Loading...
09-079.00 Inland Asphalt: Pines Mansfield Congestion Relief _ Washington State v7AW Department of Transportation Change Order - Minor Change Contract Number Contract Title Federal Aid Number TA-2942 Pines-Mansfield Corridor Congestion Relief Project CM-9932(032) Change Order Number Change Description Date 20 Cold Weather Protection - October May 6, 2009 Region Project Engineer Phone Number Eastern Region Steven M. Worley 509-688-0198 Prime Contractor Inland Asphalt Company , ~ Ordered by Engineer under the terms of Section 1-04.4 of the Standard Specifications ❑ Change proposed by Contractor Change Description ~ The General Special Provisions for this project are supplemented as follows: Description The Contractor shall protect concrete in accordance with their proposed cold weatber protection plan Payment The lump sum amount of $1,624.00 shall be full pay for all labor, equipment and materials to perform the work specified. Contract Time Contract time will not be adjusted as a result of this Change Order. All work, materials and measurements to be in accordance with the provislons of the Siandard Specifications and Special Provisions for the type of construction involved unless stated otherwise in this document. Original Contract Amount Current Contract Amount Est. Net Change This C.O. Est. Revised Contract Amount $ 390613916.95 $ 3,202,733.99 1,624.00 $ 392049357.99 Prime Contractor Signature or Date • a°~ Method of Concurrence: ~ Project Engineer's Signature for Execution: Date ~ Distribution: Original w/Attachments - Steven M. Woriey Copy of page 1 only w/o Attachments - Inland Asphalt Company Page 1 Copy w/o Attachments - ER Construction Office DOT Form 421-005A EF Copy w/o Attachments - State Construction Office Revised 4/2002