Loading...
2012, 08-09 Permit: SW-12001946 SPOKANE COUNTY BUILDING AND PLANNING PERMIT Permit Issued Date: Application Number: SW-12001946 08/09/2012 Expiration Date: 08/10/2012 Project Description: SEWER CONNECTION Primary Contact: W C CONNER EXCAVATING Project Name: ROCKWELL PH 2 Applicant: W C CONNER EXCAVATING Permit Type: SEWER Address: 1809 E HOUSTON AVE SPOKANE,WA 99217 Phone: 509-483-1123 Email: SITE INFORMATION: Site Address: 14015 E WELLESLEY AVE Owner: MEIER, HERMANN H Parcel Number: 46353.0703 Address: 14015 E WELLESLEY AVE SPOKANE,WA 99216-1413 Subdivision: PLAT NO 4 OF WEST Phone: FARMS IRRIGATED TRACTS Assessor's Description: WEST FARM IRR TR PL 4 W1/2 OF SE1/4 TR Email: 115 EXC S2FT OF E76.22FT FOR RD Inspection Area: Water District:Trentwood Fire District:Spokane Valley Fire Irrigation District#3 Zoning: Land Area:2.4 Acre(s) CONTRACTOR INFORMATION: General Contractor WCCONE277JR W C CONNOR EXCAVATING 1809 E. HOUSTON AVE. SPOKANE,WA 99217 509-466-6178 DETAILS: Class Type Quantity Unit Charge Value SEWER SEWER CONNECTION 1 $125.00 $125.00 $125.00 FEE DETAIL: Processing-Utilities $25.94 Utilities Permit $125.00 Total Fee: $150.94 CONDITIONS: CALL 1-800-424-5555 BEFORE YOU DIG--AT LEAST 2 WORKING DAYS IN ADVANCE.SPOKANE COUNTY CODE REQUIRES THE INSTALLER COMPLY WITH ALL REQUIREMENTS OF THE WA STATE DEPT OF LABOR&INDUSTRIES, INCLUDING THOSE RELATED TO TRENCH SAFETY. Date Printed:08/09/2012 12:16:49 Printed by:IIS APPPOOL\ASP.NET v4.0 SPOKANE COUNTY BUILDING AND PLANNING PERMIT Permit Issued Date: Application Number: SW-12001946 08/09/2012 Expiration Date: 08/10/2012 FOR SEWER INSPECTIONS CALL THE UTILITIES DEPT AT(509)477-3604 FROM 8:30-5:00 MONDAY-FRIDAY PRIOR TO COVER. ONE WORKING DAY NOTICE REQUIRED. PERMIT ALLOWS FOR A 30-MINUTE INSPECTION.ADDITIONAL INSPECTION FEES APPLY AFTER 30 MINUTES. _ INSTALLER IS RESPONSIBLE TO INSURE ALL WASTEWATER DRAINS ARE CONNECTED TO THE SEWER AND MAY BE REQUIRED TO PERFORM TESTS FOR VERIFICATION. INSTALLER IS TO FIELD LOCATE AND CONFIRM THE ELEVATION AND POSITION OF SEWER STUB PRIOR TO ANY OTHER EXCAVATION. _ SEWER STUBS AND DRY SIDE SEWERS ARE TO BE CHECKED PRIOR TO CONNECTION TO ENSURE THAT THEY HAVE ACCEPTABLE GRADE AND ARE CLEAR AND UNOBSTRUCTED.SEWER LINES SHOULD BE CONSTRUCTED TO ALLOW FOR GRAVITY FLOW FROM THE LOWEST LEVEL OF THE STRUCTURE. _ THE INSTALLER AND THIS PERMIT MUST BE PRESENT AT THE JOB SITE AT THE SCHEDULED INSPECTION TIME.BOTH STATE LAW RCW 19.122 AND COUNTY CODE REQUIRES THE INSTALLER TO GIVE NOTICE OF EXCAVATION TO OWNERS OF UNDERGROUND FACILITIES. Date Printed:08/09/2012 12:16:49 Printed by:IIS APPPOOL\ASP.NET v4.0