Loading...
2012, 07-17 Permit: SW-12001762 SewerSPOKANE COUFITY.BUILDING AND PLANNING PERMIT Application Number: SW -12001762 Permit Issued Date: 07/17/2012 Expiration Date: Project Description: Project Name: Permit Type: SEWER CONNECTION ROCKWELL PH 2 SEWER Primary Contact: GOBERS LLC Applicant: GOBERS LLC Address: Phone: Email: 11215 E TRENT AVE SPOKANE, WA 99206 (509)924-5372 SITE INFORMATION - Site Address: Parcel Number. Subdivision: Assessor's Description: Inspection Area: Zoning: 14216 E WELLESLEY AVE 45022.1117 TRENTWOOD ORCHARDS TRENTWOOD ORCH TR 5 THAT PTN OF TR 5 DAF; E3/5 EXC W190FT & EXC S200FT &EXC E105FT OF N130FT Owner: Address: 14216 E WELLESLEY AVE SPOKANE, WA 99216-1415 Phone: SCHLERF, JEFFREY & STACI Email: Water District: Trentwood Fire District: Spokane Valley Fire Irrigation District #3 Land Area: 11610 Square Feet CONTRACTOR INFORMATION• General Contractor GOBERL899L7 GOBERS LLC 11215 E TRENT AVE SPOKANE, WA 99206 (509)924-5372 DETAILS: Class Type Quantity Unit Charge Value SEWER SEWER CONNECTION FEE DETAIL: Processing - Utilities Utilities Permit 1 $125.00 $125.00 Total Fee: $125.00 $25.94 $125.00 $150.94 CONDITIONS: CALL 1-800-424-5555 BEFORE YOU DIG --AT LEAST 2 WORKING DAYS IN ADVANCE. SPOKANE COUNTY CODE REQUIRES THE INSTALLER COMPLY WITH ALL REQUIREMENTS OF THE WA STATE DEPT OF LABOR & INDUSTRIES, INCLUDING THOSE RELATED TO TRENCH SAFETY. Date Printed: 07/17/2012 09:21:02 Printed by: 115 APPPOOL\ASP.NET v4.0 SPOKANE COUNTY BUILDING AND PLANNING PERMIT Permit Issued Date: Application Number: SW -12001762 07/17/2012 Expiration Date: FOR SEWER INSPECTIONS CALL THE UTILITIES DEPT AT (509) 477-3604 FROM 8:30-5:00 MONDAY -FRIDAY PRIOR TO COVER. ONE WORKING DAY NOTICE REQUIRED. PERMIT ALLOWS FOR A 30 -MINUTE INSPECTION. ADDITIONAL INSPECTION FEES APPLY AFTER 30 MINUTES. INSTALLER IS RESPONSIBLE TO INSURE ALL WASTEWATER DRAINS ARE CONNECTED TO THE SEWER AND MAY BE REQUIRED TO PERFORM TESTS FOR VERIFICATION. INSTALLER IS TO FIELD LOCATE AND CONFIRM THE ELEVATION AND POSITION OF SEWER STUB PRIOR TO ANY OTHER EXCAVATION. SEWER STUBS AND DRY SIDE SEWERS ARE TO BE CHECKED PRIOR TO CONNECTION TO ENSURE THAT THEY HAVE ACCEPTABLE GRADE AND ARE CLEAR AND UNOBSTRUCTED. SEWER LINES SHOULD BE CONSTRUCTED TO ALLOW FOR GRAVITY FLOW FROM THE LOWEST LEVEL OF THE STRUCTURE. THE INSTALLER AND THIS PERMIT MUST BE PRESENT AT THE JOB SITE AT THE SCHEDULED INSPECTION TIME. BOTH STATE LAW RCW 19.122 AND COUNTY CODE REQUIRES THE INSTALLER TO GIVE NOTICE OF EXCAVATION TO OWNERS OF UNDERGROUND FACILITIES. Date Printed: 07/17/2012 09:21:02 Printed by: IIS APPPOOL\ASP.NET v4.0