Loading...
1994, 01-14 Sewage Disposal Review `As .FI�,B(�rp;�w�l_ . S P O K A N E 7.ac :4:L!' +1. s" ti}aitA C O U N T -Y- DEPARTMENT DEPARTMENT OF BUILDINGS JAMES L.MANSON,C.B.O.,DIRECTOR ON-SITE SEWAGE DISPOSAL SYSTEM INFORMATIONAL REVIEW FORM Date: ///e///4 , The review by the various departments as provided for herein is solely for the purpose of advising the Spokane County Health District of the subject property's compliance with various codes and regulations. The issuance of a permit by the Spokane County Health District for the installation of an on-site sewage disposal system is not to be considered as a vesting of a right by the owner/representative to obtain a building permit for the property. At the time that a building permit is applied for, the subject property must comply with all applicable federal, state or local laws, ordinances or regulations with the exception of those relating to the issuance of a permit for the septic tank/drain field on-site sewage disposal system by the Spokane County Health District, pursuant to this form. Accordingly, although as of the date of this document the subject property may meet certain federal, state or local laws, ordinances or regulations, in the event such items change between the date of this document and application for a building permit, the owner/representative will be responsible for meeting such regulations on the date of the application for the building permit.S REF: Street Address I`/���` USS/q Parcel Number ` / fS3 • l G Oa Legal Description : S (,dcJ't'C( ( R dot 11lG GL ,q U( . t �6v �, -1-_►'' ti'rt j _ iramme. Property Owner 4.--- _ Describe Proposal : / d k/e-5 ' f 5&p 'C _57S c Signed: �� Date////9y/ Proposed wner or Authorized Representative 1. An initial review of the above-referenced property has been conducted by the Spokane County Planning Department and the following items are noted. An in-depth review of the property will again be made at the time a building permit is applied for. Requirements reviewed for property as of the date set forth herein above. Yes/No/N.A -f' Dedicatory Language within Plat<A24 LVW d19-(4,041.- �L'�7 ) �,� Subject Property is Legally Divided No Certificate of Exemption Required 14a„c Use Authorized Under Zoning Ordinance 4411, Setbacks Met in Zoning Ordinance f\j/.) Shorelines Permit Required N!7 Variance Required for Following Purposes: Other: Planning Department_0441404j, (a&W 0 Date: /1 it"--/(31-t 2 . An initial review of the subject property has been conducted by the Spokane County Engineer's Office and the following items are noted. An in-depth final review of the property will again be made at the time the building permit is applied for. SPECIAL REQUIREMENTS: 3 Maintained County Road Frontage V. Approach Permit Required I , Flood Zone litVariance Requirements Other: Engineer' s Office: `,,/ ► IF- i Date: /►, , t qej V / / ' / 3 . The Spokane County Department of Buildings has advised the property owner/representative that at such time a structure or building is to be placed/constructed on the property, a building permit will be required. frilpijc_j_if �/ (�/�Department of Buildings: (' Date: 1 / I