2010, 01-20 Permit App: 10000140 Residence Project Number: 10000140 Inv: 1 Application Date: 1/20/2010 Page 1 of 3
THIS IS NOT A PERMIT
Penalties will be assessed for commencing work without a permit
Project Information:
Permit Use: NEW SFR W/ATT GARAGE ON SEWER Contact: ALL HIS HOMES,LLC
Address: 15320 E MARIETTA AVE#2
C-S-Z: SPOKANE VALLEY,WA 99216
Setbacks:Front Left: Right: Rear: Phone: (509)321-2822
Group Name:
Site Information Project Name
Plat Key: Name: Range District: Nort
Parcel Number: 45153.2904 Block: Lot:
SiteAddress: 506 N VERCLER RD Owner:Name: ALL HIS HOMES,LLC
Address: 15320 E MARIETTA AVE STE 2
Location::CSV SPOKANE VALLEY,WA 99216
Zoning: R-3 SF Res District
Water District: Hold: ❑
Area: 7,816 Sq Ft Width: 0 Depth: 0 Right Of Way(ft): 0
Nbr of Bldgs: 0 Nbr of Dwellings: 0
Review Information: " ..._,.,...
Review
Building Plan Review Released By:
Originally Released: 1/20/2010 By: tmelbourn
Landuse/Zoning/HE Conditions Released By:
Originally Released: 1/19/2010 By: tschmidt
Sewer Review Released By:
100000184
Originally Released: 1/19/2010 By: MTURBAK
Permits: 4aa` .1'l *cb, m ". ""... ,,,N.
Operator: jmm Printed By: jmm Print Date: 1/20/2010
Project Number: 10000140 Inv: 1 Application Date: 1/20/2010 Page 2 of 3
THIS IS NOT A PERMIT
Penalties will be assessed for commencing work without a permit
Building Permit
Contractor: HILINE HOMES OF SPOKANE Firm: HILINE HOMES OF SPOKANE
Address: 15320 E MARIETTA AVE#2 Phone: (509)710-0009
SPOKANE VALLEY,WA 99216
Building Characteristics
Group: R-3 Type: VB
Group: U-1 Type: VB
Total Area 1716
Building Height 12
Stories 1
Dwelling Units 1
This Application: Total Project:
Description Grp Type Notes Su Ft Valuation Su Ft Valuation
1&2 FAMILY R-3 VB FIRST 1,716 $169,798.20 1,716 $169,798.20
FLOOR
COV DECK R-3 VB 36 $540.00 36 $540.00
GAR WOOD U-1 VB ATTACHED 484 $9,196.00 484 $9,196.00
Totals: 2,236 $179,534.20 2,236 $179,534.20
Item Description Units Unit Desc Fee Amount
RESIDENTIAL PERMIT FEE 1 SELECT $1,441.75
WSBCC SURCHARGE 1 SELECT $4.50
SF PLNS RVW<7999 SQ FT 1 SELECT $576.70
Permit Total Fees: $2,022.95
Mechanical Permit
Contractor: HILINE HOMES OF SPOKANE Firm: HILINE HOMES OF SPOKANE
Address: 15320 E MARIETTA AVE#2 Phone: (509)710-0009
SPOKANE VALLEY,WA 99216
Item Description Units Unit Desc Fee Amount
GAS WATER HEATER 1 NUMBER OF $11.00
GAS APPLIANCE<=100,000BTU 1 NUMBER OF $13.00
GAS PIPING 2 #OF UNITS $2.00
HEAT PUMP OR A/C 0-3 TONS 1 NUMBER OF $13.00
VENTILATING FANS 1 DUCT 3 NUMBER OF $33.00
GAS LOG OR GAS INSERT 1 NUMBER OF $11.00
HOOD-TYPE II 1 NUMBER OF $11.00
GAS APPLIANCE-MISC. 1 NUMBER OF $11.00
Permit Total Fees: $105.00
Operator: jmm Printed By: jmm Print Date: 1/20/2010
Project Number: 10000140 Inv: 1 Application Date: 1/20/2010 Page 3 of 3
THIS IS NOT A PERMIT
Penalties will be assessed for commencing work without a permit
Plumbing Permit
Contractor: HILINE HOMES OF SPOKANE Firm: HILINE HOMES OF SPOKANE
Address: 15320 E MARIETTA AVE#2 Phone: (509)710-0009
SPOKANE VALLEY,WA 99216
Item Description Units Unit Desc Fee Amount
TOILETSBIDETS 2 NUMBER OF $12.00
SINKS 4 NUMBER OF $24.00
SHOWERS 1 NUMBER OF $6.00
TUBS 1 NUMBER OF $6.00
DISH WASHERS 1 NUMBER OF $6.00
GARBAGE DISPOSAL 1 NUMBER OF $6.00
CLOTHES WASHER 1 NUMBER OF $6.00
WATER PIPING-DWV 1 NUMBER OF $6.00
Permit Total Fees: $72.00
Notes: "Oq ;HEY gzeT'
Payment Summary: F. _ ..___=1m,,,. ,. .....z. ,,,..,.. .,.,.. :- "G.G. .N
Permit Type Fee Amount Invoice Amount Amount Paid Amount Owing
Building Permit $2,022.95 $2,022.95 $574.46 $1,448.49
Mechanical Permit $105.00 $105.00 $0.00 $105.00
Plumbing Permit $72.00 $72.00 $0.00 $72.00
$2,199.95 $2,199.95 $574.46 $1,625.49
Disclaimer:
Submittal of this application certifies the owner(or person(s)authorized by the owner)has both examined and finds the information
contained within to be true and correct,and agrees that all provisions of laws and/or regulations governing this type of work will be
complied with. Subsequent issuance of a permit shall not be construed to be a permit for,or an approval of,any violation of any of
the provisions of the code or of any other state or local laws or ordinances.
Signature:
Operator: jmm Printed By: jmm Print Date: 1/20/2010
` Permit Center
iiii 11703E Sprague Ave, Suite B-3 PERMIT NUMBER: IC- 4 0
Skane Spokane Valley,WA 99206 PERMIT FEE:
400*Valleyt (509)688-0036 FAX: (509)688-0037
www.spokanevalley.org
Community Development
Residential Construction XI New Construction Accessory Bldg
Permit Application Addition/Remodel Deck
Other:
SITE ADDRESS: -<04.1 Al VL/'c,I e✓- gd . S po kavi c. Ua I ie y0 W,9-, Ci q 2 i 4.1
ASSESSORS PARCEL NO: 41515 3 , 2 0L-/ LEGAL DESCRIPTION:
Contractor: `
Building`Owners: `r
Name: ALL y/S gOmL- s LLG Name: RLI- HAS 00016.5 LLC
Address./5320 t, Met ,e 4-fes A-v l: 2_ Address:/3-3 ,, j, 11/ars r-tl-C:_ Ave. k 2
City: c-._�e Kai ht �/Ll t,1 State:ihl/I- Zip:q c(Z/ , City: 5 pc 4_, l,/�46 Le.e.,„ State: w Zipei Z I
Phone: ! Fax: Phone:3- a I Fax:
'v9 -3L/ -1-V 2 z Sol -3Z 1-�62t U 5 -3? 1 -2t3 z-L a`) -32. 1 -ZnZ,-/
Contractor Lic No: Exp Date:
frkaznlN59PkII Yid//z/a0/1
Contact Person City Business Lic.No: o %1.P./ 7
Name: -3)0n✓ /<0 t c:- Az-
Phone:
Phone: SO ci -.32..1 — 2_.v-1--2-
Describe the scope of work in detail: Cost of Project: $ 4--5-) 0 O n
*-
34,1," 'i 5,'.74 /c •C4.-7, `/y r. s,`d,c,1-;a / h,.•:s,e v,, )14,'J Lt % ,
Proposed Use: S;hy`e Ani ,' /7 /wine .
**************The following MUST be complete: (write N/A if not applicable)**********************
HEIGHT TO PEAK:1DIMENSIONS:
f 3� , 1
#OF STORIES: TOTAL HABITABLE SPACE:
1 , . / 71G•
MAIN FLOOR TO SQ. 2Nu FLOOR SQ. FTG: UNFIN BASEMENT SQ. FTG: IMPERVIOUS SURFACE
FTG: AREA:
/7/4 6 rte ✓— � 4 , C/ao
FINISHED BASEMENT GARAGE SQ. FTG: DEC /COV. P'TIO Q. FTG: 30% SLOPES ON
SQ. FTG: �//4 6A1/ O (` PROPERTY: N/4
#OF BEDRO MS: 3 CONSTRUCTION TYPE: HEA- '•URCE:- SEWER OR SEPTIC?
n
taVol3 in e ci /,✓/;<7-,4�e, ,- 4 d1-5 5 e Lk:r
The permitee verifies,acknowledges and agrees by their signature that: 1) If this permit is for construction of or on a dwelling,the
dwelling is/will be served by potable water. 2) Ownership of this City of Spokane Valley Permit inure to the property owner. 3) The
signatory is the property owner or has permission to represent the property owner in this transaction. 4) All construction is to be done
in full compliance with the City of Spokane Valley Development Code. Referenced codes are available for review at the City of
Spokane Valley Permit Center. 5) This City of Spokane Valley Permit is not a permit or approval for any violation of federal, state or
local laws,codes or ordinances.6) Plans or additional information may be required to be submitted,and subsequently approved before
this application can be processed.
SIGNATURE: /0..,,-, 1c-e, DATE: //T/fv
-V
Method of Payment:
❑ Cash Eiheck ❑ Mastercard ❑ VISA t
Bankcard#: Expires: VIN#: IAM II 2010
Authorized Signature:
REVISED 2115/07 .-_..-.
Permit Center
• Sfokane11703 E Sprague Ave,Suite B-3 PERMIT NUMBER:
j�''^ Spokane Valley, 99206
rllllcyx (509)688-0036 FAX:(509)688-0037 PERMIT FEE:
permitcenter@spokanevalley.org
Community Development
Plumbing Permit Application I ] Commercial Residential
SITE ADDRESS: _ 5060 i(). Vbe c.-1 � ln
ed, 5eoK«rtC lki 1I,/ W 4 %�}q;21
Building Owner pj, /41.5 /ItO m e'S LLL
Fax:(6-61/�41,1_ fcl`5 M.Anl� 1-1.e:� Phone:(.5a�)3l/ -2€"2 Z F
Name: :311-.1$ y
Address: City: State: Zip:
Contractor A_1. h /S J OM t
Name: IY,j Phone: Fax:
,9u 1�iS /�i�/Y/A£S �� 3Z/ ,l�z� ( f..,9) 3z 1- 2,r2 Y
Address: Ave 14 2 City SGt,1tr.+� ✓til/cy State: Zip: q C ZI
/532C �. 19�.+riC /t`i 1 /
License No: City Business Lic:
vz yyti 7g 5:krE
Contact/Project Manager:'—D0 Ali KLJLc-Z.—'
Name: 4)t'/%-) Kin e•-2-- Phone: q, — 3 Z 1 — �$ Z.�
#OF UNITS
PLUMBING FIXTURE ON A TRAP
TOILETS —
'2,
URINALS
—
TUBS — X '
SHOWERS(per trap) I
—
Lav/Basins,Bar,Floor,Kitchen,Laundry,Utility,Janitor,Photo,X-ray,Food, Lf
SINKS Prep/Culinary Meat —
I
DISHWASHER —
CLOTHES WASHER — I
GARBAGE DISPOSAL
—
WATER SOFTNER —
FLOOR DRAIN Area,Case,Coil,Trench,Condensate —
ROOF DRAIN/OVERFLOW DRAINS
—
FOUNTAIN,DRINKING —
WATER PIPING/DRAIN-IN WASTE Installation,Alterations,Repair,Reversals _
WATER USING DEVICE Ice and/or Coffee maker,hose bib,steamer proofer,carbonator,swamp cooler —
PRIVATE SEWAGE DISPOSAL SYSTEM --
WATER HEATER If Gas,See Mechanical
INDUSTRIAL WASTE PRETREATEMENT
INCEPTORS Including traps,vents except kitchen type grease interceptors functioning as fixture traps
REPAIR OR ALTERATION Water piping,drainage or vent piping —
ATMOSPHERIC TYPE VACUUM BREAKER
BACK FLOW PROTECTIVE DEVICE Other than atmospheric type vacuum breakers
MEDICAL GAS —
INCEPTORS —
DCASH 0 CHECK 0 VISA 0 MC EXPIRES:
4141‘.-a 0,.'t.:'ei
Card# VIN:
SIGNATURE:
CURRENT FEES AVAILABLE AT:http://www.spokanevalley.orq/under the quick links for Forms,Master Fee Schedule.
http://www.spokanevalley.org/uploads/Community_Development/Documents/Forms/Building/PlumbingPermitAppl ication040309.doc
• f\ Permit Center
S+ Ore ` 11703E Sprague Ave,Suite B-3
P Spokane Valley,WA 99206 PERMIT NUMBER:
Walley (509)688-0036 FAX:(509)688-0037 PERMIT FEE:
Community Development permitcenter@s_pokanevallev.org
Mechanical Permit Application n Commercial 1 Residential
SITE ADDRESS: 5 A). V ^[',1 r e d. 5 rc V a.l G-e/ [.U�-- /1_1
Building OwnerA/40.„ L 1"f l S h�ct m t S' L
Name: /4/5 / i P5 LLL Phone:5,> ,34i Fax: - 3 z) - ?Z kt
Address:/532_0 E-. Ina✓i c era hit R- y City: State: Zip: ` 714
Sok:, w4 . Digi
Contractor
Name: Phone: Fax:_
A-GLih5 Ate: ... s ! 3z/ 2, z - Z/.Zr?LZ
Address: City: I _ State: x Zip: ct,Z�
/S3Zv 6. Ij'du r;r� /�-u 6' �� o Y�'� �l"'7 (.✓
License No: 6 v 2 „ 9 lilt --7q$ City Business Lie: O Z -9 y y-7c'
Contact/Project:Manager:
Name: /Do A.; K UL L Phone: 0 , �—
#UNITS
FURNACES&SUSPENDED HEATERS-INSTALLATION OR RELOCATION Up to&including 100,000 BTU
FURNACES&SUSPENDED HEATERS-INSTALLATION OR RELOCATION Over 100,000 BTU
DUCT WORK SYSTEM
HEAT PUMP/AIR CONDITIONER 0-3 TON
AIR CONDITIONER Over 3-15 TON
AIR CONDITIONER Over 15-30 TON
AIR CONDITIONER Over 30-50 TON
AIR CONDITIONER Over 50 TON
GAS WATER HEATER
GAS PIPING SYSTEM(each outlet) 2
GAS LOG,FIREPLACE,&GAS INSERT
APPLIANCE VENTS INSTALLATION,RELOCATION,REPLACEMENT
REPAIRS OR ADDITIONS
BOILER,COMPRESSORS,ABSORPTIONS SYSTEM 0 to 3 hp-100,000 BTU or less
BOILER,COMPRESSORS,ABSORPTIONS SYSTEM Over 3-15 hp-100,001 to 500,000 BTU
BOILER,COMPRESSORS,ABSORPTIONS SYSTEM Over 15-30 hp -500,001 to 1,000,000 BTU
BOILER,COMPRESSORS,ABSORPTIONS SYSTEM Over 30 hp-1,000,001 to 1,750,000 BTU
BOILER,COMPRESSORS,ABSORPTIONS SYSTEM Over 50 hp-over 1,750,000 BTU
AIR HANDLER(DOES NOT include ducting) Each unit up to 10,000 cfm,including ducts
AIR HANDLER(DOES NOT include ducting) Each unit over 10,000 cfm
EVAPORATIVE COOLERS(other than portables)
VENTILATION AND EXHAUST Each fan connected to a singe duct 3
VENTILATION AND EXHAUST Each ventilation system
VENTILATION AND EXHAUST Each hood served by mechanical exhaust
INCINERATORS Installation or relocation of residential
INCINERATORS Installation or relocation of commercial
APPLIANCES Range,Clothes Washer
UNLISTED APPLIANCES Under 400,000 BTU
UNLISTED APPLIANCES Over 400,000 BTU
HOOD Type I
HOOD Type II
L P STORAGE TANK
—
WOOD OR PELLET STOVE INSERT
_WOOD STOVE SYSTEM-FREE STANDING
EXPIRES: VIN:
❑CASH ❑CHECK ❑VISA ❑MC
CARD#: SIGNATURE
http://www.spokanevalley.org/uploads/Community_Development/Documents/Forms/Building/MechanicalPermitApplication040309.clot
S r,4e- P\cw, Foc V\L-on.c \-Vo vv\eS
Ma;\\‘,1 Adkfe.cc : l532() iz. S110,(\ettek, Pve- Su\-e_ 2 Scokavte_ lIct\\1 ctc(21(
.P\,ov\e- I : DOA K tC.Z ScCt-321- 2122
Sc+e.. /Ms ; 5o(o N Vecc\ex g), scol�arie.ga\\.e. gR2llo
PacCe-\ ; L\5 tS 3.2ctQL
Pru ter*' Scre- Foy+ e ; —VII t
S
o Scale--
":--
_<---Z--- " 20i
A 1
2o'
{ 12� > --1%-r9 '
\o il ("1d tpi
IS
0 r"\v e_ to u
-n—t — —
®rowel 281
WS
< q5" >
N Vest_ter I
For City Use Only
CITY OF PLUS Project Number JO — f L/0
pokane Project Address
ValleY®
11703 E Sprague Ave Suite B-3 • Spokane Valley WA 99206
509.688.0036 ♦ Fax: 509.688.0037 ♦ permitcenter@spokanevalley.org
As part of our on-going commitment to customer service during the review process of your project
application, we are providing you with a TARGET DATE for the initial technical application review. If for
any reason we cannot meet this date, we will contact you with a revised target date.
Your application review TARGET DATE is F { '
The TARGET DATE is the date we estimate your project application will have had its initial technical
review. It is not the date for approval or permit issuance.
Tips for a Smoother Project Application Review
➢ Submit complete, accurate plans and documents.
Extra time may be required for re-submittals as project application reviewers work on multiple applications and it
may be several days before they can look at your new or revised information.
➢ Designate a specific contact person to communicate with the City.
While the person designated as the applicant's contact person with the City can be changed, one individual with the
expertise for dealing with reviewer comments would be the best choice for the entire review process.
➢ Call staff regarding the status of your project only after the target date shown at the top of the page.
Although you should be contacted on or by the target date,please feel free to contact us if you haven't heard from us
by your target date. Staff may contact you before the target date if the initial review is complete. By following this
procedure,you will save time and allow the reviewers to complete the work more expeditiously.
Steps in the Permit Process
1. Counter Complete. Your application has been accepted as counter complete. This means all of the required
documents, as indicated on your Pre-Application Checklist have been submitted or have been approved for deferred
submittal. This does not prevent technical staff from requesting additional information as a result of their technical review.
2. Quality Check. The next step in the process is a quality check to make sure that the application is reviewable and free
from substantive flaws that would prevent technical staff from completing the technical review once it is started. When
this step is complete, your application will be routed to the appropriate staff and remain in their review queue until it
comes up for review.
3. Technical Compliance. Once an application is administratively complete, it is routed to technical staff for compliance
review. Depending on the type of project, technical staff may include multiple reviewers. You should be contacted by
phone,fax, email,or mail by your TARGET DATE once the initial technical compliance review is complete.
4. Permit Issuance. When the technical compliance review of the application is complete, including any subsequent re-
submittals, each reviewer will approve their section of the application and route it to the Permit Center. When all sections
of the application are received, a Permit Specialist will process the application and contact the person specified on your
application for permit pick-up. Information regarding fees and pre-construction meetings (if required) will be provided by
the Permit Specialist at that time.
WHITE—APPLICANT PINK—BUILDING FILE REV 9/07
y
506 N. Vercler
45153:2903
1 /
451531904 1 45153.1803
' J Cita G]E V L3 11.L4i1
—
_.
L
;PI 00 — .. .
s
I," 4.',*:''.-
fill
ri y t '.'3',„^---,.--
73
45153:2905
ICL
22.1 0 11.07 22.1 Feet This map is a user generated static output from an
i Im , Internet mapping site and is for reference only.
Data layers that appear on this map may or may
0 not be accurate,current,or otherwise reliable.