2008, 10-01 Permit App: 08003796 Greenhouse Project Number: 08003796 Inv: 1 Application Date: 10/1/2008 Page 1 of 2
THIS IS NOT A PERMIT
Penalties will be assessed for commencing work without a permit
Project Information: _. � _,.....
Permit Use: GREENHOUSE Contact: NORTHERN LIGHTS SUNROOM CREA
Address: 6211 S MEADOWLANE RD
C-S-Z: SPOKANE,WA 99224
Setbacks:Front Left: Right: Rear: Phone: (509)747-1110
Group Name:
Site Information Project Name
Plat Key: Name: Range District: East
Parcel Number: 45251.0113 Block: Lot:
SiteAddress: 1608 S VERA CREST DR Owner:Name: PERRIN,MICHAEL E
Address: 1608 S VERA CREST DR
Location::CSV VERADALE,WA 99037-9036
Zoning: R-4 SF Res Urban District
Water District: 010 VERA Hold: ❑
Area: .00 Acres Width: 0 Depth: 0 Right Of Way(ft): 0
Nbr of Bldgs: 0 Nbr of Dwellings: 0
Review Information: ;, � ,,,,. .n
Review
Building Plan Review Released By:
Originally Released: 9/25/2008 By: tmelbourn
Landuse/Zoning/HE Conditions Released By:
Originally Released: 10/1/2008 By: LBARLOW
Operator: JD Printed By: jmm Print Date: 10/1/2008
Project Number: 08003796 Inv: 1 Application Date: 10/1/2008 Page 2 of 2
THIS IS NOT A PERMIT
Penalties will be assessed for commencing work without a permit
Building Permit
Contractor: NORTHERN LIGHTS SUNROOM, Finn: NORTHERN LIGHTS SUNROOM,
Address: 25515 E.MOFFAT RD Phone: (509)747-1110
NEWMAN LAKE,WA 99025
This Application: Total Project:
Description Grp Type Notes Sq Ft Valuation Sq Ft Valuation
GARAGE U-1 VB GREEN 0 $30,750.66 0 $30,750.66
HOUSE
Totals: 0 $30,750.66 0 $30,750.66
Item Description Units Unit Desc Fee Amount
RESIDENTIAL PERMIT FEE 1 SELECT $451.85
WSBC SURCHARGE 1 SELECT $4.50
SF PLNS RVW<7999 SQ FT 1 SELECT $180.74
Permit Total Fees: $637.09
Notes• , , „. _._. mss, �,,.
Payment Summary: .,�. .,.
Permit Type Fee Amount Invoice Amount Amount Paid Amount Owing
Building Permit $637.09 $637.09 $0.00 $637.09
$637.09 $637.09 $0.00 $637.09
Disclaimer:
Submittal of this application certifies the owner(or person(s)authorized by the owner)has both examined and finds the information
contained within to be true and correct,and agrees that all provisions of laws and/or regulations governing this type of work will be
complied with. Subsequent issuance of a permit shall not be construed to be a permit for,or an approval of,any violation of any of
the provisions of the code or of any other state or local laws or ordinances.
Signature:
Operator: JD Printed By: jmm Print Date: 10/1/2008
�� 7
(Staff Use Only)-
�e PERMIT NUMBER: 3 / r-
r Eley PERMIT FEE:
CITY OF SPOKANE VALLEY
Community Development Department
Permit Center
11703 East Sprague Avenue, Suite B-3
Spokane Valley, WA 99206
Tel: (509) 688-0036
Fax: (509) 688-0037
permitcenterPspokanevalley.org
RESIDENTIAL CONSTRUCTION PERMIT APPLICATION
0 NEW CONSTRUCTION ►/ ADDITION/REMODEL 0 ACCESSORY BUILDING
0 DECK 0 OTHER
SITE ADDRESS:1608 S. VERACREST, SPOKANE VALLEY, WA 99037
ASSESSORS PARCEL NO.: LEGAL DESCRIPTION:
BUILDING OWNER NAME:MIKE AND HELEN PERRIN
NAME:MIKE AND HELEN PERRIN
ADDRESs:1608 S. VERACREST
CITY:SPOKANE VALLEY STATE:WA ZIP:99037
PHONE:509-924-8489 FAx: CELL:
CONTACT NAME:MIKE PERRIN
PHONE:509-924-8489 FAX: CELL:
CONTRACTOR NAME:NORTHERN LIGHTS SUNROOM CREATIONS LLC
MAILING ADDRESS:6211 S. MEADOWLANE RD.
CITY:SPOKANE STATE:WA ZIP:99224
PHONE:509-747-1110 FAx:509-621-0053 CELL:
CONTRACTOR LICENSE NO.:NORTHLS969CC EXPIRES:02/03/2010 CITY BUSINESS LICENSE
NO.:
DESCRIBE THE SCOPE OF WORK IN DETAIL AND INDICATE USE:
FOUNDATION WITH SLAB ON GRADE
BUILDING 9'-3-1/2"x 12-3-1/2"SUNROOM ATTACHED TO THE EXTERIOR OF HOME
BUILDING TO REMAIN INDEPENDENT OF HOME BY EXTERIOR DOOR PASSAGE
No ELECTRICAL OR HVAC
PROPOSED USE:
BUILDING TO BE USED AS GREENHOUSE FOR PLANTS
Effective October 28, 2007 Page 1 of 1
1-37T G
****YOU MUST COMPLETE THE FOLLOWING****
MARK N/A IF NOT APPLICABLE
Height to Peak:9'-11- Dimensions:9'-3- No. of Stories:1 Total Habitable
3/16" 1/2"X12'-3-1/2" Space:NA
Main Floor SQ FT:lQeUpper Floor SQ FT:NA Unfinished Basement Finished Basement
Mt SQ FT:NA SQ FT:NA
Garage SQ FT:NA Deck/Covered Patio Impervious Surface 30% Slopes on
SQ FT:NA Area:NA Property:NA
No. of Bedrooms:NA Construction Heat Source:NA Sewer or
Type:CONVENTIONAL Septic:SEWER
TOTAL COST OF PROJECT: $30750.66
DISCLAIMER
The permitted verifies,acknowledges and agrees by their signature that: 1) if this permit is for construction or on a dwelling,the dwelling is/will
be served by potable water. 2) Ownership of this City of Spokane Valley permit inure to the property owner. 3) The signatory is the property
owner or has permission to represent the property owner in this transaction. 4) All construction is to be done in full compliance with the City of
Spokane Valley Development code. Referenced codes are available for review at the City of Spokane Valley Permit Center. 5) The City of
Spokane Valley ' not a permit or approval for any violation of federal, state or local laws, codes or ordinances. 6) Plans or additional
information may'be requi to be subm' ed an. ,se. . tly approved before this application can be processed.
Signature i (.m Date:09/24/08
Method of payment: ❑ Cash ® Check ❑ Visa 0 Mastercard
Bankcard #: EXP: VIN#:
Authorized Signature:
Effective October 28, 2007 Page 2 of 2
ti..-.,.!.......... ....i.-..,...,-.u........,ia..,i.,�.��ir.......,....:�., n......i.......,...tin.............f.-ice......, ic..:u:....io...-:.t....F:�i r..... -.-..,.}:,...
For City Use Only
CITYpOF PLUS Project Number ) ; `-4 &
O�I ne Project Address
.y
400Valle O 11703 E Sprague Ave Suite B-3 ♦ Spokane Valley WA 99206
�/ 509.688.0036 ♦ Fax: 509.688.0037 ♦ permitcenter@spokanevalley.org
As part of our on-going commitment to customer service during the review process of your project
application, we are providing you with a TARGET DATE for the initial technical application review. If for
any reason we cannot meet this date, we will contact you with a revised target date.
Your application review TARGET DATE is
—f I . 1" a
I 1
The TARGET DATE is the date we estimate your project application will have had its initial technical
review. It is not the date for approval or permit issuance.
Tips for a Smoother Project Application Review
➢ Submit complete, accurate plans and documents.
Extra time may be required for re-submittals as project application reviewers work on multiple applications and it
may be several days before they can look at your new or revised information.
> Designate a specific contact person to communicate with the City.
While the person designated as the applicant's contact person with the City can be changed, one individual with the
expertise for dealing with reviewer comments would be the best choice for the entire review process.
➢ Call staff regarding the status of your project only after the target date shown at the top of the page.
Although you should be contacted on or by the target date,please feel free to contact us if you haven't heard from us
by your target date. Staff may contact you before the target date if the initial review is complete. By following this
procedure,you will save time and allow the reviewers to complete the work more expeditiously.
Steps in the Permit Process
1. Counter Complete. Your application has been accepted as counter complete. This means all of the required
documents,as indicated on your Pre-Application Checklist have been submitted or have been approved for deferred
submittal. This does not prevent technical staff from requesting additional information as a result of their technical review.
2. Quality Check. The next step in the process is a quality check to make sure that the application is reviewable and free
from substantive flaws that would prevent technical staff from completing the technical review once it is started. When
this step is complete, your application will be routed to the appropriate staff and remain in their review queue until it
comes up for review.
3. Technical Compliance. Once an application is administratively complete, it is routed to technical staff for compliance
review. Depending on the type of project, technical staff may include multiple reviewers. You should be contacted by
phone, fax, email,or mail by your TARGET DATE once the initial technical compliance review is complete.
4. Permit Issuance. When the technical compliance review of the application is complete, including any subsequent re
submittals, each reviewer will approve their section ofthe application and route it to the Permit Center. When all sections
of the application are received, a Permit Specialist will process the application and contact the person specified on your
application for permit pick-up. Information regarding fees and pre-construction meetings (if required) will be provided by
the Permit Specialist at that time.
WHITE-APPLICANT PINK-BUILDING FILE REV 9/07
Property Line
182.20'
34'+/-
Property Line 10'-8"
98.15' 41'-6"
120'+/- 30'-6" Deck
21'-5"
Driveway
33'-7"
Greenhouse
Addition
9'-3 1/2"x
12'-3 1/2" 28'-6" U
35'-5"
Arc 171.76'
14'-4" Chord 170.48'
Deck
236.91' Property Line
12'-5"
North Property Line 43'+/-
PL:
/-pL 'ED PLANNING DEPT. A 'PROVED
1608 S Vera Crest Drive
BY Plot Plan L.`
Scale: 1" =25' _
DA�, _ DATE: aj-- t og