Loading...
The URL can be used to link to this page
Your browser does not support the video tag.
2009, 10-08 Permit App: 09003154 Remodel
Project Number: 09003154 Inv: 1 Application Date: 10/8/2009 Page 1 of 2 THIS IS NOT A PERMIT Penalties will be assessed for commencing work without a permit Project Information: Permit Use: EXTEND DECK 6.5 FEET AND CHANGE STAIRS Contact: D AND S GODLEY CONSTRUCTION DIRECTION Address: 6311 N CHRISTENSEN RD C-S-Z: SPOKANE WA 99224 Setbacks:Front Left: Right: Rear: Phone: (509)244-3075 Group Name: Site Information Project Name: Plat Key: CARN Name: CARNAHAN CREST PUD District: Sout Parcel Number: 35261.1703 Block: Lot: SiteAddress: 1808 S VIEWCREST LN Owner:Name: WERNZ,MICHAEL J Address: 1808 S VIEWCREST LN Location::CSV SPOKANE VALLEY,WA 99212 Zoning: R-2 SF Res Suburban District Water District: 098 SPO CO WATER DIST#1 Hold: ❑ Area: 8,296 Sq Ft Width: 0 Depth: 0 Right Of Way(ft): 15 Nbr of Bldgs: 1 Nbr of Dwellings: 2 Review Information: Review Building Plan Review Released By: Originally Released: 10/8/2009 By: tmelbourn Landuse/Zoning/HE Conditions Released By: { Originally Released: 10/5/2009 By: tschmidt Permits: . tea, Operator: jmm Printed By: jmm Print Date: 10/8/2009 , Project Number: 09003154 Inv: 1 Application Date: 10/8/2009 Page 2 of 2 THIS IS NOT A PERMIT Penalties will be assessed for commencing work without a permit Building Permit Contractor: D&S GODLEY CONSTRUCTION Firm: D&S GODLEY CONSTRUCTION Address: 6311 N CHRISTENSEN Phone: (509)244-3075 SPOKANE WA 99224 This Application: Total Project: Description Grp Type Notes So Ft Valuation So Ft Valuation DECK OPEN R-3 VB DECK 132 $1,980.00 132 $1,980.00 ADDITION Totals: 132 $1,980.00 132 $1,980.00 Item Description Units Unit Desc Fee Amount RESIDENTIAL PERMIT FEE 1 SELECT $69.25 WSBCC SURCHARGE 1 SELECT $4.50 SF PLNS RVW<7999 SQ FT 1 SELECT $27.70 Permit Total Fees: $101.45 Notes THE DEVELOPER SHALL INSTALL A MINIMUM OF A 2 HOUR FIRE WALL SEPARATION BETWEEN UNITS. WHEN THE TOTAL STRUCTURE SIZE EXCEEDS 4,000 SQ FT THE DEVELOPER SHALL UTILIZE A 4 HOUR CONCRETE MASONRY SEPARATION WALL BETWEEN THE UNITS. CONTOL AREA FOR DRAINAGE MORITORIUM SEE MAPS FOR SPECIFICS Payment Summary: F ,,,. ,,,. Permit Type Fee Amount Invoice Amount Amount Paid Amount Owing Building Permit $101.45 $101.45 $27.70 $73.75 $101.45 $101.45 $27.70 $73.75 Disclaimer: Submittal of this application certifies the owner(or person(s)authorized by the owner)has both examined and finds the information contained within to be true and correct,and agrees that all provisions of laws and/or regulations governing this type of work will be complied with. Subsequent issuance of a permit shall not be construed to be a permit for,or an approval of,any violation of any of the provisions of the code or of any other state or local laws or ordinances. Signature: Operator: jmm Printed By: jmm Print Date: 10/8/2009 itFE:Efrr. Sc�TY of ''�� (Staff Use Only) pokane PERMIT NUMBER: St/ 4000 ValleT. PERMIT FEE: CITY OF NE VALLEY Community Delve opment Departure t RECEIVED Permit Center CS" PERMIT CENTER 11703 East Sprague Avenue, Suite 4-3 Spokane Valley, WA 99206 OCT 0 1 2009 Tel: (509) 688-0036 ? ( Fax: (509) 688-0037 Project ____ permitcenter spokanevalley.org Name l-.-- RESIDENTIAL C '' r' • T APPLICATION ❑ NEW CONSTRUCTION ❑ ADDITION/REMODEL ❑ ACCESSORY BUILDING DECK ❑ OTHER SITE ADDRESS:1808 S.VIEWCREST LANE, SPOKANE VALLEY,WA 99212-3216 ASSESSORS PARCEL NO.:35261.1703 LEGAL DESCRIPTION:CARNAHAN CREST PUD LOT 3, BLK 1 BUILDING OWNER NAME:MICHAEL J WERNZ NAME:MICHAEL J WERNZ ADDRESS:1808 S.VIEWCREST LANE CITY:SPOKANE VALLEY STATE:WA ZIP:99212-3216 PHONE:509-535-3144 FAx:509-481-2480 CELL:509-999-7005 CONTACT NAME:MICHAEL WERNZ PHONE:509-535-3144 FAx:509-481-2480 CELL:509-999-7005 CONTRACTOR NAME:D AND S GODLEY CONSTRUCTION MAILING ADDREss:N 6311 CHRISTENSEN RD CITY:SPOKAN E STATE:WA ZIP:99224 PHONE:509-244-3075 FAX: CELL:509-230-6426 CONTRACTOR LICENSE NO.:DSGODC*190JN EXPIRES:04/15/10 CITY BUSINESS LICENSE NO.:L10088584 DESCRIBE THE SCOPE OF WORK IN DETAIL AND INDICATE USE: EXTEND DECK 6.5 FEET TO INCORPORATE THE CHANGE IN DIRECTIONS OF STAIRS FROM EAST/WEST TO NORTH/SOUTH. THE STAIRS WILL NOW BE INSIDE THE DECK PERIMETER WHERE BEFORE THEY EXTENDED OUTSIDE THE DECK PERIMETER. PROPOSED USE: BARBEQUE, RELAX AND ENTERTAIN. Effective October 28, 2007 Page 1 of 2 C:\Users\Michael\Documents\Michael J\Viewcrest\09-30-09 Residential Construction Permit App.1.doc • ****YOU MUST COMPLETE THE FOLLOWING**** MARK N/A IF NOT APPLICABLE Height to Peak:N/A Dimensions:VAR No. of Stories:N/A Total Habitable Space:N/A Main Floor SQ FT:N/A Upper Floor SQ Unfinished Basement Finished Basement FT:N/A SQ FT:N/A SQ FT:N/A Garage SQ FT:N/A Deck/Covered Patio Impervious Surface 30% Slopes on SQ FT:NEw 1,e{l 32-- Area:N/A Property:N/A No. of Bedrooms:N/A Construction Heat Source:N/A Sewer or Septic:N/A Type:WOOD/COMPOSITE TOTAL COST OF PROJECT: $ DISCLAIMER The permitted verifies, acknowledges and agrees by their signature that: 1) if this permit is for construction or on a dwelling,the dwelling is/will be served by potable water. 2) Ownership of this City of Spokane Valley permit Inure to the property owner. 3) The signatory is the property owner or has permission to represent the property owner in this transaction. 4) All construction is to be done in full compliance with the City of Spokane Valley Development code. Referenced codes are available for review at the City of Spokane Valley Permit Center. 5) The City of Spokane Valley permit is not a permit or approval for any violation of federal, state or local laws, codes or ordinances. 6) Plans or additional information may be required to be submitted and subsequently approved before this application can be processed. Signature .,„\ j LA Date: ©I(3Q)05 Method of payment: ❑ Cash ® Check ❑ Visa El Mastercard Bankcard #: EXP: VIN#: Authorized Signature: Effective October 28, 2007 Page 2 of 2 C:\Users\Michael\Documents\Michael J\Viewcrest\09-30-09 Residential Construction Permit App.1.doc 1C* 4eki :4 PROVIDE DIAGRAMS AND ENGINEERING LAYOUTS FOR ROOF TRUSSES, BEAMS At FLOOR SYSTEMS PRIOR TC t 1Ii''G INSPF:OTION3 S A 4 4 , , s. KEPT i ` • J THIS BUILDING. SUBJECT TO FIELD U PECTION'OORRECTIONS N Sg kr REVIEWF FCS PGDF COMP LANCE SPOKANE VAL t E BUIL NG !VISION lO Y v9 6.5 161. " —] 15 lu veto setback Nil,setback 11' ' 49' / 23' liti .--• to 16.5 /' bischri 7411,_ 17' to Pr... a* Sookane Va.WA 14' mv 1--------.5 . 177.27 _ ' \ 1 Cr t \\ L1-1 .......,, 0 •••-- 1.,... .c."—.4-i'l \ ( „1 , ....., s , PLANNING DEPT. APPROVED , w ,;.-... .... BY: -7ii .-.. DATE: For City Use Only SPLUS Project Number poIneCITY OF Project Address 4000 a Q ° 11703 E Sprague Ave Suite B-3 ♦ Spokane Valley WA 99206 509.688.0036 ♦ Fax: 509.688.0037 ♦ permitcenter@spokanevalley.org As part of our on-going commitment to customer service during the review process of your project application, we are providing you with a TARGET DATE for the initial technical application review. If for any reason we cannot meet this date, we will contact you with a revised target date. Your application review TARGET DATE is The TARGET DATE is the date we estimate your project application will have had its initial technical review. It is not the date for approval or permit issuance. Tips for a Smoother Project Application Review ➢ Submit complete, accurate plans and documents. Extra time may be required for re-submittals as project application reviewers work on multiple applications and it may be several days before they can look at your new or revised information. ➢ Designate a specific contact person to communicate with the City. While the person designated as the applicant's contact person with the City can be changed, one individual with the expertise for dealing with reviewer comments would be the best choice for the entire review process. ➢ Call staff regarding the status of your project only after the target date shown at the top of the page. Although you should be contacted on or by the target date,please feel free to contact us if you haven't heard from us by your target date. Staff may contact you before the target date if the initial review is complete. By following this procedure,you will save time and allow the reviewers to complete the work more expeditiously. Steps in the Permit Process 1. Counter Complete. Your application has been accepted as counter complete. This means all of the required documents, as indicated on your Pre-Application Checklist have been submitted or have been approved for deferred submittal. This does not prevent technical staff from requesting additional information as a result of their technical review. 2. Quality Check. The next step in the process is a quality check to make sure that the application is reviewable and free from substantive flaws that would prevent technical staff from completing the technical review once it is started. When this step is complete, your application will be routed to the appropriate staff and remain in their review queue until it comes up for review. 3. Technical Compliance. Once an application is administratively complete, it is routed to technical staff for compliance review. Depending on the type of project, technical staff may include multiple reviewers. You should be contacted by phone,fax, email,or mail by your TARGET DATE once the initial technical compliance review is complete. 4. Permit Issuance. When the technical compliance review of the application is complete, including any subsequent re- submittals, each reviewer will approve their section of the application and route it to the Permit Center. When all sections of the application are received, a Permit Specialist will process the application and contact the person specified on your application for permit pick-up. Information regarding fees and pre-construction meetings (if required) will be provided by the Permit Specialist at that time. WHITE-APPLICANT PINK-BUILDING FILE REV 9/07