14-039.11 Max J Kuney: Sullivan West Bridge Ph 2 ISI-09. (( ftfl'(M' 00 Spokane . ..Valley. CHANGE ORDER NO: 11 DEPARTMENT OF PUBLIC WORKS CONSTRUCTION CONTRACT NO: 14-039 PROJECT: Phase 2-Sullivan Road West Bridge Replacement Project CONTRACT DATE: 8/8/2014 PRIME CONTRACTOR: Max J.Kuney Company CIP NO: 0155 DESCRIPTION OF CHANGES This Change Order pertains to: Schedule C-Work on State-Owned Lands The Contractor shall perform Phase 2 of the Centennial Trail realignment work as shown and specified in Attachment A(Drawings) and Attachment B(Technical Special Provisions),which were issued as part of Change Order No.8. In general,the Phase 2 work includes revisions to the stairway connection between the South Overlook and the Centennial Trail and the 54-inch high Type 6 vinyl coated chain link fence along the North Retaining Wall, Payment will be made for the Phase 2 Centennial Trail Realignment work according to the unit price list below and actual field measurements. The South Overlook Lower Stairway(Pay Item CO-11.8(C))work shall be performed per Section 1-09.6, Force Account, of the Standard Specifications. Item No. Description gait Quantity Unit Price Total , CO-11.1(C) Cement Conc.Sidewalk SY 84 $ 110.00 $ 9,240.00 CO-11.2(C) Rock for Rock Wall Ton 13 109.00 1,417.00 CO-11.3(C) Backfill for Rock Wall Ton 3 138.00 414.00 CO-11.4(C) Structure Excavation Class B CY 2 166.00 332.00 CO-11.5(C) Shoring or Extra Excavation Class B SF 30 19.00 570.00 CO-11.6(C) Coated Chain Link Fence Type 6 LF 240 31.00 7,440.00 CO-11.7(C) End,Gate,Corner,and Pull Post for Chain Link Fence EA 2 286.00 572.00 CO-11.8(C) South Overlook Lower Stairway FA 1 Estimate 62,236.00 CO-11.9(C) Single Rail Railing at Stairway LF 10 51.00 510.00 CO-11.10(C) Pedestrian Railing at South Overlook and Stairway LF 54 240.00 12,960.00 Subtotal $ 95,691.00 8.7% Sales Tax(applicable only to Bid Schedules C,D,and E) $ 8,325.12 Total Amount of this Change Order(incl.Tax): $ 104,016.12 PHYSICAL COMPLETION Original Contract Working Days: 484 Revision By This Change Order: 0 Revisions by Prior Change Orders: 31 Total Revised Contract Working Days: 515 CONTRACT AMOUNT THESE CHANGES RESULT IN THE FOLLOWING ADJUSTMENTS OF TOTAL CONTRACT AMOUNT: ORIGINAL TOTAL CONTRACT AMOUNT $ 12,307,560.31 TOTAL PRIOR CONTRACT CHANGE ORDER AMOUNT(through CO#10) $ 454,990.03 TOTAL CONTRACT AMOUNT PRIOR TO THIS CHANGE ORDER $ 12,762,550.34 NET THIS CHANGE ORDER $ 104,016.12 TOTAL CONTRACT AMOUNT INCLUDING THIS CHANGE ORDER -�-��- $ 12,866,566.46 CONTRACTOR ACCEPTANCE: ,semi,�� aria ,411111i DATE: 7 113 /2-0/b The contractor hereby accepts this adjustment under of Sectio 04.' of the original contract. 1.-z...bt RECOMMENDED BY: `,,,�, ..�� -. . ' , DATE: 1 I)5 t7 \ Project Manag=� Page 1 of 2 COSV Form 9/5/2014 CHANGE ORDER NO: 11 DEPARTMENT OF PUBLIC WORKS CONSTRUCTION CONTRACT NO: 14-039 PROJECT: Phase 2-Sullivan Road West Bridge Replacement Project CONTRACT DATE: 8/8/2014 PRIME CONTRACTOR: Max J. Kuney Company CIP NO: 0155 APPROVED BY: DATE: —7/64fr nQPuubliclWoorrks Director APPROVED BY: ` A. _ VtRI� DATE: -71'V16 City Manager ATTACHMENTS: None Distribution: ORIGINAL TO: City of Spokane Valley Clerk's Office COPIES TO: Contractor,PW Project File,Project Inspector,Finance Department,WSDOT ER Local Programs Page 2 of 2 COSV Form 9/5/2014 CORPORATE HEADQUARTERS MAILING ADDRESS: AZ:figzSINCE 1930a 120 N.RALPH STREET PO BOX 4008 y SPOKANE,WA 99202-4744 SPOKANE,WA 99220-0008 '41` PHONE:509-535-0651 rett GENERAL CONTRACTORS FAX: 509-534-6828 WEBSITE:WWW.MAXKUNEY.COM WA CONTRACTORS LICENSE KU-NE-YM-J 372 NO EMAIL:MAXKUNEY@MAXKUNEY.COM File:SL to COSV—037 July 13, 2016 Cityof Spokane Valley p 11707 E. Sprague Ave. Suite 106 Spokane Valley,WA 99206 Attention: Mr. Jim Dingfield, P.E., Project Manager Reference: Stage 2-Sullivan Road West Bridge Replacement COSV Contract#0155 MJK Job 107 Subject: SL 037 Change Order No. 11 Centennial Trail Realignment Phase 2 Dear Mr. Dingfield: Max J. Kuney Co. signs the attached Change Order No. 11 Centennial Trail Realignment Phase 2 with the understanding that additional working days (with or without time related overhead cost)will be addressed in a later change order. If you have any questions or need further clarification regarding this matter, please contact me at (509)535-0651. Sincerely, MAX J. KUNEY C ) .".°44" Rodney Rodriguez Project Manager Attachments:CO#11 Cc:RR/TD