2012, 04-18 Permit: SW-12001145 Sewer SPOKANE COUNTY BUILDING AND PLANNING
PERMIT
Permit Issued Date:
Application Number: SW-12001145 04/18/2012
Expiration Date:
Project Description: SEWER CONNECTION Primary Contact: ELLINGSON, KEITH W
Project Name: ROCKWELL PH 2 Applicant: ELLINGSON, KEITH W
Permit Type: SEWER Address: 2813 N VISTA RD
SPOKANE VALLEY,WA 99212
Phone: 509-638-5095
Email:
SITE INFORMATION:
Site Address: 14013 E WELLESLEY AVE Owner: ELLINGSON, KEITH W
Parcel Number: 46353.0809 Address: 2813 N VISTA RD
SPOKANE VALLEY,WA 99212
Subdivision: PLAT NO 4 OF WEST Phone: 509-638-5095
FARMS IRRIGATED
TRACTS
Assessor's Description: W FARM IRR 4 EVERGREEN S1/2 OF L7 EXC Email:
E25FT
Inspection Area:
Water District:Trentwood Fire District: Fire District 1
Irrigation District#3
Zoning: Land Area: 0.3747 acres/16320 sqft
CONTRACTOR INFORMATION:
Owner Acting As Builder
OWNER
OWNER
NOT KNOWN AT TIME OF ENTRY
UNKNOWN, UK 00000
DETAILS:
Class Type Quantity Unit Charge Value
SEWER SEWER CONNECTION 1 $125.00 $125.00
$125.00
FEE DETAIL:
Processing-Utilities $25.94
Utilities Permit $125.00
Total Fee: $150.94
CONDITIONS:
Inside Public Transit Benefit Area
Possible Floodzone On Site
Date Printed:04/18/2012 09:57:30 Printed by:IIS APPPOOL\ASP.NET v4.0
SPOKANE COUNTY BUILDING AND PLANNING
PERMIT
Permit Issued Date:
Application Number: SW-12001145 04/18/2012
Expiration Date:
CALL 1-800-424-5555 BEFORE YOU DIG--AT LEAST 2 WORKING DAYS IN ADVANCE.SPOKANE COUNTY CODE REQUIRES THE
INSTALLER COMPLY WITH ALL REQUIREMENTS OF THE WA STATE DEPT OF LABOR&INDUSTRIES, INCLUDING THOSE
RELATED TO TRENCH SAFETY.
FOR SEWER INSPECTIONS CALL THE UTILITIES DEPT AT(509)477-3604 FROM 8:30-5:00 MONDAY-FRIDAY PRIOR TO COVER.
ONE WORKING DAY NOTICE REQUIRED. PERMIT ALLOWS FOR A 30-MINUTE INSPECTION.ADDITIONAL INSPECTION FEES
APPLY AFTER 30 MINUTES. —
INSTALLER IS RESPONSIBLE TO INSURE ALL WASTEWATER DRAINS ARE CONNECTED TO THE SEWER AND MAY BE REQUIRED
TO PERFORM TESTS FOR VERIFICATION. INSTALLER IS TO FIELD LOCATE AND CONFIRM THE ELEVATION AND POSITION OF
SEWER STUB PRIOR TO ANY OTHER EXCAVATION. —
SEWER STUBS AND DRY SIDE SEWERS ARE TO BE CHECKED PRIOR TO CONNECTION TO ENSURE THAT THEY HAVE
ACCEPTABLE GRADE AND ARE CLEAR AND UNOBSTRUCTED.SEWER LINES SHOULD BE CONSTRUCTED TO ALLOW FOR
GRAVITY FLOW FROM THE LOWEST LEVEL OF THE STRUCTURE. —
THE INSTALLER AND THIS PERMIT MUST BE PRESENT AT THE JOB SITE AT THE SCHEDULED INSPECTION TIME. BOTH STATE
LAW RCW 19.122 AND COUNTY CODE REQUIRES THE INSTALLER TO GIVE NOTICE OF EXCAVATION TO OWNERS OF
UNDERGROUND FACILITIES.
Printed by:IIS APPPOOL\ASP.NET v4.0
Date Printed:04/18/2012 09:57:30