2012, 07-25 Permit: SW-12001840 Sewer s,
SPOKANE COUNTY BUILDING AND PLANNING
PERMIT
Application Number: SW-12001840 Permit Issued Date:
07/25/2012
Expiration Date:
Project Description: SEWER CONNECTION Primary Contact: NEAL, DARREN G&KATHLEEN A
Applicant: NEAL, DARREN G&KATHLEEN A
Permit Type: SEWER Address: 14425 E WELLESLEY AVE
SPOKANE,WA 99216-1417
Phone:
Email:
SITE INFORMATION:
Site Address: 14425 E WELLESLEY AVE Owner: NEAL, DARREN G&KATHLEEN A
Parcel Number: 46353.0608 Address: 14425 EN W
SPOKAE,WA 99216-141ELLESLEYAVE7
Subdivision: HENDRICKSON Phone:
SUBDIVISION
Assessor's Description: WEST FARMS IRRIGATED TRACTS E 150.13' Email:
OF S 335.6'OF PLAT 4 OF TRACT 114 TOGTHER
WITH VAC 15FT R/W E OF&ADJ TO(RES#85-
0299)
Inspection Area:
Water District:Trentwood Fire District:Spokane Valley Fire
Irrigation District#3
Zoning: Land Area: 1.35 Acre(s)
CONTRACTOR INFORMATION:
Owner Acting As Builder
OWNER
OWNER
NOT KNOWN AT TIME OF ENTRY
UNKNOWN, UK 00000
DETAILS:
Class Type Quantity Unit Charge Value
SEWER SEWER CONNECTION 1 $125.00 $125.00
$125.00
FEE DETAIL:
Processing-Utilities $25.94
Utilities Permit $125.00
Total Fee: $150.94
CONDITIONS:
Inside Public Transit Benefit Area
Possible Floodzone On Site —
Date Printed:07/25/2012 12:39:23 Printed by:IIS APPPOOLWSP.NET v4.0
I
SPOKANE COUNTY BUILDING AND PLANNING
PERMIT
Application Number: SW-12001840 Permit Issued Date:
07/25/2012
Expiration Date:
CALL 1-800-424-5555 BEFORE YOU DIG--AT LEAST 2 WORKING DAYS IN ADVANCE.SPOKANE COUNTY CODE REQUIRES THE
INSTALLER COMPLY WITH ALL REQUIREMENTS OF THE WA STATE DEPT OF LABOR& INDUSTRIES, INCLUDING THOSE
RELATED TO TRENCH SAFETY.
FOR SEWER INSPECTIONS CALL THE UTILITIES DEPT AT(509)477-3604 FROM 8:30-5:00 MONDAY-FRIDAY PRIOR TO COVER.
ONE WORKING DAY NOTICE REQUIRED. PERMIT ALLOWS FOR A 30-MINUTE INSPECTION.ADDITIONAL INSPECTION FEES
APPLY AFTER 30 MINUTES.
INSTALLER IS RESPONSIBLE TO INSURE ALL WASTEWATER DRAINS ARE CONNECTED TO THE SEWER AND MAY BE REQUIRED
TO PERFORM TESTS FOR VERIFICATION. INSTALLER IS TO FIELD LOCATE AND CONFIRM THE ELEVATION AND POSITION OF
SEWER STUB PRIOR TO ANY OTHER EXCAVATION.
SEWER STUBS AND DRY SIDE SEWERS ARE TO BE CHECKED PRIOR TO CONNECTION TO ENSURE THAT THEY HAVE
ACCEPTABLE GRADE AND ARE CLEAR AND UNOBSTRUCTED.SEWER LINES SHOULD BE CONSTRUCTED TO ALLOW FOR
GRAVITY FLOW FROM THE LOWEST LEVEL OF THE STRUCTURE.
THE INSTALLER AND THIS PERMIT MUST BE PRESENT AT THE JOB SITE AT THE SCHEDULED INSPECTION TIME.BOTH STATE
LAW RCW 19.122 AND COUNTY CODE REQUIRES THE INSTALLER TO GIVE NOTICE OF EXCAVATION TO OWNERS OF
UNDERGROUND FACILITIES.
Date Printed:07/25/2012 12:39:23 Printed by:IIS APPPOOL\ASP.NET v4.0