Loading...
2012, 10-31 Permit: SW-12002468 Sewer SPOKANE COUNTY!,3UILDING AND PLANNING PERMIT Permit Issued Date: Application Number: SW-12002468 10/31/2012 Expiration Date: Project Description: SEWER CONNECTION Primary Contact: VIETZKE EXCAVATING CO Project Name: SUTTERS PH 3 Applicant: VIETZKE EXCAVATING CO Permit Type: SEWER Address: 2011 S CRAIG RD AIRWAY HEIGHTS,WA 99001 Phone: 509-244-9607 Email: SITE INFORMATION: Site Address: 807 S WARREN RD Owner: FORSTER,ANDREA L Parcel Number: 45233.0105 Address: 1310 LAKEWOOD LN BELLINGHAM,WA 98229 Subdivision: KRALIK SUBDIVISION Phone: Assessor's Description: VERA KRALIK B146 L5 B1 Email: Inspection Area: Water District:Vera Fire District:Spokane Valley Fire Irrigation District#15 Zoning: Land Area: 13680 Square Feet CONTRACTOR INFORMATION: General Contractor VIETZEC121MA VIETZKE EXCAVATING CO 2011 S CRAIG RD AIRWAY HEIGHTS,WA 99001 509-244-9607 DETAILS: Class Type Quantity Unit Charge Value SEWER SEWER CONNECTION 1 $125.00 $125.00 $125.00 FEE DETAIL: Processing-Utilities $25.94 Utilities Permit $125.00 Total Fee: $150.94 CONDITIONS: Plan review fee is required for all site plan reviews conducted by Spokane Valley Fire. Inside Public Transit Benefit Area CALL 1-800-424-5555 BEFORE YOU DIG--AT LEAST 2 WORKING DAYS IN ADVANCE.SPOKANE COUNTY CODE REQUIRES THE INSTALLER COMPLY WITH ALL REQUIREMENTS OF THE WA STATE DEPT OF LABOR&INDUSTRIES, INCLUDING THOSE RELATED TO TRENCH SAFETY. Date Printed: 10/31/2012 12:53:50 Printed by:115 APPPOOLWSP.NET v4.0 SPOKANE COL.NTY BUILDING AND PLANNING PERMIT Permit Issued Date: Application Number: SW-12002468 10/31/2012 Expiration Date: FOR SEWER INSPECTIONS CALL THE UTILITIES DEPT AT(509)477-3604 FROM 8:30-5:00 MONDAY-FRIDAY PRIOR TO COVER. ONE WORKING DAY NOTICE REQUIRED. PERMIT ALLOWS FOR A 30-MINUTE INSPECTION.ADDITIONAL INSPECTION FEES APPLY AFTER 30 MINUTES. INSTALLER IS RESPONSIBLE TO INSURE ALL WASTEWATER DRAINS ARE CONNECTED TO THE SEWER AND MAY BE REQUIRED TO PERFORM TESTS FOR VERIFICATION. INSTALLER IS TO FIELD LOCATE AND CONFIRM THE ELEVATION AND POSITION OF SEWER STUB PRIOR TO ANY OTHER EXCAVATION. _ SEWER STUBS AND DRY SIDE SEWERS ARE TO BE CHECKED PRIOR TO CONNECTION TO ENSURE THAT THEY HAVE ACCEPTABLE GRADE AND ARE CLEAR AND UNOBSTRUCTED. SEWER LINES SHOULD BE CONSTRUCTED TO ALLOW FOR GRAVITY FLOW FROM THE LOWEST LEVEL OF THE STRUCTURE. THE INSTALLER AND THIS PERMIT MUST BE PRESENT AT THE JOB SITE AT THE SCHEDULED INSPECTION TIME.BOTH STATE LAW RCW 19.122 AND COUNTY CODE REQUIRES THE INSTALLER TO GIVE NOTICE OF EXCAVATION TO OWNERS OF UNDERGROUND FACILITIES. Date Printed:10/31/2012 12:53:50 Printed by:IIS APPPOOL\ASP.NET v4.0