Loading...
The URL can be used to link to this page
Your browser does not support the video tag.
2008, 03-24 Permit App: 08000903 Deck Cover, Patio
Project Number: 08000903 Inv: 1 Application Date: 3/24/2008 Page 1 of 2 THIS IS NOT A PERMIT Penalties will be assessed for commencing work without a permit Project Information: Permit Use: COVER EXISTING DECK AND PATIO Contact: DOBSON,KRISTI A Address: 3318 S VERCLER DR C-S-Z: SPOKANE VALLEY,WA 99206 Setbacks:Front Left: Right: Rear: Phone: (509)928-0723 Group Name: Project Name: Site Information: xA. p � � , � . •:. ;, g._.R 3 Plat Key: 005828 Name: MIDILOME EAST 01ST ADD District: Sout Parcel Number: 45342.0210 Block: Lot: SiteAddress: 3318 S VERCLER DR Owner:Name: DOBSON,KRISTI A Address: 3318 S VERCLER DR Location::CSV SPOKANE VALLEY,WA 99206 Zoning: CF Community Facilities Water District: 007 MODEL Hold: ❑ Area: 15,965 Sq Ft Width: 79 Depth: 156 Right Of Way(ft): 50 Nbr of Bldgs: 1 Nbr of Dwellings: 1 Review Information: umalmwei.ev.,„ussimmamlov e<. ..� Review Building Plan Review Released gy „ A° Originally Released: 3/24/2008 By: tmelbourn Landuse/Zoning/HE Conditions Released Br 4 Originally Released: 3/17/2008 By: CJJANSSE Operator: jmm Printed By: jmm Print Date: 3/24/2008 Project Number: 08000903 Inv: 1 Application Date: 3/24/2008 Page 2 of 2 THIS IS NOT A PERMIT Penalties will be assessed for commencing work without a permit Building Permit Contractor: OWNER Firm: OWNER Phone: (000)000-0000 This Application: Total Project: Description Grp Type Notes Sq Ft Valuation Si Ft Valuation COV DECK R-3 VB COVER 320 $4,800.00 320 $4,800.00 DECK/PATI 0 Totals: 320 $4,800.00 320 $4,800.00 Item Description Units Unit Desc Fee Amount RESIDENTIAL PERMIT FEE 1 SELECT $111.25 WSBC SURCHARGE 1 SELECT $4.50 SF PLNS RVW<7999 SQ FT 1 SELECT $44.50 Permit Total Fees: $160.25 Notes: .IAx o ,. ._ : � � _.;_:.- DO NOT ISSUE SEWER PERMITS WITHOUT APPROVAL OF UTILITIES PER ROGER 12/3/97 OK TO ISSUE SEWER PERMITS FOR PORTIONS OF PLAT-SEE MAP IN PLAT FILE PER BILLY 4/24/98 OK TO ISSUE SEWER PERMIT FOR LOT 2-BLOCK 3 ONLY PER MIKE FLUGEL 9/30/98 Payment Summary• Permit Type Fee Amount Invoice Amount Amount Paid Amount Owing Building Permit $160.25 $160.25 $0.00 $160.25 $160.25 $160.25 $0.00 $160.25 Disclaimer: Submittal of this application certifies the owner(or person(s)authorized by the owner)has both examined and finds the information contained within to be true and correct,and agrees that all provisions of laws and/or regulations governing this type of work will be complied with. Subsequent issuance of a permit shall not be construed to be a permit for,or an approval of,any violation of any of the provisions of the code or of any other state or local laws or ordinances. Signature: Operator: jmm Printed By: jmm Print Date: 3/24/2008 Permit Center Scof 11703 E Sprague Ave, Suite B-3 PERMIT NUMBER: ,� %Gf 7 pokmane Spokane Valley,WA 997,06---, 51 ,...47PERMIT FEE: „ Valley (509)688-0036 FAX (509)68870 � . wtivw.spokanev llev.org �� C1 Community Development As Residential Construction 1 New Construction Accessory Bldg Permit Application Fy �� ~ ddition/Remodel k Deck/CcYe,- al X Other: beck Corer SITE ADDRESS: 33/6) f er I er 1)i ASSESSORS PARCEL NO: LEGAL DESCRIPTION: Building Owner: Contractor: Name: k,r;s 44 3 Nips, Name: Address: 33,e s vera cr DR. Address: City: �po,e-ar� State:, -- Zip: Z0(r City: State: Zip: Phone: 1 Fax: - Phone: Fax: ice._®'7)3 Contractor Lic No: Exp Date: Contact Person City Business Lic.No: Name: ` -cc--- 06S0,,.. Phone: 9? -5-832 Describe the scope of work in detail: Cost of Project: $ 13 00 --Tb Cover- o.,(" e..)c;si-,yam Decd cr.-4 pd o, Proposed Use: /‘/A **************The following MUST be complete: (write N/A if not applicable)********************** HEIGHT TO PEAK: DIMENSIONS: #OF STORIES: TOTAL HABITABLE SPACE: MAIN FLOOR TO SQ. 2"" FLOOR SQ. FTG: UNFIN BASEMENT SQ. FTG: IMPERVIOUS SURFACE FTG: AREA: FINISHED BASEMENT GARAGE SQ. FTG: D K/COV. PATIO Q. FTG: 30% SLOPES ON SQ. FTG: 3Lo PROPERTY: #OF BEDROOMS: CONSTRUCTION TYPE: EATS URCE: SEWER OR SEPTIC? The permitee verifies,acknowledges and agrees by their signature that: 1) If this permit is for construction of or on a dwelling,the dwelling is/will be served by potable water. 2) Ownership of this City of Spokane Valley Permit inure to the property owner. 3) The signatory is the property owner or has permission to represent the property owner in this transaction. 4) All construction is to be done in full compliance with the City of Spokane Valley Development Code. Referenced codes are available for review at the City of Spokane Valley Permit Center. 5) This City of Spokane Valley Permit is not a permit or approval for any violation of federal,state or local laws, codes or ordinances.6) Plans or additional information may be required to be submitted, and subsequently approved before this application can be processed. SIGNATURE: •__..Y 12 DATE: Method of Payment: ❑ Cash El Check 0 Mastercard El VISA Bankcard#: Expires: VIN#: Authorized Signature: REVISED 2/15/07 SCITYOne 11703E Sprague Ave Suite B-3♦ Spokane Valley WA 99206 Ore ♦509.688.0036 ♦ Fax: 509.688.0037 • 4 °Valley © Completed Building and Mechanical Application with: Accurate address, Parcel Number and/or Legal Description, description of work, owner and contractor information, signature and date. ❑X Three (3) sets of plans including Site Plan, elevations, floor plans, foundation plans with details, roof plan, framing plans and details. ❑X Show the height of any proposed buildings or accessory structures. © Floor plan for each floor: Dimension to scale(minimum 1/8") and label each room (including sq footage of house and garage on plans) show each level of existing house and square footage of any additions. . © Egress windows: Provide at least one window or exterior door approved for emergency escape or rescue from basement and in every room for sleeping. © Floor framing details: Joist type, size, spacing and installation details. MX Roof framing plan and details © Furnace and hot water heater location MX All header locations: type, size and connections ❑X Foundation plan ❑X Insulation information © Decks and Stairway details All braced wall panel types: show locations and details of installation, including engineered design Smoke detector locations 22" x 30" attic access location 18" x 24" crawl space access One-hour separation detail: between house and garage Project New project Previous pre-app meeting ❑ Ar'liCITY Wu i1011°11°°NllIlltkk °KaneTransmittal Plan revisions ❑ City of Spokane Valley Transmittal Date: .0,00Valley Community Development Friday,March 14,2008 Department 11703 E.Sprague Ave,Suite B3 Spokane Valley,WA 99206 Phone:509.688.0036 Site Address: 3318 S VERCLER DR Project Number: 08000903 Parcel Number: 45342.0210 Zoning: CF Water District: MODEL Fire District: FD 01 Applicant: DOBSON, KRISTI A Owner: DOBSON, KRISTI A 3318 S VERCLER DR 3318 S VERCLER DR SPOKANE VALLEY, WA 99206 SPOKANE VALLEY, WA 99206 (509) 928-0723 e-mail: e-mail: Contact: DOBSON, KRISTI A Occupant: 3318 S VERCLER DR SPOKANE VALLEY, WA 99206 e-mail: (509) 928-0723 e-mail: D s r �'�!�7 i ri- Contractor: OWNER Arch/Engineer: l ( ) 0 LD e-mail: QI U IU LL 11-1 1 Project COVER EXISTING DECK AND PATIO Description: Building Landuse Engineer Utilities Health Fire Dist Assessor APPLICATION k CONSTRUCTION PLANS SITE PLAN TDS \ \ Please send all plan review and project comments via e-mail to the highlighted individuals. For City Use_Only_ CITY OF pone PLUS Project Number ;-Project Address 3\ J arc. �/ 4 •vV alle ° y 11703 E Sprague Ave Suite B-3 • Spokane Valley WA 99206 509.688.0036 ♦ Fax: 509.688.0037 ♦ permitcenter@spokanevalley.org As part of our on-going commitment to customer service during the review process of your project application, we are providing you with a TARGET DATE for the initial technical application review. If for any reason we cannot meet this date, we will contact you with a revised target date. --, Your application review TARGET DATE is j I LLD The TARGET DATE is the date we estimate your project application will have had its initial technical review. It is not the date for approval or permit issuance. 4 Tips for a Smoother Project Application Review ➢ Submit complete, accurate plans and documents. Extra time may be required for re-submittals as project application reviewers work on multiple applications and it may be several days before they can look at your new or revised information. ➢ Designate a specific contact person to communicate with the City. While the person designated as the applicant's contact person with the City can be changed, one individual with the expertise for dealing with reviewer comments would be the best choice for the entire review process. ➢ Call staff regarding the status of your project only after the target date shown at the top of the page. Although you should be contacted on or by the target date,please feel free to contact us if you haven't heard from us by your target date. Staff may contact you before the target date if the initial review is complete. By following this procedure,you will save time and allow the reviewers to complete the work more expeditiously. f Steps in the Permit Process 1. Counter Complete. Your application has been accepted as counter complete. This means all of the required documents,as indicated on your Pre-Application Checklist have been submitted or have been approved for deferred submittal. This does not prevent technical staff from requesting additional information as a result of their technical review. I 2. Quality Check. The next step in the process is a quality check to make sure that the application is reviewable and free from substantive flaws that would prevent technical staff from completing the technical review once it is started. When this step is complete, your application will be routed to the appropriate staff and remain in their review queue until it comes up for review. 3. Technical Compliance. Once an application is administratively complete, it is routed to technical staff for compliance I review. Depending on the type of project, technical staff may include multiple reviewers. You should be contacted by phone,fax, email,or mail by your TARGET DATE once the initial technical compliance review is complete. 4. Permit Issuance. When the technical compliance review of the application is complete, including any subsequent re- submittals, each reviewer will approve their section of the application and route it to the Permit Center. When all sections of the application are received, a Permit Specialist will process the application and contact the person specified on your application for permit pick-up. Information regarding fees and pre-construction meetings (if required) will be provided by the Permit Specialist at that time. WHITE-APPLICANT PINK-BUILDING FILE REV 9/07 . . 0 v 1 , (4. If' C ea '- 4 Forott ell e•/------'-------.. ac., cr col-to/box 1 -;„, ...................1.. a-- covv. ""1/44ft,,,t)srisimemais. _ 11 ha. 1 PLANNING DEPT. APPROV Ip4t.44 o. / iBY . Z I DATE: 3( I�- ( Ou I \Lw a ex- „v" 47-------4.1.1 . 2.:.. .....5 1 frx;s4-,NeNt teg.t. ri Rod- I '1 t‘(A, %ft"'"--\ I \. ci I I tj --- V,. :. i_______ cru 7 1 it) I '''''''n 4 r41 mi ._ _ , erfer4-7: rs r .k_ aCettl- b't t f.., 1,A c..)" ? ;1-7, 0bO - A Ar) • , — 43 A --6-' f.' gel 1 4._ 1 i)Or*St#4 M 1-,,,,,t ° I cr ettig•tb,04, 1 -4Empoemsoll111..gli4111M11 i %=''' h..... 4 ctovv. --...,.„:61„... ri.m.m. 1i I (:).0,- o I I I i i , .4 -,meg 13 .6(:S.4-IrNil ' te4V.., a ' A, k POP I&/ d 1►mac. ' la 4)( Ck' 5 t II 1t40 - cs. - ,..--?:. 4 \ er4retiry , 1 .,'...„, ',.. la et4''' "e" froref-1-1 { ., . , 1),(--ko.re., Livai i A ni Ob0 11 Roofing material . Sheathing ir` // 7.4 7`T, I Rafter size x See / spacing _ details I _ 2x blocking A s-L rte! Beam size x House _ /1°." 14ft maximum wall Post size b x C" (4 x 4 minimum) spacing 16 (6 x 6 recommended) Pre-engineered bracket DES► tED Foe LIN.:F--7 g!Tei / 21" minimum depth wimiiiil / 18" minimum width /� Existing °\ ,, rafters Continuous 2x ledger Existing anchor bylagscrews wall 2x blocking .t..... _►► , Approved hanger ... ...... _. ._ ,_ ._. ,A iii%New rafter Ne rafter to Existing existing bearing �' wall L L y Approved metal bracing Bracing required id ,,....2 -1. , „: 25 ' -) ',-•'..,,.',', ' •-;:,,, ,,,,- 01 .., . . ;,,,/-:: • „, ,, ,. .. ,.. . .. ,.,•' . ... p p, ...' • • . . . .. • ,,r, . ..,.._.,,,• ,...., 1 .,..., . ,,,,-,• • , .;,,,,, i,-- ,.,,,,,, t 0 ,to / : c), ''. “.•.- 1 •e, .. . .. • ...••.. - _ • .... .. .. ,..• . . . ....... _. ..._. . .. .. . ..,. . .. .. , ,.. ...„ 9 . . . ., . . •. ........ .. ..• . .. . ......._• • . tx$1 r) 1--)". .. . • r . '' ' ' - .- , • , ,, „. •,. •• , •, , ...,, , .:., „ _., R 4 ''"'"""............w• . . . • . „,,,,, ,,),1 , , ...........„ . . . . -,,dttls, tl s+ A , , ....,, 1, I ,,.. v , (-J.- 4- .... . . . . A., ts 0 I , 0, ....+-"'"4,,,,,,,,..,,,t,,,,,,,,,,,,,......., .. it". fier0.11101.01.01004111.1101•10•1041.01.11.1110.10W0. ' ....- ..ft t 4 t No, 1 Cr ,.. A) 1 ., ft jet--d-S1.2 'FoAci rvi (> )_3 ill 1.1.E. —Dr,' ),rD Gs--)9 Q '--)os ---d 0 • ii , ,... , , .... r --- lr'ri irr-Iti ) I ..i. .,_................._................k....................... . . . . t 46, .11•••••••11.111111•••=1, 4Z.. I .....„, wr,p9 ( c a -x /...--L) • , -4 C • S ,.... v ... . ... no . •• A ,„...i.. : ilkAl 1" .•..... - —11. ite___,.............. .1/4/0........017.1••••}4.1.•••••••30.1..11.1....................44.......4.........................m.,..... ....-*,.. et...... • . 4 j _ LUMBERMENS ., .__ril_ SPOKANE i4l+i 1 FI A ® ALanogaCompany 11310 E MONTGOMER' AVE SPOKANE, WA 99206-4 (50' .924-2420 ******************* INVOICE#: 489449 * ESTIMATE * DATE 3/15/2007 PAGE: I ACCOUNT: 19-0 0 0027 '01 **************** .* 10:27 AM -- - C 0 D RETAIL S JEFF O H L I D P T HOUSE COD T 0 0 a T COCO SELLING 19 SHIPPING 1 SALES 1935 CHRIS M. 489449-00 c cm o STORE STORE PERSON 111111111111111111111111111111111111111111111111111111111111 CUSTOMER `.D FO# TERMS 10TH NXT MTH H <D IT EXTENDED QUANTIFY OUANTOY Umd UN ITEM DESCRIPTION UNIT PRICE CD ORDERED SHIT FED 13 EA 058716 7/16 4X8 OSP . 416MSF 215. 00 89. 44 T co o 1 EA 2KDL21216 2X12 16' 28BTR FIR/LARCH KD . 032MBF 503. 00 16. 10 T z 2 EA 2131144 ACES 6X POST TIE END PLATE 2EA 3.29 6.58 T 0 2 EA 2GF60614 6X6 14' 20TR GRN FIR .084t1BF 1386.00 116. 42 T o 9 EA SL521224 2X12 24' SELCT STRUCTURE . 432MBF 1398.00 603. 94 T 2 16 EA 2131319 LSSU-210 FIELD SKEWABLE HANGE 3 16EA 5. 69 91.04 T 0 17 LF GLB515 5-1/8"X15" GLULAM 17LF 14. 43 245. 31 T 1/17' IS 6L-3-1-6 **RECEIVE AS ROA** ** CASH ON DELIVERY ** Expires: 3/22/2007 t CUSTOMER SIGNATURE DATE NET SALE TAXABLE SALE TAX% TAX TOTAL \ DELIVERED # f),:,:-, K DELIVERED BY 1168. 82 1168.83 8.612 100. 52 1,269. 35 f 1EV 10/04 s PROVIDE DIAGRAMS AND ENGINEERING LAYOUTS FOR ROOF TRUSSES, BEAMS AND FLOOR SYSTEMS PRIOR TO FRAMING INSPECTIONS CITY COPY THIS BUILDING SUBJECT TO FIELD INSPECTION CORRECTIONS 1, ley REVIEWED FOR CODE COMPLIANCE SPOKANE VALLEY B ILDING SION r 2 cer