2012, 08-01 Permit: SW-12001874 Sewer SPOKANE COUNTY BUILDING AND PLANNING
PERMIT
Permit Issued Date:
Application Number: SW-12001874 08/01/2012
Expiration Date:
Project Description: PRIVATE SEWER EXTENSION&SEWER Primary Contact: CROWN CONSTRUCTION LLC
CONNECTION
Project Name: ROCKWELL PH II Applicant: CROWN CONSTRUCTION LLC
Permit Type: SEWER Address: 1725 S GRAND
SPOKANE,WA 99203
Phone: 509-216-5995
Email:
SITE INFORMATION:
Site Address: 14504 E WELLESLEY AVE Owner: HUTCHINSON TRUST
Parcel Number: 45022.1012 Address: 1725 S GRAND BLVD
SPOKANE,WA 99203
Subdivision: Phone:
Assessor's Description: TRENTWOOD ORCHARDS W132FT OF TR3 EXC Email:
RD TOGETHER WITH S1/2 OF E 2AC OF TR 4
Inspection Area:
Water District:Trentwood Fire District:Spokane Valley Fire
Irrigation District#3
Zoning: Land Area:2 Acre(s)
CONTRACTOR INFORMATION:
General Contractor
CROWNCL916RS
CROWN CONSTRUCTION LLC
1725 S GRAND
SPOKANE,WA 99203
509-216-5995
DETAILS:
Class Type Quantity Unit Charge Value
SEWER SEWER CONNECTION 1 $125.00 $125.00
SEWER PRIVATE SEWER EXTENSION 1 $125.00 $125.00
$250.00
FEE DETAIL:
Processing-Utilities $25.94
Utilities Permit $250.00
Total Fee: $275.94
CONDITIONS:
Possible FEMA Flood Zone
Inside Public Transit Benefit Area
Date Printed:08/01/2012 08:07:25 Printed by:IIS APPPOOLWSP.NET v4.0
SPOKANE COUNTY BUILDING AND PLANNING
PERMIT
Permit Issued Date:
Application Number: SW-12001874 08/01/2012
Expiration Date:
CALL 1-800-424-5555 BEFORE YOU DIG—AT LEAST 2 WORKING DAYS IN ADVANCE.SPOKANE COUNTY CODE REQUIRES THE
INSTALLER COMPLY WITH ALL REQUIREMENTS OF THE WA STATE DEPT OF LABOR&INDUSTRIES, INCLUDING THOSE
RELATED TO TRENCH SAFETY.
FOR SEWER INSPECTIONS CALL THE UTILITIES DEPT AT(509)477-3604 FROM 8:30-5:00 MONDAY-FRIDAY PRIOR TO COVER.
ONE WORKING DAY NOTICE REQUIRED.PERMIT ALLOWS FOR A 30-MINUTE INSPECTION.ADDITIONAL INSPECTION FEES
APPLY AFTER 30 MINUTES.
INSTALLER IS RESPONSIBLE TO INSURE ALL WASTEWATER DRAINS ARE CONNECTED TO THE SEWER AND MAY BE REQUIRED
TO PERFORM TESTS FOR VERIFICATION. INSTALLER IS TO FIELD LOCATE AND CONFIRM THE ELEVATION AND POSITION OF
SEWER STUB PRIOR TO ANY OTHER EXCAVATION.
SEWER STUBS AND DRY SIDE SEWERS ARE TO BE CHECKED PRIOR TO CONNECTION TO ENSURE THAT THEY HAVE
ACCEPTABLE GRADE AND ARE CLEAR AND UNOBSTRUCTED.SEWER LINES SHOULD BE CONSTRUCTED TO ALLOW FOR
GRAVITY FLOW FROM THE LOWEST LEVEL OF THE STRUCTURE.
THE INSTALLER AND THIS PERMIT MUST BE PRESENT AT THE JOB SITE AT THE SCHEDULED INSPECTION TIME.BOTH STATE
LAW RCW 19.122 AND COUNTY CODE REQUIRES THE INSTALLER TO GIVE NOTICE OF EXCAVATION TO OWNERS OF
UNDERGROUND FACILITIES.
Date Printed:08/01/2012 08:07:25 Printed by:IIS APPPOOL\ASP.NET v4.0