2009, 11-16 Permit App: 09003675 Remodel Project Number: 09003675 Inv: 1 Application Date: 11/16/2009 Page 1 of 2
THIS IS NOT A PERMIT
Penalties will be assessed for commencing work without a permit
Project Information:
Permit Use: REMODEL BASEMENT Contact: VEZEAU,M&MASSICOTTE-VAZEA
Address: 3729 S VERCLER LN
C-S-Z: SPOKANE VALLEY,WA 99206
Setbacks:Front Left: Right: Rear: Phone: (509)474-9481
Group Name:
Project Name:
Site In ormation
Plat Key: Name: Range District: Sout
Parcel Number: 45342.3008 Block: Lot:
SiteAddress: 3729 5 VERCLER LN Owner:Name: VEZEAU,M&MASSICOTTE-VA
Address: 3729 S VERCLER LN
Location::CSV SPOKANE VALLEY,WA 99206
Zoning: R-3 SF Res District
Water District: 007 MODEL Hold: ❑
Area: 9,117 Sq Ft Width: 0 Depth: 0 Right Of Way(ft): 0
Nbr of Bldgs: 0 Nbr of Dwellings: 0
Review Information: , � , . .. o ... .. ;: . 'er.... . ..,. ,
Review
1
Building Plan Review i Released By:
Originally Released: 11/13/2009 By: tmelbourn
Permits: ...� .Y ��.. ,.. .. �..,.. _..�... , . .. ... . . w..� ...... . ...:;�= bA
Building Permit
Contractor: OWNER Firm: OWNER
Phone: (000)000-0000
This Application: Total Project:
Description Grp Type Notes Sq Ft Valuation So Ft Valuation
BASEMENT R R-3 VB BASEMENT 0 $3,700.00 0 $3,700.00
REMODEL
Totals: 0 $3,700.00 0 $3,700.00
Item Description Units Unit Desc Fee Amount
RESIDENTIAL PERMIT FEE 1 SELECT $97.25
WSBCC SURCHARGE 1 SELECT $4.50
SF PLNS RVW<7999 SQ FT 1 SELECT $38.90
Permit Total Fees: $140.65
Operator: jmm Printed By: JD Print Date: 11/16/2009
•
Project Number: 09003675 Inv: I Application Date: 11/16/2009 Page 2 of 2
THIS IS NOT A PERMIT
Penalties will be assessed for commencing work without a permit
Notes• .. .., ,,.. . ..a...,.....,..., _.,. ., .,..
Issued home occupation Affidavit of Exemption 1/10/2008-Karen Bleick, "Trinity Marketing" (mjp)
Payment Summary: yr ,..,.. u g MAC,
Permit Type Fee Amount Invoice Amount Amount Paid Amount Owing
Building Permit $140.65 $140.65 $38.90 $101.75
$140.65 $140.65 $38.90 $101.75
Disclaimer:
Submittal of this application certifies the owner(or person(s)authorized by the owner)has both examined and finds the information
contained within to be true and correct,and agrees that all provisions of laws and/or regulations governing this type of work will be
complied with. Subsequent issuance of a permit shall not be construed to be a permit for,or an approval of,any violation of any of
the provisions of the code or of any other state or local laws or ordinances.
Signature:
Operator: jmm Printed By: JD Print Date: 11/16/2009
i
(Staff Use Only)
Spokane
cm PERMIT NUMBER: / ✓ l)
Valleys PERMIT FEE:
CITY OF SPOKANE VALLEY
Community Development Department
Permit Center s i. EN ER
11703 East Sprague Avenue, Suite B-3
Spokane Valley, WA 99206 . Z
Tel: (509) 688-0036 ;, � ; 11 1-
Fax: (509) 688-0037
germitcenter@spokanevalley.or
lornittal
RESIDENTIAL CONSTRUCTrON PE MIT APPLICATION
NEW CONSTRUCTION ❑ ADDITION/REMODEL ❑ ACCESSORY BUILDING
❑ DECK X(1 OTHER
SITE ADDRESS:3729 S VERCLER LANE
ASSESSORS PARCEL NO.:45342.3008 LEGAL DESCRIPTION:LoT 8,BLOCK 3,PINE
ROCK RIDGE SECOND ADDITION
BUILDING OWNER NAM E:MARCEL VEZEAU
NAME:MARCEL VEZEAU
ADDRESS:3729 S.VERCLER LANE
CITY:SPOKANE VALLEY STATE:WA ZIp:99206
PHONE:509-474-9481 FAX: cELL:509-847-4544
CONTACT NAME:SAME
PHONE: FAX: CELL:
CONTRACTOR NAME:SAME
MAILING ADDRESS:
CITY: STATE: ZIP:
PHONE: FAX: CELL:
CONTRACTOR LICENSE No.: EXPIRES: CITY BUSINESS LICENSE NO.:
DESCRIBE THE SCOPE OF WORK IN DETAIL AND INDICATE USE:
BUILD WALLS ALL AROUND THE BASEMENT PERIMETER TO COVER THE EXISTING INSULATION.
ADD TWO DIVIDING WALLS(NON STRUCTURAL),FLOORING AND ACCOUSTIC CEILING TILES.
PROPOSED USE:
PERSONAL ENTERTAINMENT
c.x B.A�.eiW'7—
C. IL{-7 cF (ANFouIS (-(€D 6AS d
****YOU MUST COMPLETE THE FOLLOWING****
MARK N/A IF NOT APPLICABLE
Height to Peak:N/A Dimensions:N/A No. of Stories:N/A Total Habitable
Space:N/A
Main Floor SQ FT:N/A Upper Floor SQ Unfinished Basement Finished Basement
FT:N/A SQ FT:300 SQ FT:Z96' N 3
Garage SQ FT:N/A Deck/Covered Patio Impervious Surface 30% Slopes on
SQ FT:N/A Area:N/A Property:N/A
No. of Bedrooms:N/A Construction Heat Source:FORCED Sewer or Septic:N/A
Type:N/A AIR
TOTAL COST OF PROJECT: $3700 NA
DISCLAIMER
The permitted verifies,acknowledges and agrees by their signature that: 1) if this permit is for construction or on a dwelling,the dwelling is/will
be served by potable water. 2)Ownership of this City of Spokane Valley permit inure to the property owner. 3) The signatory is the property
owner or has permission to represent the property owner in this transaction. 4) All construction is to be done in full compliance with the City of
Spokane Valley Development code. Referenced codes are available for review at the City of Spokane Valley Permit Center. 5) The City of
Spokane Valley permit is not a permit or approval for any violation of federal, state or local laws, codes or ordinances. 6) Plans or additional
information may be required to be su. itted and subsequently approved before this application can be processed.
Signature , �' Date: // 3
Method of payment: ❑ Cash n Check ❑ Visa Xig Mastercard
Bankcard #: EXP: VIN#:
Authorized Signature:
0PProject Newprnject
ITPrerior�spre-app meeting 0
4."1pokane Transmittal
Plan revisions
City of Spokane Valley Transmittu/Date.•
4011010ValleY
Community Development Friday,Nozember13,2009
Department
11703 E.Sprague Ave,Suite B3
Spokane Valley,WA 99206
Phone:509.688.0036
Site Address: 3729 S VERCLER LN Project Number: 09003675
Parcel Number: 45342.3008
Zoning: R-3 Water District: MODEL
Fire District: FD 01
Applicant: VEZEAU, M & MASSICOTTE -VAZE Owner: VEZEAU, M & MASSICOTTE -VAZ
3729 S VERCLER LN 3729 S VERCLER LN
SPOKANE VALLEY, WA 99206 SPOKANE VALLEY. WA 99206
(509)474-9481
e-mail: e-mail:
Contact: VEZEAU. M & MASSICOTTE -VAZE Occupant:
3729 S VERCLER LN
SPOKANE VALLEY. WA 99206 e-mail:
(509) 474-9481
e-mail: D) ECEllWE
Contractor: OWNER Arch/Engineer: � V D
() - o
AUN
e-mail: „ N H
Project REMODEL BASEMENT
Description:
Building Landuse Engineer Utilities Health Fire Dist Assessor
APPLICATION 4
CONSTRUCTION PLANS ,
TDS 1
Please send all plan review and project comments via e-mail to the
highlighted individuals.
•
• For City Use Only
SCITY SctNume
pokaneProject Address 3 -7„/-1.
40.000 alle
y 11703 E Sprague Ave Suite B-3 • Spokane Valley WA 99206
509.688.0036 • Fax: 509.688.0037 • permitcenter®spokanevalley.org
As part of our on-going commitment to customer service during the review process of your project
application, we are providing you with a TARGET DATE for the initial technical application review. If for
any reason we cannot meet this date, we will contact you with a revised target date.
i
Your application review TARGET DATE is
The TARGET DATE is the date we estimate your project application will have had its initial technical
review. It is not the date for approval or permit issuance.
Tips for a Smoother Project Application Review
' Submit complete, accurate plans and documents.
Extra time may be required for re-submittals as project application reviewers work on multiple applications and it
may be several days before they can look at your new or revised information.
➢ Designate a specific contact person to communicate with the City.
While the person designated as the applicant's contact person with the City can be changed, one individual with the
expertise for dealing with reviewer comments would be the best choice for the entire review process.
➢ Call staff regarding the status of your project only after the target date shown at the top of the page.
Although you should be contacted on or by the target date,please feel free to contact us if you haven't heard from us
by your target date. Staff may contact you before the target date if the initial review is complete. By following this
procedure,you will save time and allow the reviewers to complete the work more expeditiously.
Steps in the Permit Process
1. Counter Complete. Your application has been accepted as counter complete. This means all of the required
documents, as indicated on your Pre-Application Checklist have been submitted or have been approved for deferred
submittal.This does not prevent technical staff from requesting additional information as a result of their technical review.
2. Quality Check. The next step in the process is a quality check to make sure that the application is reviewable and free
from substantive flaws that would prevent technical staff from completing the technical review once it is started. When
this step is complete, your application will be routed to the appropriate staff and remain in their review queue until it
comes up for review.
3. Technical Compliance. Once an application is administratively complete, it is routed to technical staff for compliance
review. Depending on the type of project, technical staff may include multiple reviewers. You should be contacted by
phone,fax, email, or mail by your TARGET DATE once the initial technical compliance review is complete.
4. Permit Issuance. When the technical compliance review of the application is complete, including any subsequent re-
submittals, each reviewer will approve their section of the application and route it to the Permit Center. When all sections
of the application are received, a Permit Specialist will process the application and contact the person specified on your
application for permit pick-up. Information regarding fees and pre-construction meetings (if required) will be provided by
the Permit Specialist at that time.
WHITE-APPLICANT PINK-BUILDING FILE REV 9/07