1995, 01-13 Permit: 95000208 MH SPOKANE COUNTY DEPARTMENT OF BUILDINGS
(i: ••••••••11291.MM1.
WEST 1026 BROADWAY • SPOKANE,WA 99260-0050 r,
(509)456-3675
SITE INFORMATION PROJECT INFORMATION
SITE ADDRESS: 1010 S WALNUT RD PROJECT NUMBER: 94010661 ISSUE DATE: 10/31/94
SPOKANE WA 99206
PERMIT USE: DOUBLE WIDE MANUFACTURED HOME W/DECK
PARCEL NUMBER: 45204.1653
APPLICANT: LITTLEJOHN, KARL & J
SUBDIVISION: UNIVERSITY PLACE PHONE: 509 922 7011
LOT: BLOCK: 15 ZONE: UR-3.5 ADDRESS: 1010 S WALNUT RD
SPOKANE WA 99206
INSPECTOR: DAVE SILVA CONTACT: JUDY OR KARL LITTLEJ PHONE: 509 922 7011
WATER DIST: SETBACKS -> FRONT: 28 LEFT: 24 RIGHT: 5 REAR: 20
OWNER: LITTLEJOHN, KARL & JUDY LENDER NAME:
PHONE: 509 922 7011 PHONE:
ADDRESS: 1010 S WALNUT RD ADDRESS:
SPOKANE WA 99206
PERMIT(S)
BUILDING PERMI 'e" •
CONTRACTOR CONTRACTOR
OWNER OWNER PrOdjeC7riLICENSE #: LICENSE #:BUILDING ADDITION INSPECTION FEE 2 fle e '-
DIM .= 8 X 10 1 STORIES
SQ FT = 80 STATE SURCHARGE 4.50
COUNTY SURCHARGE 18.00
COV DECK R-3 VN 80
TOTAL PERMIT FEE $122.50 l tek S
TOTAL VALUE: $560.00
herd.
RESIDENTIAL VALUATION 35.00 -1-14 n d
TOTAL PERMIT FEE $35.00 -1-0
Lar- t -A' 1.-;111 c)k
ClV LOCJC.ittco
N Y OR
g7q /3
CPAYMENT SUMMARY NOTES
PAYMENT DATE RECEIPT# PAYMENT AMOUNT ± PROJ : MANUFACTURED HOME MUST MEET DEFINITION OF "CLASS A
MANUFACTURED HOME" PER THE ZONING CODE
10/31/94 00012945 $157.50 EXISTING BUILDINGS TO BE REMOVED
TOTAL FEES AMOUNT PAID AMOUNT OWING
$157.50 $157.50 $.00
ISSUED PERMIT BY: JULIE SHATTO
NOTICE
It is the responsibility of the permittee, not Spokane County,to see to it that the use described on the front of this permit complies with applicable codes
an requirements and that required inspections are requested. Failure to request required inspections and obtain the necessary approvals prior to
progressing beyond the point where inspections are required may necessitate removal of certain parts of the construction at the owner's/permittee's
expense. At a minimum, the following inspections ARE REQUIRED by County Code:
•
1. FOOTING - when forms and reinforcement are in place and prior to placement of concrete.
NOTE: This inspection includes review of the structure's setbacks from property lines. Minimum setbacks are established by County zoning
regulations.Typically, side and rear yard setbacks are measured from property lines,while setbacks for yards abutting streets are measured from
the property line or the center line of the roadway right-of-way, whichever provides the greater setback from the center line of the roadway
right-of-way. Curb lines and fence lines are not necessarily indicative of property lines. In some residential areas, the County can own as much
as 20 feet of right-of-way between your property and the actual improved street/curb. The responsibility to comply with applicable setback
provisions lies solely with the permittee—neither Spokane County nor its authorized representatives assume any responsibility for the verification
or location of your property lines. Please verify their location prior to locating your structure. Failure to properly locate the structure may require
its relocation at the owner's/permittee's expense.
2. FOUNDATION - when forms and reinforcement are in place and prior to placement of concrete. (Blocking for a manufactured home is
required to be inspected prior to the installation of skirting.)
3. FRAMING - after all framing, bracing and blocking is in place, and prior to concealing.
4. INSULATION - prior to the installation of drywall.
5. PLUMBING - after rough-in, before covering, and final.
6. MECHANICAL - rough-in of piping, before covering, metal chimneys before concealment, and final.
7. FINAL - when complete and prior to occupancy and/or use. Please provide 24 hours notice.
NOTE: In addition to inspection of the structure, this inspection includes review of site improvements (typically depicted on the approved site
plan) required by ordinance or as a condition of approval of this permit. Items such as the installation of fire hydrants,fire department access,
on-site drainage("208 swales"), road improvements, parking, and landscaping are common requirements of a permit/site plan which must
be completed prior to final approval of a building or issuance of a Certificate of Occupancy.
In addition to the above any plumbing or mechanical systems or materials which would be concealed by framing, drywall, concrete, etc., must be
inspected prior to cover. Check with the department for "special inspections" in conjunction with commercial projects.
CALL 456-3675 FOR INSPECTIONS.
TO INSURE PROMPT SERVICE, PLEASE GIVE 24 HOUR NOTICE.
YOUR INSPECTOR IS
UNDER CERTAIN CIRCUMSTANCES, PARTS OF YOUR PROJECT MAY REQUIRE INSPECTIONS FROM OTHER AGENCIES:
• Road cuts for utilities or drives, County Engineer's Office • Sewer connection, County Utilities Department
456-3600 456-3604
or State Department of Transportation or City Public Works Department
456-3000 625-6300
• On-site waste disposal system, Spokane County Health District • Electrical wiring, State Department of Labor and Industries
324-1560 324-2640
• Construction in a flood plain, County Engineer's Office
456-3600
EXPIRATION
Unless otherwise noted, this permit will be considered null and void by limitation of the work authorized by the permit if not commenced or is stopped
for a period of 180 days, unless a written request for an extension of the permit is received and approved by the Building Official prior to expiration.
At a minimum an inspection should be requested at least once every 180 days to assure the validity of the permit. A permit may be renewed within
one year of the date of expiration for one-half the original fee, subject to certain limitations—please call us if you have any questions.
MISTAKES?
If you think we've made an error in processing this permit or in conducting inspections pertaining to it, or find erroneous information in the permit,
please bring it to our attention immediately by filing a written request for correction within 10 working days of discovery. All such requests should be
directed to the Department of Buildings at the address found on the face of this permit.
I certify that I have examined this permit/application, state that the information contained in it and submitted by me or my agent to compile said
permit/application is true and correct, and authorize Spokane County to proceed with processing. In addition, I have read and understand the
INSPECTION REQUIREMENTSJ'NOTICE provisions included herein and agree to comply with same. All provisions of laws and ordinances
governing this type of work will be compiled with whether specified herein or not. I understand that the issuance of this permit/application and any
subsequent inspection approvals or Certificates of Occupancy shall not be construed to give authority to violate or cancel the provisions of any
state or local law regulating construction, or as a warranty of conformance with the provisions of any state or local laws regulating construction.
SIGNATURE OF APPLICATION
OWNER OR AGENT DATE
SPOKANE COUNTY DEPARTMENT OF BUILDINGS
WEST 1026 BROADWAY • SPOKANE,WA 99260-0050
(509) 456-3675
SITE INFORMATION PROJECT INFORMATION
SITE ADDRESS: 1010 S WALNUT RD PROJECT NUMBER: 95000208 ISSUE DATE: 01/13/95
SPOKANE WA 99206
PERMIT USE: DOUBLE WIDE MOBILE HOME W/DECK
PARCEL NUMBER: 45204.1653
APPLICANT: LITTLEJOHN, KARL & J
SUBDIVISION: UNIVERSITY PLACE PHONE: 509 922 7011
LOT: BLOCK: 15 ZONE: UR-3.5 ADDRESS: 1010 S WALNUT RD
SPOKANE WA 99206
INSPECTOR: DAVE SILVA CONTACT: JUDY OR KARL LITTLEJ PHONE: 509 922 7011
WATER DIST: SETBACKS -> FRONT: 28 LEFT: 24 RIGHT: 5 REAR: 20
OWNER: LITTLEJOHN, KARL & JUDY LENDER NAME:
PHONE: 509 922 7011 PHONE:
ADDRESS: 1010 S WALNUT RD ADDRESS:
SPOKANE WA 99206
PERMIT(S)
BUILDING PERMIT MOBILEFE-Paid u..z_ .. ,...,...o.:,,<,
CONTRACTOR CONTRACTOR
OWNER OWNER
LICENSE #: LICENSE #:
BUILDING ADDITION INSPECTION FEE 2
DIM.= 8 X 10 STORIES
SO FT = 80 STATE SURCHARGE 4.50
COUNTY SURCHARGE 18.00
COV DECK R-3 VN 80
TOTAL PERMIT FEE $122.50
TOTAL VALUE: $720.00
RESIDENTIAL VALUATION 35.00
TOTAL PERMIT FEE $35.00
PAYMENT SUMMARY NOTES
PAYMENT DATE RECEIPT# PAYMENT AMOUNT
01/13/95 00000287 $157.50
TOTAL FEES AMOUNT PAID AMOUNT OWING
$157.50 $157.50 $.00
FILE
ISSUED PERMIT BY: CAROL FRAZIER
I JOTIC,E
It is the responsibility of the permittee, not Spokane County,to see to it that the use described on the front of this permit complies with applicable codes
and requirements and that required inspections are requested. Failure to request required inspections and obtain the necessary approvals prior to
progressing beyond the point where inspections are required may necessitate removal of certain parts of the construction at the owner's/permittee's
expense. At a minimum, the following inspections ARE REQUIRED by County Code:
1. FOOTING - when forms and reinforcement are in place and prior to placement of concrete.
NOTE: This inspection includes review of the structure's setbacks from property lines. Minimum setbacks are established by County zoning
regulations.Typically,side and rear yard setbacks are measured from property lines,while setbacks for yards abutting streets are measured from
the property line or the center line of the roadway right-of-way, whichever provides the greater setback from the center line of the roadway
right-of-way. Curb lines and fence lines are not necessarily indicative of property lines. In some residential areas, the County can own as much
as 20 feet of right-of-way between your property and the actual improved street/curb. The responsibility to comply with applicable setback
provisions lies solely with the permittee—neither Spokane County nor its authorized representatives assume any responsibility for the verification
or location of your property lines. Please verify their location prior to locating your structure. Failure to properly locate the structure may require
its relocation at the owner's/permittee's expense.
2. FOUNDATION - when forms and reinforcement are in place and prior to placement of concrete. (Blocking for a manufactured home is
required to be inspected prior to the installation of skirting.)
3. FRAMING - after all framing, bracing and blocking is in place, and prior to concealing.
4. INSULATION - prior to the installation of drywall.
5. PLUMBING - after rough-in, before covering, and final.
6. MECHANICAL - rough-in of piping, before covering, metal chimneys before concealment, and final.
7. FINAL - when complete and prior to occupancy and/or use. Please provide 24 hours notice.
NOTE: In addition to inspection of the structure, this inspection includes review of site improvements (typically depicted on the approved site
plan) required by ordinance or as a condition of approval of this permit. Items such as the installation of fire hydrants,fire department access,
on-site drainage("208 swales"), road improvements, parking,and landscaping are common requirements of a permit/site plan which must
be completed prior to final approval of a building or issuance of a Certificate of Occupancy.
In addition to the above any plumbing or mechanical systems or materials which would be concealed by framing, drywall, concrete, etc., must be
inspected prior to cover. Check with the department for "special inspections" in conjunction with commercial projects.
CALL 456-3675 FOR INSPECTIONS.
TO INSURE PROMPT SERVICE, PLEASE GIVE 24 HOUR NOTICE.
YOUR INSPECTOR IS
UNDER CERTAIN CIRCUMSTANCES, PARTS OF YOUR PROJECT MAY REQUIRE INSPECTIONS FROM OTHER AGENCIES:
• Road cuts for utilities or drives, County Engineer's Office • Sewer connection, County Utilities Department
456-3600 456-3604
or State Department of Transportation or City Public Works Department
456-3000 625-6300
• On-site waste disposal system, Spokane County Health District • Electrical wiring, State Department of Labor and Industries
324-1560 324-2640
• Construction in a flood plain, County Engineer's Office
456-3600
EXPIRATION
Unless otherwise noted, this permit will be considered null and void by limitation of the work authorized by the permit if not commenced or is stopped
for a period of 180 days, unless a written request for an extension of the permit is received and approved by the Building Official prior to expiration.
At a minimum an inspection should be requested at least once every 180 days to assure the validity of the permit. A permit may be renewed within
one year of the date of expiration for one-half the original fee, subject to certain limitations—please call us if you have any questions.
MISTAKES?
If you think we've made an error in processing this permit or in conducting inspections pertaining to it, or find erroneous information in the permit,
please bring it to our attention immediately by filing a written request for correction within 10 working days of discovery. All such requests should be
directed to the Department of Buildings at the address found on the face of this permit.
CI certify that I have examined this permit/application, state that the information contained in it and submitted by me or my agent to compile said
permit/application is true and correct, and authorize Spokane County to proceed with processing. In addition, I have read and understand the
INSPECTION REQUIREMENTS/NOTICE provisions included herein and agree to comply with same. All provisions of laws and ordinances
governing this type of work will be complied with whether specified herein or not. I understand that the issuance of this permit/application and any
subsequent inspection approvals or Certificates of Occupancy shall not be construed to give authority to violate or cancel the provisions of any
state or local law regulating construction, or as a war anty(of conformance with the provisions of any state or local laws regulating construction.
SIGNATURE OF / APPLICATION
OWNER OR AGENT 7/ DATE �- /3
_ ',cps PAYMENT DOCUMENT
Pv# SPOKANE COUNTY AUDITOR Mange order#
Dept ..
Bid ID
VENDOR: SFS TO: BILL TO: Blanket#
t,.i T.rL. JOH%II KARL E. JUDY
902 LOCUST AVENUE. u33 Rc#
NYSSA, OR 97913
vI#
Vendor Contact/Tel Confirming Order
FOB: PO DATE: BLDG/ROOM: BUYER
ACCTG. PERIOD: DELIVERY DATE: WAREHOUSE:
COMMENTS: ENTERED BY: PURCUASING DIRECTOR:
COMM LN# DESCRIPTION
COMMODITY NO REF ACCT LINE QUANTITY UNIT UNIT PRICE I TOTAL PRICE
'*.C.10 -; - - 1010 S. WALNUT PROJECT CANCELED - 80% REFUND - MOBILE :_. ERMIT
$4.50 R 100% = $ 4.50 x 0.00000u 4.50
t.:.-94010888 - 1010 S. WALNUT PROJECT CANCELED - 80% REFUND - SE 4ER PETIT
$40.00 X 100% = 40.00 0.000000 40.00
#94010863
il 0.003030 8.30
S10. - 8.00
94 1-
BLDG PERMIT 80% X $35.00 $ 28.00 ✓ 0.00 0000 122. 40
MANU HONE PERMIT 80% X $118.00+ 94.40 +122.40
TOTAL REFUND $174.90
SYSTEM VOID JTAL: 174. 90
I
l . a
LINE NO. FUND I AGCY I QRQ SB ORG 1 ACT OBI SB OBI REV SRC SB REV 1 RPT CAT BS ACCT I JOB NO. I PAY TI-IIS A}'VIQIJNT PIF
,J1 406 ,030 00J 4210 Jr~ 14,2.4i
02 N20 675 4. 50
03 436 030 0008 2210 02 8.00
04 401 436 0000 4241 40.00
;RAND TOTAL a 174.90 ii
RECEIVING CERTIFICATION PAYMENT CERTIFICATION TRAVEL CERTIFICATION
Materials noted in quantity ./have been I,the undersigned do hereby certify under penalty of perjury that sufficient funds have been budgeted for this claim,the I hereby certify under penalty of perjury that this
received in good condition or contracted for. materials have been furnished,services rendered or labor performed as described herein or contracted for,that the claim is is a true and correct claim for necessary expenses
a just,due and unpaid obligation against Spokane County or fund agency indicated above,that I am authorized to authenticate incurred by me and that no payment has been received
SIGNED and certify to said claim. by me on account thereof
t •
TITLE 4 y SIGNED \ )`,�,,inTITLE SIGNED TITLE
\
DATE `^ .,...,,• `1 DATE .." l-^-•_ k+ DATE PAGE
DEPARTMENT 2