Loading...
2012, 09-13 Permit: SW-12002207 Sewer SPOKANE COUNTY BUILDING AND PLANNING PERMIT Permit Issued Date: Application Number: SW-12002207 09/13/2012 Expiration Date: Project Description: SEWER CONNECTION Primary Contact: LISH EXCAVATION CO Project Name: WEATHERWOOD Applicant: LISH EXCAVATION CO Permit Type: SEWER Address: 9912 E 50TH AVE SPOKANE,WA 99206 Phone: 509-216-0549 Email: SITE INFORMATION: Site Address: 615 N VIRGINIA CT Owner: MOORE,ROGER E Parcel Number: 45153.4604 Address: 615 N VIRGINIA CT SPOKANE VALLEY,WA 99216 Subdivision: ALKI EAST ADDITION Phone: Assessor's Description: PT OF TR 82 OPP ALKI EAST ADD L4 B1 (NOTE: Email: SR/DIS EX 100%AT THIS TIME) Inspection Area: Water District:Modern Fire District:Spokane Valley Fire Electric Water Company Zoning: Land Area: 11512 Square Feet CONTRACTOR INFORMATION: General Contractor LISHEEC936O5 LISH EXCAVATION CO 9912 E 50TH AVE SPOKANE,WA 99206 509-216-0549 DETAILS: Class Type Quantity Unit Charge Value SEWER SEWER CONNECTION 1 $125.00 $125.00 $125.00 FEE DETAIL: Processing-Utilities $25.94 Utilities Permit $125.00 Total Fee: $150.94 CONDITIONS: Plan review fee is required for all site plan reviews conducted by Spokane Valley Fire. Inside Public Transit Benefit Area CALL 1-800-424-5555 BEFORE YOU DIG—AT LEAST 2 WORKING DAYS IN ADVANCE.SPOKANE COUNTY CODE REQUIRES THE INSTALLER COMPLY WITH ALL REQUIREMENTS OF THE WA STATE DEPT OF LABOR&INDUSTRIES,INCLUDING THOSE RELATED TO TRENCH SAFETY. Date Printed:09/13/2012 13:04:28 Printed by:IIS APPPOOL\ASP.NET v4.0 SPOKANE COUNTY BUILDING AND PLANNING PERMIT • Permit Issued Date: Application Number:SW-12002207 09/13/2012 Expiration Date: FOR SEWER INSPECTIONS CALL THE UTILITIES DEPT AT(509)477-3604 FROM 8:30-5:00 MONDAY-FRIDAY PRIOR TO COVER. ONE WORKING DAY NOTICE REQUIRED.PERMIT ALLOWS FOR A 30-MINUTE INSPECTION.ADDITIONAL INSPECTION FEES APPLY AFTER 30 MINUTES. INSTALLER IS RESPONSIBLE TO INSURE ALL WASTEWATER DRAINS ARE CONNECTED TO THE SEWER AND MAY BE REQUIRED TO PERFORM TESTS FOR VERIFICATION.INSTALLER IS TO FIELD LOCATE AND CONFIRM THE ELEVATION AND POSITION OF SEWER STUB PRIOR TO ANY OTHER EXCAVATION. SEWER STUBS AND DRY SIDE SEWERS ARE TO BE CHECKED PRIOR TO CONNECTION TO ENSURE THAT THEY HAVE ACCEPTABLE GRADE AND ARE CLEAR AND UNOBSTRUCTED.SEWER LINES SHOULD BE CONSTRUCTED TO ALLOW FOR GRAVITY FLOW FROM THE LOWEST LEVEL OF THE STRUCTURE. THE INSTALLER AND THIS PERMIT MUST BE PRESENT AT THE JOB SITE AT THE SCHEDULED INSPECTION TIME.BOTH STATE LAW RCW 19.122 AND COUNTY CODE REQUIRES THE INSTALLER TO GIVE NOTICE OF EXCAVATION TO OWNERS OF UNDERGROUND FACILITIES. Date Printed:09/13/2012 13:04:28 Printed by:IIS APPPOOL\ASP.NET v4.0