2012, 07-24 Permit: SW-12001806 Sewerir
SPOKANE COUNTY B1ZLDING AND PLANNING
PERMIT
Application Number: SW -12001806
Permit Issued Date:
07/24/2012
Expiration Date:
Project Description: SEWER CONNECTION
Permit Type: SEWER
Primary Contact:
Applicant:
Address:
Phone:
Email:
•GOBER'S LLC
•GOBER'S LLC
11215E TRENT AVE
SPOKANE, WA 99206
509-924-5372
SITE INFORMATION•
Site Address: 14216 E WELLESLEY AVE
Parcel Number: 45022.1117
Subdivision:
Assessor's Description:
Inspection Area:
Zoning:
TRENTWOOD
ORCHARDS
TRENTWOOD ORCH TR 5 THAT PTN OF TR 5
DAF; E3/5 EXC W190FT & EXC S200FT & EXC
E105FT OF N130FT
Owner:
Address:
Phone:
Email:
SCHLERF, JEFFREY & STACI
14216 E WELLESLEY AVE
SPOKANE, WA 99216-1415
Water District: Trentwood Fire District: Spokane Valley Fire
Irrigation District #3
Land Area: 11610 Square Feet
CONTRACTOR INFORMATION:
General Contractor
GOBERL*899L7
*GOBER'S, LLC
11215 E. TRENT AVE.
SPOKANE, WA 99206
509-924-5372
DETAILS:
Class
Type
Quantity
Unit Charge
Value
SEWER SEWER CONNECTION
FEE DETAIL:
Processing - Utilities
Utilities Permit
1
$125.00
$125.00
Total Fee:
$125.00
$25.94
$125.00
$150.94
CONDITIONS:
Possible FEMA Flood Zone
Inside Public Transit Benefit Area
Date Printed: 07/24/2012 14:11:36
Printed by: IIS APPPOOLVASP.NET v4.0
SPOKANE COUNTY BUILDING AND PLANNING
PERMIT
Permit Issued Date:
Application Number: SW -12001806 07/24/2012
Expiration Date:
CALL 1-800-424-5555 BEFORE YOU DIG—AT LEAST 2 WORKING DAYS IN ADVANCE. SPOKANE COUNTY CODE REQUIRES THE
INSTALLER COMPLY WITH ALL REQUIREMENTS OF THE WA STATE DEPT OF LABOR & INDUSTRIES, INCLUDING THOSE
RELATED TO TRENCH SAFETY.
FOR SEWER INSPECTIONS CALL THE UTILITIES -DEPT AT (509) 477-3604 FROM 8:30-5:00 MONDAY -FRIDAY PRIOR TO COVER.
ONE WORKING DAY NOTICE REQUIRED. PERMIT ALLOWS FOR A 30 -MINUTE INSPECTION. ADDITIONAL INSPECTION FEES
APPLY AFTER 30 MINUTES.
INSTALLER IS RESPONSIBLE TO INSURE ALL WASTEWATER DRAINS ARE CONNECTED TO THE SEWER AND MAY BE REQUIRED
TO PERFORM TESTS FOR VERIFICATION. INSTALLER IS TO FIELD LOCATE AND CONFIRM THE ELEVATION AND POSITION OF
SEWER STUB PRIOR TO ANY OTHER EXCAVATION.
SEWER STUBS AND DRY SIDE SEWERS ARE TO BE CHECKED PRIOR TO CONNECTION TO ENSURE THAT THEY HAVE
ACCEPTABLE GRADE AND ARE CLEAR AND UNOBSTRUCTED. SEWER LINES SHOULD BE CONSTRUCTED TO ALLOW FOR
GRAVITY FLOW FROM THE LOWEST LEVEL OF THE STRUCTURE.
THE INSTALLER AND THIS PERMIT MUST BE PRESENT AT THE JOB SITE AT THE SCHEDULED INSPECTION TIME. BOTH STATE
LAW RCW 19.122 AND COUNTY CODE REQUIRES THE INSTALLER TO GIVE NOTICE OF EXCAVATION TO OWNERS OF
UNDERGROUND FACILITIES.
Date Printed: 07/24/2012 14:11:36
Printed by: IIS APPPOOLWSP.NET v4.0