2012, 08-09 Permit: SW-12001946 SPOKANE COUNTY BUILDING AND PLANNING
PERMIT
Permit Issued Date:
Application Number: SW-12001946 08/09/2012
Expiration Date: 08/10/2012
Project Description: SEWER CONNECTION Primary Contact: W C CONNER EXCAVATING
Project Name: ROCKWELL PH 2 Applicant: W C CONNER EXCAVATING
Permit Type: SEWER Address: 1809 E HOUSTON AVE
SPOKANE,WA 99217
Phone: 509-483-1123
Email:
SITE INFORMATION:
Site Address: 14015 E WELLESLEY AVE Owner: MEIER, HERMANN H
Parcel Number: 46353.0703 Address: 14015 E WELLESLEY AVE
SPOKANE,WA 99216-1413
Subdivision: PLAT NO 4 OF WEST Phone:
FARMS IRRIGATED
TRACTS
Assessor's Description: WEST FARM IRR TR PL 4 W1/2 OF SE1/4 TR Email:
115 EXC S2FT OF E76.22FT FOR RD
Inspection Area:
Water District:Trentwood Fire District:Spokane Valley Fire
Irrigation District#3
Zoning: Land Area:2.4 Acre(s)
CONTRACTOR INFORMATION:
General Contractor
WCCONE277JR
W C CONNOR EXCAVATING
1809 E. HOUSTON AVE.
SPOKANE,WA 99217
509-466-6178
DETAILS:
Class Type Quantity Unit Charge Value
SEWER SEWER CONNECTION 1 $125.00 $125.00
$125.00
FEE DETAIL:
Processing-Utilities $25.94
Utilities Permit $125.00
Total Fee: $150.94
CONDITIONS:
CALL 1-800-424-5555 BEFORE YOU DIG--AT LEAST 2 WORKING DAYS IN ADVANCE.SPOKANE COUNTY CODE REQUIRES THE
INSTALLER COMPLY WITH ALL REQUIREMENTS OF THE WA STATE DEPT OF LABOR&INDUSTRIES, INCLUDING THOSE
RELATED TO TRENCH SAFETY.
Date Printed:08/09/2012 12:16:49 Printed by:IIS APPPOOL\ASP.NET v4.0
SPOKANE COUNTY BUILDING AND PLANNING
PERMIT
Permit Issued Date:
Application Number: SW-12001946 08/09/2012
Expiration Date: 08/10/2012
FOR SEWER INSPECTIONS CALL THE UTILITIES DEPT AT(509)477-3604 FROM 8:30-5:00 MONDAY-FRIDAY PRIOR TO COVER.
ONE WORKING DAY NOTICE REQUIRED. PERMIT ALLOWS FOR A 30-MINUTE INSPECTION.ADDITIONAL INSPECTION FEES
APPLY AFTER 30 MINUTES. _
INSTALLER IS RESPONSIBLE TO INSURE ALL WASTEWATER DRAINS ARE CONNECTED TO THE SEWER AND MAY BE REQUIRED
TO PERFORM TESTS FOR VERIFICATION. INSTALLER IS TO FIELD LOCATE AND CONFIRM THE ELEVATION AND POSITION OF
SEWER STUB PRIOR TO ANY OTHER EXCAVATION. _
SEWER STUBS AND DRY SIDE SEWERS ARE TO BE CHECKED PRIOR TO CONNECTION TO ENSURE THAT THEY HAVE
ACCEPTABLE GRADE AND ARE CLEAR AND UNOBSTRUCTED.SEWER LINES SHOULD BE CONSTRUCTED TO ALLOW FOR
GRAVITY FLOW FROM THE LOWEST LEVEL OF THE STRUCTURE. _
THE INSTALLER AND THIS PERMIT MUST BE PRESENT AT THE JOB SITE AT THE SCHEDULED INSPECTION TIME.BOTH STATE
LAW RCW 19.122 AND COUNTY CODE REQUIRES THE INSTALLER TO GIVE NOTICE OF EXCAVATION TO OWNERS OF
UNDERGROUND FACILITIES.
Date Printed:08/09/2012 12:16:49 Printed by:IIS APPPOOL\ASP.NET v4.0