2013, 03-04 Permit: SW-13000128 Sewer SPOKANE COUNTY UTILITIES
PERMIT
Application Number: SW-13000128 Permit Issued Date: 03/04/2013
Project Description: SEWER CONNECTION
Project Name: WEST FARMS
Primary Contact: COURCHAINE EXCAVATION Applicant: COURCHAINE EXCAVATION
Phone: 509-928-0846 Address: 19818 E SPRAGUE
GREENACRES,WA 99016
Phone: 509-928-0846
Email:
SITE INFORMATION:
Site Address: 12907 E WELLESLEY AVE Owner: DUNHAM,MELVIN DEAN
Parcel Number: 46343.9110 Address: 12907 E WELLESLEY AVE
SPOKANE,WA 99216-1230
Phone:
Assessor's Description: 34-26-44 COMM AT S1/4 COR OF SD SEC;THS Email:
89DEG 38MIN 11SDS W,472.93 FT ALG THE SEC
LN;TH N ODEG OMIN 45SDS W,302FT TO THE
TRUE POB;TH S 89DEG 38MIN 11SDS W, 160FT;
TH N ODEG OMIN 45SDS W,257FT;
Inspection Area: : (509)-477-3675
Water District:Trentwood Irrigation District Fire District:Spokane Valley Fire
#3
Zoning: Land Area: 0.94 Acre(s)
CONTRACTOR INFORMATION:
COURCC*181R7, Exp. 10/10/2013
COURCHAINE EXCAVATION
19818 E SPRAGUE
GREENACRES,WA 99016
509-928-0846
DETAILS:
Class Type Quantity Unit Charge Value
SEWER SEWER CONNECTION 1 $125.00 $125.00
$125.00
FEE DETAIL:
Processing-Utilities $26.32
Utilities Permit $125.00
Total Fee: $151.32
CONDITIONS:
Inside Public Transit Benefit Area
Plan review fee is required for all site plan reviews conducted by Spokane Valley Fire.
CALL 1-800-424-5555 BEFORE YOU DIG--AT LEAST 2 WORKING DAYS IN ADVANCE. SPOKANE COUNTY CODE REQUIRES THE
INSTALLER COMPLY WITH ALL REQUIREMENTS OF THE WA STATE DEPT OF LABOR&INDUSTRIES, INCLUDING THOSE
RELATED TO TRENCH SAFETY.
FOR SEWER INSPECTIONS CALL THE UTILITIES DEPT AT(509)477-3604 FROM 8:30-5:00 MONDAY-FRIDAY PRIOR TO COVER.
ONE WORKING DAY NOTICE REQUIRED. PERMIT ALLOWS FOR A 30-MINUTE INSPECTION.ADDITIONAL INSPECTION FEES
APPLY AFTER 30 MINUTES.
Date Printed:03/04/2013 10:50:04 Project Coordinator:Kathy Cummings
SPOKANE COUNTY UTILITIES
PERMIT
Application Number: SW-13000128 Permit Issued Date: 03/04/2013
INSTALLER IS RESPONSIBLE TO INSURE ALL WASTEWATER DRAINS ARE CONNECTED TO THE SEWER AND MAY BE REQUIRED
TO PERFORM TESTS FOR VERIFICATION. INSTALLER IS TO FIELD LOCATE AND CONFIRM THE ELEVATION AND POSITION OF
SEWER STUB PRIOR TO ANY OTHER EXCAVATION.
SEWER STUBS AND DRY SIDE SEWERS ARE TO BE CHECKED PRIOR TO CONNECTION TO ENSURE THAT THEY HAVE
ACCEPTABLE GRADE AND ARE CLEAR AND UNOBSTRUCTED.SEWER LINES SHOULD BE CONSTRUCTED TO ALLOW FOR
GRAVITY FLOW FROM THE LOWEST LEVEL OF THE STRUCTURE. _
THE INSTALLER AND THIS PERMIT MUST BE PRESENT AT THE JOB SITE AT THE SCHEDULED INSPECTION TIME.BOTH STATE
LAW RCW 19.122 AND COUNTY CODE REQUIRES THE INSTALLER TO GIVE NOTICE OF EXCAVATION TO OWNERS OF
UNDERGROUND FACILITIES.
Date Printed:03/04/2013 10:50:04 Project Coordinator:Kathy Cummings