2013, 03-06 Permit: SW-13000159 SewerSPOKANE COUNTY UTILITIES
PERMIT
Application Number: SW -13000159 Permit Issued Date: 03/06/2013
Project Description: SEWER CONNECTION
Project Name: SUMMERFIELD
Primary Contact: PERFORMANCE PLUS, LLC
Phone:
Applicant: PERFORMANCE PLUS, LLC
Address: 4326 S DORSET RD
SPOKANE, WA 99224
Phone:
Email:
SITE INFORMATION.
Site Address: 14906 E WELLESLEY AVE Owner: PERFORMANCE PLUS, LLC
Parcel Number: 45021.0715 Address: 4326 S DORSET RD
SPOKANE, WA 99224
Phone:
Assessor's Description: TRENTWOOD ORCHARDS KING'S SUB PT BLKS Email:
1 - 2 & 11 E7 0' OF W1401 OF N130' OF LT 5 BLK 2
Inspection Area: : (509)-477-3675
Water District: Trentwood Irrigation District Fire District: Spokane Valley Fire
#3
Zoning: Land Area: 9100 Square Feet
CONTRACTOR INFORMATION:
OWNER, Exp. 12/31/2015
OWNER PERFORMING THE WORK
SAME AS SITE ADDRESS
SAME, WA 00000
DETAILS.
Class
Type
Quantity Unit Charge Value
SEWER
FEE DETAIL.
Processing - Utilities
Utilities Permit
SEWER CONNECTION
Total Fee:
$26.32
$125.00
$151.32
1 $125.00 $125.00
$125.00
CONDITIONS'
Plan review fee is required for all site plan reviews conducted by Spokane Valley Fire.
Inside Public Transit Benefit Area
Possible FEMA Flood Zone
CALL 1-800-424-5555 BEFORE YOU DIG—AT LEAST 2 WORKING DAYS IN ADVANCE. SPOKANE COUNTY CODE REQUIRES THE
INSTALLER COMPLY WITH ALL REQUIREMENTS OF THE WA STATE DEPT OF LABOR & INDUSTRIES, INCLUDING THOSE
RELATED TO TRENCH SAFETY.
FOR SEWER INSPECTIONS CALL THE UTILITIES DEPT AT (509) 477-3604 FROM 8:30-5:00 MONDAY -FRIDAY PRIOR TO COVER.
ONE WORKING DAY NOTICE REQUIRED. PERMIT ALLOWS FOR A 30 -MINUTE INSPECTION. ADDITIONAL INSPECTION FEES
APPLY AFTER 30 MINUTES.
Date Printed: 03/06/2013 14:38:24 Project Coordinator: Kathy Cummings
SPOKANE COUNTY UTILITIES
PERMIT
Application Number: SW -13000159 Permit Issued Date: 03/06/2013
INSTALLER IS RESPONSIBLE TO INSURE ALL WASTEWATER DRAINS ARE CONNECTED TO THE SEWER AND MAY BE REQUIRED
TO PERFORM TESTS FOR VERIFICATION. INSTALLER IS TO FIELD LOCATE AND CONFIRM THE ELEVATION AND POSITION OF
SEWER STUB PRIOR TO ANY OTHER EXCAVATION.
SEWER STUBS AND DRY SIDE SEWERS ARE TO BE CHECKED PRIOR TO CONNECTION TO ENSURE THAT THEY HAVE
ACCEPTABLE GRADE AND ARE CLEAR AND UNOBSTRUCTED. SEWER LINES SHOULD BE CONSTRUCTED TO ALLOW FOR
GRAVITY FLOW FROM THE LOWEST LEVEL OF THE STRUCTURE.
THE INSTALLER AND THIS PERMIT MUST BE PRESENT AT THE JOB SITE AT THE SCHEDULED INSPECTION TIME. BOTH STATE
LAW RCW 19.122 AND COUNTY CODE REQUIRES THE INSTALLER TO GIVE NOTICE OF EXCAVATION TO OWNERS OF
UNDERGROUND FACILITIES.
Date Printed: 03/06/2013 14:38:24
Project Coordinator: Kathy Cummings