by a Safery Factor of 2.
Maximum Flow Depth is based on curb crest above inlet.
Calculated in accordance with Spokane Counry Guidelines for
Stormwater Management, Section 4-1.
InletSmp
DISHMAN COMMONS
Basin Summary Table
Road Imp. House Area Driveway Total Peak 208' Vol, Bowstring 208' Vol.
Total Area Area 1800SFILot Area Imp. Area Runoff Flow 1 Req'd Vol. Req'd Prov'd Outflow Number & Type
Basln (SF) (Acres) (SF) Houses (SF) (SF) (SF) Coeff. (cfs) (cu.ft) (cu,ft) (cu.ft) (cfs) of Drywells
A1 17,455 0.40 3,992 1.0 1,800 750 6,542 0,40 0.51
A2 3,993 0.09 3,993 0.0 0 0 3,993 0,90 0,26
A 21,448 0.49 7,985 1.0 1,800 750 10,535 0.49 0.76 333 217 355 0.3 1 Single
61 31,212 0.72 17,766 0.0 0 0 17,766 0.56 1.17
62 56,881 1.31 0 0.0 0 0 0 0.10 0.42
B3 5,723 0.13 5,723 0.0 0 0 5,723 0.90 0,38
B4 42,983 0.99 5,745 4.0 7,200 3,000 15,945 0.40 1.25 -
B 171,987 3.9 29,234 4.0 1,200 3,000 39,434 0.28 3.25 1218 708 2143 2.0 2 Doubles
C1 39,974 0.92 0 0.0 0 0 0 0.10 0,25
C2 2,675 0.06 2,266 0.0 0 0 2,266 0.78 0,15
C3 5,261 0.12 5,261 0.0 0 0 5,261 0.90 0.35
C4 34,933 0.80 20,236 0.0 0 0 20,236 0.56 1,33
C5 58,780 1.35 8,840 6.0 10,800 4,500 24,100 0.43 1.64
C6 64,684 1.48 11,624 6.0 10,800 4,500 26,924 0.43 1.76
C7 89,442 2.05 12,531 9.0 16,200 6,750 35,481 0.42 2.24
C 296,123 6.80 60,718 21.0 37,800 15,750 114,268 0.41 7.92 2530 3328 2832 2.0 2 Doubles
D 10,719 0.25 4,993 0.0 0 0 4,993 0.47 0.37 208 57 312 0.3 1 Sinale
E 4,706 0.11 2,271 0,0 0 0 2,271 0.49 0.17 95 0 186 0.3 1 Sinqle
NOTE: C= f0.9'(IMPERVIOUS AREA) + 0.1'(PERVIOUS AREAWTOTAL AREA
WHERE C = RUNOFF COEFF.
99353 . CLC ASSOCIATES, INC. 9l1112000 ,
Weighted Runoff Coefficient Calculation
I
Pro ISHMAN COMMONS
~ect. D
Basin: A1 CLC Job S990353 .
Total Area (SF): 17455 Designer: DJD
Imp. Area (SF): 6542 Date: 8/7/2000
Grass Area (SF): 10913
Imp. Area "C": 0.90
Grass Area "C": 0.10
(Imp. Area)*(Imp. "C")= 5888 ,
(Grass Area)*(Grass "C")= 1091
TOTAL 6979
6979
Weighted "C"= 0.40
17455
'
~
Weighted Runoff Coefficient Calculation
Project: DISHMAN COMMONS
Basin: A2 CLC Job S990353
Total Area (SF): 3993 Designer: DJD
Imp. Area (SF): 3993 Date: 7/18/2000
Grass Area (SF): 0
Imp. Area "C": 0.90
Grass Area "C": 0.10
(Imp. Area)'(Imp. "C")= 3594 (Grass Area)*(Grass "C")= 0 70TAL 3594
3594
Weighted '.C"= 0.90
3993
'
~
Weighted Runoff Coefficient Calculation
Project: DISHMAN COMMONS
Basin: A CLC Job S990353
, Total Area (SF): 21448 Designer: DJD
Imp. Area (SF): 10535 Date: 8/7/2000
Grass Area (SF): 10913
Imp. Area "C": 0.90
Grass Area "C": 0.10
(Imp. Area)"{Imp. "C")= 9482
(Grass Area)*(Grass "C")= 1091
TOTAL 10573
10573
Weighted "C"= 0.49
21448
'
Weighted Runoff Coefficient Calculation
' Project: DISHMAN COMMONS
Basin: B1 CLC Job S990353
Total Area (SF): 31212 Designer: DJD
Imp. Area (SF): 17766 Date: 7118/2000
Grass Area (SF): 13446
Imp. Area "C": _0.90
Grass Area "C": 0.10
(Imp. Area)*(Imp. "C")= 15989
(Grass Area)*(Grass "C")= 1345
TOTAL 17334
17334
Weighted "C"= 0.56
31212
,
~
Weighted Runoff Coefficient Calculation
Project: DISHMAN COMMONS Basin: B2 - CLC Job # S990353
Total Area (SF): 56881 Designer: DJD
Imp. Area (SF): 0 Date: 7/18/2000 Grass Area (SF): 56881
Imp. Area "C": 0.90
Grass Area "C": 0.10
(Imp. Area);(Imp. "C")= 0
(Grass Area)"(Grass "C")= 5688
TOTAL 5688
5688
Weighted "C"= 0.10
56881
'
,
Weighted Runoff Coefficient Caiculation
'
ProJect: DISHMAN COMMONS
Basin: B3 CLC Job # S990353
Total Area (SF): 9647 Designer: DJD
Imp. Area (SF): 9647 Date: 8/7/2000
Grass Area (SF): 0
imp. Area "C": 0.90
Grass Area "C": 0.10
(Imp. Area)"(Imp. "C")= 8682
(Grass Area)*(Grass "C")= 0
TOTAL 8682
8682
Weighted "C"= 0.90
' 9647
, . -
' .
' -
'
'
Weighted Runoff Coefficient Calculation
Project: DISHMAN COMMONS
Basin: 134 CLC Job # S990353
Total Area (SF): 42983 Designer: DJD
Imp. Area (SF): 15945 Date: 8/7/2000
Grass Area (SF): 27038
Imp. Area "C": 0.90
Grass Area "C": 0.10
(Imp. Area)'(Imp. "C")= 14351
(Grass Area)*(Grass "C")= 2704
TOTAL 17054
17054
Weighted "C"= 0.40
42983
'
'
' -
' -
' • -
'
'
Weighted Runoff Coefficient Calculation
I Pro1'ect: DISHMAN COMMONS
Basin: B CLC Job S990353
Total Area (SF): 171987 Designer: DJD
.Imp. Area (SF): 39434 Date: 9/11/2000
Grass Area (SF): 132553
Imp. Area "C": 0.90
Grass Area "C": 0.10
(Imp. Area)*(Imp. "C")= 35491
(Grass Area)*(Grass "C")= 13255
TOTAL 48746
48746
W eighted "C"= 0.28
171987
'
,
,
'
' . .
Weighted Runoff Coefficient Calculation Project: DISHMAN COMMONS
Basin: C1 CLC Job S990353
Totat Area (SF): 39974 Designer: DJD
Imp. Area (SF): 0 Date: 7/18/2000
Grass Area (SF): 39974
imp. Area "C": 0.90
Grass Area "C": 0.10
~
(lmp. Area)*(Imp. "C")= 0
(Grass Area)''(Grass "C")= 3997 TOTAL 3997
3997 .
Weighted "C"= 0.10
39974
' ,
Weighted Runoff Coefficient Calculation
Project: DISHMAN COMMONS
Basin: C2 CLC Job S990353
Total Area (SF): 2675 Designer: DJD
Imp. Area (SF): 2266 Date: 7/18/2000 .
Grass Area (SF): 409
Imp. Area "C": 0.90 .
Grass Area "C": 0.10
(Imp. Area)'(Imp. "C")= 2039
(Grass Area)*(Grass "C")= 41
TOTAL 2080
2080
Weighted "C"= 0.78
2675
1 -
i . .
1 - .
' - .
Weighted Runoff Coefficient Calculation
' ProJ'ect: DISHMAN COMMONS
Basin: C3 CLC Job # S990353
Total Area (SF): 5261 Designer: DJD
Imp. Area (SF): 5261 Date: 8/7/2000
Grass Area (SF): 0
imp. Area "C": 0.90
Grass Area "C": 0.10
(Imp. Area)'(Imp. "C")= 4735
(Grass Area)'(Grass "C")= 0
TOTAL 4735
4735 Weighted "C"= 0.90
5261
' ' - - .
' .
Weighted Runoff Coefficient Calculation
Project: DISHMAN COMMONS
Basin: C4 CLC Job S990353
Total Area (SF): 34933 Designer: DJD
Imp. Area (SF): 20236 Date: 7118/2000
Grass Area (SF): 14697
Imp. Area "C": 0.90
Grass Area "C": • 0.10
(Imp. Area)'(Imp. "C")= 18212 ~
(Grass Area)*(Grass "C")= 1470
TOTAL 19682
19682
Weighted "C"= 0.56
34933
'
' - . ~ .
~
Weighted Runoff Coefficient Calculation
' Project: DISHMAN COMMONS
Basin: CS CLC Job S990353
Total Area (SF): 58780 Designer: DJD
Imp. Area (SF): 24100 Date: 7/18/2000
Grass Area (SF): 34680
Imp. Area "C": 0.90
Grass Area "C": 0.10
(Imp. Area);(Imp. "C")= 21690
(Grass Area)'(Grass "C")= 3468
TOTAL 25158 25158
Weighted "C"= 0.43
58780
i
r
Weighted Runoff Coefficient Calculation
Project: DISHMAN COMMONS
Basin: C6 CLC Job # S990353 Total Area (SF): 64684 Designer: DJD .
imp. Area (SF): 26924 Date: 7/18/2000
Grass Area (SF): 37760
Imp. Area "C": 0.90
Grass Area "C": 0.10
(Imp. Area)'(Imp. "C")= 24232
(Grass Area);(Grass "C")= 3776
TOTAL 28008
28008
W eighted "C"= 0.43
64684
' .
' . -
Weighted Runoff Coefficient Calculation
' Project: DISHMAN COMMONS
Basin: C7 . CLC Job S990353
Total Area (SF): 89442 Designer: DJD
Imp. Area (SF): 35481 Dafe: 8/7/2000
Grass Area (SF): 53961
Imp. Area "C": 0.90 .
Grass Area "C": 0.10 -
(Imp. Area)*(Imp. "C")= 31933 (Grass Area)}(Grass "C")= 5396
TOTAL 37329
' 37329
Weighted "C"= 0.42
' 89442 1 - -
~ .
~ _
'
,
Weighted Runoff Coefficient Calculation
Project: DISHMAN COMMONS
Basin: C CLC Job S990353
Total Area (SF): 296123 Designer: DJD
Imp. Area (SF): 114268 Date: 9/11/2000
Grass Area (SF): 181855
, Imp. Area "C": • 0.90
Grass Area "C": 0.10
(Imp. Area)*(Imp. "C")= 102841
(Grass Area)*(Grass "C")= 18186
' TOTAL ~ 121027
, 121027
Weighted "C"= 0.41
296123
1 .
'
~
~
Weighted Runoff Coefficient Calculation
, Pro1'ect: DISHMAN COMMONS
Basin: D CLC Job S990353
Total Area (SF): 10719 Designer: DJD
Imp. Area (SF): 4993 Date: 9/11/2000
Grass Area (SF): 5726
' Imp. Area "C": 0.90
Grass Area "C": 0.10
(Imp. Area)*(Imp. "C")= 4494
(Grass Area)*(Grass "C")= 573
' TOTAL 5066
5066
Weighted "C"= 0.47
10719
'
,
'
Weighted Runoff Coefficient Calculation
Pro'ect: DISHMAN COMMONS
I
~
Basin: E CLC Job # S990353
Total Area (SF): 4706 Designer: DJD
imp. Area (SF): 2271 Date: 7/18/2000
Grass Area (SF): 2435
Imp. Area "C": 0.90
Grass Area "C": 0.10
(Imp. Area)*(Irnp. "C")= 2044
(Grass Area)*(Grass "C")= 244
TOTAL 2287 ~
2287
Weighted "C"= 0.49
4706
'
~
Weighted Runoff Coefficient Calcutation
Project: DISHMAN COMMONS
Basin: • F CLC Job # S990353
Tofal Area (SF): 35545 Designer: DJD
Imp. Area (SF): 4858 Date: 7/18/2000
Grass Area (SF): 30687
Imp. Area "C": 0.90
Grass Area "C": 0.10 - ' (Imp. Area)*(Imp. "C")= - 4372
(Grass Area) (Grass C„)- 3069
TOTAL 7441
7441
Weighted „C"= 0.21
35545
'
PEANC FLOW CALCULATIDN - PROJECT: D~SHMAN COMMONS
~ BAS IN~ A 1
Tat. Area = 0.40 Acres _
Imp. Area = 3,992 SF
G = Q_40 -
CASE 1
50 ft. Overfand Flow .
Ct = 0.15
L = 50 ft. , -
n = 0.400
- S _ 0.014
Tc = 3_60 rxrin., by Equation 3-2 of Guidelines
86 ft. Gutter flow ,
_ Zl = 50.0
Z2 T - 3.50 D 0.016
S = 0.0314
d ~ -0.095 ft.
A R 0 Tc Tc tota# I Qc
0.24 0.05 0.52 0.66 5.00 3.18 0.51
Qpeak #or Ca- se 1 = 0.51 _cfs - -
~ C►ASE 2- ,
Case 2 assumes a Time af. Concentratian less than 5 minutes so that the
~ peak flow =.90(3.18){Imp.Area} O.26 cfs
So, the Peak flouv for #he BasFn- is fhe gre'ater of the two flows,, 0.51 cfs
99353 BASIN.As CLC ASSOCIATES, INC. 7l25f20[]0
PEAK FLOW CALCULATION PROJECT: DISHMAN COMMONS
BASIN: A2 Tot. Area = 0.09 Acres
, Imp. Area = 3,993 SF
C = 0.90
' CASE 1
0 ft. Overland Flow
Ct = 0.15
L = 0 ft.
n = 0.400
S = 0.010
Tc = 0.00 min., by Equation 3-2 of Guidelines
86 ft. Gutter flow
Z1 = 50.0 Z2 = 3.50
n = 0.016 S = 0.0314
d = 0.073 ff. A R Q Tc Tc total i Qc
0.14 0.04 0.26 0.79 5.00 3.18 0.26
Qpeak for Case 1= 0.26 cfs CASE 2
Case 2 assumes a Time of Concentration less than 5 minutes so that the
' peak flow =.90(3.18)(Imp. Area) = 0.26 cfs
So, the Peak flow for the Basin is the greater of the two flows, 0.26 cfs
99353 BASIN.xIs CLC ASSOCIATES, INC. 7/25/2000
PEAK FLOW CALCULATION PROJECT: DISHMAN COMMONS
' BASIN: A
Tot. Area = 0.49 Acres .
Imp. Area = 7,985 SF
C = 0.49
CASE 1
50 ft. Overland Flow Ct = 0.15
L = 50 ft. n = 0.400
S = 0.010
Tc = 3.60 min., by Equation 3-2 of Guidelines
86 ft. Gutter flow
Z1 = 50.0 .
Z2 = 3.50
n = 0.016
S = 0.0314
d = 0.110 ft.
A R Q Tc Tc total I Qc
0.32 0.05 0.77 0.60 5.00 3.18 0.76
Qpeak for Case 1= 0.76 cfs .
CASE 2
Case 2 assumes a Time of Concentration less than 5 minutes so that the
' peak flow =.90(3.18)(Imp. Area) = 0.52 cfs
So, the Peak flow for the Basin is the greater of the two flows, 0.76 cfs
99353 BASIN.xIs CLC ASSOCIATES, INC. 7/25/2000
' .
BOWSTRING METHOD PROJECT: DISHMAN COMMONS
' DETENTION BASIN DESIGN BASIN: A .
DESIGNER: DJD
DATE: 07/25/00 Time Increment (min) 5
Time of Conc. (min) 5.00
Outflow (cfs) 0.3
Design Year Flow 10 Area (acres) 0.49
Impervious Area (sq ft) .7985
'C' Factor 0.49
'208' Volume Provided 355
Area * C 0.240
Time Time lnc. Intens. Q Devel. Vol.ln Vol.Out Storage
(min) (sec) (in/hr) (cfs) (cu ft) (cu ft) (cu ft)
5.00 300 3.18 0.76 307 90 217
5 300 3.18 0.76 307 90 217
10 _ 600 2.24 0.54 378 180 198
15 900 1.77 0.42 426 270 156
20 - 1200 1.45 0.35 453 360 93
25 1500 1.21 0.29 465 450 15
30 1800 1.04 0.25 475 540 0 35 2100 0.91 0.22 481 630 0
40 2400 0.82 0.20 493 720 0
45 2700 0.74 0.18 498 810 0
50 3000 0.68 0.16 506 900 0
208' DRAINAGE POND CALCULATIONS Required '208' Storage Volume -
= Impervious Area x.5 in / 12 in/ft 332.7 cu ft 208' Storage Volume Provided 355 cu ft DRYWELL REQUIREMENTS - 10 YEAR DESIGN STORM
Maximum Storage Required by Bowstring 217 cu ft Provided Storage Volume 355 cu ft @ 6" depth Number and Type of Drywells Required 1 Single 0 Double .
99353 CLC ASSOCIATES 7/25/2000
PEAK FLOW CALCULATION PROJECT: DISHMAN COMMONS
. BASIN: B1
Tot. Area = 0.72 Acres
Imp. Area = 17,766 SF
- C = 0.56
CASE 1
0 ft. Overland Flow
Ct = 0.15
L = ' 0 ft.
n = 0.400
S = 0.010
Tc = 0.00 min., by Equation 3-2 of Guidelines
595 ft. Gutter flow
Z1 = 50.0
Z2 = 1.00 n = 0.016
S = 0.0080 •
d = 0.168 ft.
A R Q Tc Tc total I Qc
0.72 0.08 1.14 6.24 6.24 2.83 1.14
Qpeak for Case 1= . 1.14 cfs -
' CASE 2_
- Case 2 assumes a Time of Concentration less than 5 minutes so that the
' peak flow =.90(3.18)(Imp. Area) = 1.17 cfs
So, the Peak fiow for the Basin is the greater of the two flows, 1.17 cfs
99353 BASIN.xIs CLC ASSOCIATES, INC. 7/25/2000
PEAK FLOW CALCULATION PROJECT: DISHMAN COMMONS
BASIN: 132
Tot. Area = 1.31 Acres
Imp. Area = 0 SF
C = 0.10
CASE 1 -
365 ft. Overland Flow
Ct = 0.15
L = 365 ft.
n = 0.040
S = 0.010
Tc = 2.97 min., by Equation 3-2 of Guidelines
0 ft. Gutter flow
Z1 = 50.0
Z2 = 1.00
n = 0.016
S = 0.0080
d = 0.115 ft.
~
A R Q Tc Tc total I Qc
0.34 0.06 0.42 0.00 5.00 3.18 0.42
Qpeak for Case 1= 0.42 cfs .
~ CASE 2_ Case 2 assumes a Time of Concentration less than 5 minutes so that the
peak flow =.90(3.18)(Imp. Area) = 0.00 cfs
So, the Peak flow for the Basin is the greater of the two flows, 0.42 cfs
99353 BASIN.xIs CLC ASSOCIATES, INC. 7/25/2000
PEAK FLOW CALCULATION PROJECT: DISHMAN COMMONS
' - .
BASIN. B3
' Tot. Area = 0.13 Acres
Imp. Area - 5,723 SF ,
C = 0.90
CASE 1 0 ft. Overland Flow
' Ct = 0.15
L 0 ft.
n = 0.400
S = 0.010
Tc = 0.00 min., by Equation 3-2 of Guidelines
370 ft. Gutter flow
, Z 1 = 50.0
Z2 = 3.50
n = 0.016
S = 0.0300
d = 0.084 ft.
A R Q Tc Tc total I Qc
0.19 0.04 0.37 3.17 5.00 3.18 0.37 r Qpeak for Case 1= 0.37 cfs .
'
CASE 2
' Case 2 assumes a Time of Concentration less than 5 minutes so that the
peak flow =.90(3.18)(Imp. Area) = 0.38 cfs
So, the Peak flow for the Basin is the greater of the two flows, 0.38 cfs
99353 BASIN.xIs CLC ASSOCIATES, INC. 7/26/2000
'
PEAK FLOW CALCULATION PROJECT: DISHMAN COMMONS
1 BASIN: B4
Tot. Area = 0.99 Acres
Imp. Area = 5,745 SF
C = 0.41
CASE 1
~ 50 ft. Overiand Fiow
Ct = 0.15
L = 50 ft.
n = 0.400
S = 0.010
Tc = 3.60 min., by Equation 3-2 of Guidelines
1
370 ft. Gutter flow
Z1 = 50.0
Z2 = 3.50
n = 0.016
S = 0.0600
d = 0.117 ft.
A R Q Tc Tc total I Qc
0.37 0.06 1.26 1.80 5.40 3.08 1.25
Qpeak for Case 1= 1.25 cfs .
CASE 2
' Case 2 assumes a Time of Concentration less than 5 minutes so that the
. peak flow =.90(3.18)(Imp. Area) = 0.38 cfs
So, the Peak flow for the Basin is the greater of the two flows, 1.25 cfs
99353 BASIN.xis CLC ASSOCIATES, INC. 7/26/2000
'
PEAK FLOW CALCULATION PROJECT: DISHMAN COMMONS
BASIN: B
' Tot. Area = 3.90 Acres
Imp. Area = 29,234 SF
C = 0.28
CASE 1
50 ft. Overland Flow
' Ct = 0.15
L 50 ft.
n = 0.400
' S = 0.010
Tc = 3.60 min., by Equation 3-2 of Guidelines
370 ft. Gutter flow
Z1 = 50.0
Z2 = 3.50
' n = 0.016
S 0.0600
. d = 0.171 ft.
A R Q Tc Tc total I Qc
0.78 0.09 3.46 1.40 5.00 3.18 3.47
' Qpeak for Case 1= 3.47 cfs
~
CASE 2
1 Case 2 assumes a Time of Concentration less than 5 minutes so that the
peak flow =.90(3.18)(Imp. Area) = 1.92 cfs
So, the Peak flow for the Basin is the greater of the two flows, 3.47 cfs
99353 BASIN.xIs CLC ASSOCIATES, INC. 9/11/2000
' BOWSTRING METHOD - PROJECT: DISHMAN COMMONS
DETENTION BASIN DESIGN BASIN: B
DESIGNER: DJD
' DATE: 07/26/00
'
Time Increment (min) 5
Time of Conc. (min) 5.02
- Outflow (cfs) 2
Design Year Fiow 10
Area (acres) 3.10
' Impervious Area (sq f#) 29234
'C' Factor 0.33
'208' Volume Provided 2143
Area * C 1.023
Time Time Inc. Intens. Q Devel. Vol.ln Vol.Out Storage
(min) (sec) (in/hr) (cfs) (cu ft) (cu ft) (cu ft)
5.02 301 3.17 3.25 1311 603 708
5 300 3.18 3.25 1308 600 708
10 600 2.24 2.29 1610 1200 410
15 900 1.77 1.81 1815 1800 15
20 1200 1.45 1.48 1932 2400 0
25 1500 1.21 1.24 1984 3000 0
30 1800 1.04 1.06 2024 3600 0
35 2100 0.91 0.93 2050 4200 0
40 2400 0.82 0.84 2099 4800 0
45 2700 0.74 0.76 2121 5400 0
- 50 3000 0.68 0.70 2158 6000 0
208' DRAINAGE POND CALCULATIONS -
Required '208' Storage Volume -
Impervious_Area x.5 in / 12 infft 1218.1 cu ft
208' Storage Volume Provided _ 2143 cu ft
' .
DRYWELL REQUIREMENTS - 10 YEAR DESIGN STORM
Maximum Storage Required by Bowstring 708 cu ft , Provided Storage Volume . 2143 cu ft @ 6" depth
Number and Type of Drywells Required . 0 Single
- 2 Double
99353 CLC ASSOCIATES 7/26/2000
PEAK FLOW CALCULATION PROJECT: DISHMAN COMMONS
BASIN: C1
' Tot. Area = 0.92 Acres
Imp. Area - 0 SF C = 0.10
CASE 1
170 ft. Overland Flow
Ct = 0.15
L = 170 ft.
n = 0.400
S = 0.015
Tc = 6.65 min., by Equation 3-2 of Guidelines
0 ft. Gutter flow
Z1 = 50.0
Z2 = 1.00
n = 0.016
S = 0.0080
d = 0.095 ft.
A R Q Tc Tc total I Qc
0.23 0.05 0.25 0.00 6.65 2.74 0.25
Qpeak for Case 1= 0.25 c#s
CASE 2
~ . Case 2 assumes a Time of Concentration less than 5 minutes so that the
peak flow =.90(3.18)(Imp. Area) - 0.00 cfs
So, the Peak flow for the Basin is the greater of the two flows, 0.25 cfs
99353 BASIN.xIs CLC ASSOCIATES, INC. 7/25/2000
PEAK FLOW CALCULATION PROJECT: DISHMAN COMMONS ~
I BASIN: C2
' Tot. Area = 0.06 Acres
Imp. Area = 2,266 SF
C = 0.78
CASE 1
20 ft. Overland Flow
Ct = 0.15
L = 20 ft.
n = 0.400
S = 0.010
Tc = 2.08 min., by Equation 3-2 of Guidelines
150 ft. Gutter flow
Z1 = 50.0
Z2 = 3.50 n = 0.016
S = 0.0080
d = 0.076 ft.
A R Q Tc Tc total I Qc
0.15 0.04 0.15 2.66 5.00 . 3.18 0.15
' QPeak for Case 1= 0.15 cfs CASE 2 Case 2 assumes a Time of Concentration less than 5 minutes so that the peak flow =.90(3.18)(Imp. Area) = 0.15 cfs
So, the Peak ffow for the Basin is the greater of the two flows, 0.15 cfs 99353 BASIN.xIs CLC ASSOCIATES, INC. 7/25/2000
PEAK FLOW CALCULATION PROJECT: DISHMAN COMMONS
BASIN: C3
' .
Tot. Area - - 0.12 Acres
Imp. Area = 5,261 SF
, C = 0.90
CASE 1
0 ft. Overland Flow
Ct = 0.15
L = 0 ft.
n = 0.400
S = 0.020
Tc = 0.00 min., by Equation 3-2 of Guidelines
95 ft. Gutter flow
Z1 = 50.0
Z2 = 3.50
n = 0.016
S = 0.0080
d = 0.105 ft. .
A R Q Tc Tc total I Qc
0.29 0.05 0.34 1.36 5.00 3.18 0.34
Qpeak for Case 1= 0.34 cfs
'
CASE 2 ~
Case 2 assumes a Time of Concentration less than 5 minutes so that the
peak flow =.90(3.18)(Imp. Area) = 0.35 cfs ~
So, the Peak flow for the Basin is the greater of the two flows, 0.35 cfs ~ .
99353 BASIN.xIs CLC ASSOCIATES, INC. ' 7/26/2000
' .
PEAK FLOW CALCULATION PROJECT: DISHMAN COMMONS
'
BASIN. C4
Tot. Area = 0.80 Acres
Imp. Area = 20,236 SF
C = 0.56
CASE 1
20 ft. Overland Flow
Ct = 0.15
L = 20 ft.
n = 0.400
S = 0.010
Tc = 2.08 min., by Equation 3-2 of Guidelines .
715 ft. Gutter flow
Z1 = 50.0
Z2 = 1.00 n = 0.016
S = 0.0300
d = 0.135 ft. _
A R Q Tc Tc total I Qc
0.46 0.07 1.24 4.48 6.56 2.76 1.24
, QPeak for Case 1= 1.24 cfs -
' -
CASE 2
Case 2 assumes a Time of Concentration less than 5 minutes so that the
peak flow =.90(3.18)(lmp. Area) = 1.33 cfs
So, the Peak flow for the Basin is the greater of the two flows, 1.33 cfs
99353 BASIN.xIs CLC ASSOCIATES, INC. , 7/25/2000
PEAK FLOW CALCULATION PROJECT: DISHMAN COMMONS
BASIN: C5
, Tot. Area = 1.35 Acres
Imp. Area = 8,800 SF
C = 0.43 CASE 1
50 ft. Overland Flow
Ct = 0.15
L = 50 f t.
n = 0.400
S = 0.020
Tc = 2.93 min., by Equation 3-2 of Guidelines
510 ft. Gutter flow
Z1 = 50.0
Z2 = 50.00
n = 0.016
' - S = 0.0341
d = 0.114 f t.
A R Q Tc Tc total I Qc
0.65 0.06 1.65 3.34 6.26 2.83 1.64
Qpeak for Case 1=- 1.64 cfs
CASE 2
~ Case 2 assumes a Time of Concentration less than 5 minutes so that the
peak flow =.90(3.18)(Imp. Area) = 0.58 cfs _
So, the Peak fiow for the Basin is the greater of the two flows, 1.64 cfs
99353 BASIN.xIs CLC ASSOCIATES, INC. 7/25/2000
PEAK FLOW CALCULATION PROJECT: DISHMAN COMMONS
BASIN: C6
Tot. Area = 1.48 Acres Imp. Area = 11,624 SF
C = 0.43
CASE 1
50 ft. Overland Flow
Ct= 0.15
L = 50 ft.
n = 0.400
S = 0.020 .
Tc = 2.93 min., by Equation 3-2 of Guidelines
610 ft. Gutter flow
Z1 = 50.0
Z2 = 3.50
n = 0.016 S = 0.0276
d = 0.154 ft.
A R Q Tc Tc total I Qc
. 0.63 0.08 1.77 3.64 6.56 2.76 1.76
Qpeak for Case 1= - 1.76 cfs
' .
CASE 2
Case 2 assumes a Time of Concentration less than 5 minutes so that the
peak flow =.90(3.18)(Imp. Area) = 0.76 cfs
So, the Peak flow for the Basin is the greater of the two flows, 1.76 cfs
99353 BASIN.xIs CLC ASSOCIATES, tNG. 7/25/2000
PEAK FLOW CALCULATION PROJECT: DISHMAN COMMOfVS
BASIN: C7
Tot. Area = 2.05 Acres
Imp. Area = 12,531 SF
C = 0.42
CASE 1
50 ft. Overland Flow
Ct = 0.15 -
L = 50 ft.
n = 0.400
S = 0.020
Tc = 2.93 min., by Equation 3-2 of Guidelines 810 ft. Gutter flow
Z1 = 50.0
Z2 = 3.50
n = 0.016
S = 0.0276
d = 0.168 ft.
A R Q Tc Tc total i Qc
0.75 0.08 2.24 4.56 7.48 2.60 2.24
Qpeak for Case 1= 2.24 cfs
CASE 2
Case 2 assumes a Time of Concentration less than 5 minutes so that the
peak flow =.90(3.18)(Imp. Area) = 0.82 cfs
So, the Peak flow for the Basin is the greater of the two flows, 2.24 cfs
99353 BASIN.xIs CLC ASSOCIATES, INC. 7126/2000
PEAK FLOW CALCULATION PROJECT: DISHMAN COMMONS
BASIN: C
Tot. Area = 6.80 Acres
Imp. Area = 60,718 SF
C = 0.41
~ -
CASE 1
' 50 ft. Overland Fiow .
Ct= 0.15
L = 50 ft.
n = 0.400
S = 0.010
Tc = 3.60 min., by Equation 3-2 of Guidelines
'
650 ft. Gutter fiow
Z1 = 50.0 ,
Z2 = 3.50
n = 0.016
S = 0.0300
' d = 0.266 ft.
A R Q Tc Tc totai I Qc
1.89 0.13 7.94 2.58 6.19 2.85 7.93
' Qpeak for Case 1= 7.93 cfs
CASE 2
' Case 2 assumes a Time of Concentration less than 5 minutes so that the
peak flow -.90(3.18)(Imp. Area) - 3.99 cfs
So, the Peak flow for the Basin is the greater of the finro flows, 7.93 cfs -
99353 BASIN.xIs CLC ASSOCIATES, INC. 9/11/2000
1
BOWSTRING METHOD PROJECT: DISHMAN COMMONS
' DETENTION BASIN DESiGN BASIN: C
. DESIGNER: DJD
DAT E : 08/07/00
'
Time Increment (min) 5
Time of Conc. (min) 6.19
Outflow (cfs) 2
Design Year Flow 10
Area (acres) 6.79 impervious Area (sq ft) _ 60718
' 'C' Factor 0.41
'208' Volume Provided 2581
Area * C 2.784
Time Time Inc. Intens. Q Devel. Vol.ln Vol.Out Storage
(min) (sec) (in/hr) (cfs) (cu ft) (cu ft) (cu ft)
6.19 371 2.85 7.92 3940 742 3197
5300 3.18 8.85 3559 600 2959
10 600 2.24 6.24 4528 1200 3328
15 900 1.77 4.93 5057 1800 3257
20 1200 1.45 - 4.04 5353 2400 2953 25 1500 1.21 3.37 5478 3000 2478
30 1800 1.04 2.90 5577 3600 1977
35 2100 0.91 2.53 5640 4200 1440
40 2400 0.82 2.28 5767 4800 967
45 2700 0.74 2.06 5822 5400 422
'
50 3000 0.68 1.89 5918 6000 0
208' DRAINAGE POND CALCULATIONS '
Required ,208. Storage Volume
= Impervious Area x.5 in 1* 12 in/ft 2529.9 cu ft
~ .
208, Storage Volume Provided 2832 cu ft -
, DRYWELL REQUIREMENTS - 10 YEAR DESIGN STORM Maximum Storage Required by Bowstring 3328 cu ft
Provided Storage Volurrie . 3599 cu ft @ 8" depth
Number and Type of Drywells Required 0 Single
2 Double 99353 CLC ASSOCIATES 8/7/2000
PEAK FLOW CALCULATION PROJECT: DISHMAN COMMONS
BASIN: D
Tot. Area = 0.25 Acres
Imp. Area = 4,993 SF
C = 0.47
'
CASE 1 20 ft. Overland Flow
Ct = 0.15
L = 20 ft.
n = 0.400
i S - 0.010
Tc = 2.08 min., by Equation 3-2 of Guidelines
250 ft. Gutter flow
Z1 = 50.0
Z2 = 1.00
' n = 0.016
S 0.0168
' d = 0.096 ft.
A R Q Tc Tc total I Qc
0.24 0.05 0.37 2.63 5.00 3.18 0.37
Qpeak for Case 1= 0.37 cfs
'
CASE 2
'Case 2 assumes a Time of Concentration less than 5 minutes so that the
peak flow -.90(3.18)(Imp. Area) - 0.33 cfs
So, the Peak flow for the Basin is the greater of the two flows, 0.37 cfs
99353 BASIN.xIs CLC ASSOCIATES, INC. 9/11/2000
B4WSTRING METHOD PROJECT: DISHMAN COMMONS
I DETENTION BASIN DESIGN BASIN: D
DESIGNER: DJD
' DAT E : 07/25/00
Time Increment (min) 5 Time of Conc. (min) 5.00
Outflow (cfs) 0.3 .
Design Year Flow 10
Area (acres) 0.25
Impervious Area (sq ft) 4993
'C' Factor 0.46
'208' Volume Provided . 312
Area * C 0.115
Time Time Inc. Intens. Q Devel. Vol.ln Vol.Out Storage
(min) (sec) (in/hr) (cfs) (cu ft) (cu ft) (cu ft)
5.00 300 3.18 0.37 147 90 57
5 300 3.18 0.37 147 90 57
10 600 2.24 0.26 181 180 1
15 900 1.77 0.20 204 270 0
' 20 1200 1.45 0.17 217 360 0
25 1500 1.21 0.14 223 450 0
. 30 1800 1.04 0.12 227 540 0
35 2100 0.91 0.10 230 630 0
40 2400 0.82 0.09 236 720 0
45 2700 0.74 0.09 238 810 0
50 3000 0.68 0.08 243 900 0
208' DRAINAGE POND CALCULATIONS
Required '208' Storage Volume
= Impervious Area x.5 in / 12 in/ft 208.0 cu ft
'
208' Storage Volume Provided 312 cu ft
' DRYWELL REQUIREMENTS - 10 YEAR DESIGN STORM
Maximum Storage Required by Bowstring - 57 cu ft Provided Storage Volume 312 cu ft @ 6" depth
Number and Type of Drywells Required ' 1 Single
0 Double
99353 CLC ASSOCIATES 7/25/2000
PEAK FLOW CALCULATION PROJECT: DISHMAN COMMONS
BASIN: E
Tot. Area = 0.11 Acres
Imp. Area = 2,271 SF .
- C = 0.49
,
CAS E 1 - -
20 ft. Overland Flow Ct = 0.15
L = 20 ft.
n = 0.400 -
S = 0.010 -
Tc = 2_08 min., by Equation 3-2 of Guidelines
110 ft. Gutter fiow
Z1 = 50.0
Z2 = 1.00
' n = 0.016
S 0.0120
, d = 0.076 ft.
A R Q Tc Tc total I Qc
0.15 0.04 0.17 1.60 5.00 3.18 0.17
Qpeak for Case 1= 0.17 cfs
~
CASE 2
Case 2 assumes a Time of Concentration less than 5 minutes so that the
peak flow =.90(3.18)(Imp. Area) = 0.15 cfs .
So, the Peak flow for the Basin is the greater of the two flows, 0.17 cfs -
99353 BASIN.xIs CLC ASSOCIATES, INC. 7/25/2000
BOWSTRING METHOD PROJECT: DISHMAN COMMONS
I DETENTION BASIN DESIGN BASIN: E DESIGNER: DJD
DATE: 07/25/00
Time Increment (min) 5
Time of Conc. (min) . 5.00
Outflow (cfs) 0.3
Design Year Flow 10
Area (acres) . 0.11
Impervious Area (sq ft) 2271
'C' Factor 0.49
'208' Volume Provided 186
Area * C - 0.054 Time Time Inc. Intens. Q Devei. Vol.ln Vol.Out Storage
(min) (sec) (in/hr) (cfs) . (cu ft) (cu ft) (cu ft)
5.00 300 3.18 0.17 69 90 0<__
5 300 3.18 0.17 69 90 0<__
10 600 2.24 0.12 85 180 0<__
15 900 1.77. 0.10 96 270 0<__
20 1200 1.45 0.08 102 360 0<__
25 1500 1.21 0.07 104 450 0<__
30 1800 1.04 0.06 107 540 0<__
35 2100 0.91 0.05 108 630 0<__
40 2400 0.82 0.04 111 720 0<__
45 - 2700 0.74 - 0.04 112 810 0<__
50 3000 0.68 0.04 114 900 0<__
208' DRAINAGE POND CALCULATIONS Required '208' Storage Volume = Impervious Area x.5 in / 12 iri/ft . 94.6 cu ft
'
208,Storage Volume Provided 186 cu ft
j DRYWELL REQUIREMENTS - 10 YEAR DESIGN STORM
Maximum Storage Required by Bowstring . 0 cu ft
Provided Storage Volume 186 cu ft @ 6" depth
Number and Type of Drywells Required 1 Single
0 Double
99353 CLC ASSOCIATES 7/25/2000
PEAK FLOW CALCULATION PROJECT: DISHMAN COMMONS
BASIN: F
Tot. Area = 0.82 Acres
Imp. Area = 4,858 SF .
C = 0.21
CASE 1
145 ft. Overland Flow Ct = 0.15
L = 145 ft.
n = 0.400
S = 0.020
Tc = 5.54 min., by Equation 3-2 of Guidelines
205 ft. Gutter flow
Z1 = 50.0
Z2 = 3.50
n = 0.016
S = 0.0169
d = 0.100 ft.
A R Q Tc Tc totai I Qc
0.27 0.05 0.44 2.08 7.63 2.58 0.44
Qpeak for Case 1= 0.44 cfs CASE 2 Case 2 assumes a Time of Concentration less than 5 minutes so that the
peak flow =.90(3.18)(Imp. Area) 0.32 cfs'
So, the Peak flow for the Basin is'the greater of the two flows, 0.44 cfs
99353 BASIN.xIs CLC ASSOCIATES, INC. 7/25/2000
BOWSTRING METHOD . PROJECT: DISHMAN COMMONS
I -
DETENTION BASIN DESIGN BASIN: F
DESIGNER: DJD
' DATE: 07/25/00
Time Increment (min) 5
Time of Conc. (min) 7.63
Outflow (cfs) 0.3
Design Year Flow 10
Area (acres) 0.82
impervious Area (sq ft) 4858
'C' Factor 0.21
'208' Volume Provided 209
Area ` C 0.172
Time Time Inc. Intens. Q Devel. Vol.ln Vol.Out Storage
(min) (sec) (in/hr) (cfs) _(cu ft) (cu ft) (cu ft)
7.63 458 2.58 0.44 272 137 135
5 300 3.18 0.55 220 90 130
10 600 2.24 0.39 291 180 111
15 900 1.77 0.30 322 270 52
20 1200 1.45 0.25 338 360 0
25 1500 1.21 . 0.21 345 450 0
30 1800 1.04 0.18 350 540 0
35 2100 0.91 0.16 - 353 630 0
40 2400 0.82 0.14 361 720 0
45 2700 0.74 0.13 364 810 0
50 3000 0.68 0.12 370 900 0
t 208' DRAINAGE POND CALCULATIONS Required '208' Storage Volume
= Impervious Area x.5 in / 12 in/ft 202.4 cu ft
208' Storage Volume Provided 209 cu ft
DRYWELL REQUIREMENTS - 10 YEAR DESIGN STORM
Maximum Storage Required by Bowstring 135 cu ft
Provided Storage Volume - 209 cu ft @ 6" depth
Number and Type of Drywells Required 1 Single
0 Double
99353 CLC ASSOCIATES 7/25/2000
B-1
P-1
STORMLINF A
J-1
P-2
POND B
Project Title: OISHMAN COMMONS Project Engineer: CLC ASSOCIATES INC.
j:ldocument1993531dishman4.stm Inland Paciflc Englneering Co, StormCAO v1.0
10105/00 12:59:26 PM 0 Haestad Methods, Inc. 37 Brookside Road Waterbury, CT 06708 USA (203) 755-1666 Page 1 of 1
' Combined PipelNode Report
Pipe Up On Length Size Up On S Up Q Up Dn Dn Rim
Node Node (ft) Invert Invert (ft/ft) HGL (cfs) EGL EGL Rim (ft)
(ft) (ft) (ft) (ft) (ft) (ft)
P•1 B-1 J-1 169.00 12 inch 1,997,45 1,992.60 0.028698 1,997,91 1.17 1,998.08 1,993.23 1,996.00 2,000,37
P-2 J•1 POND B 30.00 12 inch 1,992.60 0.00 66.420000 1,993,06 1.17 1,993.23 181.15 1,993.30 1,998.00
N/A N/A N/A N/A N/A N/A N/A N/A N/A N/A N/A N/A 1,993,30
ProJect Tille: DISHMAN COMMONS Project Engineer, CLC ASSOCIATES INC.
j;ldocument1993531dishman4.stm Inland Pacific Engineering Co. StormCAD v1.0
10105I00 12:45:53 PM 0 Haestad Methods, Inc. 37 Brookside Road Waterbury, CT 06708 USA (203) 755-1666 Page 1 of 1
~ ~ ~ ~ ~ r ~ ~ ~r ~ ~ ~ ~ ~ ~ ~ ~
A2
.
STORMLIN~- B P-2
A~
,
-3
utlet
Project Title: DISHMAN COMMONS BASIN A Project Engineer: CLC ASSOCIATES, INC.
j;ldocument1993531dishman.stm Inland Pacific Engineering Co. StormCAD v1.0
10/05/00 02:54:39 PM 9 Haestad Methods, Inc, 37 Brookside Road Waterbury, CT 06708 USA (203) 755•1666 , Page 1 of 1
~ r ~ ~ ~ ~ ~ ~ ~ ~ r ~ ~ ~ ~ w ~ ~
Combined PipelNode Report
Pipe Up Dn Length Size Up Dn S Up Q Up Dn Dn Rim
Node Node (ft) Invert Invert (fUft) HGL (cfs) EGL EGL Rim (ft)
(h) (ft) (ft) fhI (ft) (ft)
P•2 A2 A1 24.67 12 inch 1,991.20 1,991.05 0.006080 1,991.41 0.26 1,991.48 1,991.43 1,993,03 1,993.03
P-3 A1 Outlet 68.00 12 inch 1,991.05 1,990.70 0.005147 1,991.42 0.17 1,991.55 1,991,20 1,990.70 1,993.03
N/A N/A N/A N/A N/A N/A N/A N/A N/A N/A N/A N/A 1,990.70
Project Title, DISHMAN COMMONS BASIN A Project Engineer: CLC ASSOCIATES, INC.
j:ldocumenfl993531dishman.stm Inland Pacific Engineering Co. StormCAD v1.0
10/05l00 02:55:04 PM 0 Haeslad Methods, Inc, 37 Brookside Road Waterbury, CT 06708 USA (203) 755-1666 Page 1 of 1
'
~
Outlet
n -
STORMLIN~- C&D
1
P-4
B3
~
P-3
1
P-2
1 _
1
134-2
B4-1
Project Title: DISHMAN COMMONS Project Engineer CLC ASSOCIATES, INC.
j:kdocument\99353\dishman1.stm - Inland Pacific Engineering Co. StormCAD v1.0
10/05/00 03:10:35 PM O Haestad Methods, Inc. 37 Brookside Road Waterbury, CT 06708 USA (203) 755-1666 Page 1 of 1
~ ~ ~ ~ ~ ~ ~ ~ ~ ~ r r r ~ ~ r ~
Combined PipelNode Report
Pipe Up Dn Length Size Up Dn S Up Q Up Dn Dn Rim
Node Node (ft) Invert Invert (fUft) HGL (cfs) EGL EGL Rim (ft)
(ft) (ft) (it) (ft) (ft) (ft)
P-2 64-2 64•1 15.00 12 inch 1,993.78 1,992.90 0,058667 1,994,19 0.94 1,994,34 1,993.57 1,995.82 1,996.72
P-3 64-1 63 24.67 12 inch 1,992.90 1,992.60 0.012161 1,993.37 1.25 1,993.55 1,993.27 1,995.82 1,995.82
P-4 B3 Outlet 24.40 12 inch 1,992.50 1,992.30 0.008197 1,993.04 1.63 1,993,26 1,993.06 1,993.30 1,995.82
N/A N/A N/A N/A N/A N/A N/A N/A N/A N/A N/A N/A 1,993.30
Project Title: DISHMAN COMMONS Project Engineer: CLC ASSOCIATES, INC.
j;ldocument1993531d1shman1.stm Inland Paclflc Engineering Co. StormCAD.v1.0
10105l00 03:11:11 PM O Haestad Methods, Inc. 37 Brookside Road Waterbury, CT 06708 USA (203) 755-1666 Page 1 of 1
~ ~ r r r ~ ~ ~ ~ ~ r ir ~ ~ ~ ~ r ~
Out et
~
P-3
STORML NE E --C2
P-2
C4
,
-1 ~
5
ProjeCt Title: DISHMAN COMMONS Project Engineer. CLC ASSOCIATES, INC.
J:Idocument1993531dishman3.stm Inland Pacific Engineering Co. StormCAD v1.0
10/05/00 03:39:25 PM 0 Haestad Methods, Inc. 37 Brookside Road Waterbury, CT 06708 USA (203) 755-1666 Page 1 of 1
Combined PipelNode Report
Pipe Up Dn Length Size Up Dn S Up Q Up On Dn Rim
Node Node (ft) Invert Invert (fUfl) HGL (cfs) EGL EGL Rim (ft)
(ft) (ft) (ft) (fi) (ft) (ft)
P-1 C5 C4 27.50 10 inch 2,009.54 2,009,40 0,005091 2,010.43 1.64 2,010.57 2,010.48 2,011.94 2,011,29
P-2 C4 C2 24.70 12 inch 2,009.40 2,008.40 0,040486 2,010.19 2.88 2,010.48 2,010.39 2,011.94 2,011,94
P-3 C2 Outlet 48.60 12 inch 2,009.25 2,009,00 0.005144 2,010.00 3.03 2,010.36 2,010.11 2,010.00 2,011.94
N/A N/A N/A N/A N/A N/A N/A N/A N/A N/A N/A N/A 2,010.00
Project Title: DISHMAN COMMONS Project Engineer, CLC ASSOCIATES, INC,
J:ldocument1993531dishman3.stm Inland PacHic Engineering Co. StormCAD,v1.0
10/05100 03:38:59 PM 0 Haestad Methods, Inc. 37 Brookside Road Waterbury, CT 06708 USA (203) 755-1666 Page 1 of 1
'
,
1 Outlet
,
STORMLINE F&G
C7 P_3 ~ ►
~ ~
1
C6
Project Title: DISHMAN COMMONS Project Engineer: CLC ASSOCIATES, INC.
j:\document\99353\dishman2.stm Inland Paciflc Engineering Co. StormCAD v1.0
10/05/00 03:17:46 PM O Haestad Methods, Inc_ 37 Brookside Road Waterbury, CT 06708 USA (203) 755-1666 Page 1 of 1
~ ~■r ~ ~ ~r ~ ~r ~ ~ ~r ~ ~ rr ~ ~r r i■r rr ~
Combined PipelNode Report
s _
Pipe Up Dn Length Size Up Dn S Up Q Up Dn Dn ~ Rim
Node Node (It) Invert Invert (ftlft) HGL (cfs) EGL EGL Rim (ft)
(ft) (ft) (ft) (ft) (ft) {ft)
P•3 C7 C3 48.00 12 inch 2,009.73 2,009.49 0.005000 2,010.64 2.24 2.010.78, 2,010.67 2,010.97 2,011,17
,
P-1 C6 C3 30.00 12 inch 2,009.64 2,009.49 0.005000 2,010.58 1.76 2,010.66 2,010.62 2,010.97 2,010,97
P•2 C3 Outlet 43,50 12 inch 2,009.39 2,009.00 0.008966 2,010.27 4.35 2,010.82 2,010.44 2,010,00 2,010,97
N/A N/A N/A N/A N/A N/A N/A N/A N/A N/A N/A N/A 2,010,00
Project Title: DISHMAN COMMONS Project Engineer: CLC ASSOCIATES, INC.
j:ldocument1993531dlshman2.stm Inland Paciflc Engineering Co. StormCAD 0.0
10/05/00 03;18:35 PM (D Haestad Methods, Inc. 37 Brookside Road Waterbury, CT 06708 USA (203) 755-1666 Page 1 of 1
BASIN A2
' Worksheet for Circular Channel
, Project Description
Project File j:ldocument199353199353.fm2 Worksheet DISHMAN COMMONS PIPING CALCULATIONS
Flow Element Circular Channel Method Manning's Formula
Solve Fvr Channel Depth
Input Data
Mannings Coefficient 0.009
Channel Slope 0.005000 fUft
Diameter 12.00 in
Discharge 0.26 cfs Results .
Depih 0.18 ft
Flow Area 0_10 ftz
Wetted Perimeter 0.88 ft
Top Width 0.77 ft .
Critical Depih 0.21 ft
Percent Full 18.10 _
Critical Slope 0.002752 fUft
Velocity 2.68 ft/s
Velocity Head 0.11 ft
Specific Energy 0.29 ft
Froude Number 1.33
Maximum Discharge 3_91 cfs
Full Flow Capacity 3.64 cfs
Full Ftow Slope 0.000026 ft/ft
Flow is supercritical. . , _
1 .
~
~ .
08/08/00 Academic Edition FlowMaster v5.17
08:26:12 AM Haeslad Methods, Inc. 37 Brookside Road Waterbury, CT 06708 (203) 755-1666 Page 1 of 1
,
BASIN A2&A1
' Worksheet for Circular Channel
Project Description
Project File j:ldocument199353\99353.fm2
Worksheet DISHMAN COMMONS PIPING CALCULATIONS
' Flow Element Circular Channel
Method Manning's Formula
Solve For Channel Depth
Input Data
Mannings Coefficient 0.009
Channel Slope 0.005000 ft/ft
Diameter 12.00 in Discharge 0.77 cfs
Results Depth 0.31 ft
Flow Area 0.21 ft2
Wetted Perimeter 1.19 ft
Top Width 0.93 ft
Critical Depth 0.37 ft
Percent Full 31.23
Criticat Slope 0.002721 fUft
Velocity 3.68 fUs .
Velocity Head 0.21 ft
Specific Energy 0.52 ft
Froude Number 1.36
Maximum Discharge 3.91 cfs , Full Flow Capacity 3.64 cfs
Full Flow Slope 0.000224 ft/ft
Flow is supercritical.
~ - . .
~ - - ' .
08l08100 Academic Edition FlowMaster v5.17
08:27:14 AM Haestad Methods, Inc. 37 Brookside Road Waterbury, CT 06708 (203) 755-1666 Page 1 of 1
BASIN B1
Worksheet for Circular Channel
Project Description
Project File j:ldocument199353199353.fm2 -
Worksheet DISHMAN COMMONS PIPING CALCULATIONS
Fiow Element Circular Channel
Method Manning's Formula
Solve For Channel Depth
input Data
Mannings Coefficient 0.009
Channel Slope 0.030000 fUft
Diameter 12.00 in
Discharge 1.17 cfs
Results Depth 0.24 ft Flow Area 0.15 ft2
Wetted Perimeter 1.03 ft
Top Width 0.86 ft
Critical Depth 0.46 ft
Percent Full 24.47 Critical Slope 0.002846 fUft -
Velocity 7.85 fUs
Velocity Head 0.96 ft
Specific Energy 1.20 ft
Froude Number 3.33
Maximum Discharge 9.59 cfs .
' Full Flow Capacity 8.91 cfs
Full Flow Slope 0.000517 fUft Flow is supercritical. ~
08108/00 Academic Edition - FlowMaster v5.17
08:28:22 AM Haestad Methods. Inc. 37 Brookside Road Waterbury. CT 06708 (203) 755-1666 Page 1 of 1
BASIN B4
Warksheet for Circular Channel
Pfaject Descr-iption _
Project File j:ldocurnent\99353199353.#m2 -
1N~rksheet DISHf~1Ahl CONlflllOf~S PfPi~`~1G CALCLJLATIOf~S
FIov~+ Ele~'rent Circular C~ranneE
Method N9anning's Formula
SQlve For Channe! Geglh .
lnpu#, Data .
f111annings CQef#icient 0.009
Ghannel Slope D.6'I 0000 ftlft Diameler 3 2_G0 in
Discharge 1.25 cfs Results
Depth 0_34 ft Flow Area 0_2:3 ftx
Vl,tetted Perimeter _ 124 f1
Top !+'llidlh 0_94 ft
Critical Depih 0.47 ft Percent FuII 3156
Critical Slape 0_002878 ftlft
Vefocity 5.40 fUs
Velocity F-lead 0.45 ft
Specific Energy 0.79 ft
Froude Number 1.92
Maximum Discharge _ 5.54 cfs -
~ Ful1 Flow Capacity 5.15 cfs _
Full Flow Slope 0_000590 fVft
Flow Is Sup@CC,itlool. ' , -
~
~ -
QalQ8l00 Ac.ademic Edikiar3 FIowAAaster v5.17 .
08:28:56 Af1? Haesfad Methods. Inc. 37 Brvoks'rde Road Waterbury. CT 06708 (203) 755-1666 Page 1 0# 1
' BASIN B3&B4
Worksheet for Circular Channel
Project Description
Project File j:\document\99353199353.fm2
Worksheet DISHMAN COMMONS PIPING CALCULATIONS . .
Flow Element Circular Channel
Method Manning's Formula
Soive For Channel Depth
Input Data -
Mannings Coefficient 0.009
Channet Slope 0.008000 fUft
Diameter 12.00 in
Discharge 1.63 cfs
Results
Depth 0.41 ft
Flow Area 0.30 ft2
Wetted Perimeter 1.39 ft Top Width 0.98 ft
Critical Depth 0.54 ft
Percent Full 41.10
Critical Slope 0.003062 fUft
Velocity 5.36 fVs Velocity Head 0.45 ft
Specific Energy 0.86 ft
Froude Number 1.70
Maximum Discharge 4.95 cfs
Full Flow Capacity 4.60 cfs
Full Flow Slope 0.001003 fUft
Flow is supercritical.
1
' -
08/08/00 ' Academic Edition FlowMaster v5.17
08:29:39 AM Haestad Methods, Inc. 37 Brookside Road Waterbury, CT 06708 (203) 755-1666 Page 1 of 1
BASIN C4
Worksheet for Circular Channel
r Project Description
Project File j:\document199353\99353.fm2
Worksheet DISHMAN COMMONS PIPING CALCULATIONS
Flow Element Circular Channel
Method Manning's Formula
Solve For Channel Depth
Input Data
Mannings Coefficient 0.009
Channel Slope 0.010000 fUft
Diameter 12.00 in
Discharge 1.33 cfs
Results -
Depth 0.35 ft -
Flow Area 0.24 ft2
Wetted Perimeter 1.26 ft Top Width 0.95 ft
Critical Depth 0.49 ft .
Peecent Full 34.68
Critical Slope 0.002913 ft/ft
Velocity 5.50 fUs
Velocity Head 0.47 ft
Specific Energy 0.82 ft
Froude Number 1.92
Maximum Discharge 5.54 cfs
Full Flow Capacity 5.15 cfs
Full Flow Slope 0.000668 ft/ft
Flow is supercritical. .
'
' . .
08/08J00 Academic Edition _ FlowMaster v5.17
08:30:04 AM Haestad Methods, Inc. 37 Brookside Road Waterbury. CT 06708 (203) 755-1666 Page 1 of 1
BASIN C5
Worksheet for Circular Channel
Project Description
Project File j:ldocument\99353199353.fm2
Worksheet DISHMAN COMMONS PIPING CALCULATIONS
Flow Element Circular Channel
Method Manning's Formula
Solve For Channel Depth
Input Data
Mannings Coefficient 0.009
Channel Slope 0.010000 fUft
Diameter 10.00 in
Discharge 1.64 cfs
Results
Depth 0.43 ft Flow Area 0.28 ft2
Wetted Perimeter 1.33 ft
Top Width 0.83 ft
Critical Depth 0.57 ft
Percent Full 51.07
Critical Slope 0.003990 fVft
Velocity 5.85 fUs
Velocity Head 0.53 it _
Specific Energy 0.96 ft
Froude Number 1.78
Maximum Discharge 3.40 cfs
~ Full Flow Capacity 3.16 cfs
Full Flow Slope 0.002686 fUft
Flow is supercritical. ' 08/08/00 Academic Edition FlowMaster v5.17
08:30:31 AM Haestad Methods. Inc. 37 Brookside Road Waterbury, CT 06708 (203) 755-1666 Page 1 of 1
1
BASIN C6
' Worksheet for Circular Channel
' Project Description
Project File j:ldocument\99353199353.fm2 -
Worksheet DISHMAN COMMONS PIPING CALCULATIONS •
Flow Element Circular Channel -
Method Manning's Formula
So(ve For Channel Dep1h _
Input Data Mannings Coefficient 0.009
Channei Slope 0.005000 fUft
Diameter 12.00 in
' Discharge 1.76 cfs .
Results
Depth 0.49 ft - Flow Area 0.38 ft2
Wetted Perimeter 1.55 ft
Top Width 1.00 ft
Critical Depth 0.56 ft
Percent Full 49.04
' Critical Slope 0.003136 fVft Velocity 4.59 fUs
Velocity Head 0.33 ft Specific Energy 0.82 ft
Froude Number 1.31
Maximum Discharge 3.91 cfs
Full Flow Capacity 3.64 cfs
Full Flow Slope 0.001170 ft/ft
Flow is supercritical.
~ .
'
08/08/00 Academic Edition FlowMaster v5.17
08:31:00 AM Haestad Methods, tnc. 37 Brookside Road Waterbury, CT 06708 (203) 755-1666 Page 1 of 1
BASiN C7
' Worksheet for Circular Channel
' Project Description
Project File j:\document199353199353.fm2
Worksheet DISHMAN COMMONS PIPING CALCULATIONS
Flow Element Circular Channel
Method Manning's Formula
Solve For Channel Depth
Input Data Mannings Coefficient 0.009
Channel Slope 0.005000 fUft
Diameter 12.00 in
Discharge 2.24 cfs
Results
Depth 0.57 ft
Flow Area 0.46 ftz
Wetied Perimeter 1.71 ft
Top Width 0.99 ft
Critical Depth 0.64 ft
Percent Full 56.73
. Critical Slope 0.003461 fUft
Velocity 4.87 ft/s
Velocity Head 0.37 ft
Specific Energy 0.94 ft
Froude Number 1.26
Maximum Discharge 3.91 cfs
Full Flow Capacity 3.64 cfs
Full Flow Slope 0.001895 fUft
Flow is supercritical. .
' . .
' .
' 08/08/00 Academic Edition FlowMaster v5.17
08:31:16 AM Haestad Methods, Inc. 37 Brookside Road Waterbury, CT 06708 (203) 755-1666 Page 1 of 1
BASIN C6&C7 .
' Worksheet for Circular Channel
Project Description
Project File j:ldocument199353199353.fm2
Worksheet DISHMAN COMMONS PIPING CALCULATIONS
Flow Element Circular Channel -
Method Manning's Formula
Solve For Channel Depth _
~
Input Data
Mannings Coefficient 0.009
Channe! Slope 0.010000 fUft
Diameter 12_00 in
Discharge 4.00 cfs
Results
Depth 0.66 ft
Flow Area 0.55 ft2
UVetted Perimeter 1.90 ft
Top Width 0.95 ft •
Critical Depth 0.85 ft
Percent Full 66.27
Critical Slope 0.005715 ft/ft Velociiy 7.24 fUs
Velocity Head 0.81 ft
' Specific Energy 1.48 ft
Froude Number 1.67
Maximum Discharge 5.54 cfs
' Full Flow Capacity 5.15 cfs
Full Flow Slope 0.006042 ft/ft
Flow is supercritical. ' -
~
08/08/00 Academic Edition FlowMaster v5.17
08:32:42 AM Haestad Methods, Inc. 37 Brookside Road Waterbury. CT 06708• (203) 755-1666 Page 1 of 1
'
BASIN C2&C4&C5
' Worksheet for Circular Channel
' Project Description
Project File j:ldocument\99353\99353.fm2
Worksheet DISHMAN COMMONS PIPING CALCULATIONS
Fiow Element Circular Channel
Method Manning's Formula
Solve For Channel Depth
Input Data
Mannings Coefficient 0.009
Channel Slope 0.010000 fVft
Diameter 12.00 in
' Discharge 3.12 cfs
Results
Depth 0.56 ft
Flow Area 0.45 ft2
Wetted Perimeter 1.69 ft
Top Width 0.99 ft
Critical Depth 0.76 ft
Percent Full 56.19
Critical Slope 0.004327 fVft
Velocity 6.87 fUs
Velocity Head 0.73 ft
, Specific Energy 1.29 ft
Froude Number 1.79
Maximum Discharge 5.54 cfs
, Full Flow Capacity 5.15 cfs
Full Flow Slope 0.003676 fUft
Flow is supercritical.
'
,
' .
08/08/00 Academic Edition FlowMaster v5.17
08:33:54 AM Haestad Methods, Inc. 37 Brookside Road Waterbury, CT 06708 (203) 755-1666 Page 1 of 1
BASIN C6&C7&C3
' Worksheet for Circular Channel
' Project Description
Project File j:\document\99353199353.fm2
Worksheet DISHMAN COMMONS PIPING CALCULATIONS
Flow Element Circular Channel
Method Manning's Formula
Solve For Channel Depth
Input Data
Mannings Coefficient 0.009
Channel Slope 0.010000 fUft
Diameter 12.00 in
Discharge 4.35 cfs
Results
Depth 0.71 fi Flow Area 0.59 1`12
Weited Perimeter 1.99 ft
Top Width 0.91 ft
Critical Depth 0.88 ft
Percent Full 70.52
Critical Slope 0.006465 fUft
Velocity 7.35 fUs
Velocity Head 0.84 ft
Specific Energy 1.54 ft
Froude Number 1.61
Maximum Discharge 5_54 cfs
Full Flow Capacity 5.15 cfs
Full Flow Slope 0.007146 fUft
Flow is supercritical.
'
'
'
08108I00 Apdemic Edition . FlowMaster v5.17
08:33:06 AM Haestad Methods, Inc. 37 Brookside Road Waterbury, CT 06708 (203) 755-1666 Page 1 of 1
' Cj,C 707 West 7th Ave. Plaiming
Associates, Inc. Suite 200 Engineering
Spokane, R'A 99204 Architecture
(509) 458-6840 Landscape Architecture
(509) 458-6844 FAX Land Surveying
a.meU ot wv,& Lna conuamm tm
Paoa~r s HVO ATO ~OWIMO,11<, onTE
soeaECT , c..vLaVOlS Br aol no. 99'3 53
i
~j ! i_..~..~ ~ l ~j.i.~I.1_~~...i~j._.I
~..y
~V~
~;_~~~t~~,~u.~~~~~~. ,~~~~.;a~ ~
~s~,' ~~f
-_i__y
~ " • ~ . t- ' a. ~ ? - i_~- ~ ~ ' ~ ' . n ' F- ~ ti- ~ ~ ~ ~ J~~._ S...r.__, ~ . i ~ '.~i- l h f i.~ _
~ " { j'j•-` ~ `~~._r ~.1- ~ ~-i----~ i , S" t~~j~ I ~ t ~K. ~ !
' ~ ~5~~~~ ~
~'f~= ,4
~ ~ ~ ~ ~ t~ ~ ' a i ~ ~ ~ ` 9 • 1 ~ e . : ! g i 1_
~~e.. .f._{..-..-9_ _1.t .i_.~. ~-,_~!_~r i.,~.+..~---~--f-3_~•--°-----i .ti~..~. Z-.~~~.L_*.,'+ ~ ~-e-~- . 1.T- e . ~ ~ ~ ~1'--~ ! p-~L_
' ~ i ~ `j + • ~ ; r- ' ~ ' ' i
F~]
/}l~/,
I't.~r.'.~~~~~i+!.0~~
i 4 { . t 1 ' I Y ~
~~_T~.i.
- ~ . ~
--~--k-.-~- --~9-•}-^r<--L-- i' -r_1 .~.s_;..;, ~-_i--~_..:,._S I 1 ~__-r-.L.,~ t_~ i_ ~t_,~.~._ i i-~_ I I _
..l.. ` ~ ~ ±_~a_~~ ~T~'~ } - ~ - 4- ~ ' ' -'--i--~ , t ~ ~ _i._. - - ~ s--'---+ - Y ~ ~ j ~ ~ -,L..t.. ~~~1_.. ~ -
, • , ~ ' ~ ; f a t ~ i ~ . , i ~ ~ y , ~ ~ . . r-~~ ~ , :
R~~a 3 s ~ ~ ~~~~~~VL~ f i` ' ..i f . -~~'Y--t _'y r.'-~` f P ~ ' ~ ! 3 r ~ • ~ ! f
~ ' ~ N ~ . , , _ a _ • t ~ ~_J _ _ , , h - •-t r • v^- ~ ^ r . f ~
~-,--~-.~~,._~_~:_t_.~ _ s__F_~__~._ .~.~iii~~ll`' . Q ; ~~63~G~'5~..;._; • < : - ~ ~ ' - [ . ~ .;-~-._~..~~..~_.~_r__~
f i . : -4- + - ~ ; - ~~-1 _ : - ~ i ~ r -t--- 1.. a~l_. ' ~ _ : e_
~ -r- - _ 1 ~ ~ -.1... _ ~_y~Q x.~'~~ : _'Li~*~,-,•'- g~ ~ ~ ~ y- ~--:-a-->_~~_.,'~ )._.1. i.._i~jt i ~ ,s~„f, ~
~ ' ~ ~ ' -'_..~''_t.. ~ ~ ' i 1 1 ~ ~ ~ + + : _ ~
~
.....Q~....~C.;~.._/D
,:..~~c..t
_J,...-' ~ ' - - , - + i ~ ~ ~ ~ - ~ - t ' ' ' ~ . .
,_"t'-J' ~ : ~ 'Y -3 -I~- ~ •~M•^~y :-~t z_~~ - ~ • _ - 4'
4- ~ ._q.
~
~ -~a-•-~-.,
. Q ' ' ✓~Z ` • , ~~j1 / . . , i , i t A ~ ~...._..~V ~t. ~ 1 I
~-^--t- : „ . t , --i._... i~~i~~ s. ~ ~ .DO .4 /-T- ~~~1-,'- -~4 4-~._ + ~ f ~ f
!
i : . _ _ . . - - • • ' . ¢-_~_=1__.__~ _ •_a_ . i_,~_~_ ~L~~`~..~.._, _•_.i ~ a
~'-o'. r a_ _ , - ~ _ ._.~,~~_.s-4--~-_t`:,V f i ~ 'OQ. _L/,-:~•L!/~i~ r- - _'.i....Kl%.`~,...-i~~~ i _...r-}_~ ~ .}..-t....t. d~.t
~
~ ~ i ~ .
.+.._,.._,a..,~.-..,~:t...~..,•~.-l~9 a '{~,T~ . , i~ e.'..A..~4......_. .F..-¢- ~ ~at'°~"',_...._.. ~ ~ . ; -.y..--.r i t,~11.-..~- .•.~s..-.~.-. ~ , ~
4- 'v. i .Y_.. ' -1-. ' ! ~ ' " " ' ' " _ ~ -6. .-b--F"~-- - ' ~ ~ . +-~_-1-. 1 t ~ ~i ~ 1 • ,i~
,~,r-}
j K. 'J
-`D ~
~._'j
,+-1-" _ ~ _ .•1».~-4. ~ ~ _ . . ~ ' ~ H.~••F•.~ ~
..1._~^
1.~....~..~ ~
-q
~ ~-''i • - ~'-=-f _3' `~.-~'r --y~ ~ GA:~!G- Ft-~ ~ i2 Q~-~ ..i_ .i.._.~~--~--~~"'t'~~}-- "'~.--j- - ~ S -i . `j f _ _i.~b--T't~ "Y _j{ ~ _
~ I ~ t ~ j,.~... j } , J- ~ ~ _J.__ 1 f ~ i o...'._ , • ~ ( i { 1_.' ' ~
1~
+l~ • ~ ~ a--L~"'T."'~.'i '
~ -r " ~ ~
T 1 f ry • ; , 1 ~ ~ ~ i " , " 1 ! ~ 1 1 7 1 ~ I ~
f
...t ~o-._ a . . ~1~--°¢ - , i' -,'+~c~-t-~.e.....~~.._,~~.i~.. . ,.~;r..' ~ S.. r...~~~..~,.at,.-c•~-.r..._. ~ ~~F~ ~ ~
. ~t...._~....~..-~
~~.~_e_ .i_._.o_ _ ~o.~. : .,5~!,,_ -~',--.j `f t..-~ _~..~',_..l~'_._i....~._.? ' ~ ~ ~'--L. ~l T. i^ 4_rl
J_
- ~1--= _ t,~i ~ i } r ~ L ' ~_-1_ i--~r._f~, { ' -~_7+~-_ ~ ~ -~--~--Y,_~ ~ y p ~
' -F -~--y .i- ---r`f--` '..f'...t.'°~..~ J. Ij _
' ~ - - ' . ~ - • ' ~ • ' ~ ~ ~
. ~ _ .-a._. .
L'
.
~
< ~ - t -
°'t Y f' '~"'i
- + d--T ~ i d ~ #--I , _
- •
-
7 I ~ a_ p
- - - -d- -c---~~ r 4-- ~ _y.~.~._._. _ ~....L-P-~ t- =
' - ~--4--, > > ' ~ ~ ' : ; ~ ~7-
{ i ~q r j-L._•~.T _ ~ _ ~ ..~_F~ ~ ~ .y..~~~_.; ~ _i•__~:
f ~-j_. i.r~ ~ s-v ~ ~4~ "r ~_.a. ~ a...j_. ~ ~..._a_+-- ~ ~ ~ "'"j
4 -i.. ! _ p•-a L ~ i ' -i - ? - i-_r- y _ ~ ^i... ~_~_..p...~ ~ ~ ~ ! L i_ E ! --~~i~ -q < L~._~
- l.~f i i,'~ _~...~_..~~I ~ E ; '.~_~-i
H-71
' i i_1~~;~~"
` }~4 /■~~..Y~ ' ~
Y
~ 1~ Q. S ~ _ y f 5_ _ /~,+t r~~ I 1',/V....i-.. ~•`~-••Y ~ ,T-. , ~ y,;. ~ I
y -l--~ ~ ~-..W .~j--~~r-~- ~ ~
~ ~
_t_.1..
r~.~.~. L.1.~..'?~'^~~
a ~T ~ ! ~ f • .8~ ~...a_-.C-•-i- (4 ( i- -~«k. ~ ~ ~
~ ~ f ~-,~_I
t j
` a--' _ ' _ _ ~ f ~ ~ i-,~~- ~ ' ' k i i - -y=-,',- 1 1 ._f ~.~V ? , {
j-- , ~ i_-~ • ~ , ' , _r i ~ , ~ ~ I~ ~
• t ~ ' . .i ' • ~ ~ _ 3 _,~.~~._T_.i ° j__~.~
, ' ♦ ' • L/
t.r-~.._f.~,~. . _ = $ t
`
_.lC~; .,~,lJ~=~~.,- (CJ a__ ~'.{~F~t-~~ ~~~~M'f'^•.....~_:.~.~ ~ ~
Y . . - y - 5-•'.-'~_'...' .i-....r--t f , ' 1 1 R ,
_ ' . _ . _ L' .~.j ~ -1-~-- ~ ._1.~. a.~_1_ r ti' - --i._ _ -o --1-..,
: 1 _.'-,-i~`~_.•_ 1
r.. L
1«3,..y......-i.._. w"~. r'~...d...7
_j
~~.i . - 7 - L- ~ _L. ~ .y~-.r' L-' S^'~ .~a__, ~.._f t _ _2._...' ' . , ~ ~ : ~ _ ..y..~
~ r . T' ~ ' ' ~ ~ . . ~ , iu ~ t ' _ _,L ~ {'~LL' s ~ 1 f ~ u~ j '
-1~- 'I• ~ _ . ..a. - j
t,.'.. . -
111 A P1liE / Of ~
, Cj,C 707 West 7th Ave. Planning
Associates, Inc. Suite 200 Engineering
Spokane, WA 99204 ~ Architecture
(509) 458-6840 LandscapeArchitecture
(509) 458-6844 FAX Land Suneying
.w .01au of cotiaro vr cew.ima rsc
P80JEeT ~D~~'~l}' S tlAiE /o ~ 5-1a)
306dE8T IA4WBy D~ JUB N8.
~I ~ ~ ; t i ; r ~ _ ~ r I ~ ....i * , ~ "'Y ~ ~i t j ~ } ! i ! ~ E ~ ; ~ ..d ~ . u • - ~ ~ ~
~ -{--r t~ n i._.. _A... _.-t ~ ~ ..~.,..1~. ~ ~.1- ....1._E"~--~~ . ~,.,.'....j.. ; .L._~._• r-~--{•- --i--'d--o -~i ~ r ~ V..3
.i 9_.~_ ~ r ~ Yt •.l_i
1.. " • ~
~ ' r ~ , ~ .~T~~ : . + ~ ~ ~.i 'i ~ ~ ~ E ~ y4'• ~ ' t ~ . I -1 } r~ ' =
- - - L - - ~ ' ~ ' ~ ° r ~ _ r . i , ; _ . . _ .
~ - , r' { - 5' 't ~ , • - _ ' j -r _ _1 _ f - _ . - - ~ - - ~ -
2 ~~-L
• - - - ~ - ~J- ' - ' ' ~ ~ ~ - - - ~V.S_ ' ' ~ ' ' _ ' 1_ i .t - ~ -
f--~--
_1....~.~!.....~ i_~-__ l_. } / ~'j, 3.~~~'. .:J ~ F-t~ ~f... ~ . ....i..L~..~,.... ~'~.i.._. - . . .
~ - _ ~ ~ . ..p, . --i C ~ - . ~_.;...fi • . r. L ' " -e~-' . - • . ~7 - • - i~.~_ _ , - y . . ~ .
~J.. .'o.~...-.....s~,. , ;.~G.-~-~4, a~...~ ^6--°^.r.~a ~ ~..~q.........~ w.s..T.z.- i~..;.. ..w.t~ ...f-..1~ . ~ ' •S•e.'..,,*..,.~.. . ' _1 ' F
e _ : . ~,.....r~.,_.~.,..: ~ r- ~ r
' 1~ ..~....~i ~ ' ' $ ' ' ~ _ fl~--•~~ ..-t_~../~~/~1~...t." _ '
v--- v+-i . y , ~ ,1...._'_'~~'r ~ ~a~- ~ . i~ _-/'t~Z. 4.. ~ ~rz~. .7 ~i .4.,. r _ _
' ~ ' - i ~ ~ i ~ . ^ j ~ ~ , . ~ . : _ 6. 1.- y i- - ~
~ • m - • ~ - ~ i ~ - - - ' • : ' . . . ~ - - - --e--__-- _..~~_..1 . . - ~
3~ . ~ . 'y ..w__~.~. .1. . -a- I.-T_.._ _ yt- ._t7 a. t-•._.-o~ ; . . ~ s
~ . 'r-' ~ _ ~ ~ ~'^T-..~-"
, , ~~1~ • t~ ~ " ..-.J,._.r_` ' -t-...r i.. ~ i ~ _ ~ w' '
L ~ • _ t _ti a. ~ V ~ D~ f ~:`9~-~. . - t-- - , - , ' -y_;. ~ , .
~ T~ ' . i ~J~ ~ ~ i $ i ' . ' s ~ . f 1 ~ i y~ . . _
_ - _ _ ~ _ . j.. ~ _1 ~-;___.~.~-s- r- , , - - , . ;4°-~- - + _t_ ~ ~ _ . . - ;`-~•-r -1.. y.. _ _ - ' . . . - :
s. . - . - . .a . ~ ..2-a.. , , „ . . . _ ~ . - . . ~ w`~. ~ , ~ . , ~ _ . . r « . . . i . . _ - . ~ . ~
~ . . ' s~ . ~ ~ ~ ' t r ~ ~ ' ~ ~ ~ . ~ :0~.^ 1._ ~ ~
; : ?S`G
_ ; 1.~-.r ~ ~.I ` Y_ v ~ _ • ~ 1 ! ' ' ✓ ~ _1__.1 _~r. . ~ .1..±- t . 1 ~ _-v~~a~ ' p ....~,_i_~~ ~ 4 ~ ~ r-♦ • ~
' ' _ - ^ ~ ~ , t ~ ~ ~ i •_,,i ' • " i _i-..i'_i~'_ 'J. ~ . -
_6,
- . ' , ' _ ' ' ' ; . • t . ' , ' Y ..7 ; . l...,._~ f......~- ; _.r_ . .r ~ . • ~ • • - . ' ~
• , ^ r . . . . . •--C+.' " ' _ ' ~'_"w ~ . 7 _
" . ' . ' y ~ ' ~ ~ ' ' ' = _ " J. _ T.`.J . i r ; i . t . f. 't~ , _ _1 . . .~1 . •
, . . . - - ' j <U,;47 L1/_ `7-,4007 "1 Tt}'I~1E'. o -~--3 i. ,S- .Tq-r..,~~-~_~_-~
~ ,ar.f.'r~ ' i i . . ~r - " ' ~ . ~~-i' .ir~_•+_i.^. , ~ . . . •
~i ♦ - ~ . ~ ' h . 'Y ~ ` ' ^ ; ~'r"h j + I 1 - ~ ~ l
~ ` . • r , ^a ~ ' , ' ~ T ' ^ ~ ~
• - • ---~-C__'_ t_~..1....'. . ~ i. , ~--.i _ . , ~ . , - ~ .y..,r_.r~_ : ~ .1. r. ..-+~-r-~-_ 1._ t,...a._r'_ . ~1_ _
. _ ~ • .2 : _.y._-~_. ~ 1 . - - -i-- L - , • ,--i--~ , - -~---r-~y- r--t--~--r`
3 , t • ,
, - - - - - , r-: 1- i'- ~ , -~--i 3 ~ ~ ~ .---r- ; `-•i- ' . . ~-3--•,._.---E ~ ___'_r ~ - .
. . . a y.. _~•--~i--''-- - j , _ - _ _t- .k_ .~....a. , ,i.._' .~,~;._~_.~.~~1._.. e~, n r y
~ltS_lr,j^r-i-
. • ~ , i t , ~ - 4_ , ' , i ~ ( e ~ -7~-...._-F- . . f ~t_ ~~i_..,, ~~....`t ~ . ~ ~ _ ~ _ ~
'
; _ . .-•--`r-.L-l.~r. , , _ _ ; ~ .4 ~°,^-E -'--;-i-%---~--~~--~-3 _;o.....~.. ~_a._~,{_?. ~ ~.~...~--:_~_...o..~~.. . _ i i .-t--
~ _ . ' F • ._t___ *..-y J
L_~___.:_~_.,--.
_ _ . . - • - . •-i - . . _ a ` ~ , Y- ~ j'°`.~'.~~ c-~'....~_.,.~.y z; _ ` 4 i •-i t ~ i.-1.--:~~ ' t _ k
g)E2-~~r~~)
_ ~ _ : . . - : _ < ..._5.._f__." ~ i.'-y ~ ~ ~ 'e - o
-0-:-t._•-t-•-_-i L_ ( _~-^?F-~+-- ~ -f-• 9- . -'t -j-..~ 4.._i_.p...~ j-...i~~..~--• _ i ~ . - i^-~-~
~r-
. . .~.._.f.
, . r ~ . . ` 6 . ~i~._~_ •
~ - ' ~-~--T--,-- ~---i-_,._ ~ , ~M" ~ t . ~ ~ _ ► _;__1__ . ^ .{_._s
~
' { ~ ° `..~J~. ~L.-~~.^ , y^--,7--Y~ Dd r ~ V • ~ , ~ 1 ~~•y T~~~^~~~ '4-i-t"'1_..+'°,...,~
A , ! , _L~ ' ~ _'T~ - . ' _~_~_`'~i j I t ~ ~ ~ ~ ~ E ~ ~ , ; s
~
,
, _t-{
r!
; ' ' ' ~ 4~ + : ! , • . ~ i ' j , i ~ ' I f . j ? • '"3°~~~_ , E !
4-
_ ~.i._ _ . _ . ~ f..._~---;- i ~ ' ~ .1' ~ , i ~ ~ ~ i._~~~!~...' ~ ; -~--t- -~~-°=-'--~--~°--i--- ~--9~ -i-- --i ~ ' ,
' _ ~i_ .y;.--t(~--. ` 1 t ~'A._f_2_ 1 i , ~ _ j._.: i~"• i^--~ e t { _ J _.4 .~.._L.. y.~.Y ....i-~. i i ~ ~6l~ ~._,i_-., . ~ ~
Or~G~/.; ~-4.`~
g ~ E , ~ 3 , - . -i--~ . - ; , • ~ o . ' 1
t
~ • _ _ Y. , f ~ ~ . b . ~ ~.V:/t~.~~/ 1 ~ - - ~ ~"1 ...a-. ~ ...4.... r g ~ E ~ k ~ • - ~ ~--E- •
-_F--: _
~ ` t
F '~-r-~- ~ a- 4 « k..~.._.p.. t ~_..i._~..« _ ~....~-i . '~.~..q_.~._3.~.~.~{..,.f..e..~ _t._ ...r_...{_._1.~._.~._ +r o
• ~ ~ ; ~ , . ~ p o ' ~ 1 ~i ; ' - 1 I , ` 1 ~ , . ` !
' , --r-- _..~~.3 8~ " ~ ~-`'~---l~"'~- • - ~ ~-~-.t ~ ~ t ( ~-~.~a.
, T ~ ~ ~~i
~ ' '
~ ~ .L~. .~.f ~ ~
Y~
, _ ~ , . . ' . _}'_~.~1.....~.~_-~.~t...._ ~ _y....~„ . ~ [ ; -~`-'~---i---'-_-••.~~~ ._4...r -~_.P ~M~.~.~.~_.~~~-~ ..y..J__ ~~i~__._i~r.~.._i•^.~j•--.
. ~~.,._.t.~.*._~,.t~= ~ i~~'~ ~ ...~C^ r~ ~`~~'~j • 1~/w/ ar S~ /y~ -`E/~ ~ ~ J~~..,,F ~I~i ~ j/ ~ ~~I t 4 y,'/` ~~~~r~~^a^.~^.-i..'~
. • - - ~ .Tt..V-~'~r"i- i~~•r-.S.L'..V,_~...,,_.~C_!y~
a.r.,~•~ -i-% `-`~-1-~~°i ~^~--7--~~i -"'°„~-"'~~~~!r^;/•;. > ~--q~-~.. j 4
. . _ __i`.,,".f.. z , : -}--~i ; r, _ :_...~_,_i ~..~.~,~...J_ i .1_..., - ~ .1- • -'r ; - •~•--E- --j--~-r•rt°-~- p -f - ; ~ ~ -~-t
L •__7_r _.~._~,I.~1--~-.__.._:_._~~._~,,..~ ~ .._.,~..1
- - - - •1- ; 4 -f --t~-~ -~t- - - ~ _ _ j ~ s...~ _ _T. - ~ • !---1 -4- - ; r- ~ ; ~ - ~ - i- ;
' . _ ' _ ._~.k- .-I_...~ ~ ~ _ _ q~ Y___ 1- 1 ~ ~...r ~ . ~ N" A. ~ ' ~,~~„J I~~k ~ ~ ♦ A.-~ .t-~'
, ~ -t. ~ -t'~ i - _ l_- L-..~~.,~,..~1--_~_.?y.-; t ~ ~-~1 y._.. ~~-7_ ..+.--:..-r i-4'-1-~' '3 ..1..._ ~ •-~'.-..i
, - • . ~ • - f...'~.. i T i _.fi_ ; 1
' ~ = S._~-,__~ . _ . L. t. s _ ~ , ~ ~,r..~-..• ..L.~.~` J.,p. i... _t, ° - ~ ~ ..~.,1.._.L_~_,.4
- . . _ w_ . . A..._ _.a..~ ~«..t+- w.~ ~ o ♦ .e v a ~e~..F . r._...-1-..tre~.~.~..:.~.5-~.w..L~ T_ A ~--~4` .~..:.-.r.~~«_3...~ 1 I..J.~+~ ~ ~ L..L.~v ~J.s•_. .._r . w..t ~d
3
v~o PnGE 2 1 0f
Cj,C 707 R'est 7th Ave. Planning
Associates, Inc. Suite 200 Engineering
Spokane, WA 99204 Architecture
(509) 458•6840 Landscape Architecture
' (509) 458-6844 PAX Land Surveying
Peod~ ~is Hr~~-Yt ) 66Mr1?~'i.~S 'm 11013"/oo
80BdEBT Q 1 P 2A P 77o/lJ~ BY d06 N0. 3 5-3
_ , ~ ;.---i. , _ a... _ . . _ ~ jo.... r .
~ , ~ ; , . .,K,,, , . ,
^!•--~-'~--1'--+~--' '-i-:^~~ ~_L _'i '..~...y ~ • . r
M~ i
I. +1.~L'~..~.Y'~ ~!~r.l~'~-•~/o.- r~ _ .t..~ . ,~N- r 0.~~ . , . . ' ' " . - a.-.-- Y.. i__._ ` + . ~ . . _ ~
r-•~.._.~.-0. -.,~..~-__~__J~{=i i ' V-~Vj'T
~...i `....'A.; ~ . ~ ~ ~ _ _ - F. 4 . 6 ~o' _ J Z.~! iT ) . ; ; ^ ~ : ~ : _ ~ . ~ . ; - - • , . J :
` ! ~ ~ ..s . a,_ : - ~ . , -r- ,
.a,~.I , ~~'~"'.k_ ' . . . F_. ; ._.;.,U..`_. . c _ .r.... . . . _ . ~ . ~ . , . -
~.a.._... ..E ~ - . ~ - - - •r - ~ _I. ~ . _._4_ . t• - - . . . ' _ . . . . __.a._..
~ 7 _ _ 9 -~i..._3 i ~ i i i v~_. r- . ~ : ' _ " _ _ , _ ' . . . _ _ _ . . . ' _ _ ' ' , ~ ' ~ ' • _ . . . ~ - ' ~ _ ~
3 ~ ^ ' . ~ 4 ~ ` : ' I - ' -z - jt~ • , . ~ i
f--~-.~~~--? --~?-.*S F J.
3.1. ' .~!_~._.t_~..,r._t.--t , ' ' S/Z - - - . _ _ , • : r . . • . ~ •i
k__~_~.'_.__k_ ~;--.F.--: ' Y_. , . _ _i ' ; ~ ' `✓o , t - - - - - . - - . . _ _ . + . _ . _ ~
( L,~__`..~,..._1,_e---~ ~ ~..'-~1-•' . -~-^_~t._{.... ' , i , : ' . .-+f - - - . . - ~ - ~ - . i
L:_~ ..i_.~ ~ • ~ ' . . . , _ ' ' . ~ •
) ° • `,~i~' i j ! _ . _ ~ . - ~ - . - , - _ . . . _ . _ ~ _ ~ ,I , . . s / /li/ .
:._._r_ Y_~~ y. .j.._y,~.._~ ~ _ w~-.~ _ •l d !DO'?,~--.V I ~A ' ~C r ~ ~ " ' v v i ~ C : • - - - - ~
_,.y' ' ;~.,5....~._l.~q.~,{F_x t. .ti . _ v" ~ . 1 ~l ti.~ V . . . , _ - • . _ . .+.a~.... ~
~ -f "i - ~ ~ ~ ' - _ ti- ' . , . - - ~ , c M _ ' . . _ i ' ' - ' r - , _ • ' i - - . _ ~ ~ . . - ' -1. ~ . _ ~
' r'~ ~ L p-"~^_ _ . i C 'V^_ ' . ~ i _.'«y.. , . . - ' "
0;Z3FT-r
' , '.-1-4--.'_~ - r { ~ . i-' ~ ! a~~ ; - ' ~ l ' . ' - - . ,
: ~ ~T,. ' ~ _ _ _ . . _ . •
t O^ •V.-. r. t ~...~ME': 2d5• ~ 60 //^.c _1..~_- . . . . . .
~.~W' - - _ . ~ . t ~ ~ ' • ~ r- : ~ ' ;.1 _ ' ~ - - . - ,!r ~ ~ '
rDUe_ t
_~._~.^~,.i_1 ...>Y_._~, a.. , ' _1 , . , i ~ s , : --'-'-•-•l• - . , - 1 ,~Y, •,_---Y-'-,-•Y-~ ~ • . ^
. ~....,~',...5. : i . ~ , __,_.t- i , ~ .j , ~ _.i . , ' . - , ' o._ .__i_ . ~ ' , . . ,
4"4 .E.T ` ~ _ I ~ t ~ f i ~ , • .
+
;....r..
~ ~ _ . t.... , j^~'-~ , i Sn ~ ; , ~ ; - 1 ' ...-._.._.i-1 i ; r . • - - . ~ .
~~.~_k./~ `~...-I~V~ -i~~. ..!^~..,ti. ' .r.~~..-.e. _.f ',ti.._..1_ --4-~ _J•:~.~.~t..~~~.l~--i-.~~~ . , . . _ r . -~q-.4.d
A ~Y~ a ~ I 1 t ` l 1 t ~ r ~ .
' ..1i«..- e~..L . ._F» . - ~ ~ . . t.t +oM , . ..e:~..•f,+-i.... r.,..l. c, ~ . r , -t*-. « ,
' K.'. ~ ~ . • ~
,.'....t ! ..a_.y .y ,-F---~{{-. ''-°i..-~7" _'!'lL/I-V`/i..._~..-. ~ / ~~~f 'T"i._~"'~_..:__•_-1...~....~ ' t__j._, , _ . a - • - ' ; - --y'
5'~4__i• ~ s ~ .r.. ..S - ' - a. .i.-- ',."~_~a...;~..',. 1 _ ' ~.-i-'r . - ' ' ' - - - ' ' "1
~ i~~ i I ~ i ~ _ i . J ~ v- ' ~ _ , ~ ~ - _s....~ ~ ` ' [~.t ! i_-••. - - ~ - ~ - ~6
~ i.~~T~ 1P ~ i ' u' ~ ~~i = ~`Z'!~l ~ = • W~`'~ ` t- ~ _ - . . _ .
y I ~ ~ y~- j ~ ~ i ~ ~ .1 : i ' , ~ ~ ~ _ ~ .,~r..,_. r. _.a _ ~ -r- ;
_ r. . ~^-.4-,.~._~~.c--•e-• ~ -A-~_-~-.•~. _ ~ . - ~ - , : ' '
~
"'f"~-~~ , t ~°.'y -r- k b°;R;. i a ♦ y......~.4 i--! ~ i 9 a f ~ _ i` , , , -,•-Y-Q
~ ~ .~_.i _i_ . ~ ~ _i. ' ~_L~.. i _ . _......}_.r..t~,_ _ ~ .4 . - • ' - ~
1 -
~r- -..1,.'f.~'=t"~~
--i--t ~._t
i,.~..._r_ .O»
~ jzY.' r.'1..dL
, , a
,
' t ~ ~ ~ ' • ~ . ' ~ s Y ~
~f~' •t 3~!~1 4-- i- - --c 0-- _
; S t 1 ~ S._ 2 ~ Q_ ~ ~ M
~"'1"S'
1 i..,~ ~ t j }Jr..T_..,`_-~_.. , j j...i~- d-~'i•-'~-'-a-1,'_`'`~a-~--,_..~-.~_'L..i. ~..~~.....1-~-l---~. ~ _R_ i l ~-1-.; F--Y
• F--~'~(4 ~ ~ -~L~~.._.~~j. } i ~ ~..~..~s a_~1~ i
~ l 9 1 .t.... 1~ ~ ~ : _y.~ ~ ...f~......~ ..s r• ~-0
F
~
"'I
' ~ ~ ' _ .
f.
1 ( ~ ~ t ! i_ ~ ~ ~ k_ _ , ~ `
~
~~4 c ' • k ~ ~ i ~ ,l_l._:'_7'_'._ , ' i t- _ , , ~ ,
~ 5,.`2•-'-~
-t K-~-'~;-
~
-~---E.~. E~.!-~_jr ~._,_a ; ` .j..a
T .~4-4-
~
y
,r -1 °i~--t-v-~- . .-r_i • _:W•~ .
,y.._~S .,';--i -.n.-_~ ~_'~_~~E~'~'Y--i•-~- ~ ~--i-'~- ~ ; - . _.i-.p._~--a,..ti.... ~~_,a-....e;
~ ..J
' ~ ! ~ I~ ~ ' i ; ~ 71yvfrV~~~ ~i~ 4'L' - ` .~_~..'i._..~..., ,.._~._x~.- - . . _ ~ _ _ . e
I_ .t... - ..Y_ ~ . ~ ~i.`~'.a, _~.s ~ S~'-• . : ° `-•-p-- e , ~ - - -
g _La_i_ _ 4_.~-.!T i ~ • ' • , :...5~: , ° : 1 ~ , : . , i ti
~p . ' ~ ~ ~ ~'..e~ ~~i'~~ ~^_'~~}~'Y f a. _ y...i _ r ...~r.~~ ' " W • '
R . ~ -s• ~ __j--{, _ ~ 1~^ ~ ~ ~ ! ~ ~ • j ~ . a , e d ~ i_ ' ' 4 "1 { ' , _ . j ' -M
~--'r-~-~1__}..-'t"'i
i.~r.~
_..j.....2_ } -{.rL1....~_..__..~.... j -1•--t-Y-+ -j
~ E-~~-~---t''_.:
1--~ ~----f--~-;__7.._ y....T.,.~.A`._,,...~^~i -l-~• ~ i ti
~ !'--r-`
-~-_~'-'i""'Y'
- -E--'~- ` ! 7--; ' -
~.r... L..o..~.,~q..r F ! b 3 ~-r ^Yw ~ ~ ~ ~ . ~ _ i 2 t ' ~ i► ~ e ~ R~,-~'_,.a~.,r
S~F~~ rT~"~~1_,.S;~`Q~:~~
.i...~....~-~ 1{_..(-.~~ : .T . , J` .Y. r. ._.i~..~,. , ...4Y , - - - _ . _t.~~ .,.-+-.:_.J. _ '_-G-- 1- . • ~ " ~ - ' . ~ • -j'-i- - f
• _S . --L._.,.-..f-•-i--~---r-4-^-....}. w. a...~=_... ~ ~ ~ _ ..S..,o" . , ' Y'. • ~ --9
~L 2
~ i q ~ ~ , ; ; ~1 ,~1-.' ~ 3 T';_'-i (~'r- ~ ; ;..';'g : , x c ~y ` • - ° _-i'_•,•. ~
i I i ' --i'-'"T - t j , • .
` y ~~._f....~»i._1.~% i i ~ ` ~ 1' i i r-= { j...~~T;_ -'T- ^1'- j` . a ..5_-}_.~ i _ ~ _ _ o - ,
~ ' ~ t. ~ 1 ~ ~ d ~ , ~...a-.,.~... i T-i ~i• f
J_ . . ~ . ? . ~ i ~ ~ i_.~ ..r.. ~ ~ ~ . { . ~ ~ _ j : ..,f__. r. _ i-- ; - - . { , - ~ - - ~ . ~ ! -
y'~-
1►1/ PA6E J~ OF ~
.
'
•
(or -Dc2 • .
, .
+ I'°
. . ~ .
I~o
D12
fat
. : 3,Q + ID° ~
~ ' .
_ ~ D 3ri ft .
.
DO nside
ittis
~ ~ - ~scl~ar8e• ~s
Q -P'pe
~
.1-W _ T ailwata dc?tl*&' .
~ .
~ pd 1r.n8~
p~ is not weU-d~'`ed'
p~ ft.
I.a. ~d~ ch~nel .
~ ~ ~ '`N = 'R~p'rap blaa~
s ~
f4v
,
S~m 4
Soc _
~~'"r'` o ~ 3pa
. ~ - .
~ 3Oo ~
: 0'1 S ~
~
.
1
. ~ , • ~ ~ ~
.
1 . _
• " ~
O0 ; 0,4t,
3
y
. a~~ate< < 0.5 0")
. , • ' •
.
Yy = 300
, ~Sa,twates 2~•S 01)
. .
~
. ~ • r~p Rev~~eIIt t
~ - ~
RiP . e outfall e11,
~p ater 1`~ana~e~en~ ' Cc
k ~eS ,~Or Stotmv' 1998
G~de
. Addend~ 6-'9'2
:
'46 1
000~
. . . ..1 ~ .w Ma'eu..nW M ~ , . ~ ~ i Eu8A4~ ~ ~~`::1~ e ",f ,r
~r-c C :)1VISIC~i`.I VV~~`i a
, , i r%;';~' ;~'q ' ~~~•i __~_r.. _ , _ . - - ' r
i ~ ~ 1 ( I. ~r w~ M~ ~ ~ w~ I • 1
I ,►~-il _ _ _ ~ - - . ' _ ' _1~.,. ~ ; ~ t
,
I, ~ _ ~ ~ .c~, ~ , ~,I O , ~ I , a Y. u ~p~l rl,~~ ( ' ' ; , _ , I• ~ .
~.r~ ~ ~r _.~c ..r~ f . ~ , . ~ r•~~ ~ ~ ~ ~ ~
~ . ~ •,.n..-. ~ LA.
.~.L.A
•I ` , ~ . ' t~:.._~~, _ ~ (_?...\C.Q ,f~. ~ ' '„ro.~_...VI:_., ~ ,
tD .~~j , , ~;~J; 1~• -~r ~ ~ P ~ ' ; ,
n A . 4 ~i ~ o, ~ , ~ ,
0
_~•~_~;1. f . . . ~
~1~.^~..,'~,G~.J_„r~;._~ , _ , n.._ . _D p
~
I. o
. ~ _ _ _ _ C~ - h ~ ,,f_ . ~ ~ : ~
I ~ . G. ~ r,,, ro{::.,,,. ,._~~.~c..~. '►_..:_._a ~ _ : .
. .....I ._L'._ p~ ~1 ~r „ , . • ~ , j , ~ ; _
`A_.L..`^
~ i - _ . _l. . _ .
~~J _ , _ ~.1J ~ , , ~.i .I..I~ _I i .I-- ~ ~ ~ i Q~ e-. ,
4-4
~ ~ l~) ,~Q r~ . _ . , _ , .
~'1 ~ _ ' _ I . ' 0 _ -L,J; _ ~ . , _ ~ i ~
. . _.._~4 ...o ~j.. 01~ ~N ~i~ a ~ , ~ I"• 'U1' ~ ~ ; ~
P'' `Z
o;
` - , oM
_,.,.._._._.14
. , _ _ ~-1~.~ _ c~....~~: ~ _ ,~o _~r_ ...r~._ _ ~ ~ ~ _ ~ ~ ~
~ _ ~ . ,...,~.ti - . •;._l..._ ~ '
_._i_.. ~c..l~ ~ ~~•J;~~.~ . -;i , i. .Ir. i I . .
_ , _ ~._p~ _ ._._r.. , ~
~ ~ ' ' . . _'...~..I...I ~ ' ~,_,,..1 ~ _ . ._r.._ _._i....;..... .
5 ,
, ~ . - - ~ . _ . . • • "
. .r'~ ~ . . ~ ~ . . . • ' • ' ~ _ .
. r - . • .
` - _
' • - - . • ' _
} " • -
. . ~ . -
i - • ' " ' •
~
J
• ll ' _
. . . .
~
30
, .r, . . 1~~ ~ - • . _
~ f~~ - ' • • ~ - -
- - - . • - _ ~ ' Q .
.
. `S~ , ~ . _ ►~-5.
°
. . , . .
. ~
.r'~ • ' .
. Al-~ . , ` . .
' C~'~' _ . r-•-.i- . .
~ ' ;.~~~--~~~~,~►~ca--~~ ~'~QG':<.-~~'.' .
-
PLarv ~ .
D
- o •
. _ .
~ . I j ' •
. ~ - ~ , _ . . : • - .
• . ~ 2ds
- - - -
" . - _ ~ • ~ _ ELcVA : ~ Ofv . . ~ - ~
. ~ . • ' . ~ • ' . . .
_ ' , •
. ~ RECQMMENDED CONFf GURA i ICN
OF RlPRAP 8~ANKt i FCR
. M1 y I M UM T:a 1 LW Ai E R :
i s .
. •
~ -
STORM DRAINAGE ANALYSIS
FOR ~
~~I_!~ur~ C''tJ~i.~ .~J~~•{i.~~~ 9 ~~~II ~
.
.
0 R~~~:~',`f~~ ~
QRCJE::~,~ . I.SBMAN COMMONS
['17:71, ~0 00W {P 0f ° ~.N E CO U NTY
4CT 0~
SPOKANE COUNTY ENGIrrEER
September 2000
CLC ASSOCIATES INC.
707 West 7`h Avenue Suite 200
Spokane, Wa 99204
~
(509)-458-6840
' This rePort has been prepared-by the staff of CLC Associates Inc. under the direction of the
undersigned professional engineer whose seal and signature appears hereon. This storm
drainage analysis has been completed in c ith the Spokane County Guidelines
for Stormwater Management. 0'~ oFwAStiG'~,
22816
SS~OMAI. EN
~ EXPIFiE3: to& j
CLC Associates Inc. . Dishman Commons
; - - ~
,
CLC - - -
; Associates, Inc.
i An AfWU a una cawnunft he.
~
t
~
I
1707 w. 7'" Ave., Ste. 200 ; October 6, 2000 , Spokane, WA 99204
± (509) 458-6840
~ (509) 458-6844 Fax
'Spokane, WA - Denver, CO
' Mr. Ed Parry
,
~ Spokane County Engineers QCT 0 S 2609
' Developer Services
! 1026 West Broadway Avenue SPOKANE COUNTY ENGINEER
Spokane, WA 99260
RE: Dishman Commons
CLC #99353
' Dear Mr. Parry:
i ~
,
; Enclosed please find two sets of revised road and drainage plans along two copies
of the drainage and pavement design report and other submittal documentation. We
i have addressed the following comments form your letter dated August 21,
,
~
~ Items on 1 st submittal.
From page 2 of 5;
I
~ l.c. Called out a traffic channeling device to be installed by Spokane County's
;
; Traffic Engineering Dept.
f
' I 6.c. A signed and stamped letter has been included in this submittal.
~ 61 We cannot predict what future homeowners will do to their lots but based on
' past experience the built-out condition on those areas that are not home site or
~ driveway will be kept in lawn and landscaped areas. In addition Lots 1-6, Block 1
i
~ have been designated by the conditions of approval as being multi-family which will
i require separate drainage plans once that area is developed. 4the short term that
'
! area is be evaluated in the pre-developed condition, but PQR6 has been up-sized in
i f anticipation of future development which will have it,5,6wn set of design and drainage
plans.
i 6.h. The grate calcs have been coordinated wj~Ah`the plan callouts and curb
a- .
conditions. `
j ' 9. A design deviation has been approved and included in this submittal..
10. The swale section detail is included on sheet S ofKl•2, and the swale sections are
included with the lot plans..
~ Planning '
i Engineering ~Items noted on 2"d submittal.
Architecture Landscape Architecture
~ Land Surveying
j
,
;
' i
~ - J
~ M I
CLC -
A. „MUM ~CoWWo~~-rft -
, 208 Lot Plans. Comments addressed.
Sheet 2. Drainage easement dimensioned on plans according to comments.
Sheet 5. Comments addressed.
Tff M. 7'" Ave., Ste. 200 ' Sheet 6. Comments addressed.
Spokwoe, WA 99204 ~
(509) 458-6840 Sheet S. Comments addressed.
(509) 458-6844 ~ax ~ Sheet #9. Comments addressed.
~
SPokane WA - Denuer, co Basin Map: Sub-basins are indicated more clearly on basin map. The lots are to be
r graded to substantial conformance to the design plans. How each individual lot is
eventually final graded and landscaped is up to each individual owner and carinot
possible be determined at the present time, but it is our belief that individual minor
fluctuations will not substantially affect the storm drainage calculations.
Pavement Design Calculations: The approval through design deviation is noted in the
; report.
,
Third Submittal:
r_
~ 1. A full submittal has been prepared.
2. Comments addressed.
3. Pipe runs have been coordinated. Calculations for stormline "A' have been
included. Calculations for rip-rap have been included. Sub-basins lines are more
visible on the basin map.
4. The O&M manual has been included again in this submittal.
S incerely,
CLC Associates, Inc.
. smond
~ 4Doug J De
~
` Project Manager
~
DJD/cf
I
~
, Enclosures
E
~
i ~
~
Planning
Engineering
Architecture
Landscape Architecture ,
Land Surveying
i
. Subaniftal Checklist .
for Road & Drainage Projects in Spokane County - Plats/Sbort Plats
This Submittal Checklist is to be compleled and signed by the Sponsor's Engineer, and included with each plan submittal into the Spokane Cou»ty Engineers Office. If this form is not fully completed and signed, do not
submit pla»s and calculations to Spokane eounty for review and acceptance. Incomplete submittals will be
returned arrd ivill cause unnecessary delays for your client. -
Pro}ect Name: ~15~m~ ~ ~ ~q9353~ .
Spokane County Pro}'ect No. P 185~~ Date: 10/~160
Project Engineer: .77if4 SC-hw$172- Phone::
r
Project Sponsor: -A< NwiDT fZ" ! on'rZ 6~1,/ TR"7702S PhonE:: G7 33
cVUs
A. 'Preliminary Process
Prior to Submittal of Road and Drainage PIans, the followi.ng events are to have already occurred:
(By checking each item off shown below, you are stalirrg that you have verified these eventslitems have beerr completed.) "
13 ~ Adoption of a Hearing Examiner's Report for this Iong plat, or a PIanning Report for this short plat. E) ~ At least one Pre-Desip Meeting has been held with County staffat tlte Enoeers Office.
❑ An "Agreement to Pay Fees" has.been signeti by theproject sponsor, ,-md submitted to ttle County
Engineers Office. - El A Cha.nnelization Plan (e.g. signing and striping pla.a) of public roadvray improvements, has been .
coordi.nated and discussed with the County Engineers Office. . , B. Road and Drainage Plan Submittai - The items listed below are to be provided as a minimum with a road and draviage -plan submittal. Additional
information may be required to demonstrate that the plans meet.all applicable stajidards. (By checkirtg "yes" for each item shown below; you are verifying that'these itenis have•.been-coinpleted and are :irrcluded:- ~in this submittcrl. For ony boz checked "n/a' ; a written justification oj any omis.vions at the end oJ this section is
required.) _ . , • - _ . Item Description - . . - . • - - .
. lYyes _Road and drainage plans, two print sets. (Certification*stateznent-on- cover of plans) :
U yes GY'"'n~a One set of plans on 24 x 36" mylarmedia, or CAD electronic fiIe '.DWG or .DXF format
1~-yes Each Plan Sheet of record is signed and.dated by die project';;porisor. : ~ . - : . . . -
0' yes The road and -drainage design .ineets. the requirenients `of `Stii~ ~ law; :WAC ' I96-27 regarding - , . "confornuty with accepteci staiidards";:.that is, the design reflects*,the :"state, of the ~practice"
for the proPosed concept. . " . - . . . . - . . .
3yes The plans, Drainage Report, basin map(s),. and any -other , (;alculations are stamped,; signed '
and dated by an engineer Iicensed in :the State of Washinjton.;
('r 'yes- 0 n/a Drainage Report, two sets: To include: basin map(s), time of concentration routes in basin
. map, and Certification statement on cover of report and basir.t map. -
D'ryes ' O n/a Geatechnical Report, one set. (Include all soii test pitlboring logs.)
- . Q yes O n/a Structural Pavement Calcutations, one set .
D-yes 0 rila Cross-slope grade calculations for road Nvidening projects.
6- ~ . .
Item Uescription - "
C!f'yes D n/a Maintenance Manual and Sinking Fund calculations for dra'vlage facilities located outside- of County road right-of-way. •
0 yes E!rn/a Written explanation of who/what entity will be responsible for maintaining drainage facilities
which are located outside of public road right-of-way, and tliat the plan is acceptable to the
County Engineers Office. . .
C?I'yes 0 n/a Channelization Plan, or sigtv.ng and striping information prcivided in the road plans.- To be
included in road and drainage plan set. Byes 0 nla I have read the Hearing Exanuner's Report (long plat), ar Planning Dept. Findings and Conditions (short plat), for this project. The design meets the conditions in tlze report. erl-y-es 0 n/a Copy of Approved Design Deviations. i~ es 0 n/a Fire District Approval, for private roads:
Q'yes 0 n/a Lot Plans. Required for any lots with drainage easements azid which fr ont a public road, or for lots wluch receive and treat runoff from apublic right--of-way. 0 yes 3'n/a *Any applicable State-and Federal permits have been obtained. (i.e. HPA, JAR.PA; etc.). For
Permits witb cond.itions, a copy of the pernut and conditions are included in the- plan
, submittal. lEf yes 0 n/a Inspection Agreement behveen the sponsor and its engixieer. 0 yes B'n/a For off-site easements to be granted to.Spokane Couraty, the foltowing items shall be
included: legal description, exhibit, and proof of ownership.
[ff ""yes ❑ a/a Erosiori Control Plan, required for "Major Land-Disturbing Activity." To be included in the
- road and drainage plan set. . ,
Explanation for any items listed above which are not i.ncluded in this submittaL (Note: an insufficient justificadon of why an item was not included in the submitted, or incomplete documents, may result
in the submittal being returned without review or Nvitbout acceptance. -Provide attachments if necessary.)
By signing below, the engineer is stating that the informatian provided in . the submittal is complete, that the
information provided in the Submittal Checklist is accurate, and the plans and calculations are in accordance with the Spokane County Standards for Road & Sewer Cotzstruction, and the Guidelines for Stormwater Management, -except where an approved Design Deviation allows otherwise.
Engineer's Signature: . Date= ~~CtY - : - .
Engineer's Name: - - -rwmr A • SGAAs
(please pr;nt)
_ If there: are, arry questioris about this form or appropriate procedures, plecrse call Development Services, .
Spolcarie Co.unry Public Works, at (509) 456=3600. . - ° - - . . , . -
For Spokane County Use Only
. Submittal No:. - . . County Plan Reviewer:- . .
. . . ..;~::~r:. - . . , _ . . . . . . . . . . -
0Accepted in for Review or Construction
.0. Returned to the engineer without review and/or acceptance, See attached Ietter of expianation.
Processing Date_ Submittal Checklist . ?
Spokane County Fublic Works; April 29, 1998
{ : .
I
~ S l~ ~ I~ ~ N" ~ U' 1-4 T ~
-
OCYISION OF ENCIhIEERING A9"dD ROADS A L}1VISION C]F TYlE IrCJBI.IC WORKS DEPAiT'MEN'I'
WiHiarn A. Tohns, P.E., Countyr Engineer
MAy 1, 2~~0
T(7~d Wh1 P.E. - - I~~ ~ Pm JO6#
CI.C As5oG1Stes, IIIC.
707 WeSt 7h AVeriue CC; List fnitial~ ~
SpCIkaIIe, WA 99204 ~ _ - ~ . .
, SUBJECT: P1859 - Dishman Commons ~
lbt" Avenue Cross-Section ~
Design Deviation Approval ~ l
Gentlemen.
We have approved this request, with conditians. I arn enclosing a copy of the approved Design
Deviation aFnd the Canditians. Please caU Ed ParrY ((509)477-3600) ifthere are any questions.
Sin+cereiy,
Wiliam A. Jolm, P.E. .
Spokane Caunty Engineer
E
idward Jr., P.E.
Plan Review Engiseer
1026 W. Broadway Ave. a Spo~ane, WA 9926Q-0170 •(50) 477-3600 TAX: (509) 477-7655 (2nd Fl4or) 477-7478 (3rd Floar) • TDD: (509) 477-7133
. . . • , .
REQUEST FOR DESIGN DEVIATION
$30.00
DATE March 14, 2000
ROAD NAME' (1) 16 th Ave. (.2) 17 th Lane
.
NAME OF PLAT Dishman Commons , Plat # p1859
ADDRESS OF BLDG East of Dishman Mica on 16th Ave. NAME OF BLDG PROJEGT BLDG# B9 ____S T R
FEDERALISTATE PROJECT # PROJECT LIMTTS
EXISTING CONDITIONS: PROPOSED IlbiPROVEMENTS:
ROAD WIDTH . SEE ATTACHED ROAD SURFACE s .F ATTACHED
AVG. DAILY TRAFFIC . Current Traffic Count Design Year Traffic Count
PROJECT DESCRIPTION _ ReGZdential nla wlrh nerimeter improvement to 16th Avenue and
interior private roads.
PROPOSED DESIGN DEVIATION (1) Curb extensiort and parking bays on 16th Avenue;
si Pwalk location adiacent to Drovosed varkine bavs on 16th Avenue ,
Detailed design specifications are attached.
HEt✓
NSTIFIGATION: MAR ) 4 2000 . .
SEE ATTACHED
uv ► c
Northwest Regional Facilitators (JIm Frank). March 14,,2000
3UBMITTED BY . , DATE .
ADDRESS West 707 7th Ave., Spokane, WA. , ZIP CODE 99204
?HONE # (509 Y458-5860 . . .
A,D1ViIlvISTRA►TTVE VA►RIANCE FEE OF $30.00 PAID i O SPOKANE COUNTY 1026 W BROADWAY, SPOKANE WA 99260-0170 PHONE (509)456-3600 FAX (509)324-3478
-REQUFST WILL NOT BE REVIEWED WITHOUT FUNDS-
~
-AS # RECENED BY
~ ~ ~ ~J I DATE j
, . . •
~
DESIGN DEVIATTON • ' ' ' •
,TAFF RECOMMENDATIONS . .
~c~9~ n~.~! ~~r~1#~ • ~c;.o,c.T1 Wlw ~to'T r~►,r4-~rt',A-r~ T~hS fNt`~4 ~ y'_'CvQ,a~(~C.
C' r~ rr trr ~1cr u E ,ti+ .4, +u -r~ ,~r+ E~ ~2) ~ ~t, c~5 l,~l rf~ f ~ R T~~ ~'c_ ~ *~Lc. ~GQ ~t .
c~ -r~ ~1've rrt¢ . .
ypraved Approved w/conditions Not A proved
) ~ , ~ , dtf
Project Manager Date
~ .
. ~ .
/ .
,pproved Approved w/condido Not Approved
} ~ ) ~ ) • • _ .
Ptan.ning & Traffic Engineer Date
.pproved Approved w/condicions Not Approved
91< `
Project Management E\eeer Date
pproved Approved w/conditions Not Approved _
) . - ( ) ( i)
~
Op rations Engineer Date
POKANE COUNTY ENGIlVEER'S ETERMIINATION: .
. . . .
pproved w/no conditions Approved as recommended above Not e
. ~
) )
.
• _Spokaue 7Cou ' eer ~ Date
' M _
. ~ •
• ' ;
S P O K A N E C O U N T Y
DMSION OF ENGWEFRING AND ROADS A DMSION OF THE PUBLIC WORKS DEPARTMENT
William A. Johns, P.E., County Engineer
MEMO
DATE: Apri126, 2000 "
TO: File PE-1859, Dishman Commons, Deviation Request dated 3/14/2 0, 3of3
~
FROM: William Johns, County Engineer
RE: Conditions of Approval
1. Provide 2 feet from the face of the nearest pole on the south side to the street face of the curb.
2. Pave with ACP between-the curb and existing ACP.
3. A type A curb may be used.
4. No maintenance of parking bays will be done by •Spokane County except for sweeping.
5. Drainage for the street and bays will be provided with standard 208 swales and drywells by the
developer.
6. Ind.ividual lot owners will be informed via a title notice filed by the devleoper,that the bays will not be
plowed of snow and a snow berm will be placed in the bays; that these are public parking spaces; and
the parking bays may-be removed in the future for road expansion.
7. Maintenance of parking bays and vegetation will be by adjoining property owners.
1026 W. Broadway Ave. • Spokane, WA 99260-0170 ~(509) 477-3600 FAX: (509) 477-7655 (2nd Floor) 477-7478 (3rd Floor) • TDD: (549) 477-7133
CLC ' -
Associates, Inc. l ~ - -
M Attplab a Colorado W W Conwttam.. trx
I
,707 W. 7'" Ave., Ste. 200 October 6, 2000
Spokane, WA 99204
(509) 458-6840
' (509) 458-6844 Fax
Spokane, WA - Denver, CO ~
FDC9
Mr. Ed Parry
~
Spokane County Engineers
, Developer Services ~
~ 1026 West Broadway Avenue
i
Spokane, WA 99260
9
' RE: Dishman Commons
CLC #99353
~
Dear Mr. Parry:
~ j I have reviewed and find acceptable the proposed changes to Stormline F& G,
~ i which consist of changing the outlet pipe from a 12" to 15" pipe, lowering the
proposed pond by 0.35' and lowering the inverts of the two 12" inflow pipes.
~
~
I ,
Sincerely,
CLC Associates, Inc.
..1 /0,10
TimothY A. Schwab' P.E. '~~~A• S
. ; O oF w sy~~
i ®r
,
~
~
~ ~,~•Q
~ MAL~
EXPIRES: /
I i ~
DJD/cf
~ I
;
f Enclosures
i
1
Planning
Engineering f
; Architecture ;
; Landscape Architecture ~
Land Surveying t
i
;
-
Outlet
Z~
STORMLINE F&G
P-2
C7 P-1 C3 ~
I L_ P-3
C6
. Project Tiqe. DISHMAN COMMONS Project Engineer CLC ASSOCIATES INC.
j:ldocument1993531dishman2.stm Inland Paciflc Engfneering Co. StormCAD v1,0
10l06100 02:42:50 PM 0 Haestad Methods, Inc. 37 Brookside Road Waterbury, CT 06708 USA (203) 755-1666 Page 1 of 1
Combined PipelNode Report
Pipe Up Dn Length` Size Up Dn S Up Q Up Dn Dn Rim
Node Node (ft) Invert Invert (fUft) HGL (cfs) EGL EGL Rim (ft)
(ft) (ft) (ft) (ft) (ft) (ft)
P-3 C6 C3 25,00 12 inch 2,008.97 2,008.85 0.004800 2,009.70 1.76 2,009.83 2,009.79 2,010.97 2,010.97
P-1 C7 C3 48.00 12 inch 2,009.17 2,008.85 0.006667 2,009.81 2.24 2,010.09 2,009.85 2,010.97 2,411.17
P-2 C3 Outlet 43.50 15 inch 2,008.85 2,008.65 0.004598 2,009.70 4,35 2,010.07 2,009.87 2,010.00 2,010.97
N/A N/A N/A N/A N/A N/A N/A N/A N/A N/A N/A N/A 2,010.00
, Project Title: DISHMAN COMMONS Project Engineer: CLC ASSOCIATES INC.
j:ldocument1993531dishman2,stm Inland Paciflc Engineering Co. StormCAO v1,0
10/06/00 02:41:42 PM 0 Haestad Methods, Inc. 37 Brookside Road Waterbury, CT 06708 USA (203) 755-1666 Page 1 of 1
B_ ~
P-1
STORMLINF- A
J-~
P-2 POND B
Project Title. DISHMAN COMMONS Project Engineer. CLC ASSOCIATES INC.
j:ldocument1993531dishman4.stm Inland Paciflc Eng(neering Co. StormCAD v1.0
10/05100 12:59:26 PM 0 Haestad Methods, Inc. 37 Brookside Road Waterbury, CT 06708 USA (203) 755-1666 Page 1 of 1
Combined PipelNode Report
Pipe Up Dn LengtP Size Up Dn S Up Q Up Dn Dn Rim
Node Node (ft) Invert Invert (fUft) HGL (cfs) EGL EGL Rim (ft)
(ft) (ft) (ft) (ft) (ft) (ft) P-1 B•1 J-1 69.00 12 inch 1,997.45 1,992.60 0.028698 1,997.91 1.17 1,998.08 1,993.23 1,998.00 2,000.37
P-2 J-1 POND B 30.00 12 inch 1,992.60 1,992,30 0.010000 1,993.06 1.17 1,993.23 1,993.00 1,993.30 1,998.00
N/A N/A N/A N/A N/A N/A N/A N/A N/A N/A N/A N/A 1,993.30
• Project Title: DISHMAN COMMONS Project Engineer: CLC ASSOCIATES INC.
j:ldocument1993531dishman4,stm Inland Pacific Engineering Co. StormCAD v1.0
10/06l00 02:46;50 PM (D Haestad Methods, Inc. 37 Brookside Road Waterbury, CT 06708 USA (203) 755-1666 Page 1 of 1
Out-et
n
STORMLINE F&G
P-2
C7 P-1 C3 ~
~
P-3
~ C6
, Project Title: DISHMAN COMMONS Project Engineer: CLC ASSOCIATES INC.
j:ldocument1993531dishman2.stm Inland Pacific Engineering Co. StormCAD v1.0
10106100 02:42;50 PM 0 Haestad Methods, Inc. 37 Brookside Road Waterbury, CT 06708 USA (203) 755-1666 Page 1 of 1
, Combined PipelNode Report
Pipe Up Dn LengtP Size Up Dn S Up Q Up Dn Dn Rim
Node Node (ft) Invert Invert (ft/ft) HGL (cfs) EGL EGL Rim (ft)
(ft) (ft) (ft) (ft) (ft) (ft)
P-3 C6 C3 25.00 12 inch 2,008.97 2,008.85 0.004800 2,009.70 1.76 2,009.83 2,009.79 2,010,97 2,010.97
P-1 C7 C3 48.00 12 inch 2,009.17 2,008,85 0.006667 2,009.81 2.24 2,010.09 2,009,85 2,010.97 2,011.17
P-2 C3 Outiet 43.50 15 inch 2,008.85 2,008,65 0.004598 2,009.70 4.35 2,010.07 2,009,87 2,010.00 2,010.97
N/A N/A N/A N/A N/A N/A N/A N/A N/A N/A N/A N/A 2,010,00
, Project Title: DISHMAN COMMONS Project Engineer: CLC ASSOCIATES INC.
j:ldocumentl993531dishman2.stm Inland Paclfic Engineering Co, StormCAD v1.0
10/06/00 02:41:42 PM 0 Haestad Methods, Inc. 37 Brookside Road Waterbury, CT 06708 USA (203) 755-1666 Page 1 of 1
_ ~
B
P-1
STORMLIN~ A
J-1
P-2 POND B
Project Title: DISHMAN COMMONS Project Engineer: CLC ASSOCIATES INC.
j:ldocument1993531dishman4.stm Inland Paciflc Engineering Co. StormCAD v1.0
10/05100 12:59:26 PM p Haestad Methods, Inc. 37 Brookside Road Waterbury, CT 06708 USA (203) 755-1666 Page 1 of 1
Combined PipelNode Report
Pipe Up Dn LengtO Size Up Dn S Up Q Up Dn Dn Rim
Node Node (ft) Invert Invert (ftlft) HGL (cfs) EGL EGL Rim (ft)
(ft) (ft) (fi) (ft) (ft) (ft) '
P•1 B-1 J-1 69.00 12 inch 1,997.45 1,992.60 0.028698 1,997.91 1.17 1,998.08 1,993.23 1,998.00 2,000,37
P•2 J-1 POND B 30.00 12 inch 1,992.60 1,992,30 0.010000 1,993.06 1.17 1,993.23 1,993.00 1,993.30 1,998,00
N/A N/A N/A N/A N/A N/A N/A N/A N/A N/A N/A NIA 1,993.30
. Project Title: DISHMAN COMMONS Project Engineer: CLC ASSOCIATES INC.
j:ldocument1993531dishman4.stm Inland Pacific Engineering Co. StonnCAD v1.0
10/06l00 02:46:50 PM 0 Haestad Methods, Inc. 37 Brookside Road Waterbury, CT 06708 USA (203) 755-1666 Page 1 of 1
Out-et
n
STORMLINE F&G
P-2
C7 P-1 C3 ,
~
P-3
, C6
Project Title: DISHMAN COMMONS Prvject Engineer. CLC ASSOCIATES INC,
j:ldocument1993531dishman2.stm Inland Pacific Engineering Co. StormCAD v1.0
10/06/00 02:42:50 PM 0 Haestad Methods, Inc. 37 Brookside Road Waterbury, CT 06708 USA (203) 755-1666 Page 1 of 1
Combined PipelNode Report
Pipe Up Dn _ength Size Up On S Up Q Up Dn Dn Rim
Node Node (ft) Invert Invert (ftlft) HGL (cfs) EGL EGL Rim (ft)
(ft) (ft) (ft) (ft) (ft) (ft)
P-3 C6 C3 25.00 12 inch 2,008.97 2,008.85 0.004800 2,009.70 1.76 2,009.83 2,009.79 2,010.97 2,010.97
P-1 C7 C3 48.00 12 inch 2,009.17 2,008.85 0.006667 2,009.81 2.24 2,010.09 2,009.85 2,010.97 2,011.17
P-2 C3 Outlet 43.50 15 inch 2,008.85 2,008.65 0.004598 2,009.70 4,35 2,010.07 2,009.87 2,010.00 2,010.97
N/A N/A N/A N/A N/A N/A N/A N/A N/A N/A N/A N/A 2,010,00
Project TiUe: DISHMAN COMMONS Project Engineer: CLC ASSOCIATES INC.
j:ldocument1993531dishman2.stm Inland Pacific Engineering Co. StormCAD v1.0
10106/00 02:41:42 PM 0 Haestad Methods, Inc. 37 Brookside Road Waterbury, CT 06708 USA (203) 755-1666 Page 1 of 1
B_.10
P-1
STORMLINF- A
J-1
. P-2
POND B
Project Title: OISHMAN COMMONS Project Engineer: CLC ASSOCIATES INC.
J:Idocument1993531dishman4.stm Inland Paciflc Engineering Co. StormCAD v1.0
10105l00 12:59.26 PM 0 Haestad Methods, Inc, 37 Braokside Road Waterbury, CT 06708 USA (203) 755-1666 Page 1 of 1
Combined PipelNode Report
Pipe Up Dn Lengtd Size Up On S Up Q Up Dn Dn Rim
Node Node (ft) Invert Invert (fUft) HGL (cfs) EGL EGL Rim (ft)
(ft) (ft) (ft) (ft) (ft) (ft) '
P•1 B-1 J-1 69.00 12 inch 1,997.45 1,992,60 0.028698 1,997.91 1.17 1,998,08 1,993.23 1,998.00 2,000.37
P•2 J•1 POND B 30.00 12 inch 1,992.60 1,992,30 0.010000 1,993.06 1.17 1,993.23 1,993.00 1,993.30 1,998.00
N/A N/A N/A N/A N/A N/A N/A N/A N/A N/A N/A N/A 1,993.30
~ Project Title; DISHMAN COMMONS Project Engineer. CLC ASSOCIATES INC.
j:ldocument1993531dishman4.stm Inland Pac(fic Engineering Co. StormCAD v1.0
10/06100 02:46:50 PM 0 Haestad Methods, Inc. 37 Brookside Road Waterbury, CT 06708 USA (203) 755-1666 Page 1 of 1
~
Sediment Yield, Flaxman Method
Project Name: Dishm`~`a""n C~omrmons S
IPE Project No. 99~353
Engirieer: Tim Schwab
Trap ID ~'rap w/ Larg,erst Subbasin
USC Soil Classification: 14 Variable
Data Input: Avg. Annual Precip., P= 'I inches
Avg. Annual Temp., T= 8 Degrees Fahrenheit
Avg. Watshed Slope, X2 = 4 percent X2
Particles Courser than 1 mm = 4 PercenU72 = X3
Percent Clay in Soil = 0 percent
2-yr Storm, Square mi., Q= 13 cfs X5
Basin Size, A= 13 acres
Time Period, T= 2 months
pH of soil = 8<-- assume worse case
(P/T)/1.43 = 0.31 X1
110 X4
SQRT(Y) = 40.90
Y= 1672.70 tons/square mile per year
Y' = 0.218 tons/(acre*month)
Y' for Basin = 4.49 tons/(basin*T)
Volume of Sediment, D= 75 cubic Ft.
--~p o, 1-I0' x/D ' TElwe/t.rFy PO~uD ro2 sepImx-~c,T w11-z. jfOt,O 7-!¢
votvM6 oF sEOIMEAIr 2F4'lvlflg~a 11r 4 oEPry oic z,6-55 77-1*9 3~ti~ES.
do~`~'~ s~
A.
WASy~~
S~4NAl.~
E)MIRES: 9*70/ ~
99353 CLC Associates, Inc. 6/16/2000
t
CLC ASSOCIATES, INC. '
.
PROJECTINFORMATION TYPICAL SECTION DATA
Project: DISHMAN COMMONS Roadway half width ENTER-> 20' PAVED WIDTH
Job No.: 99353 Road Name ENTER-> FELTS ROAD
Oisc.No.; Left orRight ENTER-> LEFT
File Name; FELTS.PVMTDES.W62 Edge Type TYPE'8' CURB & GUTTER
Calculated By: EMT Station Interval ENTER-> 50
I I MINIMUM MAXIMUM DlST. ~ OlST FROM ~ E.P. ELEV. E.P. ELEV.
C/L TO SLOPE EOGE CENTERLINE 1(-4.5% from (1% from SELECTED Edge Pave.
C/L % SLOPE SAWCUT SAWCUT ~ C/L TO PAVEMENT TO EOP I sawcut to sawcut to E.O.P. to Gutter Edge of Pv, TOP OF
STATION ELEVATION C/L ELEVATION (fEET) 1SAWCUT % SLOPE (FEET) ~ edge oI pv) edge of pv) ELEV. % GRADE %GRADE CURB El.
I I I I I I I I I 'I I I I
500,00 ~ 2028.78 1 ERR ~ 2028,72 ~ 2.00 -3.00 ~ ERR ~ 18.50 ~ 2027,98 1 2028.39 ~ 2028.20 ~ -3.15 ~ ERR ~ 2028.59
550.00 ~ 2029.18 ~ 0.80 ~ 2029.13 ~ 2.00 1 -2.50 ~ 0.82 ~ 18.50 ~ 2028.39 ~ 2028,80 ~ 2028.78 ~ •2.12 ~ 1.16 ~ 2029.17
600.00 ~ 2029.66 ~ 0.96 ~ 2029.63 ~ 2,00 ~ -1.50 ~ 1.00 ~ 18.50 ~ 2028.89 + 2029.30 ~ 2029.08 ~ -3.33 ~ 0.60 ~ 2029.47
• 65U.00 ~ 2030.16 1,00 ~ 2030.13 ~ 2.00 ~ •1,50 ~ 1.00 ~ 18.50 ~ 2029,39 ~ 202980 ~ 2029.48 i -3.94 ~ 0.80 ~ 2029,87
700,00 ~ 2030.63 0.94 ~ 2030,54 ~ 2,00 ~ .4.50 ~ 0.82 ~ 18,50 ~ 2029.80 ~ 2030.21 I 2029.88 ~ -4.00 ~ 0,80 ~ 203027
750,00 ~ 2030.67 ~ 0.08 ~ 2030.63 ~ 2.00 ~ •2.00 ~ 0.18 ~ 18.50 ~ 2029 89 ~ 2030.30 ~ 2030.28 ~ -2.12 ~ 0.80 ~ 2030.67
800.00 ~ 2031.50 ~ 1,66 ~ 2031.47 ~ 2.00 ~ •1.50 ~ 1.68 ~ 18,50 ~ 2030,73 ~ 2031,14 ~ 2031.12 ~ •2,12 ~ 1,68 ~ 2031.51
I I I I I I I I I I I I I ,
J:IDOCUMENT1993531FELTS.PVMTDES.QPW 1 ' 05l03/00
CLC ASSOCIATES, INC. '
PROJECTINFORMATION TYPlCAL SECTIONDATA
Project: DISHMAN COMMONS Roadway half wrdth ENTER-> 19.5' PAVED WIDTH
Job No.: 99353 Road Name ENTER- 16TH AVENUE
Disc.No,: Left or Right ENTER--> RIGHT
File Name: 16THS.PVMTDES.W82 Edge Type TOP OF CURB
Calculated By: EMT Station Jnterval ENTER-> 50
MINlMUM MAXIMUM '
DIST. DIST FROM E.P. ELEV. E.P. ELEV.
SEC/L TO % SLOPE EDGE SECTIONLINE (4.5% from ( 2% from SELECTED Edge Pave.
SEC/L % SLOPE SAWCUT SAWCUT SEC/L TO FAVEMENT TO EOP sawcut to sawcut to E.O.P. to Gutter Edge of Pv. TOP Of
STATlON ELEVATION SEC/L ELEVATION (FEE7) SAWCUT % SLOPE ( FEEn edge of pv) edge of pvJ ELE1/. % GRADE %GRADE CURB EL.
I I I I I I I I I I I I I
500.00 ~ 2000.32 ~ ERR ~ 2000.09 1 17.00 ~ -1,35 ~ ERR ~ 18.00 ~ 2060.05 ~ 2000.07 ~ 2000.07 1 -2.00 ~ ERR ~ 2000.46
550.00 ~ 200165 I 2.66 ~ 2001.46 ~ 17.00 ~ -1,12 ~ 2.74 ~ 18.00 ~ 2001.42 ~ 2001.44 ~ 200144 ~ -2.00 ~ 2.74 ~ 2001.83
600.00 ~ 2002.89 ~ 2.48 ~ 2002.80 ~ 17.00 ~ -0.53 ~ 2,68 ~ 18,00 ~ 2002.76 ~ 2002.78 ~ 2002 78 ~ •2.00 ~ 2.68 ~ 2003.17
650.00 ~ 2003.89 ~ 2.00 ~ 2003.69 ~ 17.00 ~ -1.18 ~ 1.78 ~ 18.00 ~ 2003.65 ~ 2003.61 ~ 2003.67 ~ -2.00 ~ 1.78 ~ 2004.06
700.00 ~ 2004.36 ~ 0.94 ~ 2004.22 ~ 17.00 ~ •0.82 ~ 1.06 ~ 18,00 ~ 2004.18 ~ 2004,20 ~ 2004.20 ~ •2.00 ~ 1.06 ~ 2004.59
750.00 ~ 2005.00 ~ 1.28 ~ 2004.79 ~ 17.00 ~.-1.24 ~ 1.14 ~ 18.00 ~ 2004.75 ~ 2004.77 ~ 2004,77 ~ •2.00 ~ 1.14 ~ 2005.16
800.00 ~ 2005.85 ~ 1,70 ~ 2005.67 ~ 17.00 ~ -1.06 ~ 1.76 ~ 18.00 ~ 2005.63 ~ 2005.65 ~ 2005.65 ~ •2.00 ~ 1.76 ~ 2006.04
850.00 ~ 2006.85 2,00 ~ 2006.60 ~ 17.00 I -1.47 ~ 1.88 ~ 18.00 ~ 2006.56 ~ 2006.58 I 2006.58 ~ •2.00 I 1.86 I 2006.97
900.00 I 2007.94 2.18 ~ 2007.73 ~ 17.00 ~ -1.24 I 2.26 ~ 18,00 I 2007.69 I 2007.71 I 2007.71 ~ •2,00 I 2.26 I 2008.10
950.00 ~ 2009.24 I 2.60 I 2009.05 ~ 17.00 ~ -1,12 I 2.64 ~ 18.00 I 2009.01 I 2009.03 ~ 2009.03 ~ •2,00 I 264 I 2009,42
1000.00 I 2010.63 ~ 2.78 201046 1 17.00 I •1,00 1 2.82 I 18.00 I 2010.42 1 2010.44 ~ 2010.44 •2.00 I 2.82 I 2010.83
105000 j 2012.06 I 2.86 2011,87 I 17,00 I -1,12 I 2.82 ~ 18.00 I 2011.63 I 2011.85 I 2011.85 •2,00 ~ 2•82 I 2012.24
1100.00 I 2013.46 I 2.80 I 2013.20 I 11,00 I -1.53 I 2.88 ~ 18.00 I 2013,18 I 2013.18 I 2013.16 •200 1 2.66 I 2013 57
1150.00 ~ 2014.96 1 3.00 I 2014.74 1 17.00 I -1,29 3.08 I 18.00 ~ 2014,70 ~ 2014.72 1 2014.72 -2.00 1 3.08 I 2015.11
1200.00 I 2016.59 I 3.26 I 2016.44 I 17.00 I -0.88 3.40 I 18,00 I 2016.40 ~ 2016,42 I 2016.42 I •2.00 I 3.40 I 2016.81
1250.00 I 2018.39 I 3,60 I 2018.28 I 17.00 I -0.65 1 3.68 I 18,00 I 2018.24 I 2018,26 I 2018,26 I •2.00 I 3.68 I 2018.65
1300.00 I 202029 I 3.80 I 2020,13 I 17.00 I -0.94 1 3,70 I 18,00 I 2020.09 I 2020.11 I 2020.11 I -2.00 I 3.70 1 2020.50
1350.00 ~ 2022.19 ~ 3.80 ~ 2022,01 ~ 17.00 1 •1.06 I 3,76 I 18,00 1 2021.97 I 2021.99 I 2021.99 I •2.00 I 3.76 I 2022.38
1400.00 I 2024,11 I 3•84 I 2023.94 ~ 11.00 I -1.00 I 3.86 I 18,00 I 2023.90 ~ 2023.92 I 2023.92 I •2.00 ~ 3.86 I 2024,31
1450.00 I 2026.02 ~ 3.82 ~ 2025.85 ~ 11.00 1 •1.00 I 3.82 I 16.00 I 2025.81 I 2025.83 I 2025.83 1 •2.00 I 3.82 I 2026.22
1500.00 I 2027,81 I 3.58 I 2027,60 I 17.00 I •1,24 I 3,50 I 18.00 I 2027.56 I 2027.58 I 2027.58 1 •2.00 I 3.50 I 2027,97
1550.00 1 2029.46 I 3.30 ~ 2029,23 I 17.00 ~ -1.35 I 3.26 I 18.00 I 2029.19 M 2029.21 I 2029.21 I •2.00 ~ 3.26 I 2029 60
1600.00 1 2030.91 I 2.90 I 2030,64 I 17,00 I •1.59 I 2.82 I 18.00 I 2030.60 ~ 2030.62 I 2030.62 I -2 00 I 2.82 I 2031.01
1850.00 I 2032.31 1 2.80 ~ 2032.02 ~ 17.00 ~ •1.71 I 2,76 1 18.00 1 2031.98 ~ 2032.00 1 2032 1 •2,00 ~ 2.76 ~ 2032,39
I I I ~ 1 I I I I I I I I ,
J:IDOCUMENT199353116THS.PVMTDES.QPW 1 05103100
t
CLC ASSOCIA TES, INC. '
PROJECT lNFORMATION TYPICAL SECTION DATA
Project; DISHMAN COMMONS Roadway half width ENTER-> 14' PAVED WIDTH
Job No.; 99353 Road Name ENTER--> 16TH AVENUE
Oisc.No.: Left or Righf ENTER--> LEFT
File Name: 16THN.PVMTDES.WB2 Edge Type EDGE OF PAVEMENT
Calcufated 8y: EMT . Station Interval ENTER--> 50
~ MlNIMUM I MAXIMUM OIST. ~ DIST FROM E.P. ELEV. I E.P. ELEV.
C/L TO I% SLOPE EDGE CENTERLINE 1( 4.5% irom (1% 1rom SELECTED Edge Pave. ~
C/1 % SLOPE SAWCUT SAWCUT ~ C/L TO PAVEMENT TO FOP ~ sawcut to sawcut to E.O.P. to Gutter I Edge of Pv. TOP OF
STATION ELEVATION C/L ELEVATION_ __LFEEM ~ SAWCUT % SLOPE (FEET) ~ edge of pv) ~ edge of pv) ELEV. % GRADE ~%GRADE CURB EL,
400A0 ~ 1998.30 ~ ERR ~ 1998.19 ~ 6.00 ~ -1,83 ~ ERR + 14.00 ~ 1997,83 ~ 1998.03 ~ 1996,05 ~ -1,75 ~ ERR ~ 1998,44 •
450A0 ~ 1999.15 ~ 1.70 ~ 1999.11 ~ 6.00 ~ -0.67 1.84 ~ 14,00 ~ 1998.75 ~ 1998,95 ~ 1998.95 ~ •2,00 ~ 1,80 ~ 1999.34
500A0 ~ 2000.30 ~ 2.30 ~ 2000.34 ~ 6,00 ~ 0.67 2.46 + 14.00 ~ 1999,98 ~ 2000,18 ~ 2000.18 ~ -2.00 ~ 2,46 ~ 2000.57
550.00 ~ 2001.63 ~ 2.66 ~ 2001,59 ~ 6.00 ~ -0.67 ~ 2.50 ~ 14.00 ~ 2001,23 ~ 2001,43 ~ 2001.43 ~ -2A0 ~ 2.50 ~ 2001,82
600A0 ~ 2002.85 ~ 2.44 ~ 2002,62 ~ 6,00 ~ -3,83 ~ 1.06 14.00 ~ 2002 26 ~ 2002A8 ~ 2002.46 ~ •2 00 ~ 2,06 ~ 2002.85
650.00 ~ 2003.87 ~ 2.04 ~ 2003,58 ~ 6.00 ~ -4.83 ~ 1.92 14.00 ~ 2003.22 ~ 2003.42 ~ 2003.42 ~ -2,00 ~ 1.92 ~ 2003.81
700.00 ~ 2004.34 ~ 0.94 ~ 2004.14 ~ 6,00 ~ -3,33 ~ 1.12 ~ 14.00 ~ 2003.78 ~ 2003,98 ~ 2003.98 ~ •2,00 ~ 1,12 ~ 2004.37
750.00 I 2004.98 I 1.24 I 2004,19 I 8,00 I •2,83 N 1.30 I 14,00 I 2004.43 ~ 2004.83 I 2004.63 1 -2A0 I 1,30 I 2005,02
800.00 ~ 2005.82 I 1.72 + 2005J8 I 8.00 I -0.67 ~ 1.98 I 14.00 I 2005.42 ~ 2005.62 1 2005.62 I •2.00 1 1,98 1 2006 01
850.00 I 2006.83 I 2.02 I 2006.84 I 6.00 I 0.17 I 2.12 I 14.00 I 2006.48 I 2006.88 I 2006.68 I •2.00 I 2.12 I 2007.07
900.00 I 2007,94 I 2,22 I 2008.01 I 6.00 I 1.17 I 2.34 1 14.00 I 2007.65 I 2007.85 I 2007.85 I •2.00 2.34 200824
950.00 I 2009,24 I 2.60 I 2009.19 I 6.00 I •0,83 I 2.36 I 14,00 I 2008.83 I 2009.03 I 2009,03 ~ •2.00 2.36 2009.42
1000,00 ~ 2010.59 I 2.70 I 2010.50 I 6.00 I •1.50 I 2,62 I 14.00 ~ 2010.14 1 2010.34 I 2010,34 I -2.00 I 2.62 1 2010,73
1050,00 I 2011.99 I 2.80 I 2011.81 I 6.00 1 -3.00 I 2.62 I 14.60 I 2011,45 I 2011.65 I 2011.65 I •2.00 I 2.62 I 2012.04
1100.00 I 2013.40 I 2.82 I 2013.23 I 8.00 ~ •2.83 I 2.84 I 14,00 I 2012,87 I 2013.07 I 2013,07 I -2.00 I 2•84 I 2013.46
1150.00 I 2014.60 ~ 2.80 I 2014.72 I 6.00 I •1.33 I 2•98 I 14.00 I 2014,36 I 2014.56 I 2014.56 I -2.00 I 2.98 1 2014.95
1200,00 I 2016.55 3.50 ~ 2018.43 1 8.00 I •2.00 3,42 I 14.00 I 2016,07 I 2016.27 I 2016.27 I •2.00 I 3.42 1 2018.86
1250.00 I 2018.35 3.60 I 2018.25 I 6.00 I -1.67 3.64 I 14.00 I 2017.89 I 2018.09 I 2018.09 I -2.00 I 3.64 I 2018.48
1300.00 I 2020.23 ~ 3.76 I 2020.09 I 6,00 I -2.33 I 3.88 I 14,00 I 2019.73 ' 2019.93 I 2019.93 I -2.00 I 3,68 I 2020.32
1350.00 I 2022.13 I 3.80 I 2021.99 I 6.00 I •2.33 I 3.80 I 14.00 I 2021.63 I 2021.83 I 2021.83 I •2.00 I 3,80 I 2022.22
1400.00 I 2024,05 I 3.84 I 2024,01 I 6.00 I •0,67 I 4.04 1 14.00 I 2023,85 I 2023.85 I 2023.85 1 -2.00 I 4.04 I 2024.24
1450.00 1 2025,99 I 3.88 1 2025.91 I 6.00 1 -1.33 1 3.80 1 14.00 I 2025.55 I 2025.75 I 2025.75 I •2.00 I 3,80 I 2026.14
1500.00 I 2027.76 I 3.54 1 2027.71 I 6.00 I -0.63 I 3.60 I 14.00 1 2027.35 1 2027.55 I 2027.55 ~ •2.00 1 3.60 j 2027.94
1550.00 I 2029.35 I 3.18 I 2029.10 I 6.00 I -4,17 I 2.78 I 14.00 1 2028.74 1 2028.94 I 2026.94 I •2.00 1 2.78 ~ 2029,33
1600.00 2030.80 I 2•90 I 2030.49 I 6.00 I •5•17 I 2.78 I 14.00 I 2030.13 I 2030,33 I 2030.33 I •2,00 I 2.78 I 2030.72
1650.00 2032.20 1 2.80 1 2031.88 I 6.00 I •5,33 I 2.78 I 14.00 1 2031.52 ~ 2031J2 1 2031.12 I •2,00 I 2.78 ~ 2032,11
1700.00 I 2033.38 1 2.36 I 203328 I 6.00 I •1.67 I 2.80 I 12.10 I 2033.01 ~ 2033.16 I 2033.16 I -1.97 I 2.88 I 2033,55
1750.00 I 2033,84 1 0.92 ~ 2033.85 I 6.00 I 0,17 I 1.14 1 7.33 1 2033.79 ~ 2033.82 ~ 2033.83 I •150 ~ 1.34 ~ 2034.22
J:IDOCUMENT199353116THN.PVMTDES,QPW 1 05103100
,
~
,
1
PURPOSE .
, The purpose of this report is to determine the extent of storm drainage facilities,
which will be required to dispose of stormwater runoff created by the improvements of
the proposed project. In accordance with the Spokane County Guidelines for
Stormwater Management, the storm drainage facilities on this project will be designed
to dispose of runoff from a ten-year design storm and the first one-half inch of runoff
from all road impervious surfaces will be treated in grass infiltration areas (`208'
swales).
ANALYSIS METHODOLOGY
The Rational Method, which is recommended, for basins less than ten acres in
size, will be used to determine the peak discharges and runoff volumes. The Bowstring
Method will be used to evaluate the adequacy of the drywells and storage capacities.
All relevant calculations have been included in the appendix of this report.
PROJECT DESCRIPTION
Dishman Commons is a 30-lot subdivision (on 10.3 acres) located in Section 29,
T 25 N, R 45 E W.M. in Spokane County. The proposed improvements include the
necessary sanitary sewer, water, road and storm drainage facilities. The storm drainage disposal and treatment is being accomplished in grassy swales that are located on
either private property or within the public right of way. The topography on the site
' slopes moderately from east to west.
Sheet 75 of the Soil Survev of Spokane Countv Wa. shows that the soil type for
the area of the proposed project is: McB - Marble sandy loam, 0 to 8% slopes: This soil is a somewhat excessively
' drained soil. Surface runoff is slow, and there is little or no hazard to erosion.
This soil type is pre-approved for the use of drywells in accordance with
the Spokane Countv Guidelines for Stormwater Manaqement.
CLCAssociates Inc. Dishman Commons
' CALCULATIONS
The 10-year peak flows for the individual basins on the project were calculated
using the Rational Method and the intensity-Duration-Frequency curves for Spokane,
Medical Lake, Reardon, Cheney and Rockford areas.
Tabulated in the appendix is the total area, road impervious area, runoff
coefficient, peak flow, `208' swale volume requirement, Bowstring volume requirement,
and number and type of drywells required for each of the basins. It is assumed for the
purposes of the swale design that a double-depth drywell has a capacity of 1.0 cfs and
a single-depth drywell has a capacity of 0.3 cfs.
Grate Calculations
The inlets shown for basin A, C3, C6 & C7 are in a sump condition.
Spokane County Type 1
From 4-1.1 of Guidelines,
Q= CPH3/2 , where C= 3.0, P= perimeter of grate, and H= depth of water.
Perimeter of grate = 6.13 ft, P/2=3.065ft.
Q= 3(3.065)(.50) ' = 3.25 CFS -
From the Basin Summary Table in the appendix of this report these grate
capacities are adequate for the peak flow in each basin. The catch basins in a sump
condition have been sized to accommodate by-pass flow from the catch basins on a
continuous grade.
The rest of the inlets shown on the plans and Basin Map are on a continuous
grade, the grate capacity calculations have been included in the appendix of this report.
STORMWATER DISP4SAL
The stormwater generated by the project will be disposed of in the `208' swales
areas and drywells as indicated on the improvement plans and basin map. The
stormwater along 16th Avenue will be collected and piped to pond B, it should be noted
that the actual crown on 16th Avenue is actually 5-6' south of the existing painted
centerline stripe which drastically reduces the actual basin size so that the amount of
' stormwater in that basin will be much less than shown in this report. The stormwater for
the rest of the basins will be routed to ponds either in a piping system or by curb drops.
The `208' swale volume as indicated on the Basin Summary Table is provided at a
depth of six inches for all ponds.
CLC Associates Inc. Disllman Commons
J:1Land Projects1993531dwg\COVER.dwg, 06/06/2000 02:50:47 PM, DJD -
.~--1
N ~
d
- - _
d _
- / r- , - -C
C)o -
_r > c-
_C ~ ~ -
WD F ~
r%o ~ - N ~ N
00 ~
_ E .
~
. / _
/ N
. ( J ~ ~
r-t-
. ~
~
F
~ j ,
J r ~ ~ 1 ' {1 r~ . ~ 4~~ .~~r~1~5 5lI1Q~1 q~ +
I r r _ _ _ ~ , ' ~i~~„ ac'i~,r~f~.~,jy ~ a fi f, ~ } . , .~'r~+i'7"[y~ ~ :s'!r.~~ ' y y x~ i ' ~ • ~ , ~ , I;1~x~ i a ~ : ~c ~~r,' A V~j iT~ ;F, f ~ u.~~'G~ r ~'7~ 1~ _ ~1 , H
i ~ 1. , ~y ,~I ; 'M i L ¢ ~+y('~,~~A ~ ~eP ~ ~ ~ I,/ ~ ,r r . ~ " ~ ~ , ~ . ' ' , ~ i 7 a ~~rry'ji±ti°-"'~~"~'~~'` ~ 1 r ~ - ~ ,~t ~ 5' N n ~ 1 j
~°S~A y: ~ j I t1 .i~ ~'~•~k~' . ~S' ~~F 1, y x ~Y~ ~~I~~ ' ~ d ~ ~ ~ ~ , 2.' ~ ~ , '~s~,r, , ;+~t ~ `ic r h°, } ~ ~ a~ [ . a'~ "~~Jt~+' d"- ~'4 yy~d+v l S.ti A, d17 y r`,,p a„ S ~ Y. n:
~ ~j1 r ~f I y'"~1~~3~;i1~~ ~ {'2 d~~ ' ~ Yy J N~'~ ~y ~ p$` Il ,~~t^ ~ I y n~ ~M~r f h i ;1..' ~ ~ y~ ~r}4~.~~' 4 !~1 , 'y~~ s~ 1 ~ ~r~ ~ ~ ' ~ , r ' 4 ~V' ` ' I W ~ b~ ~ ~+;y,'~~h ! }s~z~~~ _ u ~~e..ll ~ti, ';I:'~:
i ~~t4*' ~~9: li ~ 'L. , °.'Ifl A~i' 1~ r i. ~e~~P.~ r~s:..: . r; A~y~~ I 7 7 I'~i I A ~.~~rr lh;. 8~ f¢t.i'y~~~l~ry,$ '~'J ~ 1- I I ~1 w~"~q~ x4~t` `~':~°i~r~ • k.~ r;y 4~'{ " :fGy+y"ry. „i+ ~,',F{,.~. ~f~!RAr f 4 ` ~ ~~~1., I i~rS~AF~' 7• Y ~ 1'! F{I~~` i~i ` ~A ql~ .''~7.i 1 ~ ~YS:~:,~1 I ~'1 ti ~'i ~ zs;'.i~' r:l" • t~;J,?~ ~SY~' ~~r!'r d°y~~'~ 4"~t~ ` , a r
, ''r'. ~-~.,n "F h ~ ~ • ~ a • 7 ~ ~L~~ ~i =(1J ~'1 F • i If~ 1 1 N'1 .h ~ Y ' i~`! . . • ii i ' , ~ y~e SI • r~ ~'y~' r~~ ~ ~ 4 •r ~P, t ~ i f ~~~i~i~'1'~ ,~i ~.t.. ~7, r ~ ~ . , i r .~.y, E~ 4~ . Ct ~r , , 1~ Ir '~3~'i Si~A ~ s ~ ' J I, ri n. . 7 Y . i I~ x ~ ~ ~ ~U'~ 3 ~ a , ~ ' z Y~ ~1` ~ ~ ~ ~i ~ ~ ~ ~},t.~ ~~~1 i ~ . ~ , ~7 ~
ry~ F ~ 'y I L. ' V ~1 4 ` :,ir J~~~^~ ~a ' S~~ } g~.f` f I ti.~ ~r l~'i ' Ui ~ 7 N , ~ y {I + ~ f+' yr ~ I~ p~ ~y ti 7 ~ "~r ~
~ q ui ~1 ! ' ~ ~ ~ ~ f~ ~ ~ .i 'i~ f~ ~ ~ ~ lµh' ~ ~t ~ ~ ~5~~.~~'i;;,a~~+'_1. 4!'~` ~'u~~ ' : 7P~`~' ~ . e ~ ~ ~ et u ~ ,-iC ~~'~ik"~~~'~ 5~:~' r ,~g F^~+ ! R. i. ~ ~ {I, M
~ ~ i ~ ~s~:'' ~~a : ~M ~^'~r,].~i.,~~~~~~',g ~'yµ~,~';~ ~ 'k y¢ ~ " i 'I ~Y a1:'~ .'r, i ~ r `~4t~,~~ 1 i n~t ~~1 e :I ` F, ~ r~,
,C N ~ . ~ r~ql,; I r ~ ~ ~ ~ d w 'f V~l ~ N ~ k~.. , y e~d~' 11 • I,' .~~9. $ S q t ~ I~I ~ 1 ~9. i A ~ ~ • h " ~ ~ .
~ P a i' i ~ A. ry ~ ~ .r l k i + a~ ~7~ P ~
u ~ ur ~ ~ Y ~i-- ~ Ff~ 'k,, n ~ : ~ ~ y ~ ~ ~ ' ~g ` ~ N ' ° V ~7 h?~° r o- lL i ~ .I Ji_ ' ~ t I ~ ~:.~7 ~ n
~ I~p~ 4 ''A L~,lA ~.,1~: ~ ~ ~~.t ~t ~ 'r CJ ~ ~ 'y M1.~ ~ e ~ ~ I~ II ~ , ~ ~ ' I ~ I~, r 4 1 r •
. ~ N 'i ~ ~~,a u, ' d r 1 ~ ~I[~~~ 1 x~ Ir 2 ~ ~ • ~ ' ~
s {;3 1 ' ~ r_ ' I r 9 ` J 6 ` ~n '7~ ,i l r ~ a~ ~s
~ u y~ ~ ' s'~ ' ~ 7% ~ ~ ~ 7 f~~ . } ' 1 i ` ~Y ~ i ,g . N ~s.,y~"F i ' $ R~~,~~ : ' ~ ' ~ ! M1 ' ~'r J { l I r" ~+l. . ~ , 4 ~ .~5 f ~ y~, ~ ~ 4~' S~ ~j ` ~ '
i r ~ "i~~~'i , , _ ~{y $s .r ti . ~ ~ry , , ~ ,i y ~ r , ~ , ~ t, ~ , ~
„ ~ , , ~ . S~ ~ ~ ~,s~ , ~ ' ~k ' ~ , ~ ~ ~ , ~ ~y r ' t'
i,. r' jr t, `~'"s , ~y 1 • . I I~ ± h r ' ~ F' ~ ~e r ' f ti ~ r. ' 1i N~ ~v ia i
„r . I ~5~ r 1~ ~ j~ ~11 {F~~F~r;,M1:j.'~,'~i' ~ S~ I , ~ a 4 t~t', , A ~ f p
I , ~i ~ p fti ' ^ J l ~ p ~ ' ~ ~ '~G ~`{~q~~~~''' ' Y ' r
Y ' ~ ~ 1 ~ir ,I f 4 • 4~ ~ M ~ 1 ,I+' , 4 .p 6 /1 r~ ~}+i ry~ '~~Yrr~ '`I ~ . , ~ Yr ~ ~14
~ ~ i ~ ~ a ~ ~J i ' ~ ~>,a ti ' . ~ R i ~ 7, r s P~ I~1 I 4' i i ~ 1! E r ' ' rY I i
~ ~ ~ r ~ s ~ , , fl~v.1l ~ ~ ' , ~ ~ ~ r s ' ~ ~ F ' 4,i~1 P I rr „ y' , i + _Eyy n f I
~ ~ A I~if~ . ,~~6 ~'..11:-1.'I ~f , ~SI' . .,r , - ~ . -I r ~ 1 I I' ~ ~ 7f 1v,' t, 7~ + y
P , ~ ,n ~ ir ~ a ~ ~ ~ - ~ ~ ' , ,
~ ,d~ 'y R H ~ '
' ~ `L M J • ~ ~ ~ ~ + ~ } 'f r~
~ ,t ~ O - ~ ~ , ~
, ' ~ q ~ , ~ ,r" cy ~ ~ ~ i " ¢
~ 7 ~ ~ '~I I
~ I IL 'y ` $ I ~ r Q ~ ~ FM1~. N ~ !Y' ~ /
~ ~ I ~ 3 P ~ i9 a1: N ~ I ~ t ,,ny ~y~r < I" +i N
iw ~ ~
I + 7 sas ~ ~ ~ I~ , ~ I ~ ~ ~ w, ~ ~ * ,7 ' ~ I;
j' ~ ~ I' i;J~~ °j ~ .a ~3 V , ~ r M1
~ ~ ~y i ,i i~ ~ , ~ [ F"" ~ J
~ ~ 4 ~ ~ ` A A I 1I } ~ t ~ R S. ~ P
~f ` ~ + ` { (r y 4 ~ f~ ,l ~
, e~ ~ ~ ~ i ~ ~I ~ j~r -
~ ~ ~ F ~ , p'~y.l'' ~ ~ { ' YJ p . , ~y^ ~ ' ' ' w. ' i r ~ + r,e ~ ' ~j^• ' ¢ ~ ~ ~ ~ ~ C~ ' 1 s ~ ~ j ',r ~~a, t ~
? 5 ~r ~ n' ~I ~ ! `f~' y ~ ~sp ~ r n r ~ 'i . ~ tij~'r 4', ~ i . I 4 ,'rhi p~ ,ry ' ~ ~ ~Y ~ ' : f !y ' n Y ~ r , . I ~y ~ , 3 ~ r 4 ~ 'rl i n ~c ~ ~5 ,L~;'
I}l/~ y ~ ~ ~ [~.~i~ ~ I y' l/ / ~M I aiC A~~b~ r ~ ~ .1' \rl~ ~ '.5 1~,' J ~ e,- ti a "n Ikl~ r i, s, ~ ~ r. • 1 ' ,I 'I, ~ } o ? ~ .r ~ a~ . ~
~r S' ' •i ' t'~~ y~, , 0 1 ~ ~ 4 ~l ~ ' e ' ~r I 1 ~ , ' ~ , , ~ 3F,'w ~ ~ '
~ n ~ ~ ~ _ . ~ , ~ , ~ ~ ~~x ~ , ,
~ N* ~ • ' ~Y .~fk.; ~ ~ 9 : ~ ~i ' r:~ M F_•, h*_ i Y' , y. S ~ i !i+ ti "t ~ . + ~ ~ o. ~ ~ ~ c ~ ! ~ r'~ d ~ r e
I ~ ~ i~' ' t I ~ ~f ~ r ..1~ 5 I,, ~ I.4 ~ i . { - ' ~ ~ •G, 4 'ry. i # I~~~ °1~ ~ p ~
r, ` ~ r ~ ~ ~ , 1'~ ~
.r ~ ~ ~ y • ; ~ i i ' n I, ' e ~ ' , r .f', f, ~ 'IS 4' ' ~
p a, i " + e ~ 'F -7 ~ ~f.i `i 2 ~f, r :
1 ~ j ~,,fi ~ :t n ? ' i ! . s 1 `~~i ~~~,I~ s F' ~ ~ -
~la~~ ~ ; k - ! w ' ~ O - i~ h Y , ~rFe I~ p 1
w ,F4 1 ~y,~y..~s 4 s f f~ I '!I ~i ~K~ ~.i'j'Y. ! 7
~ ? n ~ A ~ - S r~ ~ a f ` + o ~ I ~ F "S ~
~~n.^~~ 2~'~x P'r , ~k ~ ~ r 4 v ~ ~ 1~" ~`~~li,'yk~~" • ~ • ' rt r ~ ,
~I~:. ^t ~ LL. '~~~n~~'~~ i 1 u Yi ~i~N ~ ry~~n~ ~ ' h ~ ,d
I~o~~ y~~~ ° ~ , '1x 4 t ~ c ~ 1~ ~ F ~
,k • i i ~ p II~ 5'I 1 ~I ~ ~ & ~ n~, ~ I + 4
L~y,t~; ,~s L ~ R k ' - ~ ~i
~ ~ y ~ i I ~ ~ r ' 1 o F~° u ~ g ~ y t '~1 3 V~ i 7 r I
''`~x , ' y; ' ~ ~ bY~q~A I ~ 1'~ .9+ ~i t ,r 'jl~ ~ ~ ,~d. ~r r~'~'9 f t 1 ~ y ~ ,
* ' ~y RA ~ ~ ~ r, N' ' ut~ ~ ! ~ ti
'4~ a ~ ~i ' f ~ ~ r ~ R ~ I . i ~J `e~ ' - ' "4 r; i r ~ 4 ~ S : i ,1 ' +~A ~ ~ . ,~}y~ ~'i' ,'Si,
~I ' 4 ~ N' # ^a n+ ~ r ~ r~. ~ ~ . ~ 4 ~ , r ~ ~',~titi: ,v~ ' y' • ~ , " , , ~ ~
y YY ~ ~ h'.'~' f 9 5 , uF 'g ~ rl ' ~ ,l i ~ ~'I~ r • " ~ : ~ ,~d •,3~' y S. ~i, ~ ~•l V + L~' 'u'44 d'i~~ ,I ~~I' f~ ' ia~ Y ~ " [r ~i~~ i ~ ~ r~ .
' ~a { ~ , v~~~•, ~ • ' , ' , , ~ J~ J ' ~ 'N ~.:h~~ i a~k5 'v ` ~ ' ~~'.~E ~i1"r~kl~[u y~~~ 1 r~ ~ 4 ,.~r, ~~ir,,. . _ ~ s~ im c it i. '~~.a...r'~ir • - ~ ' 'N 5~ ~l ~
- , [~L ~aar~s ~u~o~~ '~l tiZ'!
, ~;;,i;s;;~•~.~ ~ •
~ ~ ; -,r.",q,;'~'.,;;:r~~•~;M:~ ~ ' . ~ ~ ~iiif Y~1~::~ y . ~ . ~ ~ ~i ~4~s K'~i~iY'' . ~ ~ ~ 't1ii.. ^ti~{"~ ~~;.i~ 5~~~~ ' " . ~ i ° . ~ f ~i-~ Yi ~ ~ ~'~i'~~'~A: I~~~~-~i'Ji lii~r'
' ~t=~ ~ ' . ' ~ • '..~i`~: .~i il:3 ` ~F.•Aas 'j d i~lF'~'.~~~' I'141?r . • ' - , . - r,'~.~ 5 . !~"1a t'M+~''~ ~ r fi~ ~:s~~.'i~, . , „ ~v:`•: ' :,-=,s „ ~ . ~ r,r'„y , ;,~..r. ~;r~ ~ r,;; 's ~ - 5 .ltil "~ry'II~',; ,F. ~~.~tiA,. . . ~4 ' . I;1'~,.,;, Nt,~s"f~i i:, F~s'•;,~•• ~f'{ 1~r;,'~,'nfV~. ~y S~y~4n'' . , w'' ~ ~a S~ s; ~ ~ q.~. - _ ~ :Rerti . . ' ~ • ~ :.s• 1:", 5 ' ~l~. 7"~`~i' ~c~:~ ~4 4F°~"
S , - ` `,'n~ _ ~;y ;'y.~.'~ .d~,: '~,~;,'r~ d'~^,~'yf.yc.,.:~?i~Sn'~~ ~ ~~a..,w,w~, i , r M " -r :~~Pa~;a. , ; ~r~t~; :~..r+~ z x , ~ '~,r , ~ ".7,,f' ;''f .,.~a~. `~roh.~s .y.. . ~y~. : S + r,• F~.,,. a.;~~ r~ 'rt~ `'~!s`: , ~,1^,7,G ~~~~~:r ~ . ~ ~`±,4;~~`kS:;:l,,,` •'~~.i~~`'y • ,;x: , ~~~n- ~~:~:r.,~~~~'v~,i~'~+' ~7 , ~ ~"4 ~ ~~;f~ r~ 4~ . -~l.r .~,}~',~'~~,i"ir:n;~~7;Ar~r~~.Y..,~.., •t~ _~i',~'~".i'y~' P~ ,a'_I~`,', ,~-,,:p X~' ~y":~~t -7', ~.~'f ~ ui~ .i . ~ - a.,4~~r,,. ~~~.s•a T.:tu~ I'y,r`,l-'J `'a~,+~ ..~Y•~w~?~A5k7•i}'~ .~T:.:1 .il}riix*,.~r+i.~~•~ +.i~'. .V, ~ ' n{~~ ~,~~n~l'"r m5 R i ~r S~~ ry ~
: ~ ' i ~ i, d~ , 14.~. r•~,Y- e,~y 4 ~P,`. , r' : ~`.i' ~ F, . ~.i;~~'~ ,+y ~:4~"'' ~ ~ ~,.a : tii _ v. ~`.M, p ,s~,{T.~ ~ ~ ~ y.~,~~ ^l~~J'?~5~' ' A,~~ ..l,~.i , N~.` ~ ~ in 4' r i i'`r~ .~~r -.~U~s^t ~+~':i.v~r. ,~P7,~`.~P~r~~ ~ '!~1`0 ~~~~'p -xw~ i„~.'}~~P_'}'~,;~p~~;;': „rl' ~~~y,r.,~~~ ~`'k=i._,~: f~6 rF i~i '~7 4~ ^~f=w4^ n•Y'o- ~,f5 ^~~l~~7=.~~ ri~r ~ Y ~7.~ ~ W - ~f~i~~ . ~,t^' "e' V. 9A'' ''F~ t"•; ~~1':. -,~_..5;!• L d r,[,..,7'w. 5-; 'i ~ ~ n ~ L`~.?i''~M'r' ~ w,:'r'~~ 'rrM~i,~: i L~ M F~ + tr, p 5 ~ '-f+'h r . x,'y'; e ',N., A~, J" ~r~, G'~:';",~'~ ,~,n ~ i ~r ^„i 1 s" f. I;, ~ ~'th~ ~ : + a~' Xtif ~g ~ ~~~W. ' ~l' . i ~~4E ' 1'~4' 1~7 ~,~-r~,1~~;4 r,•iry~~~~,[~ t ' i ~
~ y„~~~.~~i~kG °R.9?' '7 ~ ~ . . ' . _ , . i ~ . ~ . . io n . . . . . _ . _
i _ _ ~ . . .dY '~k ~ . P~
+ e i , v ~
i, , ~
~
° t r~i A , I' 4~`;{ r'+'"~ ~ ry q ~ Y r~~k4 w~A r, G{ ' v , L M-= .w ~ i . ' ,~u7, a ~ ; i ~
_ t~,:r...wiM~ ~~"~,~?~a~da.i~ei,•'.;r.:y:rv~~~.r:"..~~nY:rbM ry:rr - -,"x,,. e~tiu~h~P'uS„•. ,~ryi:"` aa..~.... ~'~.F~~~;.,.,, ,~ks~~' 1'~ 4"1' ' . , ~ . ~ , . . . r .oFrA'rko. . ..,.w~,_ 3 dr. 1.lxw ..N~ N n
1
DISHMAN COMMONS 99353
Spokane County, Washington 08/07/00
10-Year Design Storm Engineer: DJD
GRATE TNLET CALCULATIONS
on Gontinuous Grade Inlet Basin Gutter Cross- Grate Depth of Gutter Gutter Flow By-Pass
Basin Street and Peak Flow Slope Slope Width Flow Flow Width Velocity Received Flow
Area Station (cfs) (ft/ft) 11"L (ft) (ft) (ft) (fps) (cfs) (cfs)
16TH AVENUE
Bl STA 5+17,5 RT. 1.17 0.0330 0.020 4,00 0.12 5.986 2.317 1.1l 0.06
HER.ALD LANE
C4 STA 11+36.36 RT. 1.33 0.0075 0.024 4.00 0.18 . 7,399 1.639 1.16 0.17
ALLEY
CS 1.64 0.0200 0,020 2.00 0. 15 7.463 3,106 0.93 0.71
HERALD LANE
C2 STA 11+36,36 LT: 0.15 0.0075 0.024 2.00 0.08 3,264 0.882 0.14 0.01
17TH LANE
B4 STA 12+28.48 RT. 1.25 0.0600 0.024 2.00 ' 0,12 4,895 4,014 0.94 0.31 17TH LANE B4 STA 11+51.90 RT. 0.31 0.0600 0.024 2.00 0.07 2.902 2.130 0.30 0,01
17TH LANE
B3 STA l l+S 1.90 LT. 0.38 0.0600 0.024 2,00 0.08 3.132 2.363 0.35 0.03
This form is in accordance with the WSDOT Hydraulic Manual Grate Widths
Section 5•5.1, Capacity of Inlets on a Continuous Grade , Herringbone = 1.67'
Vaned =1.67'
wl 2" suitip = 2.00'
InletC
~ ~ ~■r ~ ~ ~ ~ ~ ~ ~ ~ ~ ~■r ~ ~ ~ ~ ~
Dishman Commons S990353
Spokane Counry, Washington 08/07/00
10-Year Strom Event Engineer: DJD
INLET FLOW CAPACITIES
in Sump Conditions
Inlet. . Basin Basin + Inlet Maximum Inlet ~ r By-Pass Basin Shpeetand , In1et,Type, PeakFlow By-Pass Perimeter FlowDepth** .D,ischarge*** Flow
Station -(cfs) Q P H Qa Q-Qa 17th Lane ~ TYPE 1
A1 ~ STA 11+51.90RT, ~ GRATE ~ 0.51 ~ 0.51 ~ 3.67 ~ 0.33 ~ 2.09 -1.58 .
~ 17th Lane ~ TYPE 1
~ A2 ~ STA I1+51.94LT.• N GRATE ~ 0.26 ~ 0,26 ~ 3.67 ~ 0,33 ~ 2.09 ~ -1.83 ~
~ Herald Lane ~ TYPE 1 • ~ - ~ ~ ~ i ~
C6 ~ STA 10+36.88 RT, ~ GRATE ~ 2.13 ~ 2.13 ~ 5.91 ~ 0.33 ~ 3.36 ~ -1.23 ~
~ 17TH LANE ~ TYPE 1 I I - I I I I
~ C7 ~ STA 17+21.89 RT. ~ GRATE ~ 2.24 ~ 2,24 ~ 5.91 ~ 0.33 ~ 3.36 ~ -1.12
HERALD LANE TYPE 1 ~ I - ~ I I I I
~ C3 ~ STA 10+36.88 LT, GRATE ~ 0.35 ~ 0.35 ~ 3.67 ~ 0.33 ~ 2.09 -1.74 ~
Grate Perimeters* Qa = C* P* H^ 1,5
Herringbone = 3.67' Where; C= 3.0, P= Perimeter, H= Flow Depth
Vaned = 3.67'
WSDOT= 5.91' . * Grate Perimeter = Available Perimecer Divided by a Safety Factor of 2.
Maximum Flow Depth is based on curb crest above inlet.
Calculated in accordance with Spokane Gounty Guidelines for
Stormwater Management, Section 4-1.
InietSmp
~ ~ ~■~r ~ ~ ~ ~ ~ r ~ ~ ~ r r r r ~ ~
DISHMAN COMMONS
Basin Summary Table
Road Imp. House Area Driveway Total Peak 208' Vol. Bowstring 208' Vol.
Total Area Area 1800SFlLot Area Imp. Area Runoff Flow 1 Req'd Vol. Req'd Prov'd Outflow Number & Type
Basin (SF) (Acres) (SF) Houses (SF) (SF) (SF) Coeff. (cfs) (cu.ft) (cu.ft) {cu.ft) (cfs) of Drywells
A1 17,455 0.40 3,992 1.0 1,800 750 6,542 0.40 4.51
A2 3,993 0.09 3,993 0,0 U 0 3,993 0.90 0.26
A 21,448 0.49 7,985 1,0 1,800 750 10,535 0.49 0,76 333 217 355 0.3 1 Single
81 31,212 0.72 17,766 0.0 0 0 17,766 0.56 1,17
82 56,881 1.31 0 0.0 0 0 0 0.10 0.42
83 5,723 0.13 5,723 4.0 0 0 5,723 0.90 0.38
B4 42,983 0.99 5,745 4.0 7,200 3,000 15,945 0.40 1.25
B 171,987 3.9 29,234 4.0 7,200 3,000 39,434 0.28 3.25 1218 708 2143 2,0 2 Doubles
C1 39,974 0.92 0 0.0 0 0 0 0.10 0.25 -
C2 2,675 0.06 2,266 0.0 0 0 2,266 0.78 0.15 -
C3 5,261 0,12 5,261 0.0 0 0 5,261 0.90 0.35
C4 34,933 0,80 20,236 0.0 0 0 20,236 0.56 1.33
C5 58,780 1.35 8,800 6.0 10,800 4,500 24,100 0,43 1.64
C6 64,684 1.48 11,624 6.0 10,800 4,500 26,924 0.43 1.76
C7 89,442 2.05 12,531 9,0 16,200 6,750 35,481 0.42 2.24
C 296,123 6.80 60,718 21,0 37,800 15,750 114,268 0.41 7.92 2530 3328 2832 2,0 2 Ooubles
D 10,719 0.25 4,993 0.0 0 0 4,993 0.47 0.37 208 57 312 0.3 1 Sinale
E 4,706 0,11 2,271 0.0 0 0 2,271 0,49 0.17 95 0 186 0.3 1 Single
NOTE; C=(0.9'(IMPERVIOUS AREA) + 0.1'(PERVIOUS AREA)IlTOTAL AREA
WHERE C = RUNOFF COEFF.
99353 CLC ASSOCIATES, INC. 9111J2000 ,
' ~ .
' •
Weighted Runoff Coefficient Calculation
Project: DISHMAN COMMONS -
Basin: A1 CLC Job S990353
Total Area (SF): 17455 Designer: DJD
Imp. Area (SF): 6542 Date: 8/7/2000
Grass Area (SF): 10913
' Imp. Area "C": 0.90
Grass Area "C": 0.10
(Imp. Area)*(Imp. "C")= 5888
(Grass Area)}(Grass "C")= 1091
TOTAL 6979
6979
Weighted "C"= 0.40
17455
, .
~
1
~ .
Weighted Runoff Coefficient Calculation
Project: DISHMAN COMMONS
Basin: A2 CLC Job # S990353
Totai Area (SF): 3993 Designer: DJD
Imp. Area (SF): 3993 Date: 7/18/2000
Grass Area (SF): 0
imp. Area "C": 0.90
Grass Area "C": 0.10
(imp. Area)'(Imp. "C")= 3594
(Grass Area)*(Grass "C")= 0
TOTAL 3594
3594
Weighted "C'.= 0.90
3993
,
~ . .
Weighted Runoff Coefficient Calculation _
Pro i SHMAN COMMONS
~
~ect. D
Basin: A CLC Job # S990353
Total Area (SF): 21448 Designer: DJD
Imp. Area (SF): . 10535 Date: 8/7/2000
Grass Area (SF): 10913
Imp. Area "C": 0.90
Grass Area "C": 0.10
(Imp_ Area)*(Imp. "C")= 9482
(Grass Area)''(Grass "C")= 1091
TOTAL 10573
10573
W eighted "C"= 0.49
21448
'
, .
'
, .
Weighted Runoff Coefficient Calculation
Project: DISHMAN COMMONS
Basin: B1 CLC Job # S990353
Total Area (SF): 31212 Designer: DJD
Imp. Area (SF): 17766 Date: 7/18/2000 Grass Area (SF): 13446
' Imp. Area "C": 0.90
Grass Area "C": 0.10
(Imp. Area)*(Imp. "C")= 15989
(Grass Area)*(Grass "C")= 1345
TOTAL 17334
17334
Weighted "C"= 0.56
31212
' _ .
' .
Weighted Runoff Coefficient Caiculation Project: DISHMAN COMMONS -
Basin: 132 CLC Job # S990353
Total Area (SF): 56881 Designer: DJD
Imp. Area (SF): 0 Date: 7/18/2000
Grass Area (SF): 56881 Imp. Area "C": 0.90
Grass Area "C": 0.10
(Imp. Area)"(Imp. "C")= 0
(Grass Area)'(Grass "C")= 5688
TOTAL 5688
5688
Weighted "C"= 0.10
56881
~
'
, •
Weighted Runoff Coefficient Calculation -
Project: DISHMAN COMMONS
Basin: 133 CLC Job # S990353
Total Area (SF): 9647 Designer: DJD
Imp. Area (SF): 9647 Date: 8/7/2000
Grass Area (SF): 0
Imp. Area "C": 0.90
Grass Area "C": 0.10
(Imp. Area);(Imp. "C")= 8682 (Grass Area)*(Grass "C")= 0
TOTAL 8682
8682
Weighted "C"= 0.90
9647
~ - .
Weighted Runoff Coefficient Calculation
Project: DISHMAN COMMONS
Basin: 134 . CLC Job S990353
Total Area (SF): 42983 Designer: DJD
imp. Area (SF): 15945 Date: 8/7/2000
Grass Area (SF): 27038
Imp. Area "C": 0.90
Grass Area "C": 0.10
(Imp. Area)*(Imp. "C")= 14351
(Grass Area)'(Grass "C")= 2704
TOTAL 17054
17054
Weighted "C"= 0.40
42983
~
Weighted Runoff Coefficient Caiculation
Project: DISHMAN COMMONS
Basin: B CLC Job S990353
Total Area (SF): 171987 Designer: DJD
Imp. Area (SF): 39434 Date: 9/11/2000
Grass Area (SF): 132553
Imp. Area "C": 0.90
Grass Area "C": 0.10
(Imp. Area)*(Imp. "C")= 35491
(Grass Area)''(Grass "C")= 13255
TOTAL 48746
48746
Weighted '.C"= 0.28
171987
~
Weighted Runoff Coeffrcient Calculation Project: DISHMAN COMMONS
Basin: C1 CLC Job S990353
Total Area (SF): 39974 Designer: DJD
Imp. Area (SF): 0 Date: 7/18/2000
Grass Area (SF): 39974
Imp. Area "C": 0.90
Grass Area "C": 0.10
(lmp. Area)'(imp. "C")= 0
(Grass Area)''(Grass "C"}= 3997
TOTAL 3997
3997
Weighted .,C"= 0.10
` 39974
' -
Weighted Runoff Coefficient Calculation Project: DISHMAN COMMONS _
Basin: C2 CLC Job S990353
Total Area (SF): 2675 Designer: DJD
Imp. Area (SF): 2266 Date: 7/18/2000
Grass Area (SF): 409
Imp. Area "C": 0.90 Grass Area "C": 0_ 10
(Imp. Area)*(Imp. "C")= 2039
(Grass Area)*(Grass "C")= 41
TOTAL 2080
2080
Weighted "C"= 0.78
2675
Weighted Runoff Coefficient Calculation
' Pro1'ect: DISHMAN COMMONS
Basin: C3 CLC Job # S990353
Total Area (SF): 5261 Designer: DJD
Imp. Area (SF): 5261 Date: 8/7I2000
Grass Area (SF): 0
Imp. Area "C": 0.90
Grass Area "C": 0.10
(Imp. Area)''(Imp. "C")= 4735 (Grass Area)'(Grass C/, 0
TOTAL 4735
' 4735 Weighted "C"= 0.90
' S261
~
' .
Weighted Runoff Coefficient Calculation
' Project: DISHMAN COMMONS
Basin: C4 CLC Job # S990353
Total Area (SF): 34933 Designer: DJD
Imp. Area (SF): 20236 Date: 7/18/2000
Grass Area (SF): 14697
Imp. Area "C": 0.90
Grass Area "C": • 0.10 .
(Imp. Area)*(Imp. "C")= 18212
(Grass Area)*(Grass "C")= 1470
TOTAL 19682
19682
Weighted "C"= 0.56
~ 34933
'
~ ~ .
'
~ . - .
'
Weighted Runoff Coefficient Calculation -
' Project: DISHMAN COMMONS
Basin: C5 CLC Job # S990353 .
Total Area (SF): 58780 Designer: DJD
Imp. Area (SF): 24100 . Date: 7/1'8/2000
Grass Area (SF): 34680
1 Imp. Area "C": 0.90
Grass Area "C": 0.10
~
(Imp. Area)*(Imp. "C")= 21690 .
(Grass Area)*(Grass "C")= 3468
TOTAL 25158 ~
~ 25158
W eighted "C"= 0.43
58780
,
'
~
~
Weighted Runoff Coefficient Calculation
' Project: DISHMAN COMMONS
Basin: C6 CLC Job # S990353 ~
Total Area (SF): 64684 Designer: DJD
Imp. Area (SF): 26924 Date: 7l1812000
Grass Area (SF): 37760
Imp. Area "C": 0.90 .
Grass Area "C": 0.10
(Imp. Area)'(Imp. "C")= 24232
(Grass Area)*(Grass "C")= 3776
TOTAL 28008
28008
W eighted "C"= 0.43
64684
, .
,
Weighted Runoff CoefFicient Calculation
Project: DISHMAN COMMONS
Basin: C7 CLC Job #S990353
Total Area (SF): 89442 Designer: DJD
Imp. Area (SF): 35481 Date: 8/7/2000
Grass Area (SF): 53961
Imp. Area "C": 0.90 .
Grass Area "C": 0.10
(tmp. Area)*(Imp. "C")= 31933
(Grass Area)'(Grass "C")= 5396
TOTAL 37329
37329
Weighted "C"= 0.42
89442
~ . ~
~
~
Weighted Runoff Coefficient Calculation
~ Project: DISHMAN COMMONS
Basin: C CLC Job S990353
Total Area (SF): 296123 Designer: DJD
Imp. Area (SF): 114268 Date: 9/11/2000
Grass Area (SF): 181855
Imp. Area "C": 0.90
Grass Area "C": 0.10
(Imp. Area)"(Imp. "C")= 102841
(Grass Area)*(Grass "C")= 18186
TOTAL ~ 121027
121027
Weighted "C"= 0.41
296123
~
~
~
~
Weighted Runoff Coefficient Calculation -
8 Project: DISHMAN COMMONS
Basin: D CLC Job S990353
Total Area (SF): 10719 • Designer: DJD
imp. Area (SF): 4993 Date: 9/11/2000
Grass Area (SF): 5726
Imp. Area "C": 0.90
Grass Area "C": 0.10
~ (Imp. Area)*(Imp. "C")= 4494
(Grass Area)*(Grass "C")= 573
TOTAL 5066
5066
Weighted "C"= 0.47
10719
O
O
~
D - Weighted Runoff Coefficient Calculation
O Pro)'ect: DISHMAN COMMONS
Basin: E CLC Job # S990353
Total Area (SF): 4706 Designer: DJD
Imp. Area (SF): 2271 Date: 7/18/2000
Grass Area (SF): 2435
Imp. Area "C": 0.90 .
Grass Area "C": 0.10
(Imp. Area)*(Imp. "C")= 2044
(Grass Area)*(Grass "C")= 244
TOTAL 2287
2287
Weighted "C"= 0.49
O 4706 ~ .
Weighted Runoff Coefficient Calculation
Project: DISHMAN COMMONS
Basin: - F . CLC Job # S990353
Total Area (SF): 35545 Desigrier: ~ DJD
~
Imp. Area (SF): 4858 Date: 7/18/2000
Grass Area (SF): 30687
Imp. Area "C": 0.90
Grass Area "C": 0.10
D (Imp. Area)*(Imp. "C")= - 4372
(Grass Area) (Grass C" 3069
TOTAL 7441
7441
Weighted "C"= 0.21
35545
,
D
0 ~ - . . . . .
PEAK FLOW CALCULATION PROJECT: DISHMAN COMMONS
O BASIN: A1
Tot. Area = 0.40 Acres
O Imp. Area = 3,992 SF
C = 0.40
CASE 1
50 ft. Overland Flow Ct = 0.15
L = 50 ft. n = 0.400
S = 0.010
Tc = 3.60 min., by Equation 3-2 of Guidelines
86 ft. Gutter flow
Z1 = 50.0
Z2 = 3.50
n = 0.016 S = 0.0314
d = 0.095 ft. -
A R Q Tc Tc total I Qc .
0.24 0.05 0.52 0.66 5.00 3.18 0.51
~ Qpeak for Case 1= 0.51 cfs CASE 2
Case 2 assumes a Time of Concentration less than 5 minutes so that the
O peak flow =.90(3.18)(1mp. Area) = 0.26 cfs So, the Peak flow for the Basin is the greater of the finro flows, 0.51 cfs 99353 BASIN.xIs CLC ASSOCIATES, INC. 7/25l2000
o _ PEAK FLOW CALCULATION PROJECT: DISHMAN COMMONS
BASIN: A2 Tot. Area = 0.09 Acres
Imp. Area = 3,993 SF
C = 0.90 CASE 1
0 ft. Overland Flow
Ct = 0.15
L = 0 ft.
n = 0_400
S = 0.010
Tc = 0.00 min., by Equation 3-2 of Guidelines
86 ft. Gutter flow
Z1 = 50.0
Z2 = 3.50
n = 0.016
S = 0.0314
d = 0.073 ft.
A R Q Tc Tc total I Qc
0.14 0.04 0.26 0.79 5.00 3.18 0.26
Qpeak for Case 1= 0.26 cfs .
O CASE 2-
Case 2 assumes a Time of Concentration less than 5 minutes so that the
O peak flow =.90(3.18)(Imp. Area) = 0.26 cfs
So, the Peak flow for the Basin is the greater of the two flows, 0.26 cfs
99353 BASIN_xls - CLC ASSOCIATES, INC. 7l25/2000
PEAK FLOW CALCULATION PROJECT: DISHMAN COMMONS
~ BASIN: A ~
Tot. Area = 0.49 Acres
. Imp. Area = 7,985 SF
C = 0.49
CASE 1
50 ft. Overland Flow
Ct = 0.15
L = 50 ft.
n = 0.400
S = 0.010
Tc = 3.60 min., by Equation 3-2 of Guidelines
86 ft. Gutter flow .
Z1 = 50.0
Z2 = 3.50
n = 0.016
S = 0.0314
d = 0.110 ft.
A R Q Tc Tc total I Qc
0.32 0.05 0.77 0.60 5.00 3.18 0.76
Qpeak for Case 1= 0.76 cfs
O . .
CASE 2
Case 2 assumes a Time of Concentration less than 5 minutes so that the
peak flow =.90(3.18)(Imp. Area) = 0.52 cfs .
So, the Peak flow for the Basin is the greater of the two flows, 0.76 cfs
99353 BASIN.xIs CLC ASSOCIATES, INC. 7/25/2000
BOWSTRING METHOD PROJECT: DISHIUTAN COMMONS
DETENTION BASIN DESIGN BASIN: A -
DESIGNER: DJD
DATE: 07/25/00 Time Increment (min) 5
Time of Conc. (min) 5.00
.Outflow (cfs) 0.3
Design Year Flow 10
Area (acres) 0.49 Impervious Area (sq ft) 7985
'C' Factor 0.49
'208' Volume Provided 355
Area * C 0.240
Time Time inc. Intens. Q Devel. Vol.in Vol.Out Storage
(min) (sec) (in/hr) (cfs) (cu ft) (cu ft) (cu ft)
5.00 300 3.18 0.76 307 90 217
5 300 3.18 0.76 307 90 217
10 600 2.24 0.54 378 180 198
15 900 1.77 0.42 426 270 156
20 1200 1.45 0.35 453 360 93
25 1500 1.21 0.29 465 450 15
30 1800 1.04 0.25 475 540 0
35 2100 0.91 0.22 481 630 0
40 2400 0.82 0.20 493 720 0
45 2700 0.74 0.18 498 810 0
50 3000 0.68 0.16 506 900 0
208' DRAINAGE POND CALCULATIONS Required '208' Storage Volume
= Impervious Area x.5 in / 12 in/ft 332.7 cu ft
. 208' Storage Volume Provided 355 cu ft - -
DRYWELL REQUIREMENTS - 10 YEAR DESIGN STORM
a Maximum Storage Required by Bowstring . 217 cu ft . .
Provided Storage Volume - • 355 cu ft @ 6" depth
Number and Type of Drywells Required 1 Single
0 Double .
99353 CLC ASSOCIATES 7/25/2000
PEAK FLOW CALCULATION PROJECT: DISHMAN COMMONS
BASIN: B1
Tot. Area = 0.72 Acres
Imp. Area = 17,766 SF
C = 0.56
CASE 1
0 ft. Overland Flow
Ct = 0.15
L = 0 ft.
n = 0.400
S = 0.010
Tc = 0.00 min., by Equation 3-2 of Guidelines
595 ft. Gutter flow
Z1 = 50.0
Z2 = 1.00 -
n = 0.016
S = 0.0080
d = 0.168 ft.
A R Q Tc Tc total I Qc
0.72 0.08 1.14 6.24 6.24 2.83 1.14
Qpeak for Case 1= 1.14 cfs ~
CASE 2
Case 2 assumes a Time of Concentration less than 5 minutes so that the ~
peak fiow =.90(3.18)(Imp. Area) = 1.17 cfs
So, the Peak flow for the Basin is the greater of the two flows, 1.17 cfs
99353 BASIN.xIs CLC ASSOCIATES, INC. 7/25/2000
~
PEAK FLOW CALCULATION PROJECT: DISHMAN COMMONS
- BASIN: 132
Tot. Area = 1.31 Acres
Imp. Area = 0 SF
C = 0.10
CASE 1 365 ft. Overland Flow
Ct = 0.15
L = 365 ft.
n = 0.040
S = 0.010
Tc = 2.97 min., by Equation 3-2 of Guidelines
0 ft. Gutter flow
Z1 = 50.0
Z2 = 1.00
n = 0.016
S = 0.0080
d = 0.115 ft.
A R Q Tc Tc total I Qc
0.34 0.06 0.42 0.00 5.00 3.18 0.42
Qpeak for Case 1= 0.42 cfs
CASE 2 Case 2 assumes a Time of Concentration less than 5 minutes so that the
e peak flow =.90(3.18)(Imp. Area) = 0.00 cfs
So, the Peak flow for the Basin is the greater of the two flows, .0.42 cfs
99353 BASIN.xIs CLC ASSOCIATES, INC. 7/25/2000
PEAK FLOW CALCULATION PROJECT: DISHMAN COMMONS
BASIN: B3
Tot. Area = 0.13 Acres
Imp. Area = 5,723 SF ,
C = 0.90
CASE 1
0 ft. Overiand Flow
Ct = 0.15
L = 0 ft.
n = 0.400
S = 0.010
Tc = 0.00 min., by Equation 3-2 of Guidelines
370 ft. Gutter flow
Z1 = 50.0
Z2 = 3.50
n = 0.016
S = 0.0300
d = 0.084 ft.
A R Q Tc Tc totai I . Qc
0.19 0.04 0.37 3.17 5.00 3.18 0.37
Qpeak for Case 1= 0.37 cfs CASE 2 Case 2 assumes a Time of Concentration less than 5 minutes so that the peak flow =.90(3.18)(Imp. Area) = 0.38 cfs So, the Peak flow for the Basin is the greater of the two flows, 0.38 cfs,
99353 BASIN.xIs CLC ASSOCIATES, INC. 7/26/2000
'
PEAK FLOW CALCULATION PROJECT: DISHMAN COMMONS
' BASIN: B4 -
Tot. Area = 0.99 Acres
Imp. Area = 5,745 SF
C = 0.41 '
CASE 1
' 50 ft. Overland Flow
Ct = 0.15
L = 50 ft.
n = 0.400
S = 0.010
Tc = 3.60 min., by Equation 3-2 of Guidelines
'
370 ft. Gutter flow
Z1 = 50.0
Z2 = 3.50
n = 0.016
S = 0.0600
' d = 0.117 ft.
A R Q Tc Tc total I . Qc
0.37 0.06 1.26 1.80 5.40 3.08 1.25
~ Qpeak for Case 1= 1.25 cfs
'
CASE 2
~ Case 2 assumes a Time of Concentration less than 5 minutes so that the
. peak flow =.90(3.18)(Imp. Area) = 0.38 cfs
So, the Peak flow for the Basin is the greater of the two flows, 1.25 cfs
99353 BASIN.xIs CLC ASSOCIATES, INC. 7/26/2000
PEAK FLOW CALCULATION PROJECT: DISHMAN COMMONS
I BASIN: B
' Tot. Area _ 3.90 Acres
Imp. Area - 29,234 SF
C = 0.28
CASE 1
50 ft. Overland Fiow
, Ct = 0.15
L 50 ft.
n = 0.400
S = 0.010
Tc = 3.60 min., by Equation 3-2 of Guidelines
370 ft. Gutter flow
' Z1 = 50.0
Z2 = 3.50
n = 0.016
S = 0.0600
. d = 0.171 ft.
A R Q Tc Tc total I Qc
0.78 0.09 3.46 1.40 5.00 3.18 3.47
Qpeak for Case 1= 3.47 cfs
CASE 2
' Case 2 assumes a Time of Concentration less than 5 minutes so that the
peak flow =.90(3.18)(Imp. Area) - 1.92 cfs
So, the Peak flow for the Basin is the greater of the two flows, 3.47 cfs
99353 BASIN.xIs CLC ASSOCIATES, INC. 9/11/2000
' BOWSTRING METHOD - PROJECT: DISHMAN COMMONS
DETENTION BASIN DESIGN BASIN: B
DESIGNER: DJD
' DATE: 07/26/00
~
Time Increment (min) 5
Time of Conc. (min) 5.02
Outffow (cfs) 2
Design Year Flow 10
Area (acres) 3.10
, impervious Area (sq f#) 29234
'C' Factor 0.33
'208' Volume Provided 2143
Area * C 1.023
Time Time Inc. Intens. Q Devel. Vol.ln Vol.Out Storage
(min) (sec) (in/hr) (cfs) (cu ft) (cu ft) (cu ft)
5.02 301 3.17 3.25 1311 603 708
5 300 3.18 3.25 1308 600 708
10 600 2.24 2.29 1610 1200 410
15 900 1.77 1.81 1815 , 1800 15
20 1200 1.45 1.48 1932 2400 0
25 1500 1.21 1.24 1984 3000 0
30 1800 1.04 1.06 2024 3600 0
35 2100 0.91 0.93 2050 4200 0
40 2400 0.82 0.84 2099 4800 0
45 2700 0.74 0.76 2121 5400 0
50 3000 0.68 0.70 2158 6000 0
208' DRAINAGE POND CALCULATIONS
Required '208' Storage Volume
Impervious Area x.5 in / 12 in/ft . 1218.1 cu ft
208' Storage Volume Provided . . 2143 cu ft
i
DRYWELL REQUIREMENTS --10 YEAR DESIGN STORM
Maximum Storage Required by Bowstring 708 cu ft
' Provided Storage Volume _ 2143 cu ft-@ 6" depth
Number and Type of Drywells Required 0 Single .
- 2 Double
99353 CLC ASSOCIATES 7/26/2000
'
PEAK FLOW CALCULATION PROJECT: DISHMAN COMMONS
BASIN: C1
1 Tot. Area _ 0.92 Acres
Imp. Area - 0 SF C = 0.10
'
CASE 1
170 ft. Overland Flow Ct = 0.15
L = 170 ft.
n = 0.400
~ S = 0.015
Tc = 6.65 min., by Equation 3-2 of Guidelines
0 ft. Gutter flow
Z1 = 50.0
Z2 = 1.00
~ n = 0.016
S 0.0080
~ d = 0.095 ft.
A R Q Tc Tc total I Qc
0.23 0.05 0.25 0.00 6.65 2.74 0.25
' Qpeak for Case 1= 0.25 cfs
~
CASE 2
Case 2 assumes a Time of Concentration less ihan 5 minutes so that the
peak flow =.90(3.18)(Imp. Area) = 0.00 cfs
So, the Peak flow for the Basin is the greater of the two flows, 0.25 cfs
99353 BASIN.xIs CLC ASSOCIATES, INC. 7/25/2000
'
PEAK FLOW CALCULATION .PROJECT: DISHMAN COMMONS ~
BASIN: C2
' Tot. Area _ 0.06 Acres
Imp. Area - 2,266 SF
C = 0.78
CASE 1
20 ft. Overland Flow
' Ct = 0.15
L 20 ft.
n = 0.400
S = 0.010
Tc = 2.08 min., by Equation 3-2 of Guidelines
150 ft. Gutter flow
Z1 = 50.0
Z2 = 3.50
n = 0.016
. S = 0.0080
d = 0.076 ft.
A R Q Tc Tc total I Qc
0.15 0.04 0.15 2.66 5.00 3.18 0.15
, Qpeak for Case 1= 0.15 cfs
' .
CASE 2
~ Case 2 assumes a Time of Concentration less than 5 minutes so that the
. peak flow =.90(3.18)(Imp. Area) - 0.15 cfs
So, the Peak fiow for the Basin is the greater of the two flows, 0.15 cfs 99353 BASIN.xIs - CLC ASSOCIATES, INC. 7/25/2000
' PEAK FLOW CALCULATION PROJECT: DISHMAN COMMONS
BASIN: C3
, _ .
Tot. Area 0.12 Acres
Imp. Area*= 5,261 SF
C = 0.90
CASE 1
0 ft. Overland Flow
Ct = 0.15
L = 0 ft.
n = 0.400
- S = 0.020
Tc = 0.00 min., by Equation 3-2 of Guidelines
95 ft. Gutter flow
Z1 = 50.0
Z2 = 3.50
n = 0.016
S = 0.0080
d = 0.105 ft.
A R Q Tc Tc total I Qc
0.29 0.05 0.34 1.36 5.00 3.18 0.34
Qpeak for Case 1= 0.34 cfs
'
CASE 2
Case 2 assumes a Time of Concentration less than 5 minutes so that the
peak flow =.90(3.18)(Imp. Area) = 0.35 cfs
~
. So, the Peak fiow for the Basin is the greater of the two flows, 0.35 cfs _
99353 BASIN.xis CLC ASSOCIATES, INC. 7/26/2000
PEAK FLOW CALCULATION PROJECT: DISHMAN COMMONS
' BASIN: C4
Tof. Area = 0.80 Acres
Imp. Area = 20,236 SF ,
C = 0.56
CAS E 1 ~ 20 ft. Overiand Flow
Ct = 0.15
L = 20 ft.
n = 0.400
S = 0.010
Tc = 2.08 min., by Equation 3-2 of Guidelines
, 715 ft. Gutter flow
Z1 = 50.0
22 = 1.00
n = 0.016
S = 0_0300
d = 0.135 ft.
A R Q Tc Tc total I Qc
0.46 0.07 _ 1.24 4.48 6.56 2.76 1.24
, Qpeak for Case 1= 1.24 cfs
'
CASE 2
' Case 2 assumes a Time of Concentration less than 5 minutes so that the
peak flow =.90(3.18)(Imp. Area) = 1.33 cfs
So, the Peak flow for the Basin is the greater of th-e two flows, . 1.33 cfs
99353 BASIN.xIs CLC ASSOCIATES, INC. _ 7/25/2000
PEAK FLOW CALCULATION PROJECT: DiSHMAN COMMONS
BASIN: C5
' Tot. Area = 1.35 Acres
Imp. Area - 8,800 SF
C = 0.43
'
CASE 1
50 ft. Overland Flow .
Ct = 0.15
L = 50 ft. n = 0.400
' S = 0.020
Tc = 2.93 min., by Equation 3-2 of Guidelines
510 ft. Gutter flow
Z1 = 50.0
Z2 = 50.00
n = 0.016
S = 0.0341
d = 0.114 ft.
A R Q Tc Tc tota! I Qc
0.65 0.06 1.65 3.34 6.26 2.83 1.64
' Qpeak for Case 1=- 1.64 cfs '
CASE 2
Case 2 assumes a Time of Concentration less than 5 minutes so that the , peak flow =.90(3.18)(Imp. Area) = 0.58 - cfs
So, the Peak flow for the Basin is the greater of the two flows, 1.64 cfs
99353 BASIN.xIs CLC ASSOCIATES, INC. 7/25/2000
PEAK FLOW CALCULATION PROJECT: DISHMAN COMMONS
'
BASIN. C6
Tot. Area = 1.48 Acres
Imp. Area = 11,624 SF .
C = 0.43
CASE 1 50 ft. Overland Flow
Ct = 0.15
L = 50 ft.
n = 0.400
S = 0.020
Tc = 2.93 min., by Equation 3-2 of Guidelines
610 ft. Gutter fiow
Z1 = 50.0
Z2 = 3.50
n = 0.016
S = 0.0276
d = 0.154 ft.
A R Q Tc Tc total I Qc
. 0.63 0.08 1.77 3.64 6.56 2.76 . 1.76
Qpeak for Case 1= 1.76 cfs
CASE 2 ' Case 2 assumes a Time of Concentra#ion less than 5 minutes so that the pea k f low 9 0( 3. 1 8)( Imp. Area) = 0.76 c fs
So, the Peak flow for the Basin is the greater of the two flows, 1.76 cfs
99353 BASIN.xIs CLC ASSOCIATES, INC. 7/25/2000
PEAK FLOW CALCULATION PROJECT: DISHMAN COMMONS
BASIN: C7
Tot. Area = 2.05 Acres
Imp. Area = 12,531 SF
' C = 0.42
CASE 1
50 ft. Overland Flow
Ct = 0.15 - -
L = -50 ft.
n = 0.400
S = 0.020
' Tc = 2.93 min., by Equation 3-2 of Guidelines 810 ft. Gutter flow Z1 = 50.0
Z2 = 3.50
n = 0.016
S = 0.0276
d = 0.168 ft.
A R Q Tc Tc total I Qc
0.75 0.08 2.24 4.56 7.48 2.60 2.24
Qpeak for Case 1= 2.24 cfs
CASE 2
Case 2 assumes a Time of Concentration less than 5 minutes so that the
peak flow =.90(3.18)(Imp. Area) = 0.82 cfs
So, the Peak flow for the Basin is the greater of the two flows, 2.24 cfs
99353 BASIN.xis CLC ASSOCIATES, INC. 7l26/2000 .
PEAK FLOW CALCULATION PROJECT: DISHMAN COMMONS
BASIN: C
' Tot. Area _ 6.80 Acres
imp. Area - 60,718 SF
C = 0.41
CASE 1
50 ft. Overland Flow
Ct = 0.15
L = 50 ft.
n = 0.400
S = 0.010
Tc = 3.60 min., by Equation 3-2 of Guidelines
650 ft. Gutter flow
Z1 = 50.0
Z2 = 3.50
n = 0.016
S = 0.0300
d = 0.266 ft.
A R Q Tc Tc total I Qc
1.89 0.13 7.94 2.58 6.19 2.85 7.93
Qpeak for Case 1= 7.93 cfs
CASE 2
Case 2 assumes a Time of Concentration less than 5 minutes so that the
peak flow =.90(3.18)(Imp. Area) = 3.99 cfs
So, the Peak flow for the Basin is the greater of the two flows, 7.93 cfs
99353 BASIN.xts CLC ASSOCIATES, INC. 9/11/2000
BOWSTRING METHOD PROJECT: DISHMAN COMMONS
, DETENTION BASIN DESIGN BASIN: C
DESIGNER: DJD
DATE: 08/07/00
,
Time Increment (min) 5
Time of Conc. (min) 6.19
Outflow (cfs) 2
Design Year Flow 10
Area (acres) 6.79
Impervious Area (sq ft) 60718
'C' Factor 0.41
'208' Volume Provided 2581
Area * C 2.784
Time Time Inc. Intens. Q Devel. Vol.ln Vol.Out Storage
(min) (sec) (in/hr) (cfs) .(cu ft) (cu ft) (cu ft)
6.19 371 2.85 7.92 3940 742 3197
5 300 3.18 8.85 3559 600 2959
10 600 2.24 6.24 4528 1200 3328
15 900 1.77 4.93 5057 1800 3257
20 1200 1.45 4.04 5353 2400 2953
25 1500 1.21 3.37 5478 3000 2478
30 1800 1.04 2.90 5577 3600 1977
35 2100 0.91 2.53 5640 4200 1440
40 2400 0.82 2.28 5767 4800 967
45 2700 0.74 2.06 5822 5400 422
50 3000 0.68 1.89 5918 6000 0
208' DRAINAGE POND CALCULATIONS Required '208' Storage Volume = Impervious Area x.5 in / 12 in/ft 2529.9 cu ft
208' Storage Volume Provided 2832 cu ft DRYWELL REQUIREMENTS - 10 YEAR DESIGN STORM
Maximum Storage Required by Bowstring 3328 cu ft
Provided Storage Volume 3599 cu ft @ 8" depth
Number and Type of Drywells Required - 0 Single
2 Double
99353 CLC ASSOCIATES 8/7/2000
'
PEAK FLOW CALCULATION PROJECT: DISHMAN COMMONS
BASIN: D
Tot. Area = 0.25 Acres
Imp. Area = 41993 SF
C = 0.47
CASE 1
20 ft. Overland Flow
Ct = 0.15
L = 20 ft.
n = 0.400
S = 0.010
Tc = 2.08 min., by Equation 3-2 of Guidelines
250 ft. Gutter flow
Z1 = 50.0
Z2 = 1.00
n = 0.016
S = 0.0168 .
d = 0.096 ft.
A R Q Tc Tc total I Qc
0.24 0.05 0.37 2.63 5.00 3.18 0.37
Qpeak for Case 1= 0.37 cfs
CASE 2
Case 2 assumes a Time of Concentration less than 5 minutes so that the
peak flow =.90(3.18)(Imp. Area) = 0.33 cfs
So, the Peak flow for the Basin is the greater of the two flows, 0.37 cfs
99353 BASIN.xIs CLC ASSOCIATES, INC. 9/11/2000
BOWSTRING METHOD PROJECT: DISHMAN COMMONS
DETENTION BASIN DESIGN BASIN: D
~
DESIGNER: DJD
DATE: 07/25J00
. Time Increment (min) 5
Time of Conc. (min) . 5.00
Outflow (cfs) 0.3
Design Year Flow 10
Area (acres) 0.25
Impervious Area (sq ft) 4993
'C' Factor 0.46
'208' Volume Provided 312
Area * C 0.115
Time Time Inc. Intens. Q Devel. Vol.ln Vol.Out Storage
(min) (sec) (in/hr) (cfs) (cu ft) (cu ft) (cu ft)
5.00 300 3.18 0.37 147 90 57
5 300 3.18 0.37 147 90 57
10 600 2.24 0.26 181 180 1
15 900 1.77 0.20 204 270 0
20 1200 1.45 0.17 217 360 0
25 1500 1.21 0.14 223 450 0
30 1800 1.04 0.12 227 540 0
35 2100 0.91 0.10 230 630 0
40 2400 0.82 0.09 236 720 0
45 2700 - 0.74 0.09 238 810 0
50 3000 0.68 0.08 243 900 0
208' DRAINAGE POND CALCULATJONS '
Required '208' Storage Volume
= Impervious Area x.5 in / 12 in/ft 208.0 cu ft
'
208' Storage Volume Provided 312 cu ft
~ DRYWELL REQUIREMENTS - 10 YEAR DESIGN STORM
Maximum Storage Required by Bowstring - 57 cu ft Provided Storage Volume 312 cu ft @ 6" depth
Number and Type of Drywells Required 1 Single
0 Double
99353 CLC ASSOCIATES 7/25/2000
' PEAK FLOW CALCULATION PROJECT: DISHMAN COMMONS ' . .
BASIN. E
Tot. Area = 0.11 Acres
Imp. Area = 2,271 -SF
C = 0.49
CASE 1
~ 20 ft. Overland Flow
Ct = 0.15
L = 20 ft.
n = 0.400 . .
S = 0.010
Tc = 2.08 min., by Equation 3-2 of Guidelines
' 110 ft. Gutter flow
Z1 = 50.0
Z2 = 1.00 n = 0.016
S = 0.0120
~ d = 0.076 ft.
A R Q Tc Tc totai I Qc
0.15 0.04 0.17 1.60 5.00 3.18 0.17
' QPeak for Case 1= 0.17 cfs
'
CASE 2
' Case 2 assumes a Time of Concentration less than 5 minutes so that the _
peak flow =.90(3.18)(Imp. Area) = 0.15 cfs
So, the Peak flow for the Basin is the greater of the two flows, 0.17 cfs
99353 BASIN.xis CLC ASSOCIATES, INC. 7/25/2000
, BOWSTRING METHOD PROJECT: DISHMAN COMMONS
DETENTION BASIN DESIGN BASIN. E
DESIGNER: DJD
' DATE: 07/25/00
Time Increment (min) 5
Time of Conc. (min) 5.00
Outf low (cfs) 0.3
Design Year Flow 10 Area (acres) 0.11
Impervious Area (sq ft) 2271
'C' Factor 0.49
'208' Volume Provided 186
Area * C 0.054
1
Time Time inc. Intens. Q Devel. Vol.in Vol.Out Storage
(min) (sec) (in/hr) (cfs) (cu ft) (cu ft) (cu ft)
5.00 300 3.18 0.17 69 90 0<__
5 300 3.18 0.17 69 90 0<__
10 600 2.24 0.12 85 180 0<__
15 900 1.77 0.10 96 270 0<__
20 1200 1.45 0.08 102 360 0<__
25 1500 1.21 0.07 104 450 0<__
30 1800 1.04 0.06 107 540 0<__
35 2100 0.91 0.05 108 630 0<__
40 2400 0.82 0.04 111 720 0<__
45 2700 0.74 0.04 112 810 0<__
50 3000 0.68 0.04 114 900 0<__
' 208' DRAINAGE POND CALCULATIONS ,
Required '208' Storage Volume = Impervious Area x.5 in / 12 in/ft 94.6 cu ft
'
208' Storage Volume Provided 1,86 cu ft
' DRYWELL REQUIREMENTS - 10 YEAR DESIGN STORM
Maximum Storage Required by Bowstring 0 cu ft
Provided Storage Volume 186 cu ft @ 6" depth
Number and Type of Drywells Required 1 Single
0 Double
99353 CLC ASSOCIATES 7/25/2000
PEAK FLOW CALCULATION PROJECT: DISHMAN COMMONS
~
BASIN: F
Tot. Area = 0.82 Acres
Imp. Area = 4,858 SF C = 0.21
CASE 1 .
~ 145 ft. Overland Flow Ct = 0.15
L = 145 ft.
n = 0.400
S = 0.020
Tc = 5.54 min., by Equation 3-2 of Guidelines
'
205 ft. Gutter flow
Z1 = 50.0
Z2 = 3.50
n = 0.016
S = 0.0169
d = 0.100 ft.
A R Q Tc Tc totai I Qc
0.27 0.05 0.44 2.08 7.63 2.58 0.44
' QPeak for Case 1= 0.44 cfs
~
CASE 2
~ Case 2 assumes a Time of Concentration less than 5 minutes so that the
peak flow =.90(3.18)(imp. Area) = 0.32 cfs
So, the Peak flow for the Basin is'the greater of the two ftows, 0.44 cfs
99353 BASIN.xIs CLC ASSOCIATES, INC. 7/25/2000
'
BOWSTRING METHOD . PROJECT: DISHMAN COMMONS
DETENTION BASIN DESIGN BASIN: F
DESIGNER: DJD
' DATE: 07/25/00
,
' Time Increment (min) 5
Time of Conc. (min) 7.63
Outflow (cfs) 0.3
Design Year Fiow 10
Area (acres) 0.82
impervious Area (sq ft) 4858 -
'C' Factor 0.21
'208' Volume Provided 209
Area * C 0.172
'
Time Time Inc. Intens. Q Devel. Vol.in Vol.Out Storage
(min) (sec) (in/hr) (cfs) (cu ft) (cu ft) . (cu ft)
7.63 458 2.58 0.44 272 137 135
5 300 3.18 0.55 220 90 130
10 600 2.24 0.39 291 180 111
15 900 1.77 0.30 322 270 52
~ 20 1200 1.45 0.25 338 360 0
25 1500 1.21 0.21 345 450 0
30 1800 1.04 0.18 350 540 0
35 2100 0.91 0.16 353 630 0
40 2400 0.82 0.14 361 720 0
45 2700 0.74 0.13 364 810 0
50 3000 0.68 0.12 370 900 0
' 208' DRAINAGE POND CALCULATIONS
Required '208' Storage Volume
= Impervious Area x.5 in / 12 in/ft 202.4 cu ft
~
. 208' Storage Volume Provided 209 cu ft
, DRYWELL REQUIREMENTS - 10 YEAR DESIGN STORM
Maximum Storage Required by Bowstring 135 cu ft
Provided Storage Volume 209 cu ft @ 6" depth
Number and Type of Drywells Required 1 Single
0 Double
99353 CLC ASSOCtATES 7/25/2000
~ ~ r■ ~■r ~ ~ ir ~ ~■~r ~ r ~ ~r ~ r ~r ~r ~ ~
B-1
P-1
STORMLINF- A
J-1
P-2
POND B
Project Title; DISHMAN COMMONS Project Engineer: CLC ASSOCIATES INC,
j:ldocument1993531dishman4.stm Inland Pacific Engineering Co. StormCAD v1.0
10/05/00 12:59:26 PM 0 Haestad Methods, Inc. 37 Brookside Road Waterbury, CT 06708 USA (203) 755-1666 Page 1 of 1
~ ~ ~ ~ ~ ~ ~ ~ ~ ~■~r ~ r ~ r ~ ~ rr ~ ~
' Combined PipelNode Report
Pipe Up Dn Length Size Up Dn S Up Q Up Dn Dn '~1 Rim
Node Node (ft) Invert Invert (ftlft) HGL (cfs) EGL EGL Rim (ft)
(ft) (ft) (ft) (ft) (ft) (ft)
P-1 B-1 J-1 169,00 12 inch 1,997.45 1,992.60 0.028698 1,997.91 1.17 1,998.08 1,993.23 1,998.00 2,000,37
P-2 J-1 POND B 30.00 12 inch 1,992.60 0,00 66.420000 1,993.06 1,17 1,993.23 181.15 1,993.30 1,998.00
N/A N/A N/A N/A N/A N/A N/A N/A N/A N/A N/A N/A 1,993.30
Project Title: DISHMAN COMMONS Project Engineer; CLC ASSOCIATES INC,
j:ldocument1993531dishman4.stm Inland Pacific Engineering Co. StormCAD v1,0
10l05/00 12:45:53 PM 0 Haestad Methods, Inc. 37 Brookside Road Waterbury, CT 06708 USA (203) 755-1666 Page 1 of 1
~ ~r ~ ~ ~r ~ ~■r ~ ~ ~ r ~ ~ ~ ~ r ~ ~ ~
A2
STORMLIN~- B P-2
A1
-3
utlet
Project Title: DISHMAN COMMONS BASIN A Project Engineer. CLC ASSOCIATES, INC.
J:ldocument1993531dishman.stm Inland Paciflc Engineering Co. StormCAD v1.0
10/05/00 02:54:39 PPA 0 Haestad Methods, Inc, 37 Brookside Road Waterbury, CT 06708 USA (203) 755-1666 Page 1 of 1
Combined PipelNode Report
Pipe Up On Length Size Up Dn S Up Q Up Dn Dn ~ Rim
Node Node (ft) Invert Invert (ft/ft) HGL (cfs) EGL EGL Rim (ft)
(ft) (ft) (ft) (ft) (ft) (ft)
P-2 A2 A1 24.67 12 inch 1,991.20 1,991.05 0.006080 1,991.41 0.26 1,991.48 1,991.43 1,993.03 1,993.03
P-3 A1 Outlet 68.00 12 inch 1,991.05 1,990.70 0.005147 1,991.42 0.77 1,991.55 1,991.20 1,990.70 1,993.03
N/A N/A N/A N/A N/A N/A N/A N/A N/A N/A N/A N/A 1,990.70
Project Title: DISHMAN COMMONS BASIN A Project Engineer. CLC ASSOCIATES, INC.
j:ldocument1993531dishman.stm Inland Pacific Engineering Co. StormCAD 0.0
10l05/00 02:55:04 PM O Haestad Methods, Inc. 37 Brookside Road Waterbury, CT 06708 USA (203) 755-1666 Page 1 of 1
Outlet
A,
STORMLIN~- C&D
P-4
B3
~
P-3
i
P-2
1 _
134-2
134-1
Project Title: DISHMAN COMMONS Project Engineer. CLC ASSOCIATES. INC.
j:\document\99353\dishman1.stm Inland Pacific Engineering Co. StormCAD v1.0
10/05100 03:10:35 PM O Haestad Methods, Inc. 37 Brookside Road Waterbury, CT 06708 USA (203) 755-1666 Page 1 of 1
Combined PipelNode Report
Pipe Up Dn Length Size Up Dn S Up Q Up Dn On Rim
Node Node (ft) Invert Invert (fUft) HGL (cfs) EGL EGL Rim (ft)
(ft) (ft) (ft) (ft) (h) (ft)
P•2 64-2 134-1 15,00 12 inch 1,993.78 1,992.90 0.058667 1,994.19 0.94 1,994.34 1,993.57 1,995.82 1,996.72
P-3 64-1 133 24,67 12 inch 1,992.90 1,992.60 0.012161 1,993.37 1.25 1,993.55 1,993.27 1,995.82 1,995.82
P-4 B3 Outlet 24,40 12 inch 1,992,50 1,992.30 0.008197 1,993.04 1.63 1,993.26 1,993.06 1,993,30 1,995.82
N/A N/A N/A N/A N/A N/A N/A N/A N/A N/A N/A N/A 1,993.30
Project Title: DISHMAN COMMONS Project Engineer: CLC ASSOCIATES, INC,
j;ldocument1993531dishman1.stm Inland Paciflc Engineer(ng Co. StormCAD v1.0
10105/00 03:11:11 PM 0 Haestad Methods, Inc. 37 Brookside Road Waterbury, CT 06708 USA (203) 755-1666 Page 1 of 1
Out et
n
P-3
STORML NE E --C2
P-2
C4
,
-1
5
Project Title: DISHMAN COMMONS Project Engineer; CLC ASSOCIATES, INC.
j;ldocument1993531dishman3,stm Inland Pacific Engineering Co, StormCAD v1,0
10/05/00 03:39:25 PM 0 Haestad Methods, Inc. 37 Brookside Road Waterbury, CT 06708 USA (203) 755-1666 Page 1 of 1
Combined PipelNode Report
Pipe Up Dn Length Size Up On S Up Q Up Dn Dn ~ Rim
Node Node (ft) Invert Invert (ft/ft) HGL (cfs) EGL EGL Rim (ft)
(ft) (ft) (ft) (ft) (ft) (ft)
P•1 C5 C4 27.50 10 inch 2,009,54 2,009.40 0.005091 2,010,43 1,64 2,010.57 2,010.48 2,011.94 2,011.29
P-2 C4 C2 24.70 12 inch 2,009.40 2,008,40 0.040486 2,010.19 2,88 2,010.48 2,010.39 2,011.94 2,011.94
P-3 C2 Outlel 48.60 12 inch 2,009.25 2,009.00 0.005144 2,010.00 3.03 2,010.36 2,010.11 2,010.00 2,011.94
N/A N/A N/A N/A N/A N/A N/A N/A N/A N/A N/A N/A 2,010.00
Project Title: DISHMAN COMMONS Project Engineer; CLC ASSOCIATES, INC.
j:ldacument1993531dishman3.stm Inland Pacific Engineering Co. StormCAD v1.0
10105l00 03.38:59 PM 0 Haestad Methods, Inc. 37 Brookside Road Waterbury, CT 06708 USA (203) 755-1666 Page 1 of 1
Outlet
1
,
STORMLINE F&G
C7 _
~ L_
i
C6
Project TiUe: DISHMAN COMMONS Project Engineer. CLC ASSOCIATES, INC.
j:ldocument\99353\dishman2.stm Inland Pacific Engineering Co. StormCAD v1.0
10/05/00 03:17:46 PM O Haestad Methods, Inc. 37 Brookside Road Waterbury. CT 06708 USA (203) 755-1666 Page 1 of 1
Combined PipelNode Report
Pipe Up Dn Length Size Up Dn S Up Q Up Dn Dn ~ Rim
Node Node (ft) Invert Invert (ft/ft) HGL (cfs) EGL EGL Rim (ft)
(ft) (ft) (ft) (ft) (ft) (ft)
P-3 C7 C3 48.00 12 inch 2,009.73 2,009.49 0.005000 2,010.64 2.24 2,010.78 2,010.67 2,010.97 2,011,17
P-1 C6 C3 30.00 12 inch 2,009.64 2,009.49 0.005000 2,010.58 1.76 2,010.66 2,010.62 2,010.97 2,010,97
P-2 C3 Oullet 43.50 12 inch 2,009.39 2,009.00 0.008966 2,010.27 4.35 2,010.82 2,010.44 2,010.00 2,010.97
N/A N/A N/A N/A N/A N/A N/A N/A N/A N/A N/A • N/A 2,010,00
Project Title: DISHMAN COMMONS Project Engineer. CLC ASSOCIATES, INC.
j:ldocument1993531dishman2.stm Inland Paciflc Engineering Co. SlormCAD v1.0
10l05/00 03:18:35 PM (D Haestad Methods, Inc. 37 Brookside Road Waterbury, CT 06708 USA (203) 755-1666 Page 1 of 1
BASIN A2
, Worksheet for Circular Channel
' Project Description
Project File j:ldocument199353199353.fm2
Worksheet DISHMAN COMMONS PIPING CALCULATiONS
Flow Element Circular Channel
Method Manning's Formula
Solve For Channel Depth
'
Input Data
Mannings Coefficient 0.009
Channel Slope 0.005000 fUft
Diameter 12.00 in
Discharge 0.26 cfs
Results
Depth 0.18 ft Flow Area 0.10 ftz
Wetted Perimeter 0.88 ft
Top Width 0.77 ft
Critical Depth 0.21 ft
Percent Full 18.10 .
Critical Slope 0.002752 fUft
Velocity 2.68 fUs
Velocity Head 0.11 ft
Specific Energy 0.29 ft
Froude Number 1.33
Maximum Discharge 3_91 cfs
' Full Flow Capacity 3.64 cfs
Full Flow Slope 0.000026 fUft
Flow is supercritical. - . '
'
' -
08/08/00 Academic Edition FlowMaster v5.17
08:26:12 AM Haestad Methods.lnc. 37 Brookside Road Waterbury, CT 06708 (203) 755-1666 Page 1 of 1
BASIN A2&A1
Worksheet for Circular Channel
' Project Description -
Project File j:ldocument\99353199353.fm2
Worksheet DISHMAN COMMONS PIPING CALCULATIONS
Flow Element Circular Channel
Method Manning's Formula
Soive For Channel Depth .
Input Data
Mannings Coefficient 0.009
Channel Slope 0.005000 fUft
Diameter 12.00 in
Discharge 0.77 cfs
Results
Depth 0.31 ft
Flow Area 0.21 ft2
Wetted Perimeter 1.19 ft
Top Width 0.93 ft
Critical Depth 0.37 ft
Percent Full 31.23
Critical Slope 0.002721 fUft
Velocity 3.68 fUs
Velocity Head 0.21 ft
Specific Energy 0.52 ft
Froude Number 1.36
Maximum Discharge 3.91 cfs
Full Flow Capacity 3.64 - cfs
Full Flow Slope 0.000224 fUft
Flow is supercritical.
' , . .
1
08/08I00 Academic Edition FlowMaster v5.17
08_27:14 AM Haestad Methods, Inc_ 37 Brookside Road Waterbury. CT 06708 (203) 755-1666 Page 1 oi 1
BASIN B1 , Worksheet for Circular Channel
' Project Description
Project File j:ldocument\99353199353.fm2
Worksheet DISHMAN COMMONS PIPING CALCULATIONS
Flow Element Circular Channel
Method Manning's Formula
Solve For Channel Depth
Input Data .
' Mannings Coefficient 0.009
Channel Slope 0.030000 fUft
Diameter 12.00 in
Discharge 1.17 cfs
Results Depth 0_24 ft -
Flow Area 0.15 ft2
Wetted Perimeter 1.03 ft
Top Width 0.86 ft
Critical Depth 0.46 ft
Percent Full 24.47
Criticat Slope 0.002846 ft/ft -
Velocity 7.85 ftls Velocity Head 0.96 ft
Specific Energy 1.20 ft
Froude Number 3.33
Maximum Discharge 9.59 cfs
' Full Flow Capacity 8.91 cfs
Full Flow Slope 0.000517 fUft Flow is supercritical.
'
~
08l08/00 Academic Edition FlowMaster v5.17
08:28:22 AM Haestad Methods, Inc. 37 Brookside Road Waterbury, CT 06708 (203) 755-1666 Page 1 of 1
BAS I N B4
~ 111lorksheet for Circular Ghannel - -
' F'rojecE Qescriptian ,
Projec# File j.ldocument199353199353.fm2
Worksheet DISHMAhI CONIMONS P1PIfV~ CALCULATIONS
Flaw Element Circular Channel
Method Mann'rng`s Forrr:ula
~~lve For Chonnel Depth .
~
lnput Data -
~ Mannings Coefficient 0.009
Ghannel Slape 0.0 10000 fUft
piarneter 12.00 in
Qrscharge 1_25 cfs
ResuNts
Depih 0.34 ft -
Flow Area 0.23 1`112 -
V1Jetted Perimeter 1.24 ft
Top Widih 0.94 f#
CrFticaf Depih 0.47 ft
Percent FuII 3155
~ Crifical Slape 0.002878 ft}ft _
11elocjty 5.40 ftls
Velocity Head O.45 ft Spec+fiC Energy 0_79 ft .
Froude Number 9.92
Maximurn Discharge 5.54 cfs
~ Fu11 Flow Gapaci#y 5.15 cfs -
Full Flvw Slope 0.000590 ftlft
F[ow is supercritical_ ~
~ - .
p8lf18100 . Academic Etfition FlowMaster v5.17 _
08:28:56 AIVI Haestad Meihods. Ihc_ 37 E3roalcside Road Waterbury. C7 06708 (203) 755-1666 Page 1 of I
BASIN B3&B4
Worksheet for Circular Channel
Project Description
Project File j:\document199353199353.fm2
Worksheet DISHMAN COMMONS PIPING CALCULATIONS
Flow Element Circular Channel
Method Manning's Formula
Solve For Channel Depth
Input Data -
Mannings Coefficient 0.009
Channel Slope 0.008000 fUft
Diameter 12.00 in
Discharge 1.63 cfs
Results
Depth 0.41 ft
Flow Area 0.30 ft2
Wetted Perimeter 1.39 ft Top Width 0.98 ft
Critical Depth 0.54 ft
Percent Full 41.10
Critical Slope 0.003062 fUft
Velocity 5.36 fVs
Velocity Head 0.45 ft
Specific Energy 0.86 ft
Froude Number 1.70
Maximum Discharge 4.95 cfs
Full Flow Capacity 4.60 cfs
Full Flow Slope 0.001003 fUft
Flow is supercriticat.
'
' 08l08/00 Academic Edition FlowMaster v5-17
08:29:39 AM Haestad Methods. Inc. 37 Brookside Road Waterbury. CT 06708 (203) 755-1666 Page 1 of 1
BASIN C4
Worksheet for Circuiar Channel
' Project Description
Project File j:ldocument199353\99353.fm2
Worksheet DISHMAN COMMONS PIPING CALCULATIONS
Flow Element Circular Channel
Method Manning's Formula
Solve For Channel Depth
Input Data
Mannings Coefficient 0.009
Channel Slope 0.010000 fUft
Diameter 12.00 in
Discharge 1.33 cfs
Results Depth 4_35 ft -
Flow Area 0.24 ft2
Wetted Perimeter 1.26 ft
Top Width 0.95 ft
Critical Depth 0.49 ft
Peecent Full 34.68
Critical Slope 0.002913 fVft
Velocity 5.50 fUs
Velocity Head 0.47 ft
Specific Energy 0.82 ft
Froude Number 1.92
Maximum Discharge 5.54 cfs
Full Flow Capacity 5.15 cfs
. Full Flow Slape 0.000668 ft/ft
Flow is supercritical. . •
08/08100 Academic Edition FlowMaster v5.17
08:30:04 AM Haestad Methods, Inc. 37 Brookside Road Waterbury. CT 06708 (203) 755-1666 Page 1 of 1
i
BASIN C5
Worksheet for Circular Channel
Project Description
Project File j:ldocument199353199353.fm2
Worksheet DISHMAN COMMONS PIPING CALCULATIONS
Flow Element Circular Channel
Method Manning's Formula
Solve For Channel Depth
Input Data
Mannings CoeKicient 0.009
Channef Slope 0.010000 fUft
Diameter 10.00 in
Discharge 1.64 cfs Results
Depth 0.43 ft -
Flow Area 0.28 ft2 Wetted Perimeter 1.33 ft
Top Width 0.83 ft
Critical Depth 0.57 ft
Percent Full 51.07
Critical Slope 0.003990 fUft .
Velocity 5.85 fUs
Velocity Head 0.53 ft
Specific Energy 0.96 ft Froude Number 1.78
Maximum Discharge 3.40 cfs
Full Flow Capacity 3.16 cfs .
Full Flow Slope 0.002686 fUft
Flow is supercritical.
'
08/08l00 Academic Edition FlowMaster v5.17
08:30:31 AM Haestad Methods. Inc. 37 Brookside Road Waterbury, CT 06708 (203) 755-1666 Page 1 of 1
- BASIN C6 -
Worksheet for Circular Channel
, Project Description
Project File j:ldocument\99353199353.fm2
Worksheet DISHMAN COMMONS PIPING CALCULATIONS Flow Elemenf Circular Channel
Meihod Manning's Formula
Soive For Channei Depih
Input Data
Mannings Coefficient 0.009
Channel Slope 0.005000 fUft
Diameter . 12.00 in
Discharge 1.76 cfs
Results
Depth 0.49 ft -
Flow Area 0.38 ft2
Wetted Perimeter 1.55 fi
Top Widih 1.00 ft
Critical Depth 0.56 ft
Percent Full 49.04 -
Critical Slope 0.003136 fUft
Velocity 4.59 fUs
Velocity Head 0.33 ft Specific Energy 0.82 ft
Froude Number 1.31
Maximum Discharge 3.91 cfs
Full Flow Capacity 3.64 cfs
Full Flow Slope 0.001170 ft/ft
Flow is supercritical. '
~
08/08/00 Academic Edition FlowMaster v5.17
08:31:00 AM Haestad Methods. Inc. 37 Brookside Road Waterbury, CT 06708 (203) 755-1666 Page 1 of 1
'
. BASiN C7
' Worksheet for Circular Channel
' Project Description Project File j:ldocument\99353199353.fm2
Worksheet DISHMAN COMMONS PIPING CALCULATIONS
Fiow Element Circular Channel
Method Manning's Formula
Soive For Channel Depth
Input Data
Mannings Coefficient 0.009 Channel Slope 0.005000 ft/ft
Diameter 12.00 in
' Discharge 2.24 cfs
Results
Depth 0.57 ft Flow Area 0.46 ft2
' Wetted Perimeter 1.71 ft
Top Width 0.99 ft
Critical Depth 0.64 ft
, Percent Full 56.73
Critical Slope 0.003461 ft/ft ,
Vetocity 4.87 fUs
Velocity Head 0.37 ft
Specific Energy 0.94 ft
Froude Number 1.26
Maximum Discharge 3.91 cfs
Full Flow Capacity 3.64 cfs
Full Flow Slope 0.001895 ftlft Flow is supercritical. .
'
'
08/08/00 Academic Edition FlowMaster v5.17
08:31:16 AM Haestad Methods, Inc. 37 Braokside Road Waterbury, CT 06708 (203) 75-5-1666 Page 1 of 1
'
BASIN C6&C7 .
Worksheet for Circular Channel
Project Description
Project File j:\document\99353199353.fm2 '
Worksheet DISHMAN COMMONS PIPING CALCULATtONS
Flow Element Circular Channel
Method Manning's Formula
Solve For Channel Depth
Inpui Data
Mannings Coefficient 0.009
Channel Slope 0.010000 fUft
Diameter 12.00 in
Discharge 4.00 cfs
Results
Depth 0.66 ft -
Flow Area 0.55 ft2 Wetted Perimeter 1.90 ft
Top Width 0.95 ft .
Critical Depth 0.85 ft
Percent Full 66.27
Critical Slope 0.005715 fUft
Velocily 7.24 fUs
Velocity Head 0.81 ft
Specific Energy 1.48 ft
Froude Number 1.67
Maximum Discharge 5.54 cfs
Full Flow Capacity 5.15 cfs
Full Flow Slope 0.006042 fUft ,
Flow is supercritical. '
1
08/08/00 Academic Edition FlowMaster v5.17
08:32:42 AM Haestad Methods. Inc_ 37 Brookside Road Waterbury, CT 06708 (203) 755-1666 Page 1 of 1
BASIN C2&C4&C5
' Worksheet for Circular Channei
i Project Description
Project File j:ldocument199353199353.fm2
Worksheet DISHMAN COMMONS PIPING CALCULATIONS Flow Element Circular Channel
Method Manning's Formufa
Solve For Channel Depth
Input Data
Mannings Coefficient 0.009
Channel Slope 0.010000 fUft
Diameter 12.00 in Discharge 3.12 cfs Results
Depth 0.56 ft
Flow Area 0.45 ftZ
Wetted Perimeter 1.69 ft
Top Widih 0.99 fc
Critical Depth 0.76 ft
Percent Full 56.19
Critical Slope 0.004327 fUft
Velocity 6.87 fUs
Velocity Head 0.73 ft
Specific Energy 1.29 ft
Froude Number 1.79
Maximum Discharge 5.54 cfs
Full Flow Capacity 5.15 cfs
Full Flow Slope 0.003676 fUft
Flow is supercritical.
08/08/00 . Academic Edilion FlowMaster v5.17
08:33:54 AM Haestad Methods, Inc. 37 Brookside Road Waterbury. CT 06708 (203) 755-1666 Page 1 of 1
BASIN C6&C7&C3
` Worksheet for Circular Channel
~ Project Description
Project File j:ldocument199353\99353.fm2 ,
Worksheet DISHMAN COMMONS PIPING CALCULATIONS
Flow Element Circular Channel
Method Manning's Formula
Solve For Channel Depth
Input Data
Mannings CoeKicient 0.009
Channel Slope 0.010000 fUft
Diameter 12.00 in
Discharge 4.35 cfs
Resulis
Depth 0.71 ft -
Flow Area 0.59 ft2
Wetied Perimeter 1.99 ft
Top Width 0.91 ft
Critical Depih 0.88 ft
Percent Full 70.52
Critical Slope 0.006465 fUft
Velocity 7.35 fUs
Velocity Head 0.84 ft
Specific Energy 1.54 ft
Froude Number 1.61
Maximum Discharge 5.54 cfs
Full Flow Capacity 5.15 cfs
Full Flow Slope 0.007146 fUft
Flow is supercritical.
~
1
08/08/00 Academic Edition FlowMaster v5.17
08:33:06 AM Haestad Meihods, Inc. 37 Brookside Road Waterbury. CT 06708 (203) 755-1666 Page 1 oi 1
, Cj,C 707 west 7th Ave. Planning
Associates, Inc. Suite 200 Engineering
Spokane, wA 99204 Architecture
(509) 458-6840 I.anclscape Architecture
~ (509) 458-6844 PAX Land Surveying
~ - -
ti.~a wc~ c~,~...n.
Pso,~ DIs N;NI Avt~ Gc~)n,~l<, oaTE 1 ti/~/~
80DdECT I:)%.6 By dIB N0. 9~'3 S-3
~ ; T..~ s ~ o : . ; ~j , , , . . , , ~ , °-~-r--~--•._..._...P...z~ ~ ~
~ ~ 4~z~i~t~~ --4yc~.~~s~l~~~. 'iecoqV~~S~~zG~i~'it:~
, , , _,r ' f ° ~ ~ . . i I j I ! t • ~ ~ ~ ' i
j ' - . ' , : l..- iT • - - -i.... ...T_ '-j--L•r_'1"4 • - - - L_._ ~ . . • - , ~ ~ ' i_ =_s.. ~ .Y _i__. _
~
- _PJ077C
~ - - ~ ~ ' - . ~ _ . . ; . . a• .~r.~..__i ~'_t • . ~ ~ ' . . • i
T~--//s~ //~~j~~~~ f~~, ~ .__.~~~I Al ; , , . . . . _
' f4i- S'Li.~.~. }~~~~}a/~ / I..... ~ ..f ~r~.~.p • ' ~..a.. a i +s ..d-- M • p
~ ~ ' ~ ~ : . - . ~ ..i ' ' ' t ~ ~ ~ t ..S-~ -t--j ~ -t^~ J, ; ~ s- _ ~ _ t
. - • - - - - - ~ , , ~ ~ , - ~ _t_.. _ ~ . . , ~ ~ ~ ,
- - -~-l- ~ r ~ ~ ' T~ r
+ , ' ' T : • , ~ -o--~--~{- ' - ~ . - ~t
- - • • ' a~ ! : _ , ~ ~ ! ~ . L
i
~ . - - e~~/YIC//i,~~~ 4-1-
~r~--;--~-
' ~ ~ • ~ ` r r - i - ~J- l - -i_ _ , l ~ ~ ~..~,t
/ii ~ . , ' ~ - - . _ . _t
~ ' - ~ • - ' - . - - - 1 - - • Y -,iz
• . . ' - - • - - - j - -r - 0--_~ _ ~ t~~i 'S- `-'~_~--v-~ - t_u.._ ~ ) , ~ i . 1`-_ . , ._i
~ • _ . . ...~s . - . , , ' ~ _ ~ , ' . , ` ~ ~ ' v v ~ ~ ! - 1
i , • ~ • ' . ~ . - . • ; r , . ~ i ~ i ~ ( . r +
~ - - - , _ _ ~ , . . _ ; • i _ , ~ - , .~H-, ~ - - . . . ~ . _ - : -
~ • ~ - - - . ~ ; ~ - - . , ; . ~ _ ~ ..1 , ' : . K . - ; s- - q. _ , , T_ ~ -1 -~-j--:-; ' ~ , ' • . • -r•- !
- • - : - ' ~ . - , ' • ~G ? -i-'' • • , • - - - , - - • _ ~ s~. . e , . • - . ` 1 1 1^, ~-i
- • - - . _ _ ' ' _.3 _ _.1 ~ . . ~ . , < - ~ !
, ~ . , - f f , , i • ~'--r - " , , . ,
_ . . . . _ , . _ . . . . . . . _ , t, . _ _ , „ . s,'.}, y . . . . . . ,
_ _ . ~ _ . . , - - - - = - • . _ - - - . ~L.:. ~ ~ ' .t _ _ . . - ~ ~ - - ' - - ' ' _ ;
1~0 ./.^VI~,S~ O~ ~b~_~~ .~,1~ ;j~_ _ ~ = . - ~ _,~.e_ f
~7~?_,~~--; 6
- • ~ ' _ _ . ' ~ ! ' ° - , r F : e ~ e - r - i _ ' ~ ~ ~ ~ _ SCJ . _ . `
' . " ' , - . t i 1 . - - , 't..Y...-.._ T- ~ .2 ._.n._ ± .t.~ j , ~ _~-...~-."'C `'v
V ; _ . ` S. • Y ♦ ~ . ' ~ ' ~ ~ y_.;~-..i_ ~ ~ . . ~
~ I - _ • ^ 'i f ' " ''7TiA 1 k!~ .-+"{',a.^~ ••i~vi•-,~-_#-'-i~ ~ _ ~-'i--~-- ~-..i~'!"g--!' -`-s-- - ~ -
' : ~ ° i , • s r ~ ~ : . i ~ ~ ~ ' ,I-' ~ ~ ~L f ' .--,Tr ! . ~ _.i " ~
Y- ~ ' p 'i" i- ~ ? . " T '.1~ ' _ J{ ( ~ -r'_i--r(-.. ~ . _ ._.1_.i ~ . . ' r --}--•~-'l... , - ' : ~ • . ~
'~...'rr . , - ~ f -A ~ . _ i ~ ( r- .~~--.1---.- ~ ~ S- ~ `~4 1 ' -T ' y.~J;..$ .'.-J-.~--: ~.i..*- .~-..1 ~ ~ a ~ ' • ; . . i - • . f
~ t . - . r' ~ ; ' ~ '.1 -s , _ .L - ! . . e.~. ....i.,..; ~ : ! >Y . w d ! .a..,. ...y ' 4~- _ ~ _ , . i... ~ w. r._k . ~,.~.l~
- ' • ~ _ ' , _ : ~ 4. . ~ _ . .
_ _ ~ ` ` ` ~ - - _ , ~ - i.. ~.l. ' _..6 - _ . b . t-Y . -i ' j , , . - ~--t---~.•.', i
, . - . _ . _ ~.1 ~ : - - ; - + , - _i. E ~ _ } _ _ t , - • - ± .~F ~ ~ . - - _ , --Y - ~ ,
~
i' i
b-7~!`~~ •
~ J.~}..."..~~.{.'~-r. J'_ F
~ ~ ~ ' T-) j .....L E 1.. ~ ~ ~ ~ ~ ! E ~ 9 < . ~ ~
.'wr__ .~~..-d--~'i •a^r~M-~ ~.~t l-a-.~..,-_ ...~~'..~._c. t_ 6._~~`~....~~_~~'~'-`,i~ --~_.L ~ i
~ ~ i t i"--T- - . ~=-e- j, ~ ~ ~ {o. _ L i i , ~ . ~ , t_.t ~ t _}1._r ; _i.a~--~r--'1"_~._~
1 p . ; ~ , -i 1. - -t---~--~`. ~ : ~---4-~ - - 8--1.~ .L!~_J_:~..p.~~. .i ~....ti.._~____,_ •i_
r ' ~..`a.,.~ ~r•f ' ~ ~ t I { , r ^ • ~ 3 : i~~ ' , ~ . _ f,.`
~ - - ' 1 ._1_ 1 ~ . _ ' _.,I_ ...y_ ,a 5.-~-} 3~. .J1..
....r . ~~.,,i t.,~.... , . .,«.lf: ~ ~ i _ ~..'.a.+ .-t
i
~~~~~i ; ± ' { • • t ~1 ' ~ ; } ~ i i r ~"...'i. ' , 7 1 ~
`1~~ ~ 1. t . _ ; .__..__.__i t- ' 1 _ : . _ , .
1 ~ ~ .1.... ' ~ E ~._._j-- ' r~_~
_•~~-ti__r.-{.
t ~ 't o r ~ i i i,.. t f g E ~ E k ~ , i Ia~~ I t I t~- -f
~ ___-.i .~,_L._ ' }i--~ ; _1 t d1_~ -..~~__~__...a......r_•--- • ~ 1-}---
¢ ~ ~1.....~..-..-~--•-_ _ ~ 'j_. Ar. ~•*.e~J~....~.-;-~...1.~e..i F ._l__~/.~.,. { V~._ ! ~.~q._ _..~"r1_-'x"'-`-'-,---~.._~,.. ~Y~~.~ ' _.T_~...F~-
'
y~
_i_ ..t...' .s i__i , ! ~ • , - j._.d , .j_ '__i_t ' ~ '...~..,t-~'~--_-~-°¢ ~ - -~-r-~~ ~--~--~--^r-••'---~-~----~-.~ . ?--4- ~
~ ' 1 -~--t~-'#' ..s .°I-- _ . ' - -t ~ -r Y-? '
~ 1 • ~ ` ~ r ` ~-1i. ' : i i ~ ° ~ ~ ~ 3 ~r„ :
~ ~ ~ -1° ~ -L_ y^- i ~ - t ~i- ~ . - i ~ _.~~._f°~_ti T f 9 ~ j ~ ~ ~ (T ~ -i-'~9 - r-- i ; -r- : ' ~ r • - - i _ .y' ~ i
! _i--l.e,~ - i.~~ ' ~ _ • _ ~ ~ J i • ~ - r -"i-"`-- • r"~""'~-~5 '~-ti ~ ;_±_r ~ e' ; ~ . ~ - ~ ~ i ~ '
~ . ~-i ^ r , ~ . - ~ - ~ ' 1-~- ~ -i_ y - , • ; + '
w Mi- . ~ ' • ~ ~ ~ _ , E ~ ~ i_ i t_ ~ ` ( 6 E~;~ ' ~ r.., { -f-'.~."- ~
~t- "s : -f-- ` : r--t-~ _ i-- r • .
~ r
~5~ ie ~y'..-r ' ; - -4--i----, ~i ~3-~-• ~ - C - 1_.:_'-, !.,{.-.'~.^'_,}_...1_..~ ._L. ~ ; 1._•'• ' r`-4- .3--;- ---?'-h•^i-°~ 1--
~ _
. s._ ~ 1, j : 1 : ~ _ . f ~--1~- ' ' . ~ L ~ ~ r. '('~:t--,__ _ a, ~ y~ - •4-- ~ ~ - f - , - = - . -
L
. '_-f--..~ ( ; c ~~j t t ? i i , r 1 .1 ~ - j + • - ,
, L_
~ ; _..t _ ` E_ f ` ~ . f- - .a~ ; f/~-1-- t-~T'° r 1 t - + ; . ~ ~ Y_.;_ i..~...~,
L
r _ ~ _..__i.._ ' ~ ~ • - f- -t --i 3 • 3 , E,. : i - _ i ! ^ -+---i._ j...... ~ ~ S t ; , ' - S ~ ~ -.-1• ~
` ^ t ~ - ( ~ t • i ~ - T- t ~ "S°" ~
a i ~ 1- ' . _ 1 . ~ R ~ _.r-- ` f -.D...a. ~y ~ i_ r__ ._i r~~-_.1,.. ~ ~ ~
_ . ~_.t-. t ~ - - ~ ~ ~ . ~ _ r_ ' ~ r ~ . ' ~ ~ ' I i' I y ~ ~ -l ~-i t ; ~ , _ 1.----- j • ' ~ 1 ~ ' '
1 ~ ~ .r.}...~ ~ _ d . ' ~ ' . . _.9.._..• .1. -v-~.. _6~ ~ t... ~ I ' `F I- ' j '
t .y _ _ _i ~1.~ _ ~ L _ . F, ~ 5__ i ~ : .....~.-..~--1--. _ f ~"i-_ 1'_! . . ; . ' _ ~ 1 ~ a ; - _ i _ ^i^_..
rt.. ,s E ~ ~ ~__~-r . . ; ~ - - 1-.~- • ` j -~-1--: ~ i ---il.";--E ,__t - ~ - - -<i . - _i-.'
.,..'+.o.r,E..A. a~: . ..,,r ..~.~e.../..~-_~=d~/(,~ .1~ ~1~ ~•.~...x, ~ ' ~ «5a.. ~~a-~ t.~ . ...~Y.~,~~.,.~~
i - -j-- ~ , _ ~ - - ~ ~ ~-•--~j- ~~Y ~ ~'--w-/ : . ~ - i- - . ~ . f
_ b
~ s _ ~ - _ ~ 1- •r- - , ; - - - - - • ' ; . -3.. . - ~ . _ - ~ ' _ ~ ~ ' _ ; ' . _ . _ , . . . t . -F
{ ~ : ~ , , . , ~ , ; : i • - - - - ' 1
~ ' r t ~ . ,~._i~~~~~._- , ; _ Wi ..5. ..~-,-t . _Y~ . ..i_
_ . ....lc~--~- ~ - ' ._j__,._~._{ ~ ' i . r 7I + . • ~ ` ~ ~ Y
~ - . ' - - , _ -.L~ _ , _ ~ t - - . ._'~.r~ i.~. ~ . -Ir-~'.. - . - - . • ..--i_
4 • ' ~ ' ~ • ~ ; !~f' ~4-T•_. '1--~.".._~ ~~~~u r ' . _ " " _ ~ t
~ ♦ . _ _ . r -
4_
; ~ -t ~ - f--~ _ , • -r-. k- -t- •1 r ; ^_.F j -4 k-
~ _ ~
5-' ' • ~L ~ . ' " _ . _ . _ F._: _ ; . .r -•--P ~ . ' • ' } . "+,t..." ~ ' ~j.---~-~,_ j. ' ~ ~ f ' T " ' ~ ' ' ~ --~""7'~' ~
• ° 1. 3 ~ ...e.' ~ . _ i._i - -_~F-- ! : - - ' -~-Y , ' - -'~t..-.L.-.~ '~-1....~•''-(-- - - . ° _ • ~ ` , L - t ~
i ~ ~ ~ ' ` ~ r ' ~ ~Y ~ . ; ! 3 ~ ! i ~ ~ ~ ~ ~ ~ ' 6 f~
J
. . ~i~~ a.,1 - . ~-..L~ e ~ ~r..,...~.. . L.. , . . ~ a....'
.....1.~..~.►......-1...r,.~ < r~.:~ _ . ~ .
1110 ~ PA6E 4 / Of ~
CI,C 707 West 7th Ave. Planning
Associates, inc. Suite 200 Engineering
Spokane, WA 99204 Architecture
(509) 458-6840 Landscape Architecture
( (509) 458-6844 FAX Land Surve}ring
1 _ -
As .ffiMe d Cduode Wd ComahaD, lm
PRBJECT DisHtAAA) ~ozwm/S DATE /Q 15-100
8adECT BY Ud~ d06 N0.
s - -ti~'''+~k_`i_ ~ V ! 1 ~4- t..
, ' ~ , - • - _.__"'...t...~' ~ ~ e
h. ~ _ _ . _ + . , . . . . . . . . ~ ' ~ , ~ ' ' . ' ~ , . ' . ' - . , ~ . ~ ;
' i ~ , ' ' ' • ' ~ ~
. • ~ , _ . ~ . ~ ~a w - ~1. 4.~
~ , ' 3~ , `i • < < , r ~ , , ~ ~ i
; : ' . . . - • , u . ' _ Ov _ Z - , , : • . - - - , . . --t~ _ --i.. ; ~ ~ ,
. - . ~ - - - - . , - - - - . ~ : - ~ ~ ~
` . _ . , . . _ : . . , . ~ . ` . ~ . • . _ ~ ~ _ . . , : ; . K ~ ;
c~.2S'D F~;=~-~s.
- , ,
- - - - - • • - . . . .
. ~ . ' ' ~ USE' ~ :GA =/DI`T., Vy= 7 f7-, S 7Z)04-
~ ; _ . . _ . - . ' ~ - - - i._ _ .7_ _ . v. ~ • - - - - - - - -
'S~~~%~L~/1/~' ~ ~ t. . . _ - . . _ ! ~ ; . -c_.1•-~--_._LL : ,
- - - . . • . . - ~ - - ~ a-• -~-i- ~ 1_;_ _
3 • . , . . . . . ~ ~ ~ti ~ Y~ . ~ ~ ~ ~
j--r-~- ~ . . ~ i , - . - - _ ~~''7 //f.rl - , 3 • _.i...~--~-~-j'-°: _ ~w . _ . _ _ . ~
` ~t . ~ , ' : . ~ . . . . ! ~ ~ • , r/' - S
f . . . r ~ - ~ _ . _ _ , _ t . . ~j+ : ' ~ ~ ' - / 0 • O V M. ~ _ " ~ S ' y ~ J .-..A ~e L . . t _ • s-' e,-_.~- • • _ ~ " A' ' '
, - ~ ~ s~ ~ ~ ~ _?_,f ~ F_.f,. . ~ Y o
~ -Y'~--"'--'' - - i_ 1" 1'^ ~ : -l i-~ - ; ~ '-'j-; `f• 1 E-~L~-~`--~-`--~ •-t--~.E._', .i._~ az~ 'e ! ~ 4_ - - .
~.i. _+...c _ ~ _ _ .P Y .~-..t._•~__<<. ~._n .~~a---' i . Tt ~ J1_ ('S_ C ' : • . .e
+ t _F"
~ ~ • . f. ~ . ~ • ~ ; ° - ~ - - ~ t- ~ _ ~ . _ ~ . • . _ _ i_i= j_ . f .J-_.!_.i_..~_.....L: - r-T- - - ry, ~ y ~ ~ -1
~,_.r. a ~ ; ~ ' ' ~ / ' -1.. •u-L._. E , } i-I- ; C~ _ t +
± 700 j _~.--~J,~ ~,,.y ♦ _ ~ .--.t ~ ' , . ~ ' i` ,--i - , ✓Q' . , ' • . ~ , a _ {--~_.~.-.'~s.- 'i 1_~A..-a._~~ ,~..~j..~.~ _d j~ ~ - t
-I_.;~_~... ~ . ' . . 6 _.i. , l • ~r i-.. r
. ~ • _ ~ : « . . .1 uA. V m ; . . { ' 1~- ti...~."._ ~ ~L~L". V ~ ~
7 .
~J.t .~~y.._l~ ~ . ' S_" ' ' ":...1-.~--•-~ 1 S_.-.._ '9'-4-._{^ i-•I ~.~~,~.t~ ~'y~-~ t i
~ , _ - • ~ -t ~ / _.c r-~ i.s:. ~ ~ ~ ' ~t-a--~--~-+-----'- ~-5 -l_ .
r ~ / A / ~ • , ~ ~ 't-
' _ ' ` _ ~ i ~ • ' r ! ' _ . ,V ~ y V`1_ W ~f/ . ~ s.r~ - ~L_ ~ • ~a ~ F...'T __~w... L_~. _ S
~j _.j__~ _ • _ . . , _ : ~
B ' _ ~ L. _ • ' • . • ' _ • _ - . _ ~ ~ ~ n_~. ~4-. _ ? ~ • a ~ A
~ . ~ . a • F ~ ~ ~ . , ~•._.L--•'
. ' ~
~ ~ - ~ ~ P ~ • - = f~~~~5 ~ . .
.7
. ~ 'i i' _ . - ~+J-.a-.~. ~.--v--•,...-~--t_.'~.- . ' - --^-v~ t... ~ i S^,.. ~ ~ - ~ A. ~"1` a - ~
tt/ ,-F - j--
••i ~ ~ ' < 4 . . ' ` ~jr ~ / .r. ;/1-••- { -~-~~-J~--~...~± i. ~ ' 4_ ~ , v ~ ~ t .
_e-4-`-!A ~ ~ • ~ r_e- Vt'=.~~.L S . iw (~'t': + i ' _ ' ' - -"T_~~`~- '~.k " i'^~-'1"'-~- i_~ ~ i _ ~ ' . - '
i ; : , . f ~ ~ , , ~ " . j • ° , , , ,
~.~."i _ ' ~ j , , r Q r . ~ . . _ ~ ! ~ i r ~ "Y..y"... ~ _ i 4~ . . '
i .r _i_~..~~...~ ! ~ : -i - - 7^-+ ! --I~.~'-- , " ~ _ . ' ' . . _d-. .F.--•- y- .r. ~ . ' i _ . t . ~ ~.t_ ;~~'_'-.J - ' '
t ~ ' ; , • ~ ~ t r t . ' . i .
0-- . ~ . ~ _ j__~.-._ _ _ ' .~i" ' " _ ' _ " • i ' h...__ 3~ -i~ . _s- _J~ _ - ~
: , , • y , • ~ i . . ~ _}....~.t. : C.Q_.,_ o -r ,
i ; . _~.;~t_'~..~._ i. s i . • _ . -i-.n . -L-
~i. _ _ i ti ~ .i~. 1-_._{_ s. • . - - . _ • ~-•P-•R
" .ar ~..w. 1 ~ T I . ' . • - • .e.. k~~i~'u' . ~ ~ . .
1A ~~rXd=.~:_ - - ~
~ - i . ~ ~ . : ~ ! . ~ 4 ' ` t , ~ ~ • ~ i ' i ~ ~ . . ~ . ~ _ '
' ' ' ' ' ' i",' t..' " = . .t' ' ' ' . ' r ' ~-.t`..'; _.1. ~-y ' , " ' ' ~ ' y • ' ' ' i' i . a . '
p- „ " - ' ° , ~-•~°1- ~ - , - . ~ . ' , `w~ J. t..~._..,J__~_ r..~ ~ ' ~ ; ' i ' _f-!_-~-' -i--,~--, ' . . .
~ _ _ • . I 1•-. `I ~ t i . _ ~ _ . . , ~ ~"_t ; i_~_j - . .1._d ~ . • _ . f ~ s , . .
~y ~•-r -i ~ _i { ~ ~ _ . ~ ~ .r.! _i.._", b~'.~ _ I ~ • • . _ _ . -
; - _ - ~ - - L-.-~ ~ ~ - i ~ -a- - - ` ' ' ~ . ~ _ i : ~ 6_ i ~ ~ ' ; t - ~ - S " , • • ^
f . -~r .t`- . t ~ ~ ° ;--1
~.'i- _ ~ i , . ~ ir i ~ .1_.~-_ _ . . ~ ~ . . - t- `.~,j_~.~_~.~;_~... - -C ~ .b i . - ' ~ ~ . "
, S s _ p ~ ~ "~_..t. 1 ~ ~ « . _ • _ ~ t ~rr~ f .~r- T ~ . ~ • ' ' ~
_ . . . . . ~ .a. - ~ ~ 4 - - • . ~ . - r,. } ~ . ~ ~ _ _ ,..b_ _ _ ~ . . . . _ _ ,.s. e . . . . .
3
vlo PA N z of
CI,C 707 West 7th Ave. Planning
Associates, Inc. Suite 200 Engineering
Spokane, WA 99204 Architecture
(509) 458-6840 Landscape Architecture
~ (509) 458-6844 FAX Land Stinong
1 -
Ae mffiIlne d C4bndo Ia0 Casatono, !oc
PRldEBT lJ) 5 N,0 f~-~1) i~O 11'If%1:..t.S DATf /~~~/cv
I ~
soadECr t P P~;~,v~ sr Dd ~ jOB IYo. g9 3 5`3
~r^s--...,._..i~.i__a_s~.rt~~ t_L~_F _~~~.I__J_-._. _~_'_a ' ' - - •,-.,-~--,Y-♦--~.. ~ . =_j=..'~_ ~_,_~.,~..i~.s.'._t
51~~✓1~IlV~'...l~~~: - ~ . - .y- ' - - . ` ~ - ~ - - < < _ ; , , f
_ _ ~ , . - ~ - _ _ . _ ~ . ; ~ • ; - : - . - - - ' ~ ~ . ~
..-.--T_. . . r t ^ ~ ~ . - _ ~ . . ._'1""_~ _ ~ ' . . • ` + I _
C='_ ' a 'i r . _r.Y`.. ~y~.~ . , . . ~ , . '
' T _ . ~ ~ . _ _ I_' • ~ . . _ _ _ ' _ ' • . _ . . y _ . ...a ~ - - _ 1. a ~ -
_ _ z_. . - - - • ~ _ . i
--700 12'r/
i _ _ ~ _ . . . ~ _ - _ - + _ y • ~0 3/l ' - , - . . ~ = . ~ i . ~ ' , ' ~ ~ 's
~ - ~ ~ • . . . - - * • - ` ` ' . . . . . _ ~ y. :
q LA. 2'
. , . _ ..'j~ : ~ . ~ .
0.25. Z3_FT-~
~ ~ . : , ~ ~ _ . ~ . . ~ . . _ : ~ . . . . - -
~ 5't'M9- O9~J'17'( ° 2 dS--_'
_ , ' .....~..t~V ~ ' 1 , , ' J . ' , ~ ~ .Y
" ` ' _ T _ ' . . ' ' ' ' ' ' ' • ' . ~ ' _ . . _ . ~
i
+ ' _ " I. X. . _ ' ' ' ' ' ' " ' ' i . A__ .~V.~.. t. ~ ' '
~_i . ' y._R-i,-._.~--'-'-"- . " ~ j- - " ~ - - - . . , . , ~ ' ` ' ~ ' •r.~ -t
_ i ~ + _ .E _ . ~ ~ . . " - _ _ . . . _ _ _ , .._...r - - ~ ` ' - ~ 't-
~l/~- ~ f ~ ~ • . . . • ~ i..-. . , ' l
' `~!t/I_'i' F ~I V~~'' ~.i.._ ' " ' ~ " ' " _T_~ , ~ P - •4 .R
~ 5 Z.~G~ . r ~ , d._ . a,,,.. . _ . _ . - , _ ~ rt..,»~.. . , ~ • ! ,
- ~ - ~ - - . . < - ~--~.m..~ :
l~rvEN-
' f ~ ' ' ~ i . J • : , ~s-, - j--~--; °
.12`':~
1 - - - - - ' i-~--`~' ~ t ` - - - ~ ? ` , • , . , _ ~ , ` - { _ _ _ , , , _ :Y a_ .-1- ~
~ 'r ~ i~_,~_~_~_,~-..~.-~-_L._•_ i t ~ -i-J ~ • t t ~ . - ' t :._._.t_.t_.1_~ _ ~ -r P_~ _i _ t
r - _ ~ _ . _ . . __p ..b . ~ - i - _ _ _.~d 1. . r ~ ~ - - J,. -..a__'- -'t-- ~ ~ - i
.~Li-- , - ~ • ~ - - ~ - - ~ -
f - ' "j_ . ~ _.S' • ~ a'- ^ ' - 1' ' ~ , ~ ' ' . , . - ~ ~_.1. 1.T
46 3~,,_~• . ~-{-'-r'•.~.-."~ ~ ~~i~s.E~~
~ .j ; ~m~.._'-.~_~__~ ~--~_t_..~_• - - - ~ _
I,L.. ~r ~ ~ ~-~--f-r 1_-..; j ...~u - - , . ' _ ~-K-..r- ' ; •j •a : F q,._~! t ~ '
i ~ ! E~- r ~--t-L E~---~~~; ~i- -iV'~.--:-.. . _ - -y-'~•-1-' - ~ ~y . -~-~-y--ti- t-•-- E f ~ ± r
k
~ ..f~,. r, 1 ~ i _i--~_.,.-..,, ~ ; . k., . o- - - - . • _I-' o ' ~ . _ i-_ ~ '~..~y. .3 . ~ 1.-a-. r
,vu_.-~ ko. F7: ~ . . _ ' ; t T_'~„ ' : t ' ;
~ v j T +l Y ~ . ~ i . ~ ~ . , . ~',r-- ~ -TM._._ =r-'
;--E--: t~.~-.~ `...d--~-•~ i ^ ; ; - i ~ , ~ -a ~ • - - _ - - - ~ ..`.f l..
J
~ , ' } ' - 5 ♦ r \ 'f ' ' y ' ~ • 3
g~y : -'y.--~ lY.~ ~~.-C_.~_~a.' ' -t--. '~_-o__ 1 e.- _rn-~i~~.:..~~ - . - , ' _..~..f.-'i "YI _ ' • - ' -y---• F --~--r' o-
2 ~ .v~ ~ _t._. _ j_ ~ ~ f ~ 4-....--~-_.s.._~' « ' ` ' ' ivr~ -e.~ yp.._s.. N~-' - ~.__t. ~ ~ ~_--j...at._.
~ ' ! { ~ j~_ivj ! j_3 ~ i^! - ~-j' - - ~t~ ~ r - I a --....~--...._i -_._i 1 1 I
} ; _i ~ i~~., a~-^ S--j- • T7 T
-'r--'--~' ~ ! k'-t-~_~•-r'~i'-~' # }-f~F' i ~ j^~} ' ,i, c o~~ --s-^r' -'--'...i.-i ~ j"_-- ~Q^ .
. ~ . e. ~ ~ ~ S : , t - r"r•- > _ ~ . : . .t ' . _ _ 1 _ : . ~ . -
° ~ ~~,..-.y}~-f- _--L- ~-{-{-r- , ; -i- - . . ; ~ ,
p , ~ , , ~ ' : • ~
.7,- -1-s_ ~ ~.,-'L s.._.C..' '_,.~.T_S ~ ~ .>_;_.....t ' ~ -r -~-l._• : .~_.-•r- - ,
...1.fr I ~ . f...Z... y.._ !._;_..1. 1- .:__~7,_±_. t . i . - ' - - , - .~,-.3..Y_y.~ i_ f ~ ~ . -5-... ~ ~ `1
4 ~ _ _e , : - ' ~ ' f'- • . ~ .....i - ~ - - ' ° ~ ~ , 1 ^i ' _ _ i _ . . » •
~ . A , _ S . ' ~ S t ' ~ , , ' ~ j - ' • y_-' ~-.i -e I
4
~
~ p.. A..i.._~.- ~ ~ -i--~ ~ y,l°{"-~'-}--~ _ . ' ' '_r ' ._'~'_1 •~°t ~~k~,~ ' i ~ ~T` y -T-
4
M,,~ _ ~..(/Af_~ tyS FT~ ~ G'~'/_,T.A._,.- =~;~C~~ ~y ~ ~ f _/..a / 8''..a._.._.;
~ ~ , i ^ , ~Y ~ . ~ • t i . • ~ _ ~ j
y- _ ° . ; - ~ _ . , , a _ ~ -
. ~ t -~--k--' -°C _ i . _ ~ ! • ! - , o - • ~ - , ---s - . - b- . - -i - , - ` _ y. _i_: __~-4 - " _ . . ~
- - ~ j ~ ~ : - - - _-.-o-._-. ~ h . . _ . - . - - - ~ ~ - . , ' ~ : . ; ~j--' ` . ¢
p.
~ r{',.}_.~-i ~.t~ ~ - _ ~ . • a . ' i ~ ' j. _ I.. , ~ •t ~ y. - n.~ J' •1 . ~ ~ ' S
~ • ~ • ~ W i 1 ~ 1 i ~ ~ ~ , ~ N ~ ~ : ' F ~ , ~ ~
; _ Y • , . ' ~ . _ _ ~..~r. ; t.. ._.._~-_r,.. . _ - . ~ . - , r - , - ~ --r--t..., + .
T-1 ~ ! i ~ ' ' ~ f ' ~ i ~ i i ~ R _ . ~ , r ~ . ' ~ _ ' ! ~ '
-r-s~. ' p`.i ..i r_ y- ~_,,.~...i_.-~. .t-y-. , - _ . . , ~ F - - - ~ ~ i '""~"'d' S x
~ ~ j--~ -'a--~ -t^"^ { - -'t ~ ~ ~ 1,_ ~ ' ~ . - - '.t .,..T..- _ . . ' . 1 ~ ' . ~ . _S--y~: ~ , ~
. . ~ t ~ > i ~ ~ ~ ! ` "E ' , ~ , • ~ ~ ~ .
x ; -~--f_1t. ..'.5.~~- . . . `-"f --r'~--`b--"'-.' , r : , . .i_ ~ - ' ~ • - ~ -~._._-~.-A._~_- . y
t_,'..... .,_a~-.a...~.~.,s_..r._~.~. ~_m.,-. ...,~._,...f.. ~ ....e~:,.,~,xe...'>~ . _ _ ........A-......,_ . : ....o..~t, .;e~..,.~....
1110 , PA6I .3 IF
, .
fOf TW < D12 ~ .
+
1.a 3n . .
. Do ~
foc D~
3Q + ~O
_ . .
La _ _ 3n. `
D° de ~vert voidth. ~
`N~~~' _ ma~cin"~sr► ~
- Da ~
cfS
~charg+~~
Q _ pipc
~
~ Tw
~
,~p~, pa+d 10'~' , . not ,~.U..defistied, f~..
. ~ _ La. ,U,, d~ c~~ ts
Rip~`p p~'~ ~ .
~ ~ sum~ ~
Sc~c S°. ~pD
o~ 01 _ 3oa _
~ Da 3 `
-'-30. 1
► ~
2 `
r ~
, . ~
5 t
_ - 1
.
t ~
. - ~ ' ► ~
1 ~ . .
r ~
W = 300 ~ O.QL, .
~ • . iT a~~►ate< < U-S
~
. s '
~ ~4L~ ~
- yy_3po} 050, . .
. ~Ta~,nratet 2 -
.
• rap Revetno`en a
~
Tip putfall ~111
. ~p
M~ageme
~ C~c
~ ~,es f o~ ~'~O~~vater -
e Februa~Y 199$
G- ~d p,daend~ ,
fr; 82 ~ -
~ ~
_ .
, ~ / '(~G' ~~~/!i'! :11~'•, i VI S1Qi~~) c . ~ `'.11l~f~1 \VU ~J . ~i~, ;1 •
. , r r%'; °i' ,r'•+~ ~~~~i ' .~~_.r _ , _ ...___....w.,__.__- ~ '
; _f.. r_ ~ , ~
. . vi ~'I ~ I..~, ~ . ~ w . ' . ~ ~
I { t•}.u ~ - r._. _ ~ . . ~ / . ~ I ~ I..._. I _ .I I i~ .
~ ~ _,~c ..r~ ~ . , . ~o.._ r•--~ _ . ~ ~ ,
, ~-r,~ .i,. M j. ~ ~ ~ u •~p~~ ~I~4'~ ~ ' ' ~ I ~ )n
( _I... „ (1~ ~ . . . tn . _ l` _ , ' . ' ~ . Q ~ , - ~ .
LA
..~.._I
~ _ ~ _ _..1..►. , _ ....1._ . _ _ . .,_.1
° ~
~ ~F . . o~ u a . , , ~ I i . _ J ~ S• P~ , ~ 1
Jj
~_.~1 . p (11.. (I?. - ,
i n , C ~ n r, ~ 4 ~ ~ ~ . ~ ~ ~ ,
lO c>~i C) I. p ' 1.,..~_! _ ' .__i i ; , .
~ ~,c ~ . f I I.. . ,r ` _,I p' ~ _ ~ , r•~ ~ __~r~..~ _-1~ ~ ~ ~ ' ~ r. ~ . ,
,._..~.rt..~.
{ I I I• ~ ~ 1 I I . ~,._~/1..~ V`. ~ ~ ~
._~.'._,~..__l,~_;0~~._.~~~~ , . Q_ ~ • ~ ~ ~ ~ ~i
/
^R ~
~ ~ ~o ~ u . i . i - ~ ~ , _ ~I- : ~7~ , : . ,
~ _ . . . -i-. ~
l„w. 1
I ~ ~ ~ . .~...~1 I ~ . . y ..~~i ~ . . w.;
~ _ . _ . ~ ~ - .
, . { _ _ _ ~ ::r~•....~ ~ , i o .I ; i i 1,..,. ~ i I , _ , .
,
~ , _ . _ ! , p7l _ :"I' ~ . rf ~ ~ l~~ . _ . ~ I '
. - . -I •i' I'~ I K.~, ~r ~ ,
. . _ O ~
~ r.~ ~ ~ _ ; , ~ ~ ~
, _ . ~i- ~ ~o
~~i~..,,_ ~ _ ~ ~ ~ ,
A~
. ~ ~ , .`i , ~ i , :
. . . ~ . _ . . . . . _ . . _ _ .
~ , , . .I , I I_ . . . ~.~.r..~..., 1 .I ....I~_ _ . .~.4~L,.,. ~...r '
~ , ' • , • - . - , • . • " - .
. ! . ' • . . . - , . , - • -
f • • , .
n • _ ' ' - .
' ~ . . • .
~ . • . . •
. • } - • '
. O
J ~
_ - LL
~ . .
300
' .
i°~~ • -
_ A . ~ ~ . • , • .
, . 1~ a0 . ~ -
. . .
. ~ 10 I~ • ' : ; - -
f`~~1~
; x . • ~ ~.10 ~ . . . . ~ A .
. , .
~
`s? ~ • _ - p - :
L w. • •/l
~ ` ~ ~ • ! - .
. ~l ' ` . . .
~ c,-. _ ~(Ioo . ' .
~ . -~v~~~---~'~~-~~~-~ ~ca- ~`'~'rt •~G'{-7~ -
ti-•- - '
PLAN
~ - . . .
. - o
. o .
~ - + ~ . . : - • _
J~ ~ 1 ; • ~ ~ f.,..,,-.~ . :.:_.r... : ~ . . . . ~ • ' -
pi . _ ~ - - . . • . _
i . - _ ~ ~ ' , E! =VA i iON
, . . . . . _
. . ~ RECOyfMEiNDED CONFIGURA i !CN
~ - - . ~ OF R! °RAP BLANKt i FGR
M iNI iv1 UM TA1 L W Ai ER .
" ' - • : ' . _ - _-;oL ~ i ~ t S ' ' ~
~ • ~
,
~
~ i ~ ~ 1 ~ I` f l~, ~ ~
~ ~ . ~ ~ ` ~ . ~ ~ 1 f t ~ - ~ - - # p4 WA Sh+ ~ , ~ ~
4 ~ , 24.0~ ; ~ ~ ~ t ~ ~ ~ ~ ~ ~ ; ~ ~ ~ . t , ~ 3 ~ F ~
~ . ~ ~ s ~ ~ ~ I ' } ' ~ ~
~ ~ e 11 .9 : a ~ i ~>~v~':~ f ; ~ , ~ ~ Eo ~ ~ ~ ~ . ~q ~~f
, . ~ t ' ~ ~ ~t 7 ~ { ~a 'w,,~ ~ I ~ • I, § , ~ ~ , o ~z~~s ~
r ~ ~ t , t ~ ~ ~ , F ~ ~ ~ ~ , f ~ f ~15~~.~ ~ , ' ~ 3 i S' ~
PR~PER~Y r, a ~ ~ ~ I ~ ~'1~f 1 r . 1 ~ e ~ I t '+~~M • BOl1~DAR~ TYP ~ • , r ' i ~
~ ~ # I ! ~ , ~ ~ ~ , , ~ ,
~ ~ : ~ ~ ~ I ~ ~ _ ~~(PiRES 9 2~ ~ r + d~
i ~ ~ ~ I i . A ~ 1 I ~ , ~ ~ ~ I ~ ~ F
P'~OP05ED C0~1 ~0~~~ ' L ~ ~ ' ~ ! I ~ ~ ► , ~ . : ~
~ I ~ . , . F ` ~ ~ ~ ~ ' . , ~ ~E r I ~
~ . ~I Ib ' ~ ~ ~ ~ I ~ ~ ~ ~ ~ P
1 ti ~ Cf I l ~ I ~ Rp r / f F 1 ' ~p ~ ~ ~ ~ ~ I
~ ~ ~ ~ ~ 24.~~ ~ ~ ~ ~ • , ~ TYP' ~ ~ d r . - E 8 CI~RB PER SP~f(ANE t , ~ 3 W
5 ~ ~ ~ ~ ► , ~ ~ •~r v~ + ~ C~UNTY STANDARQ Pl.~~! ~-3 ~ , 34. ti ~ ~ ~ ; ~
~ ~ x ~ ~ ~ ~ ti f ~ ~ ~ ~ ~ r ~ ~
~ f L ~ 't , ~ r k J ~ ~ P ~ 1
~5 I ~ ~ t I ~ ~ ~ k ~ 16. ~ ~ ~ ~ ~ ~ I
~ ~ ~ ~ E ` 3 . ~ i ~ ~ ~ ~ s I
I . ~ ~ ~ ~ E ~ ~ s ~ E ~ ~ ~ ~
~ ~ ~ ~ 1 ~ ~~AIN ~GE # i E ~ ti ~ ~ , ~ ~ i
~ , ~ , I EASEMENf E i ~ 3~ I ~ ~I 1 ~ 1 f
' ` ~ 3 ~3.27`. t ~ L~,..._..,~.1 ~ 1 . 1~ ~ t
# ~ ~ ~ 4 ' 1 i ~ I~--1~.5 LlTiLI~ ~
E y ~ ~ ~ ~ ~ASEM~NT ti , ~ ~ , ,
. s , ~7 ~ , r ~ ~fi_BO / ' ~
~ ~ - ~ _ ~ 5' ' ~ ~ SPOKANE ~~UNTY STANQARD E ~ ~ v I e. y..
~ ` CONCRE~E lNLET TYPE ~ W/ TYPE 1 ~ f ~r ~ ~ ~ , ~ M~rAL ~RAM~ & TYP~ 2 METAL I
~ , Id + t ~ C`iR101TE. 5Y14 ~~~35.'~4, 14.~~' ~T.
~ ~ I ~ . { ~ ' RAT V.= 1. 7 ; . G E~LE 20 0 9 ~ ~ ~ ~ ~
~ 3 ~ ~ ~ ~ i ~
i s ~ ~ t i q D ~
j i E~~"~~ ~ - - ~ ~G ~ ~ ~ ~ t a ~ ~ ~ f_"
.r ~ 1 ~ ~~-y V ~
w
SPO~AN~ ~COLiNTY ~1'ANDARD ~POKANE C~~lN~Y SfiAN~AR~
TY~P R Y 1~ ~H TY 4 ~ 8 0 1~ d E L L P~ T Y P~ B D R Y W E L L W l l' H T Y P E 4 7~ M~ T A L G R A T E A N D F R A M E M~~ A L ~ R A~ E A~ V D F R A M~
~TA i 6+~0.64, Z3.~~' ~T. STA 1 fi+81 23.5~' ~T.
~ ~~ILAN~ CQ~f~l~Y T = - ~~GIN~~R ~~A E ELE ~009.~~ GRA~~ ~LEV,-20Q9.5~
SCALE: 1 ~F=LV1 LE: 1 "=20'
~ ~ ~ ,
; ~ ~ ~ ~ ~
~ ~i ~~a`` ~ ~ ~ ~ _ ~ ~ ~ ~
~ ~
1iLV ~~~d~rl~~~i4f ~~L~. , $POKM[~E+ WA = OEN4CR, CO ~ 7a~ w¢gt x~ .~,~t~ 2~0 ~~o~a ;~e-sa,o DATE: ~ 0/~4~~0
5pokona~ q!A 99204 FAIL' (399~ 458-6844 ~ i r.rr ~ 1O f 04/00
~~oF wasC
y~yy
EASEMENT
OR R.O.W.
~ DRAINAGE EASEMENT AS SPECIFlEO ON PLAN
~ TOP OF BERM ELEV.- 2291 6
~ TOP Of CURB ELEV. F ~ f S T ER~`` ~
i+ so Fr• 1.5" SOD ON TOPSOIL, SOD s+
. SIONpI
~ INStALLED CONCURRENT WIiH .
OCCUPANCY OF AOJACENT HOUSE
3.M AX.~ EXPIRES 912V01
3: 1 (tYP)
GRAlE ELEVAl10N ~
1 5,
RAINAGE 3;1 MpX.
STRUPTURE
NOTE: STORM PIPE
PROVIDE FlLTER FABRIC (AMOCO 4545 OR EQUAL) BETWEEN RIP RAP i i
THE NATIVE SOIL AND THE WASHEO DRAIN ROCK AND BETY4EEN t%
THE WASHEO DRAIN ROCK AND THE ORYWELI. BARREL. 1"-3" TOPSOIL ON ~C= -
GRADED PONO BOTTOM 11' C:=
l~ cv
GRADEO POND BOTT0M cn
1.11'-1.28' BELOW
SECTIONAL VIEW EDGE OF ASPHALT p
~
TYPICAL POND CROSS-SECTION WITH STORM DRAIN PIPE
uJ o
NOT TO SCALE a: N
, . ,
TYPICAL 9208' POND
CROSS SEC110NS
ac aeeoaetee, nc.
iOtMf. Y . OOf.0. f0
7Q1 'M 7M fulb 700 (G01)/0!-INO
'~Y
ft1Y~y, IW 00704
R' •
September 27, 2000
Mr. Ed Parry
Spokane County Engineers
Developer Services
1026 West Broadway Avenue
Spokane, WA 99260
RE: Dishman Commons
CLC #99353
Dear Mr. Parry:
Enclosed please find the residential sub-division quantity list for street and storm
drainage items needed to set the bond amount. Please review the list and advise our
office of any necessary changes or additional information needed to set the bond
amount for the above referenced project, thank you.
Sincerely,
CLC Associates, Inc.
Dou . Desmond
Proj ect Manager
DJD/cf
Enclosures
w
r
DISHMAN COMMONS QUANTITY LIST
I I I I I I I I I
~ I 11 TTH LN. I HERALD LN, I FELTS RD. I 16TH SOUTH I 16TH NORTHI ALLEY I
~ STREET LENGTH (FT) 1,350.0 ~ 233.0 ~ 360.0 ~ 1,150.0 ~ 1,150.0 ~ 340.0 ~
~ STREET WIDTH (FT) 32.0 ~ 32.0 ~ 12.0 ~ 5.0 ~ 14.0 ~ 20.0
ITEM I I I I I I I I I TOTAL
STORM DRAINAGE I I I I I I I I I
DOUBLE DEPTH I I I 3•0 I 2•0 I 2•0 I I I I 7.0
208' PONDS (SF) 4,710,0 ~ 5,399A 1 630A 1 110,739.0
CATCH BASINS 6•0 1,0 7.0
PIPING (FT) 205.2 ~ 169.7 199•8 574.7
STREETS I I I I I I I I I
PAVING 2" ON 6" (SF) 16,800.01 6,800.0
PAVING 2" ON 7" (SF) ~ I 143,200.01 7,456.0 1 1 1 150,656.0
PAVING 3" ON 6" (SF) 4,320A 1 1 1 4,320.0
PAVING 4" ON 9.5" (SF) 5,750.0 1 16,100.0 1 121,850.0
TTPE A CURB (FT) 360.0 ~ 1,150.0 1,510.0
TYPE R CURB FT 2,700.0 466.0 3,166.0
FAX COVER SHEET.
DATE:
Number Of Pa~es (Includin~ Cover Sheet):
SPOK~~£ COU~TY
LO ei ti
FROyI: cDepartment of Public Worics Engineering Division Department: ~~1Li-
GG
r/~~&e-eoF
~
To:
~ ~ .
F.AX 3 0
COtiIP
A.NY• .
CITY / STATE: xE:
MESSAGE / SPECIAL INSTRUCTION:
r-v~ 0,/` v4o
•r ~
~f.~i✓/~/rl / ~ ~ •
. ~
~
SPOK:ANE COUNTY ENGNEERS 1026 bV BROADtiVAY SPOK.ANE, tiVA 99260
FAX # ls` Floor 456-2243 Phone 456-3600
P. 1
COMMUNICATION RESULT REPORT ( MAR. 2.1999 12:37PM
~ TTI SPK CNTY BLDG&PLANNING
FILE MODE OPTION ADDRESS (GROUP) RESULT PAGE
329 MEMORY TX 94585562 OK P. 6i6
REASON FOR ERROR
E-1) HANG UP OR LINE FAIL E-2) BUSY
E-3) NO ANSWER E-4) NO FACSIMILE CONNECTION
i
~ E,44X C,
.
~
Nurn~er Of Pages (Includmo ~ Cover Sheec): _
SPOWT- COuNrl'X .
FR4M:
DepArtrrjent of Pubiic yyorks ~ -
Engineering Division
DepaTtIriC11t: 06VA-Al
~
TO:
FAX
co~ANY: 6, l'~ ~.~0~ ~ .
CIT'Y l STATE:
RTZ. c~
~
FAX COVER SHEE~
~ DATE:
RRR
Number Of Pages (Includin~ Cover Sheet):
SPOK4AIN
JE COUI\UY
FROM:
Department oFPublic Works
Engineering Division
Department: 06- O it ~-e,
t TO:
Fa.X
coMPArY: c~t re~ o,-&J6~
CITY / STATE: ~ ~ 1402,V61
RE: ~1 1gSC~ -
MESSAGE / SPECIAL IiNSTRUCTION:
&C
~
~
~
SPOKA.NE COUNTY ENGINEERS 1026 tiV BROADWAY SPOKANE, tiVA 99260
FAX # ls' Floor 456-2243 Phone 456-3600
~
P. 1
COMMUNICATION RESULT REPOP,T ( MAR. 2.1999 12:40PM
•
TTI SPK CNTY BLDG&PLANNING
FILE MODE OPTION ADDRESS (GROUP) RESULT PAGE
330 MEMORY TX 94830345 OK P. 6i6
REASON FOR ERROR
E-1) HANG UP OR LINE FAIL E-2) BUSY
E-3) NO ANSWER E-4) NO FACSIMILE CONNECTION
I ' 1
I
1 ~
~
F A ~X COV. ~R SHEET
~
» DAs;'E: ~ ~''~~1
,
JL I it ~
SPQ~~~ ~ N'urx~ber Of ~'a;es (Inc]uding Cover Sheet):
UKTy '
I • ~
D FRO:M:
epaRment af Public tiVorks
Engineering Division ~ ~ 6,7L
Depaitment: 7L&9!51e- ,--A
~ .
To:
. ; ,
FAX
coMPANY. - UJ ,2
~ t ~
~
CZTX' / S T ~ ~j ~ "
.~T~. ~
~
R *p.• l C~_ ~ •
~ - ~
i ~
~
d
I . ~
' a ' ! I I 1 I ~ I . ~ -
~ ~ ~ ~ ~ ~ f`~ ~
~ f Cr 1 ~ , • ~ 1 e f~-~r ~ ~ ~ ~ t`Y, ~a k . _ _ ~ ~1 I f ~ J ~ ' ■ i
f ~ ~ a kY ~U~ ~ 1~~~ o z ~
f I ~ ~ f~ 1 r f ~ I F Y 4
I ~ ~~g~ ~ ~ ~~N ~ ~ , ~ I 9S i~s~.~ i9~l.~&} ~ ~ I ~ ~~m~tue~~a . ~ _ _ , 4 ~ ~°aarecT~E" ~ 1~~ ■1 ~
.19~87 ~ ~E~199a67(kQ61 95'~N ggiaN EL 2Sd3~J8` ~mad. ~S`.55f ~•is z~e(~rf 16IH AYE. ~e RiM.aai3.49 ~x-2o+l.as ~ _~uT a+ao 6wS 7+ao e±m wm ~ t i~ kE.zoosaslMio) ~s+cQ . i ~ 2f~nJ
vacuEa'r~u :1-~'- _ : r ~,.W~ ~ _ - i . , t~°0 i+tao r ~d t 1 n~D ~iuE ira Pa , ~ - - ~ ~ ' ~ ~ ~ _ ' ~ - EI. ~ -55eH ~
. ~ {mktl~ 1497~Sd]~~ - __~y.,_~_~_~_~-, ~~'~L F-*---- ~ ~ - ' . ~ ~ _ _ _ ~ ~ Rral-2410.SB iEa4020.44{stld 1
~ r 1 ' ; 1 ~ ~ ~ fS.,~ca._--------~------- - - _f~ ti I ~ - FcNCC , ~ f i ~ I ' ' ' . . I
L_ ; ~ ~ ~ _ _ ~ - - - - - - - - ~ !r--~ I 1 ! + I ) I _ ! I I I i I i f ~ ~ ~ - ~ - - - ~ ~ , _ ~ ~ _ ~ A.N~ _ ~ ~,C ~ - I r-- r-,~ I ~ _ - - -I - - ~ x - - _ ~ _ _ _ _ ~ , ~ ~ ~,i I. T r . + F ~
I „G~' . I ~ I ~ ~ ! ~ I ~ " I ~ If ~ I i ~ # ! G S 1 E k } k I ~ r~ 4 _ f ~ ~ ~ ~ i~ i~ ~
L_ J N ~ ~I d ~ I! ~ 4 a I a P I i I~ I ~ _ . . i ~ a I~ ~ ~ I ~ i~ I ~ i~ i ! j i ~ I i
-~--F ~I_.i.~+, ~I I_ 1__~ . I I F ~ 4 ilk I I~ ~ I I I I I k I E! I .1 I I I I . I ~ a~ e x. a I ~ d~~-~- ~11 L~ I ~ ~r i I I I i--- ~a~~ --,t f ,3
~ ~~x - - ~ i I ~ ! I!~ I _.T w 3 I i i 6 I r- rt x f 9 { j F ~ I~ ~ lu 1 ~ ii~ , . l_~ , I
I ~ ~ r . , ~ I r r ~l~L I I'~I E I I I~ i 1! ~ I E I I I I ~TER ~
. , ~ I~, I q: ~ H I r .•-r I ~ ~ I E ~ 6, i I I E i I I I 1 I I ~ ~ h ' ~ I i I . I _ -la ~ ~ ~H ~ ~ 1 f ~ ~ y.. - ~ ~ k l l{ ~ I t i I I I I~ E ° f . I i I~ I ~ 5 5 i ~
; I . 0 _ S ~ ~ I . Rr,~-20]~.SB ~ ~ ~ ~ i u I I~ 1 I~ f~ 4 I 1 ~ i I T~ ^ I i E a 4 fl 2 4. 4 3{ u 1 ~ 1
_ - ~ ~ 1 ~ 4 ' r, ~ i r~ i i~ ~ i ~ i 9 ~ t i ~ ~ - ! i ~ ~3 I } r~ ,~f y ' ~ ~ , _ _ _ _ _ _ _ _ ° ~ ~ ~ - ,:~~1 r~~J~ ~ ~ ~ _ _ ~ 1 ~ ~ ~ ~ _ ~ ~ - - ~ - - E _ _ _ _ ~ ~ ~ ' ~ ~ ~ ~t
~ E~ ~ F I i k I i ! E i I I I 1 ~ , ~ ~ ; . ~ i . 4 , ~ , , , ~ , , ~ ,
r * ~ t#ao _ i ` t~ao i ie 17TH LAH~e}aa f . i ~ . - i-- , ~ _ ~ • - - ~ _ ~tarm , , - it+m ~+au 1 ~ -r °~°p- ~ r-- - ~ , ~ ~
l ~ ~ - I ~ ~ • ~ ~
4~ i flf ]If !!k i I + 4 ! P • 1y ----~-~~~~=lil~r -~~=~1~-1~- °~=~i~~~l ~ I_ ~ ~ 4 ,
iM ~~~~i ~ i!a,i ~ ~ ~ ~ ~ d ti , ~ i~ i ~ ~ ~ ~ ~ I, I ~ ~ ~ E I I I 2 ~ 1 wa~zozsa~ iE=9oi S a3[~~
~ 8 4 3 ~ 1 9 ~ ~ 11 0 E ~ y I_~ i i~s~__f L__~ Ei~ ~--,4 fw--~ a i___~ ~ o
1 ~ I t I~I i ! I ~I~ d" ~f y : ~ L:-~` a'i r~ f_~{~ r~! i Y I ~ I ~ ~ i l l i ~ I 4 L L t I I 1 i~ I
~ 1 ~ { ~ ~ I ~ ; ~1 , I - y ~ ~ i ~ P ~ ~ ~ ~ ' ~ ~ ~ x I I ~ ~ ~ +irow ~ ~ rrcqo I i I I ~ I ,
~ a' ~vER,~a+ s+~ues I I r I ~ ~ r ~ ~ ~ r wcao ~ e' waaa ~ I ~ ~ ~ ~ i i i i I i
i 1 ~ ~ ~ , i ~ ~ ~ ~ I i ~ 11 ~ I a i i ~ ~ ~ ~ ~ ~ ~ f t ~ ~ ~ 1 ~ i ~ i ~ i I i ~ i i E
! i i ' ~ i " ~ 1 i ~ i ~ ~ i i , ~ ~ i ~
~ ~ ~ ~ i ~ i i , ~ i ~ I ..i R 1 ~ i ~ i, i i i ~ ~ i i ~ ~ ~ ~ ~ ~ I 1 I ~ I f I ~ ~ ~ I
~ ~ I i ~ ~ i 1 ~ ~
1 ~ ~ ~ ~ y ~ ~
5 ~5 . I WN 202}.39 ~ 1 * iE=io~SO3[~1 - 1 ~ ~ ' ~
~ ~ ~ ~z_~, a
~ ' , i ~-y i ~ ~.J ~J a
~ ~ 4
~
I 1
w • ,^f ` ~.s /n _
1 7
Memorandum
To: Pat Harper, Doug Desmond, and Ed Parry
From: Gary Nelson
Date: 10/31 /2000
Re: Dishman Commons and CRP 2875 -16t" - Dishman Mica to SR 27
Attached is a 10/23/00 memo to Bill Johns outlining the proposed typical sections for
Dishman Commons and CRP 2875 - 16t" - Dishman Mica to SR 27. Bill Johns approved
the sections, as you can see by his signature on each one.
Doug, please modify your plans accordingly.
Pat, please get the zone change conditions modified accordingly.
Ed, please check the plans accordingly.
Thanks to you all for your help in this effort.
:
x~ 1
-
~ ♦ ~
'Me11.orand
To: Bill Johns
CC: Ross Kell ,'at Harper, Doug Desmond, and Ed Parry
From: Gary Nelson
Date: 10/23/2000 .
Re: Dishman Commons and CRP 2875 16" - Dishman Mica to SR 27
Bill, attached is the recommended typical section for CRP 2875, which is 16t' - Dishman
Mica to SR-27. This section is identical to the section you recentiy approved for CRP 2791,
which is 16'h - SR27 to Sullivan.
Also attached is a typical section for Dishman Commons along the frontage of CRP 2875.
The,onty difference in this section is that the sidewalk is separated ftom the curb by a 15
feet~,wide-landscape strip. This typical section will apply where there is no parking strip
aroun'd'the Avista poles and at the intersections.
-
The third tVpical section is also fvr Dishman Commons along the frontage of CRP 2875.
_ This section applies where parking is allowed. The difference befinreen this section and the
{-T-- 'secoRd one is that the parking stnp is added. The parking strip width is deducted f rom the
'c - - 45'`feet'wide landscape strip.
.-=r-
The-sidewalk , is separated from the curb along the entire length of Dishman Commons. This
alfows the sidewalk to be located behind the Avista power poles, which exist along the south
side of 16`h. The parking strip will be eliminated in the area of the power poles, and the curb
will go around the poles.
' These sections require that the zone change conditions for Dishman Commons be modified.
The modifications required are as follows:
1. The typical section should be changed to match the attached sections.
2. The ROW dedication should be changed to match the attached sections.
3. The Future Acquisition Area requirement should be deleted.
4. The paving requirement on the north side of 16'' should be waived in lieu of a cash
payment to CRP 2875 to undertake this requirement
I have discussed these sections with Ross, and we recommend that you approve them.
r.~;~;sa.
~f. W ,~A Mi -f. T 2+'• #
A S ! ,F.- T ^ -"'i.l~• r..` _ ip~t" ~hY _ ai.,z r,T T_ 'i ~ ~ ~ 1",J
I
.
PROP. ' SECTION PROP.
R/W LI N E . R/W
30' ~ 30'
' , -
EXIST. ~ EXIST.
R/W
~ 20'-30' 20'-30' R/W
,
►
, .
2, 5, 2, 3, 12, 6, ~ 6, 12, 3, 1 2, 5. 2
~
" ►j~ ► ► ~ ►
SIDE 81KE TRAFFIC TURN 1'RAFFIC BIKE SIDE
WALK LANf1 LANE IANE I.ANE _ANE1 WAIK
4' ~ MAx - 1' ~ ~ ~ MPX .
q.1
I .:.::::::.:....:...~:tutli~~o1~~~rrrrr,~,~~rr+~~,ir,u,!~+~~~r~~~rrr~rr~~,~r~r~1111~11~~Aer~~:'.L . M.~~•~/!j~/j~/j~/~:/j ' M
x
~
N~
4'• / i i , i~ ~ T i . - . -i. ~ ~`i~`i~`i~`i~`i~i~/~i~i~i~ '~ivV~/~
N N N~~~~~~~~~;:~~~y~~i~y
~ ~i i~~i,,~ ~ ,,i i,~i~~i,
CEMENT CONC. ASPHALT CONC. PAVEMENT
CURB TYPE "B" (CLASS "A" AND CLASS "E")
CRUSHED SURFACING BASE COURSE A V
FROM DISHMAN MICA TO SR-27
-TYP CA _ SEC- 0 ~
L,,own tiy oale: 5pokane c;ounty C. R. P. 2875 SHEET
~Lsoo SCALE Public Yor~cs APPftOVE
s_I, o~
L~ssiqned8y Engineering end oa s Division 16TH AVE.
II I;.T+ 10, f~8 00 HpRIZONTAI: NONE 1026 Wesl Broadwpy Avenue
NONE O~
Checkud 9y. Spakone. WA, 99260-0170 Oote G D I S H M A N M I C A TO S R- 2 7
__wf~~_ 10/~8/00 • I
~RpCAL• 477-3600 ~
[
I
. , AVISTA POLE LINE
EX►sT. SECTION EX,sT.
R/w LI N E R/w
30' ~ 30' 13'
R.O.W. DEDICATION 0' FUTURE
I AQUISITION AREA
~
~ 3'
~
2' S' 2' 3' 12' 6' ~ 6' 12' 3' ~ 2' 15' S'
~ ~ ► ~ ~ ► -41 ► ~
SIDE 61KE TRAFFIC TURN TRAFFIC BIKE LANDSCAPE STRIP SIDE
~ WALK -ANE LANE LANE LANE _ANE1 WALK M
AX
- MqX ~-1' ~
„
~
,
f MA
k
, ~ ~~~~~~~~~~~~~~~~~~i~~~~~%~%~•
~
,~~.~i/
j)~` ~~i, ~ ~ , . N~i~~~i~\
;
CEMENT CONC. ASPHALT CONC. PAVEMENT
CURB TYPE "B" (CLASS "A" AND CLASS "E")
CRUSHED SURFACING BASE COURSE AV
D SHVA\ COV\AO\S
FROM DISHMAN MICA TO SR-27
-_YP CA _ SEC_ 0 \
WITHOUT PARKING STRIP
4
nrown oy oote: 5pokane c;ounty C.R.P. 2875
Im 10~a o SCALE Public Wor~CS , ~1PPROVE SHEET
oesiynse ey. Engineering and Roa s D~vision 16 TH A VE.
i~~~ '0 ~800 HORIzpN1AL: NONE 1026 Wcsl BroadMOy Avenue
Che~Y BY 10 18 OD yFRnCAL: NONE Spokone,477_36~60-0170 Dale•
~ ~ DISHMAN MICA TO SR-27 °f
.
EXisT. SECTION
EXIST.
R/w LI N E R/w
30' ~ 30' 13'
• y~ ► r
~ R.O.W. OEDICATION 0' FUTURE
I AQUISITION AREA
' I .5'
,
Z S 2, 3, 12, 6' ' 6, 12, 3~, 9.5, 7, 5,
, ► ~_81P- _ Y_ -r _
SIDE BIKE TRAFFIC TURN TRAFFIC BIKE PARKING ~ANDSCAPE SIDE
4. J WALK LANE LANE L A I NE LANE _AND LANE STRIP WALK AX.
~
' A
X q
_ 2/p~ ~ . 2q / 4.1 M.. .
e
A~` e:i~.iilJJr11111.tU111111J11111✓1i11JJ111J11J1t1 ~ _ • • • , ~ •,v.•
. ,a , . , , ~ X;~ 4; 1 MA
4.
\N
CEMENT CONC. . ASPHALT CONC. PAVEMENT
CURB TYPE "6" (CLASS "A" AND CLASS "E")
CRUSHED SURFACING BASE COURSE A V
D SH V_A\ COV v 0\S
FROM DISHMAN MICA TO SR-27
_YP CA_ SEC_ 0 \
WITH PARKING STRIP
,,ora«^ oY °ote: Spokane t;ounty
s.f+ I~v! c SCALE public Wor~CS APPROVC C.R.P. 2875 SHEET
QpsiQncd 8~ Engineering end Roa s Division 16 TH A VE .
A-i, 10 18 UG Hp(i1jQNTAL ►JONE 1026 Weal Broodaoy Avenve
CheN~~ay ~a ~e oo 5pokane.»_3600 99260-0170
_ J~ VERiICAL: N~,E +
Op~ DISHMAN MICA TO SR-27 '
~ I
► ; _ .
S P O K A N E i'• - C O U N T Y
DNISION OF ENGINEERING AND ROADS A DIVISION OF THE PUBLIC WORKS DEPARTMENT
William A. Johns, P.E., Counry Engineer
October 11, 2000
Oi'~'im chwab, P.E.
CLC Associates, [nc.
707 West 7h Avenue, Suite 200
Spokane, WA 22904
SUBJECT: P1859 - Dishman Commons
Submittal Acceptance
Gentlemen:
We have conducted a general evaluation of your recent submittal for this project, and we find that this submittal appears
to meet the minimum standards of the Spakane Counry Standards for Road and Setiver Construction ("SCRS"). We are,
therefore, able to accept your approvat ofthe plans and calculations for this project.
In accordance with Section 5.02.D of the SCRS, this plan acceptance is valid until October 11, 2002. If the
facilities are not constructed by then, you may request an extension of the acceptance for an additional two years;
however, the plans may need to be revised to reflect current standards prior to granting the extension
Please note:
1. The County's acceptance of this submittal does not relieve the sponsor or his agents from any
liability related to portions of the design that are not in conformance with the SCRS, or which do not
follow good engineering practice;
2. All permits and notifications necessary prior to construction are the responsibility of the project
Sponsor and/or his assigned agents; and
3. The Sponsor's Engineer is required to conduct inspection and testing work and submit Record
Drawings and inspection reports in accordance with the SCRS.
4. Final coordination regarding the County Road Project for 16'' between Dishman-Mica Road and
University Road needs to be completed, and the project pians adjusted accordingly prior to the release of a
permit for the 16`h Avenue improvements for this project.
5. Plans for the offsite pedestrian paihway (along 16`h from Felts to University) were not included
in this submittal, and are still needed prior to the start of any construction on the pathway.
A set of stamped mylars and a copy of the accepted design documents are enclosed.
Sincerely,
William A. Johns, P.E.
, Spokane County Engineer
P~.
a~P.E.
Plan Review Engineer
cc: Project Sponsor
R`, e- vAi ,e~~,:er
Projert File
1026 W. Broadway Ave. • Spokane, WA 99260-0170 •(509) 477-3600 FAX: (509) 477-7655 (2nd Floor) 477-7478 (3rd Floor) • TDD: (509) 477-7133
,
r- ~
'
f
S P O K A N E C O U N T Y
DMSION OF ENGINEERING AND ROADS A DIVISION OF TI-iE PUBLIC WORKS DEPARTMENT
William A. Johns, P.E., County Engineer
September 28, 2000
Tim Schwab, P.E.
CLC Associates, Inc.
707 West 7`h Avenue, Suite 201
Spokane, WA 99204
SUBJECT: P1859 - Dishman Commons
34..-eSubmittal
Gentlemen:
We have conducted a cursory review of your September 12, 2000 submittal of Design Documents for this
project, and we have found that the submittal generally does not conform to the requirements of the Spokane
County Standards for Road and Sewer Construction or the Cruidelines for Stormwater Management. We
are, therefore, unable to accept your submittal for construction at this time.
The attached comment list contains the items of concern that we discovered, and it is not to be construed as
being comprehensive. Given the number and degree of items to be resoived, a Pre-Submittal meeting must be
conducted prior to the next submittal, so that all parties can ensure that the comments are adequately
addressed prior to the next submittal.
If you have any questions about this review, or to set up a convenient time for the Pre-Submittal meeting,
please contact Ed Parry, P.E. at 477-3600. Thank you.
Sincerely,
William A. Johns, P. E.
Spokane County En ' eer
• iv.
Edwar . .
Plan Review Engineer
encl.: Design Documents - plans & calculations
Comments (5 pages)
Checklisis: ESC & 208 Lot Plans
cc: project file
reviewer (comments only)
Sponsor: Northwest Regional Facilitaiors
1026 W. Broadway Ave. • Spokane, WA 99260-0170 •(509) 477-3600 FAX: (509) 477-7655 (2nd Floor) 477-7478 (3rd Flaor) • TDD: (509) 477-7133
s Tim Schwab, P.E.
P1859 - Dishman Commoos
3'd Submittal
September 28, 2000
Page 2 of 6
Items remaining from 1' submittal:
~T.,.a
D tt~
~ r l,,..~-' f .;I£Ec,i~-~'i--r-ttCj_
2) Sheet 2:
r'~~ ~~eed49-Shew-h6vr-+h: ::i "i-b-al.z~~ ~ , r -eF Pele-fff
. ,
J . 7kpfil ~ . 2
g0les--'32C'd-Ee-bc -ttdtC-a+ed
!^A A;~t-
b-'i
c) Should provide a standard plan reference or a detail callout for the "traffic candles" (callout #2). Has
this been coordinated with the County Traific Engineer? (Needs to be coordinated with the County
Trafjic Engineer){The troffir channeling device sbould be noted as uto be installed by County
Trafj`'ie Engineering Dept- "
d; S miietis--($r-;kFeet-li.-ghts-71ietild b2-itidieateE#
e-3 ~-.v:,4 . 4.5) --tLe-^FFI}-e
iti' ieaied
Ax~ . eRaRC-0 BFF_ss-~-~~ e , (ealletit ;9'a? ~~d . vipe
he~ `
3) Sheet 3: a}---T:fiPcF-Sh.6i.i1f~-i++af,.l ,...I1,•..+5
b-}-it . .
ILA
f3+RAW11
4) Sheet 4:
b) LfeF G
5) Sheet 5:
a.`, . e . offset `
?e'-f3ll E-lc tec•iEti t.~ :.`--r~
"
6) Drainage Calculations:
a}--Eer-ti€ielei;A#-t~
d2-T(~}~:~ s:.~s~,-r 4
04etrId-be-yFek-+ded-(~}r~' _ . -.4~ . . ,
~ ' r'~•i:':~ I~: ';r.~.`, . r~~
~frti--t?~t° '~-i-ff~f~}F?~fF1{~F~~t~f~E~}~'sFE'-f}?~ ~ ~ . ~-F~1-f-~fFr-f-E~:S=-~'r3c~F~Hf~-r'-~~Efi/.-F.' ~ 3'~f.'•~Niff,~E~*L~: ';'fJf?-'r~?E2
h.~ieke~,
c) Sub-basins need to match the basin map (e.g., Basin A) (Need to indicate topography. The contours
on the road plans in the vicinity of Lots l0A through 6A indicate th4t there may be offsite areas
flowing onto the site. If there are contributing offsite basins, and they are to be cut of, j; then the
plans will need to reflect that) {The transmittal letter bears a statement of engineering opinion
on thb mutter. The letter needs to bear a signed, dated P.E. stamp}
.g.. Basifi,,k)
~ . ~~~~-~rr~~emiotfs-~~-~-~,~:~`~c-~1~~-~
J) "C" factor of 0.10 for Basin B(as an example) only works if those lots are kept in lawn. How does
that fit with the development plan? A typical lot development plan might be helpful in dacumenting
the assumed drainage surface factors (Not clearly addressed; basins need to be evaluated at the
i" built-out condition) {Tlie project owner has indicQted thut the lots in Basia B will be multi-
~j family lots. The basin needs to be evaluated at the built-out conditio». A ical lot develo ment
!an needs to be ineluded to s ort the design ass ' ~p p
P upp umptions for Basin B. "C" factors for the
. ,
Tim Schwab, P.E.
P1859 - Dishman Commons
P Submittal
September 28, 2000
Page 3 of 6
peak flow culeulations (.28) and the storm volu»te calculations (33) also need to be eoordinated
(check for all basins - these are an example) }
J•.sV ~T[ ten~ nnlnr "CC~C'LCTs'?Y~'f'1~•~ ncri~.t~n~ ii.J7CCfT'I«( n .r .n~.l~n~_i1~,c~
v "fQpl~lliC~i~~`T~rIT7C
- -r -
h) Grate calcs work if the 6" water depth doesn't obstruct the roadway. Need to maintain at least a 12'
clear lane centered on CL. Grates should be evaluated for the flows they actually receive [Grate calcs
need to be coordinaied wuh the plan callouts and curb conditions]
74-ReF pFek-tetfs-e-iihai-l. -ft1-l V:-afe-j),FiYate-thefa41~s-a+A-s~ eeNN-iier-s"
:kssee-iatte
8~ \ I . manual. Jtfti4 ` d
! i
9) Pavement Design: Need to include CBR test data & calculations, data used to convert CBR to Mr (Data
was provided with this submittal. Technical Reference B of the Standards does not indicate that a
direct conversion of CBR to M, is an acceptable standard method for determining M,, Approval of a
Design Deviation Request will be needed for this method, per our 13 July 00 e-mail correspo»dence.
The County's evaluation of this approach has found thot CBR tests are too variable among samples
wfthin o soil type to be a reliable predictor of the M, value. The CBR variability appears to be borrre
out by the test data provided. Please obtain the County Engineer's approval of a I)esign Deviation
Request for this method prior to the next submitta!) fiVeed to lnclude copy of the approved Design
Deviation. Pavement widening cross-slope calculations are needed in eaeh submittal; these were
received on Sept 28"61
10) 208 Lot Plans: Need to include a swale section detail for those lots with swales (Swale section detail was
»ot received with this submittal) {A separate sectio» cut sheet u needed for Block 1, Lots 3,4, & 6.
Please refer to the "208 Lot Plon Checkllst" in tke GSM, a copy is attached for your reference}
Items noted on ZdSubmittal:
208 Lot Plans
• Lot 3, Block 1:
n.~Un l le 1~in .~i~.e r.f l~~r~ r~rni inrre nnrniiinil r» I r~. l 1_ glQeT'` 1 1~~.~ •.i~l .-ill ..nnt~ ee b,+ ^~nr/:nnl~ ne~
L/ J ~
U 3L pafate~ ~ .
Storm Drain piping will need to be contained in an easement (Need to tweak the easemenl
dimensioning - see redlines)
• Lot 6, Block 1 Blecii . , ed te-be-dedieaEe~
~
Storm Drain piping will need to be contained in an easement (Need to tweak the easement
dimensioning - see redlines)
• Lot 4, Block 1
A-sepafa{e4Fae~4s-iieeE4ed !aF-PeRd-B
Storm Drain piping will need to be contained in an easement (Need to tweak the easement
dlmensioning - see redlines)
• Lot 2, Block 1
North line of the Drainage Easement needs to be d.imensioned aiong the 16`h Avenue R/W
line; east Iine needs to be dimensioned. from the 16`h Avenue R/W (Are drainage easements still
contemplated for Block 1, Lots 2& S, as shown ort prevlous submittals?)
Tim Schwab, P.E.
P1859 - Dis6man Commons
3''d Submittal
September 28, 2000
Page 4 of 6
Sheet 2:
Drainage easement for pipe system needs to be dimensioned (7eed to tweok the easement
dinrensioning - see redlines)
Sheet 4:
C-a4etK zeds-te-~~
C-alletit . - )ag-e
944a . - - t-amp
Sheet 5 ced4-e-~',dH;
_ 4 y ✓ i ` Lafle)
Pipes need to be indicated in profile; profile of piping system is also needed (GSM, para. 2.I.a)
{Previous comment should have been clearer: Pipes erossing the road and CB's ott the curbline need to
be shown in the road CL and curbline profles, as well as in profile along the pipe route}
Tract C limits need to be clearly indicated {Tract C(contains Pond uA dlmen.sions 8c bearings
need to be indicated}
%Z-U~4 be-eeefdiiiated . V' .
Sheet 6
Pipes need to be indicated in road profile; profile of piping system is also needed (GSM, para. 2.1.a)
{Previous conrment should have been clearer: Pipes crossing the road and CB's on the curbline need to
be shown in the road CL and curbline profiles, as well as in profile Qlong the pipe route }
1 , &trb Id-L.'-11YTiil'i-C nt ail ~ Or.
C,eut
Callout #2:
- 1i-bas-i~
Grate elevation needs to be coordinated with T/C elevation (With the typical 2" depression
at the inlet, the grate elevatlon = T/C - 0. S' for a Type R curb)
&i4oW, '7: `4~t~ Callout # 14: Grate elevation needs to be coordinated with T/C elevation (W'uh the typical 2"
depression at the inlet, the grarte elevatioa = T/C - 0. S' for a Type R curb)
Detail ##4: Is the private road in a tract or an easement? (aeed to indicate "Easement" or "Tract" in
the detail - see redlines)
Sheet 8:
De+ail ~ .
tit ;Y9r'81Teet--4-
Detail #2:
Need to indicate easement dimensions (Need to tweok the ease►nent dimensioning - see
redlines)
Tim Schwab, P.E.
P1859 - Dishman Commons
3'd Submittai
September 28, 2000
Page 5 of 6
9evelepet-+~s-?e-c~E~r-.d-B4n-a-sefmtlate-t+a~
, ,
~~~e~r . e~ .~!,~e~~~ti+-8t:Feftst~T-ter+t
De6a R :
gFading
; th~ ilie pi-ap.,Sed-easenie~-'-"
~ k t~-{e-l-~~!Avel-lt-S--c.itai efida-ItIg He:
Detail #6: {Deleted entire detail - no further action needed}
n! the-~vLVV id
gisnn1„zM r.eedr /e be d.:~ie.....:......d D lW'1:..,.
, eH i:•idi nlle..t 44C!ienf 9
AOV dees »e1 elinreanh j~VIT
~lµblin ~ I«t. AI'hAri.`fe~_.. n T .ne.i ..a .~J_ t_ !_,3 ^.'.~n+~r.-..-r i.•.fIw~Z~
N~• ~ V r.\`blil\.\.1
Detail #9:
.Dzvelep-e-f-RA e~1,p<< L~LGly7d G n ne» n t- n f_ # r n i. {
~T~.. r
CeIT~~iTi~~LTI-R-ee g d renE.tY..r ..1•.eti ~•ill nen•~ f~~ ba = ~~i-nviCiRTCV~IZG
ti ~ c. FJTQ 1- fu
. ~e G'eiiirnnknr j:~n r~
. n., nI4•..-.~nN~ HCInl ~r~C7IITi & r~{'T~~c~~ nl-' n +~Z2~TTZ
. . ' -~T"- p'rC~L
selected • p7r' T~i.!~j~LFi 'rL.!~
~ `_iL g ♦ ~~-~~~t~.-{~}~ J
. r a
Pipes need to be located within easements {Easements need to be dimensioned along the
Lot liRes, irtstead of from another easement U»ut}
Sheet 9:
-afflieetien betw,,.,,, 1 (411 Avenue aL-ai
b~iI7~ITYL.
Ca~[11t11.~iZ:n f7YL..l nnn-~rr~'? `.3 CII~~~rclil~ iV~CC~n!{ b•~t••••~ end i. 1-'+r^ C~ rIVL i1TTi-it'~! ~ ~~illl li[t_~r~f_~r^^~nfsr»i•
1rStt'.~, f6f the niudit. r [lio Ir.tn ~~r n.-I h.• •~~ir~ nn-.-~ tOLTTC-
~
Pefliapsitist ' • . ~}etiee-~-eRti'a
,,,,l,~ ~,nt.n
and 17`'' ° - e~.~~r~e+~ .
\i 77~ r
'
~
J~Mt n T ! ~1 r~ PiiTirr-rsnir eE~rT 'ePH-160-1 :1••,, „a t 7'•n IC,,.!
tY
• Wle afe tiffable tA --F eeiistaie~ s if the fead ali"
met, Ores{.'~H
seB-aF
E6-St..-Riaa-bf-seutli31M~-bel-wleerr44th .
-~m_~~id 1-7`''-I=a,ie
E ig ~t ~
Callout #3: Need to indicate station (Need to indicate station at Felts Road approach}
Callout #4: .~e . ~t. `f ~e-~eWIFi-~-~e.,:~e~r~;~l.reaatt~-.ol--Etrb
t~t-and wiN3-d,tai' 6'Shee* 4{Deleted callout - no further oction needed}
Basin Map:
How will the lots be graded to provide the Tc path shown for Basin B2? {The response indicates
that the longest Te path would provide the more conservative result. I» fact, o shorter Tc path would
result in a higher peak flow rate. It appears that the "substantial conformarnee to the basin liaes" could
be noted by some spot elevotions or notes on the road & drainage plans}
How will lots be graded to provide the basin limits contemplated for this site? {See comment above}
Lii~fRTIT ~VTBn r•'A~TRJT& B I• n n d li i» i1 n er & nn rl ( l. c
J
Tim Sc6wab, P.E.
P1859 - Dishman Commons
3nd Submittal
September 28, 2000
Page 6 of 6
Pavement Design Calculations:
~ , `E~i ; .
_ as-eppesed The Test Pit Map needs to indicate where the CBR sample was taken from ("...from the
approximate site center..." (Jay Logan's 15 June 2000 letter) is not a very accurate description). The samples
are typically taken from within or very near to the roadway corridor. Need to provide sieve analysis results for
the sample used in CBR testing.{Addressed in the Design Deviation. The fact that thls particular method
of determining the 111, value was accepted through a Design Deviation should be noted in the report
narrative}
Roadway width, pavement section, and timing of construction should be coordinated with the
County's Engineering Design Section. A County Road Project between Dishman-Mica Road and SR27 is
anticipated for 2003. iWas thls addressed?}
Items noted on this submittal:
1. Submittal Checklist: Basin Map, Pavement Widening Cross-slope calculations, and copies of the
previously approved Design Deviations were not initially found. Basin Map was later retransmitted, and the
initially submitted Basin Map was later found in the Pavement Design booklet. All the necessary elements
need to be included with each submittal. This saves time and confusion during the plan review, and in
scavenging the project files to put together a set of Final Accepted Design Documents. Please note that a lack
of a comment on a particular element shouid not be construed as an "Acceptance". The County Engineer's
Office provides an "Acceptance" of the entire Final Design package when all the elements are acceptable.
2. I,ot Plans: Generally need to tweak the easement dimensioning - see redlines
3. Drainage Caiculations:
a, Pipe runs need to be coordinated with the plans. Some additional labeling is recommended
b. Calculations for storm line "A" were not found in this submittal
c. Calculations for the outfall pad sizing & rock gradation were not found in this submittal
d. Subbasin limits also need to be clearly delineated, to coordinate with the "C" factors assumed
4. O& M manual: Needs to be provided prior to plan acceptance. Please refer to GSM for guidance on the
necessary elements
Submittat Cliecklist
for Road & Drainage Projecfs iu Spokane County - Plats/Short Plats
Thzs Submittal Checkfist is to be completed and signed by the Sponsor's E»girteer, and included with ench plan
subii1ittal 1)110 the Spokane County Engineers Office. If thrs forrrr is not fully completed and sigrred, clo not
submit plans and caleulations to Spokane Counry for review and accepta»ce. Incomplete submittals witl be
- returned and will cause unnecessary delays for your client. Pro}ect Name: 'v S .
Spokane County Project No. -Date:
Project Engineer: ~~'~1=.S~...,7~f Phone:
Project Sponsor: 9zmE A'Q!oQQ~rx) Phone: _9,r 4~U "574o
A. Preliminary Process
Prior to Submittal of Road and Drainage Pla.ns, the followi.ng evemts are to have already occurred:
(13y checking each item off shoivn beloiv, you are stcrting lhat you hwe verified these eventsJitems have beerr completed.) '
0' Adoption of a Heari.ng Examiner's Report for this long plat, or a Planning Report for this sbort plat. [;r-- At least one Pre-Design Meeting has been held with County staff at the Enoeers Office.
Cl-- An "Agreement to Pay Fees" has been signed by the project sponsor, a.nd submitted to the County
Enoeers Office. A Cba.nnelization Plan (e.g. signing and striping plaa) of public roadway improvements, has been
coordi.nated and discussed with the County Engineers Office.
B. Road and Drainage Plan Submittal
The items listed below are to be provided as a minimum with a road and drainage plan submittal. Additional
information may be required to demonstrate that the plans meet all applicable sta.ndards.
(By checking "yes" for each item shoivn below, you are verifyirrg that these items have- been-completed and crre included in this submittal. For any boz checked "n1a a written justification oj any omissions at the end oJ this section is
required.) . , - .
Item DescriQtion - - - , Crlyes Road and drainage plans, two print sets. (CertiScation-statemeat on cover of plans)
~ -
❑ yes Q~n/a - One set of plans on 24" x 36" mylar media, or CAD electronic file DWG or DXF format
[[?'yes Each PIan Sheet of record is signed and.dated by the project'sponsor.: • . - _
0-yes - The coad and drainage design :meets the requiretnents".'of'State-taw,.WAC 196-27:regar4ing "confornvty with accepted standards';.that is, the design reflects-;the:"state of the-practice" for the psoposed concept.
9,'yes The plans, Drairiage Report, basin map(s), and a.ny -other.calculations are stamped,. signed
_ and dated by an engineer licensed in the State of Washi4ton: 1
W-yes O nla Drainage Report, two sets." To include: basin map(s), time of concentration routes in basiJ4
, map, and Certification statement on cover of reoort and basin map.
O yes 3'n/a Geotechnical Report, one set. (Include all soil test pit/boring logs.) .
W'yes O n/a Structucal Pavement Ca(culations, one set 0 yes Lnia Cross-slope grade calculations fo~ad xvidening projects. {l • • ~ ' ` .
L
Item Description
0 yes e n/a N-laintenwice Manual and Sirilcing Fund calculations for drainage facilities located outside of
County road ciot-of-way.
O yes 0,0'~a Written explanation of who/what entity will be responsible for maintaining drainage facilities
which are located outside of public road right-of-way, and that the plan is acceptable to the
County Engineers Office.
Cl-yes 0 n/a Channelization Plan, or signi.ng and striping information provided in the road plans. To be
included in road and drainage plan set.
' Q'yes 0 n/a I have read the Hearing Examiner's Report (long plat), or Planning Dept. Findings and
Conditions (short plat), for this project. The design meets the conditions in the re ort.
Ot--yes D n/a Copy of Approved Design Deviations. T '~;~.r•■~ O n+
~
0 yes C~-n/a Fire District Approval, for private roads:
C3--yes ' 0 nia Lot P1ans. Required for any lots with drainage easements and w
hich front a public road, or for [ots which receive and treat runoff from a public right-of-wa . :TO ~C
y Am
0 yes Brn/a Any applicable State and Federai pernuts have been obtained. (i.e. HPA, JARPA, etc.). For
Permits with conditions, a copy of the permit and conditions are i.ncluded in the plan
submittal.
yes O~nla Inspectioa Agreement beriveen the sponsor and its engineer.
[J yes 13' n/a For off-site easements to be granted to Spokane County, the following items shall be
included: legal description, exhibit, and proof of ownership.
@--yes 0 nla Erosion Control Plan, required for "Major Land-Disturbing ct~vity." To be included in the
road and drainage pla.n set.
Expla.nation for any items listed above which are not included in this submittal: 'Ch-c
rvla ~oox i ~rc.ti ~ ~r,~~ ~~c~v~p •v o
. Go.h~~r me- lou
(Note: an insufficient justifica[ian of why an item «+as not included in the subrrutted, or incomplete documents, may result
in the submittal being returned without review or Nvithout acceptance. Provide attachments if necessary.)
By signing below, the engineer is stating tllat the information provided in the submittal is complete, that the
information provided in the Submittal Checklist is accurate, and the plans and calculations are in accordance with the Spokane County Standards for Road & Sewer Construction, and the Cnlidelines for Stormwater Management, except where an approved Design Deviation allows otherwise. ' Engineer's Signature: Date: 2 00 Engineer's Name: ~ -rLmsoy A. s~UwAI& - -
. . . (please print) If there are' any questiorrs about this form or appropriate procedures, please call Development Services,
-Spolcarie Co.unty Public Workr, at (509) 456-3600.
: . . . - . For Spokane County Use Only .
. Submittal No: Coun Plan Reviewer: ?A01 . .
. .
~ . . . . . _ . .
ffAccepted in for Review ~
~ Retumed to the engineer without -w~ris~~ebbt acceptance, See attached letter of expIanation.
Processing Date: Submittal Cliecklist ?
Spokane Counry Public Works; Aprit 29, 1998
EROSION AND SEDIMENT CONTROL PLANS WORKSHEET
(BASED ON THE APRIL 1998 EDITION)
Page 1 of 3
Submittal of Pians
An ESC plan is required for major land-disturbing activities that require a permit or plan
acceptance by Spokane County. An ESC plan is not required for minor land-disturbing activities.
An ESC plan, when required, shall be submitted with a petmit application prior to any land-
disturbing activity. ESC plans are only required to address the area of iand that is subject to the
land-disiurbing activity for which a permit is being requested. Although others may prepare the
ESC plan, the permit applicant is responsible for ensuring that all requirements are addressed in
the ESC plan. The ESC plan is required to be on file at the County, although it will not be
reviewed or approved by the County.
Plan Contents
At a minimum, all ESC plans must be legible, reproducible, and contain the following
information:
Provided N/A
Title Block
Name of property owner
Name of permit applicant
Name of contact person at project site
Project address
Legal Description
Name of person preparing plan
Professional seal (required for major land-disturbing ESC plans)
Description of project
Description of ESC measures
Description of existing vegetation on the site
Location of any existing water bodies
Date plan was prepared
Scale of drawing
North arrow
Property boundary and dimensions
Vicinity Map
Lisi of soils on-site (information may be obtained at the County
Soil Coaservation District)
Certification statement by the person preparing the plan that the
plan meets the ESC plan requirements as listed in chapter 4.5 of
the Guidelines for Stormwater Management.
4.5.430 ESC Requirements for Minor Land-Disturbiug Artivities
Though an ESC plan is not required to be submitted for minor land-disturbing activities for which
a permit is required by Spokane County, the Performance Standards and other provisions of this
Ordinance shall remain in affect. The provisions of this Ordinance shall not govern minor land-
disturbing activities for which no permit is required. However, individuals/property owners
undertaking niinor land-disturbing activities for which a permit is not required may desire to
ensure that such activity protects adjacent and surrounding private properties.
EROSION :#JND SEDIMENT CONTROL PLANS WORKSHEET
(BASED ON THE APRIL 1998 EDITION)
Page 2 of 3
4.5.440 ESC Plan Requirements for Major Land-Disturbing Activities
All ESC plans for major land-disturbing activities shall be prepared and have a seal aff'ixed by
either a licensed professional engineer (PE) or a licensed landscape architect (LA). Both the
professional engineer and the landscape architect must be licensed in the State of Washington and
be knowledgeable in both hydrology and ESC practices.
The following fifteen (15) items shall be addressed in ESC plans for major land-disturbing
activities. As site conditions dictate, additional measures re(ating to ESC, as determined by the
licensed professional engineer (PE) or licensed landscape architect (LA) preparing the plan, shall
be addressed in order to meet the intent and purpose of this chapter and to comply with stated
performance staadards contained in section 4.5.520. Special site conditions may include, but are
not limited to, steep slopes, slope length, soii type, or vegetative cover.
1) Coastruction Access Route Addressed: N/A:
Access for construction vehicles should be limited to one route whenever possi'ble. The
access route must be stabilized to minimize the tracking of sediment onto public roads.
2) Stabilization of Denuded Areas Addressed: N/A:
Stabilization of all exposed soils to prevent soils from eroding aad depositing sediment
downstream.
3) Protection of Adjacent Properties/Water Bodies/Public and Private Roads
Addressed: N/A:
Protection of adjacent properties, water bodies, public and private roads from erosion and
sediment deposition. The intent is to keep sed'unent on the project site and not allow it to
reach adjacent properties, water bodies, and public and private roads.
4) Protectioo of Inlets Addressed: N/A:
Protection of downstream inlets to drywells, catch basins and other stormwater managemeat
facilities.
5) Increased Runoff from Construrtion Sites
Addressed: N/A:
Consideration and mitigation of the effects and impacts of increased and concentrated runoff
from land disturbing activities on downstream properties, water bodies, and public and
private roads.
6) Washoat Site for Concrete Trucks aad EQuipment
Addressed: N/A:
Designate the location of a slurry pit where concrete trucks and equipmeot can be washed
out. Sluny pits shall not be located in a swale, drainage area, stormwater facility, or water
body nor in an area where a stormwater facility is proposed.
7) Material StoragelStockpile Addressed: N/A:
Identify location for storageJstockpile areas, within the proposed ESC plan boundaries, for
any soil, earthen and landscape material which is used or will be used on-site.
. " .
EROSION AND SEDIMENT CONTROL PLANS WORKSHEET
(BASED ON THE APRIL 1998 EDITION)
Page 3 of 3
8) Nlaintenance and Permanent B1VIPs Addressed: N/A:
Maintenance of ait erosion and sediment control BMPs is required during the land-disturbing
activity. Regular inspection and maintenance of all erosion and sediment control BMPs is
required to ensure successful perfvrmance of the BMPs. Permanent BMPs shall be included
in the plan to ensure that successful transition from temporary BMPs to permanent BMPs
occurs.
9) Clearing Limits Detiaeation Addressed: N/A:
Field identification and delineation of all clearing limits, sensitivelcritical areas, buffers, trees
to be preserved, and drainage courses.
10) Sediment Trappin~ Measures Addressed: N/A:
Design and construction of sediment ponds and traps, perimeter dikes, sediment barriers, and
other onsite sediment trapping BMPs as necessary prior to the start of other land disturbing
activities.
11) Cut and Fill Slopes Addressed: N/A:
Design and construction of cut and fill slopes in a manner that will minimize erosion.
12) Stabilization of Temporarv Convevance Channels and Outlets
Addressed: N/A:
Design, construction, and stabilization of all temporary on-site conveyance channels to
preverit erosion from the velocity of runoff from storms under developed conditions. Design,
construction, and stabilization of all temporary conveyance system outlets to prevent erosion
of: stormwater facilities, adjacent stream banks, slopes and downstream reacbes.
13) Removal of Temporarv BMPs Addressed: N/A:
Removal of ali temporary sediment control BMPs within 30 days after final site stabilization
or after ihe temporary BMPs are no longer needed. Trapped sediment shall be removed frorn
the project site or stabitized on-site. Stabilization of disturbed soil areas resulting from
removal of the temporary BMPs.
14) Dewatering Construction Site Addressed: N/A:
Discharge of dewatering devices to appropriately designed sedi.ment traps or sediment ponds.
15) Control of Pollutants Ot6er Thsn Sediment on Construction Sites
Addressed: N/A: . '
Control of all on-site poltutants other than sediment in a manner that does not cause
contamination of stormwater or groundwater.
4.5.450 Modifications to Ptans
ESC plans may be modified after submittal to the County. An amended plan should be submitted
to illustrate any modifications to the techniques and methods used to prevent and control erosion
and sedimentation.
, w
208 INDIVIDUAL LOT PLAN GUIDELINES
1.Show location of easements on the lot. Include dimensions of
drainage easement and swale bottom dimensions from lot lines.
Include a description of the lot legal description such as Lot
Block , NAME OF SUBDIVISION OR SHORT PLAT. The bottom elevation
of the swale is also required. The station for any curb drops or
sidewalk inlets should be shown on the plan drawing. If a drywell
is included in the swale it should show the type of drywell, frame
and grate type, elevation of the grate, and centerline station and
offset to the drywell. .
2. If there is no swale on the lot but there is a drainage ditch,
the ditch should be shown on the plan drawing. The ditch flow line
grades should be shown along with any easement for the ditch with
dimensions from property lines.
3. All lot plans should show a north arrow, scale, street name of
adjacent street, curb and sidewalk if applicable or edge of asphalt
paving if there is no curb. The lot dimensions should also be shown
along with the building setback line with dimension from the front
property lines shown.
4. Any easements such as power line easements which prohibit
building under them should be shown on the. plan drawing. Any other
easements which could interfere with buildings should also be shown.
Any existing buildings should be shown.
5. With each plan drawing there should be submitted a typical
section drawing of a cut through the swale or ditch which best
describes how the swale and/or ditch.would look as constructed from
a side view. The typical section should show the curb and/or
sidewalk if applicable or edge of asphalt paving'in relation to the
swale. The section should also show side slopes, vertical distance
from swale bottom to top of back slope of swale or ditch, grate of
the drywell, and normal gutter line, and any applicable note or other
information which would describe the proper construct.ion of the swale
and/or ditch , concrete apron, street right-of-way line, and grass
sod or seedinq if approved on the constzuction plans. 6. The lot plan arid attached section sheets shall be on 8 1/2" x 11"
paper and should be sealed, signed and dated by the engineer in a
location outside of the lot boundaries.
7. The scale of the drawinq should be such that the lot is depicted
as large as possible and still be able to show the curb line of the
street. The interior of the lot should be as free as possible of
notes and writing to allow the builder room to draw in his proposed
house and driveway location.
, . . . .
NOTE: YOU SHOULD NOT BEGIN LOT PLAN DRAWINGS UNTIL YOU ARE CERTAIN,
THE SWALE AREAS ARE CORRECT AND YOU HAVE EASEMENTS WHICH ARE,
)PROVED.
, • .
r
PROJECT # PROJECT NAME DATE
CHECKLIST FOR USE IN PREPARING 208 LOT DRAWINGS
PLOT PLAN .
1. I have drawn the lot plan on 8 1/2" x 11" paper to a
larqe enough scale to make the lot as large as possible
and still be able to show the curb line and the
necessary notes and certif ication stamp.
2. I have shown the lot, block, and subdivision description
for the lot or tract/short plat
3. I have shown the drainage easement dimensions in relation
. to property lines or corners.
4. I have shown the bottom of swale dimensions in relation
to property lines or corners.
5. I have shown the bottom elevation of the swale.
6. I have shown the location of any curb, sidewalk or edge
of asphalt line as applicable.
7. I have shown the name of the street adjacent to the lot
being drawn.
8. I have shown the station and any invert elevation of any
curb dropior drops that empty into the swale.
9. I have shown the type of drywell, frame and grate type,
elevation of the grate, and centerline station and offset
of the drywell.
10. I have shown any required ditches, their easements on the
drawing, the ditch f low line grade and required rip rap,
etc. 11. I have shown a north arrow, scale, lot dimensions, and
building setback lines with proper dimension.
12. I have shown any easements which could af f ect any future
building locations and I have shown any existing
buildinqs. .
13. I have sealed, signed and dated each drawing that is
being submitted for review and in appropriate location.
ATTACHED SECTION DRAWING 14. I have shown the curb and/or sidewalk or edge of asphalt
in relation to the swale, sides slope, vertical distance
from the bottom of the swale to the top of back slope,
grate and normal flow line of the curb or edge of
asphalt. 15. I have shown the concrete apron, street R.O.W. line, and
. grass sod or seeding if approved and any applicable
notes or other information which may be necessary to
describe proper construction.
s =
S P O K A N E C O U N T Y
DtVISION OF ENGINEERENG AND ROnDS A DMSION OF THE PUBLIC WORKS DEPARTMENT
William A. Johns, P.E., Counry Engineer
September 8, 2000
Tim Schwab, P.E.
CLC Associates, Inc.
707 West 7'h Avenue
Spokane, WA 99204
SUBJECT: P1859 - Dishman Commons
Design Deviadon Approval
CBR to Mr Conversion
Genttemen:
We have approved this request, with these conditions:
l. The County Engi.neer does not accept this correlation method as a matter of standard practice, and
the approval is based solely on the coincidence of the design value with the data on file at the County
for this area and the similarity between the test sample soil and the 16`h Avenue test pit soils.
2. Future Mr values, where required, are to be determined either by testing of soil samples, or back-
calculation of non-destructive deflection testing data. Private consultants are locally availabie to
provide non-destructive deflection testing and back-calculation services.
3. The County Engineer does not accept the procedure used to develop design data for the 16`h Avenue
pavement section. Although the requirements for soil testing for use in pavement design may not be
explicitly spelled oirt in the Standards, it is rational to expect that the most reliable data for pavement
design would be derived from soil samples taken within, or very near to the proposed roadway
alignment. Desiga data on any future projects shall be based on the characteristics of soil sampies
obtained within or along the road alignment in question.
We are enclosing a copy of the approved Deviation Request. Please call Ed Parry ((509)477-3600) if there
are any questions.
Sincerely,
William A. Johns, P.E.
Spokane Couoty Engineer
IG• -
Edward J. a, Jr., P.E.
Plan Review Engineer
CC: Project File
1026 W. Broadway Ave. 9 Spokane, WA 99260-0170 ~(509) 477-3600 FAX: (509) 477-7655 (2nd Floor) 477-7478 (3rd Floor) • TDD: (509) 477-7133
RECEIVED ,
. REQUEST FOR DESIGN DEVIATION AUG 2 9 2000
$30.00 .
' SPOKANE COUNTY ECJGINEER
DATE August 29, 2000
ROAD NAME 16th Avenue -CRP/RID• #
NAME OF PLAT Dishman 4Commons Plat # P1859
ADDRESS OF BLDG NAME OF BLDG PROJECT BLDG# B9 S 29 T 25 R 45
FEDERALJSTATE PROJEGT # . PROTECT LIMTI'S West of Felts Road, just west
' • of Walnut Road.
'EXISTING CONDITTONS: PROPOSED IMPROVEMENT'S:
ROAD WIDTH • 30' A! ' gay,e w3.dth t curb and
ROAD SURFACE ACP gutter
AVG. DAII.Y TRA,FFIC -
Current Traffic Count Design Year Traffic Count
PROJECT DESCRIP110N -Single family residential sub-divisj9U..
PROPOSED DESIGN DEVL4TION IIse CBR value to estimate the resilient modulus for pavement
design instead of using a resilient modulus test on representative subgrade soil samples
known to consist of silty medium (SM) and slightly silty, medium sand (SP-SM).
7USTIFICATTON: The resilient modulus test cannot be quickly conducted and there are very few laboratories in
the northwest that perform this testing. CBR value has been established, and enclosed
reference materi.al relates CBR value to resilient modulus value for pavement design. Table
2.4 and Appendi.g DD of AASHTO. ,
3UBMTITED BY CLC Assoc•iates, Inc. (Doug Desmond) DATE August 29, 2000
4DDRESS 707 W. 7 th Ave., S te . 200; Spokane, WA ZIP CODE 99204
?HONE # (509) 458-6840 (509) 458-6844 (fag) .
A.DMINIST'RATIVE VARIANCE FEE OF $30.00 PAID YO SPOKANE COUN'I'Y
1026 W BROADWAY, SPOKANE WA 99260-0170 PHONE (509)456-3600 FAX (509)324-3478
-REQUEST W1LL NOT BE REVIEWID WITHOUT FUNDS- •
H~i , ~~~7
.,AS I # RECETVED BY ~ DATE 7-I/-44 41
. ~
f . DESIGN DEVIATION
. '
►TAFF RECOMMENDATIONS . . ,
ipproved Approved w/conditions Not Approved ~,,p ~ r ~ i/ ~ ~{.ZI a ~~~I ~ •
Project Manager . Date
u° i~ -~~is G r~o0 O~UG y~2 c~/i~ ./l
,pproved Approved w/conditions Not Approved ~ -
) ) ( ) / ~
Planning & Traff'ic E6/gi.neer Date
~ - ~
\ / ' - .
_ / . : . . . .
.pproved Approved w/conditions Not A,j::ii ved
) ~ )
Project Management Enginee Date
~ ` .
. /
pproved Flpproved w/conditions Not Approved
Opera /ionsEngieer Date
POKANE COUNTY ENG;UiEER'S
ETERMINATION:
. pproved w/no conditions Approved as recommended above Not Approved
) ) \
Spokane CountrEngineer Dato
► .
~ , •
Memorandum
D$te: September 7, 2000
To: Bill Hemmings, P.E.
Frnm: Ed Parry
~
Subject: P1859 - Dishman Commons
Design Deviatiofl
Use Equatioe to Correlate CBR to M, valaes in Pavement Desiga
, .
This project is located east of Dishman Mica Road, along the south line of 1e Avenue, west of Felts
Road. 16`b Avenue is a Principal Arterial (3-lane) at this location. The Sponsor's Engineer is proposing
that an equation in the AASHTO Manual be used to carrelate CBR test results to an 1Vi, value for the
pavement section design of 16`h Avenue.
The CBR test used to develop the design data for the 16`h Avenue pavement section was conducted on a
soit sample taken approximately 200' south of the 16~` Avenue road alignment.
The rer.ommended design K value of 11,000 is on the high end of the index range for the soil type (SM
a.nd SP-SM soils). CBR test was conducted on a soil sample from the approximate mid-point of 17`h Lane,
some 200' south of the 16`hAvenue alignment (See attached map). The soils along 16'b Avenue appear to
be reasonably sunilar to the soils &ora the CBR test location (See attached graQh).
The Pavement Management Section indicates that the recommended design Nit value is in line with data
about that area. However,
1. Discussions with the Pavement Management Section indicates that the County's previous studies of a
CBR Nif correlatian faund a highly variable range of CBR values for sunilar soiI types, and a highly
variable range of K values within soil types. There does not appear to be a reasonable correlation
between CBR and 1VI, values, at least for the soils in this area.
2. The CBR test was conducted on a soil sample from the southerly portion of the project site, not on a
sampie in or' very near to the 16`hAvenue alignment. Testing is customarily performed on soil
samples fram within or along the road aligiment in question.
If this Deviation is approved:
1. The Engineer should be placed on notice that
1.1. The County Engineer doe.s not accept this correlation method as a matter of standard practice,
and that the approval is based solely on the coincidence of their design value with the data on
file at the County for this area and the similarity between ttie test sample soil and the 16`h
Avenue test pit soils.
1.2. Future M, values, where required, are to be determined either by testing of soil samples, ar back-
calculation of non-destructive deflection testing data. Private consuitants are tocally available to
provide oon•de.structive deflection testing and back-calculation services.
1.3. The County Engineer does not accept the procedure used to develop design data for the 16'h
Avenue pavement section. Although the requirements for soil testing for use in pavement design
may not be expiicitty spelled out in the Standurds, it is rational to expect that the most reliable
data for pavement design would be decived from soil saznples taken within, or very near to the
proposed raadway aiignment. Design data on any future pro3ects shall be based on the .
characteristics of soil samples obtained within or along the road alignment in question.
• 1
r
S P O K A N E C O U N T Y
DIVISION OF ENGINEERING AND ROADS A DIVISIOIV OF THE PUBLIC WORKS DEPARTMENT
William A. Johns, P.E., County Engineer
September 8, 2000
Tim Schwab, P.E.
CLC Associates, Inc.
707 We.st 7~' Avenue
Spokane, WA 99204
SUBJECT: P1859 - Dishman Commons
Design Deviation Apprnval
CBR to Mr Conversion
Gentlemen:
We have approved this request, with these condftions:
l. The County Engineer does not accept this conelation method as a matter of standard practice, and
the approval is based solely on the coincidence of tbe design value with the data on file at the County
for this area and the similarity between the test sample soil and the 160, Avenue test pit soils.
2. Future Mr values, where required, are to be determined either by testing of soil samples, or back-
calculation of non-destrvctive deflection testing data. Private consultants are locally availabie to
provide non destructive deflection testing and back-calculation services.
3. The County Engineer does not accept the procedure used to deveZop design data for the 16'h Avenue
pavement section. Although the requirements for soii testing for use in pavement design may not be
explicitly spelled out in the Standards, it is rational to expect that the most reliable data for pavement
design would be derived from soil samples taken within, or very near to the proposed roadway
alignment. Design data on any future projects shall be based on the characteristics of soil samples
obtained within or along the road alignment in question.
We are enclosing a copy of the approved Deviation Request. Please call Ed Parry ((509)477-3600) if there
are any questions.
S incerely,
William A. Johns, P.E.
Spokane County Engineer
P-~. .
Edward J. , Jr., P.E.
Plan Review Engineer
CC: Project File
1026 W. Broadway Ave. • Spokane, WA 99260-0170 •(509) 477-3600 FAX: (549) 477-7655 (2nd Floor) 477-7478 (3rd Floor) 9 TDD: (509) 477-7133
DESIGN DEVIATION
. ;TAFF RECOMMENDATIONS . , .
.
ipproved Approved w/conditions Not Approved ~ iI ~ I/.~V W~ ~ ~f.~IF ~~vV .
' Project Manager . Date
~~~~y►'tm~~ ~0~~ 017W co,c~ /771o A) ~~-7 *#s D g~0,q~'11o ~6 ~s af~o2av'~-~
/ V/~rI .
,pproved Approved w/conditions Not Approved
Planni.ng & Traffic En/gineer Date
. ~ . . . . •
.pproved A.pproved w/conditions Not Ap ved
) ( } '
Project Management Engi.ne Date
~ .
. ~
pproved Approved w/conditions Not Approved
Opera ions Engineer Date
POKANE COUNTY ENGINEER'S
ETERMINATION: .
pproved w/no conditions Approved as recommended above Not Approved
) ) ~
v
l/
Spokane Coun Engineer ~ Dat,
i .
. : RECEiVED . REQUEST FOR DESIGN DEVIATION AUG 2 9 2000 $30.00 .
" . SPOKAWE COUNTY ENGINEER
DATE August 29, 2000
ROAD NAME 16th Avenue -CRP/RID. #
NAME OF PLAT Dishman Commons Plat # P1859
ADDRESS OF BLD G -
NAME OF BLDG PROJECT BLDG# B9 S 29 T 25 R 45
FEDERAIJSTATE PROJECT # . PROTECT LIMTTS West of Felts Road, just west
' - of Walnut Road.
EXISTING CONDTTIONS: , PROPOSED IMPROVEMENTS;
ROAD WIDTH 30' ± -4-4' naved width T curb and
RoaD suRFACE AcP gutter
AVG. DAII.Y TRAFFIC -
Current Traff'ic Count Design Year Traffic Count
PROTECT DESCRIPTION Single familv residential sub-division. ,
PROPOSED DESIGN DEVIATION IIse CBR value to estimate the resilient modulus for pavement
design instead of using a resilient modulus test on representative subgrade soil samples
lnown to consist of silty medium (SM) and si?ghtly silty, medium sand (SP-SM).
JUSTIFICATTON: -
The resilient modulus test cannot be quicklp conducted and there are very few laboratories in
the northwest that perform this testing. CBR value has been established, and enclosed
reference material relates CBR value to resilient modulus value for pavement design. Table
2.4 and Appendig DD of AASHTO. ,
iUBMITTED BY - CLC Assoc-iates, Inc. (Doug Desmond) DA'LE August 29 * 2000
ADDRESS 707 W. 7th Ave., Ste. 200; Spokane, WA ZIP CODE 99204 .
?HONE # (509) 458-6840 (509) 458-6844 (fag) .
ADMLNISTRATNE VARIANCE FEE OF $30.00 PAID i O SPOKANE COUN1Y
1026 W BROADWAY, SPOKANE WA 99260-4170 PHONE (509)456-3600 FAX (509)324-3478
-REQUES WILL NOT BE REVIEWED Wl'TI30UT FUNDS-
-.AS I `~3? ~l ~
. C~C # RECEIVED BY `DATE Z~Aq4q)
. ~
Memorandum
Date: September 7, 2000
To: Bill Hemmings, P.E.
Frnro: Ed Parry
~
Subject: P1859 - D19hmatt COmDioDs
Design Deviatiofl
Use Equatioe to Correiate CBR to M, values in Pavemetit Design
, . : , . . . . . :
This project is located east of Dishman Mica Road, along the south iine of 16`hAvenue, west of Felts
Road. 16'b Avenue is a Principal Arterial (3-lane) at this location. The Sponsor's Engineer is proposing
that an equation in the AASHTO Manual be used to correlate CBR test results to an K value for the
pavement section design of 16t' Avenue.
The CBR test used to develop the design data for the 16hAvenue pavement section was conducted on a
soil sample taken approximately 200' south of the 16`h Avenue road alignment.
The recommended design M, value of 11,000 is on the high end of the index range for the soil typ$ (SM
and SP-SM soils). CBR test was conducted on a soil sample from the approximate mid-point of 17c° Lane,
some 204' south of the 16`hAvenue alignment (See attached maQ). The soils along 16'bAvenue appear to
be reasonably similar to the soils from the CBR test location (See attached graph).
The Pavement Management Section indicates that the recommended design M= vatue is in line with data
about that area. However,
1. Discussions with the Pavement Management Section indicates that the County's previous studies of a
CBR N1{ correlation found a highly variable range of CBR values for similar soiI types, and a highly
variable range of M, values within soil types. There dces not appear to be a reasonable correlation
between CBR and K values, at least for the soils in this area.
2. The CBR test was conducted on a soil sample from the southerly portion of the project site, aot on a
sample in or very near to the t 6d' Avenue alignment. Testing is customarily performed on soil
samples from within or along the road alignment in question.
If this I}eviation is approved: .
1. The Engineer should be placed on notice that
1.1. The County Engineer does not accept ffiis correlarion method as a matter of standard practice,
and that the approval is based solely on the coincidence of their design value with the data on
file at the County for this area and the similarity beiween the test sample soil and the lb'h
Avenue test pit soils.
1.2. Future K values, where required, are to be determined either by testing of soil samples, or back-
calculation of non-destructive deflection testing data. Private consultants are localiy available to
provide noa-destructive deflection testing and back-calculation services.
1.3. The County Engineer does aot accepi the procedure used to develop design data for the 16th
Avenue pavement section. Although the requirements for soil testing for use in pavement design
may not be explicitly spelled out in the Standards, it is ration8l to expect that the most reliable
data for pavement design would be derived from soil samples taken within, or very near to the
proposed roadway alignment. Design data on any future projects shall be based on the .
characteristics of soil samples obtained within or along the road alignment in question.
• I
S P O K A N E ~'C O U N T Y
DMSION OF ENGINEERING AND ROADS A DMSION OF THE PUBLIC WORKS DEPARTMENT
William A. Johns, P.E., County Engineer
August 21, 2000
Tim Schwab, P.E.
CLC Associates, Inc.
707 West 7`h Avenue, Suite 201
Spokane, WA 99204
SUBJECT: P1859 - Dishman Commons
2°d Submittal
Gentlemen:
We have conducted a cwsory review of your August 8, 2000 submittal of Design Documents for this project,
and we have found that the submittal generally does not conform to the requirements of the Spokane County
Standards for Road and Sewer Construction or the Guidelines for Stor»rwater Management. We are,
therefore, unable to accept your submittal for construction at this time.
The attached comment list contains the items of concern that we discovered, and it is not to be construed as
being comprehensive. Given the number and degree of items to be resolved, a Pre-Submittal meeting is
needed, so that all parties can ensure that the comments are adequately addressed prior to the next submittal.
If you have any questions about this review, please contact Ed Parry, P.E. at 477-3600. Thank you.
Sincerely,
William A. Johns, P. E.
Spokane County Engineer
s`
d ~ . E.
~an Review Engineer
encl.: Design Documents - plans
Comments (4 pages)
cc: project file
reviewer (coinments only)
Sponsor. Northwest Regional Facilitators
1026 W. Broadway Ave. • Spokane, WA 99260-0170 o (509) 477-3600 FAX: (509) 477-7655 (2nd Floor) 477-7478 j3rd Floor) • TDD: (509) 477-7133
. • . ,
'I`im Schwab, P.E.
P1859 - Dis6man Commons
2°d Submittal
August 21, 2000
Page 2 of 5
Items remaining from 1s` submittal:
2) Sheet 2:
,
,
,
,
c) Should provide a standard plan reference or a detail callout for the "traffic candles" (callout #2). Has
this been coordinated with the Cowity Traffic Engineer? (Needs to be coordinated with the County
Traffic Engineer)
indieated
g) How is maintenance access provided to pipe outlet (callout #9)? (Needs to be clearly i»dicated on
the plans)
3) Shee# 3 :
100' wAnifauin
4) Sheet 4:
b) .
S) Sheet 5:
6) Drainage Calculations:
b) Energy Grade Line analysis for pipe systems should be provided (System A2 A1 needs to have the
rim elevations indicated. System C7-C6-C3: Calculations indicate that a freeboard less than the
required.75' will be provided)
c) Sub-basins need to match the basin map (e.g., Basin A) (Need to fndicate topography. The contours
on the road plans in the vicinity of Lots l0A through 6A indicate that there may be offsite areas
flowing onto the site. If there are contributing o,f,site basins, and they are to be cut off, then the
plans will need to reflect that)
Baski-M
e) Do the basin calcs include the sidewallc 8t curb in the impervious area? (How was this addressed?)
fl"C" factor of 0.10 for Basin B(as an exampie) only works if those lots are kept in lawn. How does
that fit with the developmerrt plan? A typical lot development plan might be helpful in documenting
the assumed drainage surface factors (Not clearly addressed; basiris need to be evaluated at the
built-out condition)
h) Grate caics work if the 6" water depth doesn't obstruct the roadway. Need to maintain at Ieast a 12'
clear lane centered on CL. Grates should be evaluated for the flows they actually receive
'
, ,
Tim Schwab, P.E.
P1859 - Dis6mAn Commons
2nd Submittal
August 21, 2000
Page 3 of 5
Asseeimien
,
outside .
9) Pavement I?esign: Need to include CBR test data & catculations, data used to convert CBR to IVi, (Data
was provided with this submittal. Technical Reference B of the Standards does not indicate that a
direct conversion of CBR to M, is an acceptable standard method for determining M,. Apprvval of a
Design Deviation Request will be needed for this method, per our 13 July DO e-mail correspondence.
The County's evaluation of this approQCh has found that CBR tests are too variable among samples
within a soil type to be a reliable predictor of the M, value. The CBR variability appears to be borne
out by the test dcrta provided. Please obtain the County Engirteer's opproval of a Design Deviation
Request for this method prior to the ne.rt submittal)
10) 208 Lat Plans: Need to include a swale section detail for those lots with swales (Swale section detail was
not received with this sUbmittal)
Items noted on 2°d Submittal:
208 Lot Plans
• Lot 3, Block l:
Due to the size of the drainage easement on Lot 3, Block 1, the easement will need to be dedicated as
a separate tract, or the Lot could be dedicated as a separate Tract for Drainage only.
Storm Drain piping will need to be contained in an easement
• Lot 6, Block 1
Due to the size of the drainage easement on Lot 6, Block l, this Lot wili need to be dedicated
as a separate tract for drainage purposes only.
Storm Drain piping will naed to be contained in an easement
• Lot 4, Block 1
A separate tract is needed for Pond B
Storm Drain piping will need to be contained in an easement
• Lot 2, Block 1
North line of the Drainage Easement needs to be dimensioned along the 16t' Avenue R/W
line; east line needs to be dimensioned from the 16'' Avenue R/W
Sheet 2:
Pipe system from 16'h Avenue to Pond B needs to shown in profile
Drainage easement for pipe system nceds to be dimensioned
Sheet 4:
Caliout #2: Needs to be coordinated with the detail page
Callout #3: Needs to be coordinated with the detail page
Callout #6: Street light needs to be located outside the sidewalk & sidewalk ramp
Sheet 5 .
Need to indicate offsets for catch basins
Contours in the vicinity of Pond B need to be coYnpleted
Driveway (callout appears to cont2ict with streetlight at I3+75 (17'b Lane)
Tim Sc6wub, P.E.
P1859 - Dishman Commons
2ad Submittai
August 21, 2000
Page 4 of 5
Pipes need to be indicated in profile; profile of piping system is also needed (GSM, para. 2. l.a)
Tract C limits need to be ctearly indicated
Callout #9: rim elevation needs to be coordinated with Detail 1/Sheet 8
Sheet 6
Pipes need to be indicated in road profile; profile of piping system is also needed (GSM, para. 2. l.a)
Calloui #1: Curb should transition similar to detail 2 on sheet 5
Callout #Z:
Need to indicate offsets for catch basin
Grate elevation needs to be coordinated with TIC elevation
Callout #7: Grate elevation needs to be coordinated with T/C elevation
Callout # 14: Grate elevation needs to be coordinated with T/C elevation
Detail #4: Is the private road in a tract or an easement?
Sheet 8:
Detail # 1: Rim elevation needs to be coordinated with callout #9/Sheet 5
Detail #2:
Need to indicate easement dimensions
Developer needs to set Pond B in a separate tract
Pipe from manhole (Sheet 2, callout #8) needs to be placed in an easement
Detail #3:
How dces the grading for Pond C remain within the proposed easement?
What about slopes from the back of curb dowo to the drywells & pond floor?
Detail #6:
North line of pond easement nceds to be dimensioned along the R/VV line; east line of pond
easement needs to be dimensioned from R/'W line
Need to coordinate rim elevation with callout #4/Sheet 9
Pond needs to be located so that runoff from private roadlalley does not encroach upon
public R/W, otherwise a License Agreement needs to be executed with the County
Detail #9:
Developer needs to set Pond C in a separate tract
Certified Record Drawings of the final pond configuration will need to be provided to the
County Engineer's Office by the Developer, not the Contractor. As an altemative, station & offset of certain
selected points on the pond floor (e.g., curve tangent points) could be tabulated and indicated on the plans
Pipes need to be located within easements
Sheet 9:
Is the private connection betwcen 16th Avenue and 170' Lane a private road, an alley, a driveway or a
commerciai access? Alleys are typically located between road intersections, not aligied with an intersection.
Is the width adequate for the multi-family development contemplated for the lots served by this access route?
Perhaps just indicating a commercial access of an appropriate width (with no connection between 16`h Avenue
and 17'b Lane) would better serve the development conc,ept for these lots. The Conditions of Approval appear
to allow an alley only to serve Lots 1 through 6 of Block 2.
Tim Schwab, P.E.
P1859 - Dishman Commons
2ad Submittai
August 21, 2000
Page S of 5
Aligrunent of the private connection between 16th Avenue and 17`h Lane needs to be coordinated
with the sewer plans. We are unable to release sewer construction permits if the road alignments on these two
sets of plans don't match.
Ci, station for south end of private connection between 16th Avenue and 17'' Lane needs to be
coordinated with callout and streetlight shown on Sheet 5
Callout #3: Need to indicate station
Callout #4: Need to indicate station & offset. Need to coordinate rim elevation with callout for curb
inlet and with detail6/Sheet 8
Basin Map: ~
How will the lots be graded to provide the Tc path shown for Basin B2?
How will lots be graded to provide the basin limits corrtemplated for this site?
Limits of Basins F& B1, aad limits of Basins C& D need to be coordinated with the spot elevations
shovm on Sheet 9
Pavement Design Calculations:
16`h Avenue is a 3 Lane Principal Arterial, as opposed to the Collector Arterial noted in the report
The Test Fit Map needs to indicate where the CBR sample was taken from ("...from the
approximate site center..." (Jay Logan's 15 June 2000 letter) is not a very accurate description). The samples
are typically taken from within or very near to the roadway corridor. Need to provide sieve analysis results for
the sample used in CBR testing.
Roadway width, pavement section, and timing of construc;tion should be coordinated with the
County's Engineering Design Section A County Road Project between Dishman-Mica Road and SR27 is
anticipated for 2003.
~
• ,
Submittal Checklist
for Road & Drainage Projects in Spokaae County - Plats/Short Plats
This Submittal Checklist is to be completed and signed by the Sponsor's Engineer, and included with each pfan
submittal inro the Spokane County E'ngineers Office. If this form is not fully completed and signed, do not
submit plans and calculations to Spokane County for review and acceptance. Incomplete submittals will be
- retccrned and will cause unnecessary delays for your client. . Project Name:
Spokane County Project No. P~ S59 Date: $l$(~v
Pro}ect Engineer: C~ 45W-IM5~IAL'7t'A! S.ChwAb Phone: _!VS7' 0y~
Project Sponsor: 41CILCHNA95r AWXQZ Phone: Ydy- 673
A. 'Preiiminary Process
Prior to Submittal of Road and Drairiage Plans, the fo[lowing events are to have already occurred: (By checking each item off shown below, you are stating that you have verifred these events/items have beerr completed.) '
Adoptioa of a Hearing Examiner's Report for this long plat, or a Planning Report for this short plat. "
At least one Pre-Desip Meeting has been held with County staff at the Engineers Office. .
A.a "Agreement to Pay Fees" has.beea signed by the-project sponsor, and submitted to the County _
Engineers Office.
R' A Channelization Plan (e.g. signing a.ad striping plan) of public roadway improvements, has been
coordinated and discussed with the County Engineers Offce. ,
B. Road and Drainage Plan Submittal . :
The items listed below are to be provided as a'muumum with a road a.ad drai.nage plan submittal. Additional
information may be required to demonstrate that the plans meet all applicable sta.ndards.
(By checking "yes" for each item shown betow; you ore veriJying that1hese items have,beert•coinpleted and are,included : in this submittal. For any box checked "n/aa writtert juslification of any omissioas at the end of this section is
required.) • •
Item Description . , . . . - . . . . _ (5 yes Road and drainage plans, two print sets. (Certificatioa-statement-on.cover of plans) .00► yes g'n/a 'One set of plans on 24" x 36 mylar media, or CAD electronic file ~.DWG or.DXF format Q' yes Each Plan Sheet of record is signed and dated by the projec#'sporisor.
The ioad and drau' e desi ineets the r uirenients~`` fStaxe
' e' yes " - - iag ga: . eq o `~'law;.:WAC -196 27~~regarding
"confortnity with accepted - standards"; .that is, the design reflects',the : "state of the -practice" . . for the proposed concept. . " . . . . . ' .
ff'yes The plans, Drainage Report, basin map(s), and a.ay ~other,calculations are stamped,: signed '
and da.ted by an engineer-licensed in.the State of Washington:- . - . . . . . : - . . -
8' yes- 0 n/a -Drainage Report, two sets: To include: basin map(s), time of concentration routes in basin
. . map, and Certification statement on cover of repoct and basin map.
' Ga- yes 0 n/a Geotechnical Report, one set. (Include all soil test pit/boring logs.) . [R- yes 0 n/a Stcucharal Pavement Calculations, one set -
L9' yes 0 nia Cross-slope grade calculations for road widening projects.
. • . - ~
. •
Item Description
eyes 0 n/a Maintenance Manuat and Sinking Fund calculations for drainage facilities located outside of
County road riQ,ht-of-way. p yes 9- nJa Written explanation of who/what entity will be responsible foc maintaining drainage facilities
which are located outside of public road right-of-way, and that the plan is acceptable to the
County Engineers Office. .
0- yes ❑ n/a Cha.nnelization Plan, or signing and sUriping information provided in the road plans.. To be
included in road and draina;~e plan set.
' yes 0 n/a I have read the Hearing Examiner's Report (long plat), or Planning Dept. Find.ings and
• Conditions (short plat), for this project. The desiga meets the conditions in the report.
yes 0 n/a Copy of Approved Design Deviations. . C3''yes 0 n/a Fire District Approval, for private roads: , Q'yes 0 nla Lot Pians. Required for aay Iots with drainage easements and which front a public road, or
for Iots which receive and treat runofffrom a public-right-of-way. O yes E" n/a *Any applicable State' and- Federal pernuts have been obtained. (i.e. HPA, JARPA, etc.). For
Permits with conditions, a copy of the pernut and conditions are included in the pian
submittal. . - ,
Q'yes 0 n/a Inspection Agreement beriveen the sponsor and its engineer.
0 yes 0'n/a For off-site easements to be gra.nted to.Spokane County, the followi.ng items shall be
included: legal description, exhibit, and proof of ownership.
O- yes 0 n/a Erosiori Control Plan, requued for "Ma}or La.nd-Disturbing Activity." To be included i.n the
road and draina.ge plan set.
Explanation for any items listed above which are not included in this submittal: _9"S Tb W sed&MW AOMXit. ~ - .
(Note: an insufficient justificadon of why an item was not included in the submitted, or incomplete documents, may result
in the submittal being rehuned without review or Nvithout acceptance. Provide attachments if necessary.)
By signing below, the engineer is stating that the infornlation provided in-the submittal is complete, that the
information provided in the Submittal Checklist is accurate, and the plans and calculations are in accordance with -the Spoka.ne County Standards for Road & Sewer Construction, a.nd the Guidelirres for Stormwater -
Management, -except where an approved Design Deviatioa allows otherwise.
Engineer's Signature: Dat:e:
. - :
' 1~`~~[~' 8 6 00
Engineer's Name: - - (please print)
. If there: are'-any questions about this form or approprrate procedures, please call Development Services,
:Spokane Co.unty Public Works, at (509) 456-3600. _ • - - ' '
For Spokane County Use Only . .
Subnuttal No County Plan Reviewer: ~ . . : - . , . . . . . . . . .
. : . . . . . . _ . . . . -
0Accepted in for Review or Construction
Returned to the engineer without r acceptance, See attached letter of explanation.
Processing Date -JA ~ iv -
Submittal Checklist . 2
Spokane County Public Works; April 29, 1998
1
S P O K A N E '1 C O U N T Y
DNISION OF ENGINEERING AND ROADS A DNISIOIV OF THE PUBLIC WORKS DEPARTMENT
Williasn A. Johns, P.E., County Engineer
July 10, 2000
Tim Schwab, P.E.
CLC Associates, Inc.
707 West 7`~ Avenue, Suite 201
Spokane, WA 99204
SUBJECT: P1859 - Dishman Commons
V Submittal
Gentlemen:
We have conducted a cursory review of your June 21, 2000 submittal of Design Documents for
this project, and we have found that the submittal generally does not conform to the requirements
of the Spokane County Standards for Road and Sewer Construction or the Guidelines for
Stormwater Management. We are, therefore, unable to accept your submittal for review at this
time.
The attached comment list contains the items of concern which we discovered, and it is not to be
construed as being comprehensive. If you have any questions about this review, please contact Ed
Parry at 477-3600. Thank you.
Sincerely,
William A. Johns, P. E.
Spokane County Engineer
? ef
Edward J. P , P.E.
Plan Review Engineer
encL: Design Documents - plans
Comments (1 page)
cc: project file
reviewer (comments only)
Sponsor. Northwest Regional Facilitaiors
1026 W. Broadway Ave. • Spokane, WA 99260-0170 •(509) 477-3600 FAX: (509) 477-7655 (2nd Floor) 477-7478 (3rd Floor) • TDD: (509) 477-7133
~ .
x _ ~
Tim Schwab, P.E.
, P1859 - Dis6man Commons
1" Submittal
Juty 10, 2000
Page 2 of 2
Items needed:
1) ESC Plan: Need to identify a location for Concrete Truck washout
2) Sheet 2:
a) Need to show how the curb line is located at least 2' north of the most northerly power pole, per
Condition of Approval # 1 for the Design Deviation (Bill Johns' memo dated April 26, 2000). Power
Poles need to be indicated
b) Need offset distance for CB at cailout # 1
c) Should provide a standard plan reference or a detail callout for the "traffic candles" (callout #2). Has
this been coordinated with the County Traffic Engineer?
d) Stations for street lights should be indicated
e) Stations for change/transition from Type B curb (callout #5) to Type A curb (callout #6) should be
indicated
fl Need offset distance for pipe outlet at catlout #9
g) How is maintenance access provided to pipe outlet (callout #9)?
3) Sheet 3:
a) Taper should match callouts
b) Inbound tapers are typically 10:1, 100' minimum
4) Sheet 4:
a) Need station & offset distance for pipe outlet at callouts #3 
b) Curve data for C13?
5) Sheet 5:
a) Need station & offset distance for pipe outlet at callouts #3 	
6) Drainage Calculations:
a) Certification statement on basin map should be provided
b) Energy Grade Line analysis for pipe systems should be provided
c) Sub-basins need to match the basin map (e.g., Basin A)
d) Basin calcs need to show how the weighted C factor is calculated (e.g., Basin A)
e) Do the basi.n calcs include the sidewalk & curb in the impervious area?
f) "C" factor of 0.10 for Basin B(as an example) only works if those lots are kept in lawn. How does
that fit with the development plan? A typical lot development plan might be helpful in documenting
the assumed drainage surface factors
g) Pipe system calcs need to show how the assumed Q is obtained (e.g., Pipes C2+C+C5)
h) Grate calcs work if the 6" water depth doesn't obstruct the roadway. Need to maintain at least a 12'
clear lane centered on CL. Grates should be evaluated for the flows they actually receive
7) Per previous e-mail, alleys are private thoroughfares, and should be maintained by the Homeowners'
Association
8) Need to provide the O&M manual, to include Sinking Fund calcs for replacement of facilities located
outside the public R/W
9) Pavement Design: Need to include CBR test data & calculations, data used to convert CBR to Ivi~
10) 208 Lot Plans: Need to include a swale section detail for those lots with swales
i
,
S P O K A N E C O U N T Y
DMSIOIV OF ENGINEERING AND ROADS A DIVISION OF THE PUBLIC WORKS DEPARTMFNT
W'illiam A. Johns, P.E., County Engineer
May 1, 2000
Todd Whipple, P.E.
CLC Associates, Inc.
707 West 7`hAvenue Spokane, WA 99204
SUBJECT: P1859 - Dishman Commons
16" Avenue Cross-Section
Design Deviation Approval _
Gentlemen:
We have approved this request, with conditions: I am enclosing a copy of the approved Design
Deviation and the Conditions. Please ca11 Ed Parry ((509)477-3600) if there are any questions.
Sincerely,
William A. Johns, P.E.
Spokane County Engineer
. ,
~G .
~ard' J. Jr., P.E.
Plan Review Engineer .
1026 W. Broadway Ave. 9 Spokane, WA 99260-0170 •(509) 477-3600 FAX: (509) 477-7655 (2nd Floor) 477-7478 (3rd Floor) • TDD: (509) 477-7133
~
c
S P O K A N E C O U N T Y
DMSION OF ENGINEERING AND ROADS A DMSION OF THE PUBLIC WORKS DEPARTMENT
William A. Johns, P.E., County Engineer
MEMO
DATE: Apri126, 2000 • TO: File PE-1859, Dishman Commons, Deviation Request dated 3/14/2 0, 3of3
~
FROM: William Johns, County Engineer
RE: Conditions of Approval
1. Provide 2 feet from the face of the nearest pole on the south side to the street face of the curb.
2. Pave with ACP between the curb and existing ACP.
3. A type A curb may be used.
4. No maintenance of parlcing bays will be done by •Spokane County except for sweeping.
5. Drainage for the street and bays will be provided with standard 208 swales and drywells by the
developer. 6. Individual lot owners will be informed via a title notice filed by the devleoper,that the bays will not be
plowed of snow and a snow berm will be placed in the bays; that these are public parld.ng spaces; and
the parking bays may-be removed in the future for road expansion.
7. Maintenance of parking bays and vegetation will be by adjoining property owners.
1026 W. Broadway Ave. • Spokane, WA 99260-0170 •(509) 477-3600 EAX: (509) 477-7655 (2nd Floor) 477-7478 (3rd Floor) • TnD: (501)l 47-7133
. a 1_ ` . .
. . - - ~ ~7-e0
. .
REQUEST FOR DESIGN DEVIATION 3 $30.00 . ~3
DATE March 14, 2000
ROAD N~1ME (1) 16 th Ave. (.2) 17 th Lane '
. , CRP/RID, # .
NAME OF PLAT Dishman Comnons Plat # P1859
ADDRESS OF BLDG East of Dishman Mica on 16th Ave. . NAME OF BLDG PROJECT BLDG# B9 _ S T R
FEDERAL,/STATE PROJECT # . PROJECT LIMTTS
EXISTING CONDTTIONS: PROPOSED IMPROVEMENTS:
ROAD WIDTH . SEE ATTACHED _
ROAD SURFACE SF.F. ATTAGHF.n
AVG. DAII.Y TRAFFIC -
Current Traffic Count Design Year Traffic Count
PROJECT DESCRIPTION Resi dpnti al nl at wi th nerimeter imFrovemPnt to 16th Avenue and
interior private roads.
PROPOSED DESIGN DEVIATION (1) Curb extension and parking bays on 36th Avenue;
(7) s;dewalk location adiacent to nroDosed DarkinQ bavs on 16th Avenue Detailed design specifications are attached.
~~~~1 V GV
rvsTIFIcaTIorr: - MAR 1 4 2000
SEE ATTACHED
r
V t
3UBMTTTED By . Northwest Regional Facilitators (JIm Frank). DATE March 14, -2000
ADDRESS West 707 7th Ave., Spokane, WA. ZIP CODE 99204
?HONE # (509 )(+58-5860
A,DN1IIOSTRATIVE VARlANCE FEE OF $30.00 PAID 7^i0 SPOKANE COUNTY
1026 W BROADWAY, SPOKANE WA 99260-0170 PHONE (509)456-3600 FAX (509)324-3478
-REQ T WILL NOT BE REVIEWED WITHOUT FUNDS-
~AS # RECENED BY DATE 1~'~`~.1~
.
~ ~ . ~"j
,
-r.
, r
. •
DESIGN DEVIATION
.
;TAFF RECOMMENDATIONS . .
'-4- P-r'cc B%M M'&4 fl;~ c1~ t~•. C l~co aotT/ W I u- NoT M,Mtp[?'A-~ 'TIhS Atr~`1
CAW tItsT ~z u».E ry+.4~u-~4+r~Eb ~2) C~O~:~t,cT~ GJ j~~T~t~tr ~~~L~- ~Gtrw
w c4eav c~roS c64te d- 6a . C,~~ ~►~K~~.~ sPa~ LIxewY e1F, erco 491 MebeT'fro,
Yproved Approved wJconditions Not A proved
) ( ) ( . ~ , t i0 Dt!
' Project Manager Date
-
►pproved Approved w/conditio Not Approved
Planning & Traf6c Engineer Date Z5"Calvl idt C^'n/w e) 75V Gz.-
.pproved Approved w/conditions Not A,pproved ~ -
c/K ~ .
. Project Management En' eer Date
, .
pproved Approved w/condirions Not Approved
) ( ) ( ) ~,r~/ ~`e7/
Op rations Engineer Date
POKANE COUNTY ENG7NEER'S ETERMMATION:
. , .
pproved w/no conditions • Approved as recommended above bt e ~
~
) ' )
. - ~
_ ~ -
..Spoka Cou ' eer Date
i~
~