2008, 10-10 Permit App: 08004030 Pole Bldg Project Number: 08004030 Inv: 1 Application Date: 10/10/2008 Page 1 of 2
THIS IS NOT A PERMIT
Penalties will be assessed for commencing work without a permit
Project Information:
Permit Use: 40 X 60 POLE BLDG Contact: QUALITY STEEL BLDGS
Address: 7810 N MARKET ST
C-S-Z: SPOKANE,WA.99217
Setbacks:Front Left: Right: Rear: Phone: (509)468-1606
Group Name:
Site In formation: Project Name:
.. Ma aiRR4+W -$n. 8 ,..:xu .wtx3...,.v;u.,^baaat9,4av wt%aYR.S3:?S ttmSMF,i n's-.,3'd> w.,.,ry a .,', ...m:x's-> 4a av a %.a wwa;a3m'ne® a,drf'p,••..;.»' 4 ;..1{y
Plat Key: 002861 Name: WEST FARMS IRRIGATED TRACT#04(FEES) District: East
Parcel Number: 46353.0703 Block: Lot:
SiteAddress: 14015 E WELLESLEY AVE Owner:Name: MEIER,HERMANN H
Address: 8821 E MARINGO DR
Location::CSV SPOKANE VALLEY,WA 99212-18
Zoning: R-3 SF Res District
Water District: 001 TRENTWOOD Hold: ❑
Area: 2.40 Acres Width: 240 Depth: 435 Right Of Way(ft): 60
Nbr of Bldgs: 2 Nbr of Dwellings: 1
Review Information:
Review
Building Plan Review Released By - r
Originally Released: 10/10/2008 By: tmelbourn
Landuse/Zoning/HE Conditions —Released Bya,
Originally Released: 10/10/2008 By: cjjanssen
Permits: 4. F..-
Operator: jmm Printed By: jmm Print Date: 10/10/2008
Project Number: 08004030 Inv: 1 Application Date: 10/10/2008 Page 2 of 2
THIS IS NOT A PERMIT
Penalties will be assessed for commencing work without a permit
Building Permit
Contractor: QUALITY STEEL BUILDINGS INC Firm: QUALITY STEEL BUILDINGS INC
Address: 7810 N MARKET ST Phone: (509)468-1606
SPOKANE,WA 99207
This Application: Total Project:
Description Grp Type Notes Sq Ft Valuation Sq Ft Valuation
POLE BDLG U-1 VB POLE BLDG 2,400 $45,600.00 2,400 $45,600.00
Totals: 2,400 $45,600.00 2,400 $45,600.00
Item Description Units Unit Desc Fee Amount
RESIDENTIAL PERMIT FEE 1 SELECT $603.35
ACCESSORY PLANS REVIEW 1 SELECT $150.84
WSBC SURCHARGE 1 SELECT $4.50
Permit Total Fees: $758.69
Notes:
Payment Summary: .rommemossimunsummmew
�
Permit Type Fee Amount Invoice Amount Amount Paid Amount Owing
Building Permit $758.69 $758.69 $0.00 $758.69
$758.69 $758.69 $0.00 $758.69
Disclaimer:
Submittal of this application certifies the owner(or person(s)authorized by the owner)has both examined and finds the information
contained within to be true and correct,and agrees that all provisions of laws and/or regulations governing this type of work will be
complied with. Subsequent issuance of a permit shall not be construed to be a permit for,or an approval of,any violation of any of
the provisions of the code or of any other state or local laws or ordinances.
Signature:
Operator: jmm Printed By: jmm Print Date: 10/10/2008
Quality
PLANNING DEPT. APPROVED STEEL BUILDINGS, INC.
N. 7810 Market Center Suite (509)468-1606 office
Spokane, Wa. 99207 (509)468-3720 fax
' - (-all.jLiac..:_ __:;icL. . LIC#QUALISBO81C7
DATE: 1° 1 1 - c SITE PLAN
SHOW 0
NORTH
WO /
1mQ
r
14E4 4 4L &lob
IS) _ -
(21.C)----4. ��
._-,-- '\
1
\f3.1..., 1
iviti) ,t5-u),s-c -,mm.E. 1 %.10
! dt— i ,- (BCS 0
V 3O K3O
-. circ; 0
k,
i L)1AtosTz .
,,,„
%,
, t T,)„,_ 0 ,.„0_ -Y-_-_-)-l.hb :---
&l Cab VI
( PilfD I
10'FROM SEPTIC/DRAINFIELD JOB NAME %_ :MO, k►\E.\Eta
SHOW STREETS/ALLEYS PHONE# Cy/A; Ola,`3
SHOW SEPTIC/SEWER/DRAINFIELD ADDRESS \415 _tn;�.(� Sst--`1
SHOW EXISTING BUILDINGS G Li cs.-cA0A%--t \)1)yti-IE kf
SHOW SETBACKS-FRONT,REAR,SIDE PARCEL# Asc;`3r,3.. 010
SHOW LOT SIZE
SIDE YARD&REAR YARD SET BACKS.
5'TO PROPERTY LINE UP TO 15'PEAK HIGH FOR
EVERY FOOT OVER 15'ADD 1'TO SET BACK.
' " For City Use Pnly
CITY OF
,_: PLUS Project Number ;, U
- 4-
Project Address # c)1 -; ( i
pokane
400.
a Q
°
11703 E Sprague Ave Suite B-3 ♦ Spokane Valley WA 99206
509.688.0036 ♦ Fax: 509.688.0037 ♦ permitcenter@spokanevalley.org
As part of our on-going commitment to customer service during the review process of your project
application, we are providing you with a TARGET DATE for the initial technical application review. If for
any reason we cannot meet this date, we will contact you with a revised target date.
Your application review TARGET DATE is1 CJI 1 '
The TARGET DATE is the date we estimate your project application will have had its initial technical
review. It is not the date for approval or permit issuance.
Tips for a Smoother Project Application Review
➢ Submit complete, accurate plans and documents.
Extra time may be required for re-submittals as project application reviewers work on multiple applications and it
may be several days before they can look at your new or revised information.
➢ Designate a specific contact person to communicate with the City.
While the person designated as the applicant's contact person with the City can be changed, one individual with the
expertise for dealing with reviewer comments would be the best choice for the entire review process.
> Call staff regarding the status of your project only after the target date shown at the top of the page.
Although you should be contacted on or by the target date,please feel free to contact us if you haven't heard from us
by your target date. Staff may contact you before the target date if the initial review is complete. By following this
procedure,you will save time and allow the reviewers to complete the work more expeditiously.
Steps in the Permit Process
1. Counter Complete. Your application has been accepted as counter complete. This means all of the required
documents, as indicated on your Pre-Application Checklist have been submitted or have been approved for deferred
submittal.This does not prevent technical staff from requesting additional information as a result of their technical review.
2. Quality Check. The next step in the process is a quality check to make sure that the application is reviewable and free
from substantive flaws that would prevent technical staff from completing the technical review once it is started. When
this step is complete, your application will be routed to the appropriate staff and remain in their review queue until it
comes up for review.
3. Technical Compliance. Once an application is administratively complete, it is routed to technical staff for compliance
review. Depending on the type of project, technical staff may include multiple reviewers. You should be contacted by
phone, fax, email,or mail by your TARGET DATE once the initial technical compliance review is complete.
4. Permit Issuance. When the technical compliance review of the application is complete, including any subsequent re-
submittals, each reviewer will approve their section of the application and route it to the Permit Center. When all sections
of the application are received, a Permit Specialist will process the application and contact the person specified on your
application for permit pick-up. Information regarding fees and pre-construction meetings (if required) will be provided by
the Permit Specialist at that time.
WHITE—APPLICANT PINK—BUILDING FILE REV 9/07