Loading...
HomeMy WebLinkAbout2012, 07-12 Permit: SW-12001745 SewerSPOKANE COUNTY BUILDING AND PLANNING PERMIT Application Number: SW -12001745 Permit Issued Date: 07/12/2012 Expiration Date: Project Description: SEWER CONNECTION Project Name: ROCKWELL PHASE 2 Permit Type: SEWER Primary Contact: GOBERS LLC Applicant: GOBERS LLC Address: 11215 E TRENT AVE SPOKANE, WA 99206 Phone: (509)924-5372 Email: SITE INFORMATION' Site Address: Parcel Number: 14206 E WELLESLEY AVE 45022.1118 Owner: HAVENS, ROBERT L & CYNTHIA J Address: 14206 E WELLESLEY AVE SPOKANE VALLEY, WA 99216 Subdivision: TRENTWOOD Phone: ORCHARDS Assessors Description: TRENTWOOD ORCHARDS E90' OF W190' OF E3/5 Email: OF BLK 5 EXC S200' & S200' OF E3/5 OF BLK 5 EXC E219' & EXC W100' Inspection Area: Water District: Trentwood Fire District: Spokane Valley Fire Irrigation District #3 Zoning: Land Area: 25520 Square Feet CONTRACTOR INFORMATION' General Contractor GOBERL899L7 GOBERS LLC 11215 E TRENT AVE SPOKANE, WA 99206 (509)924.-5372 DETAILS' Class Type Quantity Unit Charge Value SEWER SEWER CONNECTION 1 $125.00 $125.00 FEE DETAIL' Processing - Utilities Utilities Permit Total Fee: $125.00 $25.94 $125.00 $150.94 CONDITIONS: Inside Public Transit Benefit Area Possible FEMA Flood Zone Date Printed: 07/12/2012 13:49:00 Printed by: IIS APPPOOLIASP.NET v4.0 SPOKANE COUNTY BUILDING AND PLANNING PERMIT Permit Issued Date: Application Number: SW -12001745 07/12/2012 Expiration Date: CALL 1-800-424-5555 BEFORE YOU DIG --AT LEAST 2 WORKING DAYS IN ADVANCE. SPOKANE COUNTY CODE REQUIRES THE INSTALLER COMPLY WITH ALL REQUIREMENTS OF THE WA STATE DEPT OF LABOR & INDUSTRIES, INCLUDING THOSE RELATED TO TRENCH SAFETY. FOR SEWER INSPECTIONS CALL THE UTILITIES DEPT AT (509) 477-3604 FROM 8:30-5:00 MONDAY -FRIDAY PRIOR TO COVER. ONE WORKING DAY NOTICE REQUIRED. PERMIT ALLOWS FORA 30 -MINUTE INSPECTION. ADDITIONAL INSPECTION FEES APPLY AFTER 30 MINUTES. INSTALLER IS RESPONSIBLE TO INSURE ALL WASTEWATER DRAINS ARE CONNECTED TO THE SEWER AND MAY BE REQUIRED TO PERFORM TESTS FOR VERIFICATION. INSTALLER IS TO FIELD LOCATE AND CONFIRM THE ELEVATION AND POSITION OF SEWER STUB PRIOR TO ANY OTHER EXCAVATION. SEWER STUBS AND DRY SIDE SEWERS ARE TO BE CHECKED PRIOR TO CONNECTION TO ENSURE THAT THEY HAVE ACCEPTABLE GRADE AND ARE CLEAR AND UNOBSTRUCTED. SEWER LINES SHOULD BE CONSTRUCTED TO ALLOW FOR GRAVITY FLOW FROM THE LOWEST LEVEL OF THE STRUCTURE. THE INSTALLER AND THIS PERMIT MUST BE PRESENT AT THE JOB SITE AT THE SCHEDULED INSPECTION TIME. BOTH STATE LAW RCW 19.122 AND COUNTY CODE REQUIRES THE INSTALLER TO GIVE NOTICE OF EXCAVATION TO OWNERS OF UNDERGROUND FACILITIES. Date Printed: 07/12/2012 13:49:00 Printed by: 115 APPPOOLVASP.NET v4.0