2012, 08-06 Permit: SW-12001910 Sewer SPOKANE COUNTY BUILDING AND PLANNING
PERMIT
Permit
Application Number: SW-12001910 8/06/2012ed Date:
Expiration Date:
Project Description: SEWER CONNECTION Primary Contact: OVERLAND EXCAVATION INC
Project Name: ROCKWELL PH 2 Applicant: OVERLAND EXCAVATION INC
Permit Type: SEWER Address: P.O. BOX 277
NEWMAN LAKE,WA 99025
Phone: (509)939-7984
Email:
SITE INFORMATION:
Site Address: 4608 N WARREN RD Owner: MILLENNIUM TRUST
Parcel Number: 45022.2417 Address: 325 CHATHAM WAY
MOUNTAIN VIEW,CA 94040
Subdivision: THROOP& Phone:
FITZPATRICK
SUBDIVISION
Assessor's Description: TRENTWDORCH THROOP&FITZ PT OF L17-18 B4 Email:
ALL L17<L18 BEG AT NECOR TH W TO NWCOR
TH S5FT TH E TO POB
Inspection Area:
Water District:Trentwood Fire District:Spokane Valley Fire
Irrigation District#3
Zoning: Land Area:4938.94 Square Feet
CONTRACTOR INFORMATION:
General Contractor
OVERLEI951 LE
OVERLAND EXCAVATION INC
5918 E TRENT AVE
SPOKANE,WA 99212
509-939-7984
DETAILS:
Class Type Quantity Unit Charge Value
SEWER SEWER CONNECTION 1 $125.00 $125.00
$125.00
FEE DETAIL:
Processing-Utilities $25.94
Utilities Permit $125.00
Total Fee: $150.94
CONDITIONS:
Inside Public Transit Benefit Area
CALL 1-800-424-5555 BEFORE YOU DIG--AT LEAST 2 WORKING DAYS IN ADVANCE.SPOKANE COUNTY CODE REQUIRES THE
INSTALLER COMPLY WITH ALL REQUIREMENTS OF THE WA STATE DEPT OF LABOR&INDUSTRIES, INCLUDING THOSE
RELATED TO TRENCH SAFETY.
Date Printed:08/06/2012 11:20:08 Printed by:IIS APPPOOL\ASP.NET v4.0
SPOKANE COUNTY BUILDING AND PLANNING
PERMIT
- Permit Issued Date:
Application Number: SW-12001910 08/06/2012
Expiration Date:
FOR SEWER INSPECTIONS CALL THE UTILITIES DEPT AT(509)477-3604 FROM 8:30-5:00 MONDAY-FRIDAY PRIOR TO COVER.
ONE WORKING DAY NOTICE REQUIRED. PERMIT ALLOWS FOR A 30-MINUTE INSPECTION.ADDITIONAL INSPECTION FEES
APPLY AFTER 30 MINUTES.
INSTALLER IS RESPONSIBLE TO INSURE ALL WASTEWATER DRAINS ARE CONNECTED TO THE SEWER AND MAY BE REQUIRED
TO PERFORM TESTS FOR VERIFICATION. INSTALLER IS TO FIELD LOCATE AND CONFIRM THE ELEVATION AND POSITION OF
SEWER STUB PRIOR TO ANY OTHER EXCAVATION.
SEWER STUBS AND DRY SIDE SEWERS ARE TO BE CHECKED PRIOR TO CONNECTION TO ENSURE THAT THEY HAVE
ACCEPTABLE GRADE AND ARE CLEAR AND UNOBSTRUCTED.SEWER LINES SHOULD BE CONSTRUCTED TO ALLOW FOR
GRAVITY FLOW FROM THE LOWEST LEVEL OF THE STRUCTURE.
THE INSTALLER AND THIS PERMIT MUST BE PRESENT AT THE JOB SITE AT THE SCHEDULED INSPECTION TIME. BOTH STATE
LAW RCW 19.122 AND COUNTY CODE REQUIRES THE INSTALLER TO GIVE NOTICE OF EXCAVATION TO OWNERS OF
UNDERGROUND FACILITIES.
Date Printed:08/06/2012 11:20:08 Printed by:IIS APPPOOL\ASP.NET v4.0