2011, 07-19 Permit App: 11002086 Repair Fire Damage, Addition Project Number: 11002086 Inv: I Application Date: 7/19/2011 Page 1 of 3
THIS IS NOT A PERMIT
Penalties will be assessed for commencing work without a permit
Project Information:
Permit Use: FIRE DAMAGE REPAIR& 176 SQFT ADDITION Contact: DIAMOND ROCK CONSTRUCTION
Address: 2602 N SULLIVAN RD
C- S-Z: SPOKANE VALLEY,WA 99216
Setbacks: Front Left: Right: Rear: Phone: (509)924-8964
Group Name:
Site Information: Project Name:
Plat Key: 000000 Name: Range District: East
Parcel Number: 46363.0123 Block: Lot:
SiteAddress: 15911 E WELLESLEY AVE Owner:Name: BACA,ROBERT G
Address: 15911 E WELLESLEY AVE
Location::CSV SPOKANE,WA 99216-1533
Zoning: R-3 SF Res District
Water District: 001 TRENTWOOD Hold: ❑
Area: ;,288.00 Acres Width: 0 Depth: 0 Right Of Way(ft): 0
Nbr of Bldgs: 0 Nbr of Dwellings: 0
Review Information:
Review
Building Plan Review Released By:
Originally Released: 7/18/2011 By: tmelbourn
Landuse/Zoning/HE Conditions Released By:
Originally Released: 7/14/2011 By: Mharnois
Permits:
Operator: JD Printed By: JD Print Date: 7/19/2011
Project Number: 11002086 Inv: 1 Application Date: 7/19/2011 Page 2 of 3
THIS IS NOT A PERMIT
Penalties will be assessed for commencing work without a permit
Building Permit
Contractor: DIAMOND ROCK Firm: DIAMOND ROCK CONSTRUCTIO
Address: 2602 N SULLIVAN Phone: (509)924-8964
SPOKANE VALLEY WA 99216
This Application: Total Project:
Description Grp Type Notes Sq Ft Valuation Sq Ft Valuation
1&2 FAMILY R-3 VB FIRE 0 $60,000.00 0 $60,000.00
DAMAGE
& 176 SQFT
ADDITION
Totals: 0 $60,000.00 0 $60,000.00
Item Description Units Unit Desc Fee Amount
RESIDENTIAL PERMIT FEE 1 SELECT $713.75
WSBCC SURCHARGE 1 SELECT $4.50
SF PLNS RVW<7999 SQ FT 1 SELECT $285.50
Permit Total Fees: $1,003.75
Mechanical Permit
Contractor: SPOKANE HEATING&COOLING Firm: SPOKANE HEATING&COOLING
Address: PO BOX 28929 Phone: (208)755-8345
SPOKANE WA 99228
Item Description Units Unit Desc Fee Amount
VENTILATING FANS 1 DUCT 4 NUMBER OF $44.00
CLOTHES DRYER 1 NUMBER OF $10.00
RANGE 1 NUMBER OF $10.00
Permit Total Fees: $64.00
Plumbing Permit
Contractor: GOLD SEAL MECHANICAL INC Firm: GOLD SEAL MECHANICAL INC
Address: 5524 E BOONE AVE Phone: (509)535-5944
SPOKANE,WA 99212
Item Description Units Unit Desc Fee Amount
TOILETS/BIDETS 2 NUMBER OF $12.00
SINKS 3 NUMBER OF $18.00
TUBS 1 NUMBER OF $6.00
DISH WASHERS 1 NUMBER OF $6.00
GARBAGE DISPOSAL 1 NUMBER OF $6.00
CLOTHES WASHER 1 NUMBER OF $6.00
WATER HEATER- ELECTRIC 1 NUMBER OF $6.00
MISCELLANEOUS FIXTURES 2 NUMBER OF $12.00
WATER PIPING- DWV 1 NUMBER OF $6.00
Permit Total Fees: $78.00
Operator: JD Printed By: JD Print Date: 7/19/2011
Project Number: 11002086 Inv: / Application Date: 7/19/2011 Page 3 of 3
THIS IS NOT A PERMIT
Penalties will be assessed for commencing work without a permit
Notes:
Payment Summary:
Permit Type Fee Amount Invoice Amount Amount Paid Amount Owing
Building Permit $1,003.75 $1,003.75 $285.50 $718.25
Mechanical Permit $64.00 $64.00 $0.00 $64.00
Plumbing Permit $78.00 $78.00 $0.00 $78.00
$1,145.75 $1,145.75 $285.50 $860.25
Disclaimer:
Submittal of this application certifies the owner(or person(s)authorized by the owner)has both examined and finds the information
contained within to be true and correct,and agrees that all provisions of laws and/or regulations governing this type of work will be
complied with. Subsequent issuance of a permit shall not be construed to be a permit for,or an approval of,any violation of any of
the provisions of the code or of any other state or local laws or ordinances.
Signature:
Operator: JD Printed By: JD Print Date: 7/19/2011
Community Development Department (Staff Use Only)
Permit Center 77��
Sc117ITY OF =���� East Sprague Avenue, Suite B-3 PERMIT NUMBER: //'zd F
03
pOkne Spokane Valley, WA 99206
1111��((�� Tel: (509) 688-0036 PERMIT FEE:
Valley Fax: (509) 688-0037
permitcenterCa�spokanevalley.org
RESIDENTIAL CONSTRUCTION PERMIT APPLICATION
0 NEW CONSTRUCTION ADDITION/REMODEL 0 ACCESSORY BUILDING
0 DECK 0 OTHER
SITE ADDRESS: /5T/( C. exj ,l(.SIe.,Y
ASSESSORS PARCEL NO.: LEGAL DESCRIPTION:
BUILDING OWNER NAME:
NAME: /eoSQ te-e AQ GGA
ADDRESS: /5-9 fl E
CITY: dfb,k,,, c Ui'�.`Cp `f STATE: ZIP:
PHONE: FAX:
CELL:
CONTACT NAME:
PHONE: FAX:
CELL:
CONTRACTOR NAME: b;,,,,,,/,,,,,;Q (I vey,sem.,c_44 02..x.
MAILING ADDRESS: 0.26:„0 2 _/ .i , S V//1 UQN
CITY: 50,„L44_ ✓0.i STATE: (,L ZIP:. '192 1 (,
PHONE: 509 — /.2C1"' 896,1( 1 FAX: 509-9,.?6- 8o4Y CELL: 500? —217- 5-69e-.(
CONTRACTOR LICENSE NO.: EXPIRES: CITY BUSINESS LICENSE NO.:
DESCRIBE THE SCOPE OF WORK IN DETAIL AND INDICATE USE & PROPOSED USE:
l a 4 p ,;ed L Se..o Sim C.� ur
< nt l res' . _ ince..
fZe �I -Fre, do crop., a,d an mad4ton gxa- 1
****YOU MUST COMPLETE THE FOLLOWING****
MARK N A IF NOT APPLICABLE
Height to Peak: /8 Dimensions: No. of Stories: Total Habitable
33 x 3 / 1Z Space: l 5-609
Main Floor SQ FT: Upper Floor SQ FT: Unfinished asement SQ Finished Basement SQ
N (�I4 ,Q 0 . FT: FT: gvSa
Garage SQ FT: Deck/ vered Patio S Impervious Surface 300/0 Slopes on
FT: 4 ✓ L Area: Property:
3 l�-�7 SCJ 0
No. of Bedrooms: Con truction Type: 'Ll1. Heat Source: /4..,a .Sewer or Septic: J`2c�
4G
/
TOTAL COST OF PROJECT: $ 60/ cnn , as
DISCLAIMER
The permitted verifies, acknowledges and agrees by their signature that: 1) if this permit is for construction or on a dwelling,the dwelling is/will
be served by potable water. 2) Ownership of this City of Spokane Valley permit inure to the property owner. 3) The signatory is the property
owner or has permission to represent the property owner in this transaction. 4) All construction is to be done in full compliance with the City of
Spokane Valley Development code. Referenced codes are available for review at the City of Spokane Valley Permit Center. 5) The City of
Spokane Valley permit is not a permit or approval for any violation of federal, state or local laws, codes or ordinances. 6) Plans or additional
information may be required to be submitted and subsequently approved before this application can be processed.
Signature Z___ _NDate: 7/( //
Updated 1-11-11
Page 1 of 1
http://www.spokanevalley.org/filestorage/124/938/210/948/1496/Building_Permit=_Residential_11-11-11.doc
RESIDENTIAL CHECK LIST DIRECTIONS:
Place a check mark in box next to each document required for complete submittal.
o SITE PLAN
❑ Property lines and dimensions o Setbacks to property lines
•
o Direction arrow pointing North and orientation to streets o Distance between buildings
❑ Proposed/existing buildings (footprint and dimensions) o Right of way/easement location &sizes
o Utilities, septic tank/drain field locations and distances o Driveway approach size and location
BUILDING PLANS (3 SETS) (minimum 1/8 inch scale or completely dimensioned)
❑ Elevations (Front/Rear/Sides)with roof peak and wall height including basement:
❑ Foundation Plan (crawlspace, basement or slab on grade):
o Footing sizes and locations o Supporting wood cripple walls or beams
o Perimeter concrete foundation wall sizes o Thickened concrete pads supporting
o Crawlspace ventilation beams or girder trusses
❑ Floor Plan of each level (finished or unfinished)with dimensions:
o Floor Joist direction, size and spacing o Window and door location and sizes
❑ Header, beam or concrete lintel sizes o Window well locations if applicable
o Brace wall panel locations o Room usage labels
❑Water heater and furnace locations o Smoke detector locations
❑ Exhaust fan locations o Attic and crawl space access locations
❑ Deck or concrete patio sizes and locations o Fire Wall construction
❑ Roof Plan:
o Engineered truss direction and spacing o Ridge, eave and valley lines
o Rafter and over frame direction, size and spacing o Beam and girder size and location
❑ Wall Section Detail including:
Roof
o Slope/roofing material/underlayment/ ice dam protection o Truss or rafter size, spacing &connection
o Sheathing size and type o Attic insulation/air space baffle/ventilation
Ceiling
❑ Joist size and spacing o Size of ceiling gypsum wall board
Wall
o Height/top plate/stud size and spacing/sole plate o Siding/exterior house wrap/anchor bolts
o Exterior sheathing size and type o Insulation, vapor barrier, gypsum wall board
Floor
o Joist size and spacing o Sheathing or concrete floor size/ insulation
Foundation Wall
o Concrete or Masonry unit width o Footing bottom to finished ground level depth
o Earth to wood separation distance o Horizontal &vertical reinforcement if any
Footing
o Size o Reinforcement if any
Radon
o Passive system with 6mil vapor barrier o Active system with 6 mil vapor barrier
Miscellaneous Construction Details
O Deck:
o Floor plan/side view/dimensions o Footings/post/and beam size and locations
o Floor Joist/decking direction, size and spacing
O Stairway tread rise & run and nosing 0 Handrail/Guard height&spacing
Permit Center
• S"° kane 11703 E Sprague p ague Ave,Suite B-3 PERMIT NUMBER:
Spokane Valley,WA 99206
(509)688-0036 FAX:(509)688-0037 PERMIT FEE:
permitcenterAspokanevalley.org
Community Development
Plumbing Permit Application n Commercial Residential
SITE ADDRESS: /5"-/ ( 6. &21(?S/.P_y
Building Owner
Name: Q_ S& Ga_ Phone:
ex,
Fax:
Address: I'
5v(£. tec City: K- t. tJa((e State: loo. Zip:
Contractor
Name: _ (Oc- c I Phone: 5-� S1Y4/ Fax: S� 5 3c. 35pNaes:
City: State: Zip:
License No: City Business Lic:
Contact/Project Manager:
Name: Tri. ,Q Phone: 7— 5-6(t
1-1
#OF UNITS
PLUMBING FIXTURE ON A TRAP
TOILETS 2
URINALS
TUBS
SHOWERS(per trap)
Lav/Basins,Bar,Floor,Kitchen,Laundry,Utility,Janitor,Photo,X-ray,Food,
SINKS Prep/Culinary Meat
DISHWASHER
CLOTHES WASHER '
GARBAGE DISPOSAL
WATER SOFTNER
FLOOR DRAIN Area,Case,Coil,Trench,Condensate
ROOF DRAIN/OVERFLOW DRAINS
FOUNTAIN,DRINKING
WATER PIPING/DRAIN-IN WASTE Installation,Alterations,Repair,Reversals
WATER USING DEVICE Ice and/or Coffee maker,hose bib,steamer proofer,carbonator,swamp cooler 2.
PRIVATE SEWAGE DISPOSAL SYSTEM
WATER HEATER If Gas,See Mechanical
INDUSTRIAL WASTE PRETREATEMENT
INCEPTORS Including traps,vents except kitchen type grease interceptors functioning as fixture traps
REPAIR OR ALTERATION Water piping,drainage or vent piping
ATMOSPHERIC TYPE VACUUM BREAKER
BACK FLOW PROTECTIVE DEVICE Other than atmospheric type vacuum breakers
MEDICAL GAS
INCEPTORS
OCASH 0 CHECK 0 VISA 0 MC EXPIRES:
Card# VIN:
SIGNATURE:
CURRENT FEES AVAILABLE AT:http://www.spokanevalley.orq/under the quick links for Forms,Master Fee Schedule.
http://www.spokanevalley.org/uploads/Community Development/Documents/Forms/Building/Plumb ingPermitApplication040309.doc
Permit Center
•Spon_ e _ 11703 E Sprague Ave,Suite B-3
Spokane Valley,WA 99206 PERMIT NUMBER:
valley° (509)688-0036 FAX:(509)688-0037
Community Development permitcenterl7a,,spokanevalley.org PERMIT FEE:
Mechanical Permit Application n Commercial 1 esidential
SITE ADDRESS: /5-Tit E. 4-92//e s l�/
Building Owner
Name: /,Qs sa rte ,.Cta G� Phone:
�•o 7 Fax:
Address: /5-7/( 6.
Wp� City: .5141,/ ✓Q State: LcZip:
.1�
Contractor
Name: ''//--
Address: 5(7 1' ,.� !fes 1,5 Phone: 501-7417- 5-544.Fax: Sb�— ��7-YOq
J City: State: Zip:
License No: City Business Lic:
Contact/Project Manager:
Name: —fes /J /�y Phone:
�ly�55 /� 50 1-217- cc�Y
FURNACES&SUSPENDED HEATERS-INSTALLATION OR RELOCATION #UNITS
Up to$including 100,000 BTU
FURNACES&SUSPENDED HEATERS-INSTALLATION OR RELOCATION Over 100,000 BTU
DUCT WORK SYSTEM
HEAT PUMP/AIR CONDITIONER 0-3 TON
AIR CONDITIONER
Over 3-15 TON
AIR CONDITIONER Over 15-30 TON
AIR CONDITIONER
Over 30-50 TON
AIR CONDITIONER Over 50 TON
GAS WATER HEATER
GAS PIPING SYSTEM(each outlet)
GAS LOG,FIREPLACE,&GAS INSERT
APPLIANCE VENTS INSTALLATION,RELOCATION,REPLACEMENT
REPAIRS OR ADDITIONS
BOILER,COMPRESSORS,ABSORPTIONS SYSTEM 0 to 3 hp-100,000 BTU or less
BOILER,COMPRESSORS,ABSORPTIONS SYSTEM Over 3-15 hp—100,001 to 500,000 BTU
BOILER,COMPRESSORS,ABSORPTIONS SYSTEM Over 15—30 hp -500,001 to 1,000,000 BTU
BOILER,COMPRESSORS,ABSORPTIONS SYSTEM Over 30 hp—1,000,001 to 1,750,000 BTU
BOILER,COMPRESSORS,ABSORPTIONS SYSTEM Over 50 hp—over 1,750,000 BTU
AIR HANDLER(DOES NOT include ducting) Each unit up to 10,000 cfm,including ducts
AIR HANDLER(DOES NOT include ducting) Each unit over 10,000 cfm
EVAPORATIVE COOLERS(other than portables)
VENTILATION AND EXHAUST Each fan connected to a singe duct 3
VENTILATION AND EXHAUST Each ventilation system
VENTILATION AND EXHAUST Each hood served by mechanical exhaust
INCINERATORS Installation or relocation of residential
INCINERATORS Installation or relocation of commercial
APPLIANCES Range,Clothes Washer of
UNLISTED APPLIANCES Under 400,000 BTU
UNLISTED APPLIANCES Over 400,000 BTU
HOOD
HOOD Type I
Type II
L P STORAGE TANK
WOOD OR PELLET STOVE INSERT
WOOD STOVE SYSTEM—FREE STANDING
❑CASH ❑CHECK ❑VISA ❑MC EXPIRES: VIN:
CARD#: SIGNATURE
http://www.spokanevalley.org/uploads/Community Development/Documents/Forms/Building/MechanicslPermitApplication040309.doc
, • • .
(
6/6
,• . 1 t,
k. ,
I • -0 .
1"
.. ,
•i. --
I 1.1
1
d.0‘..erej.
I '
. ic 4 22'
1 .
k
'N ...
31'
re'
h
1
NC) ski'l
1'4
- ..:
\ Y-•
i1 i E. ;
s-9 tc)e,1[e„51 e_il II
ri 1 ill 7
..,s •
P0A-c_Q_1-41
Target Date sheet
For City Use Only
Sjökane
Project Address
Valley® , ,
11703 E Sprague Ave Suite B-3 ♦ Spokane Valley WA 99206
509.720-5240♦ Fax: 509.688.0037♦ permitcenter®spokanevalley.org
As part of our on-going commitment to customer service during the review process of your project application,we are
providing you with a TARGET DATE for the initial technical application review. If for any reason we cannot meet
this date,we will contact you with a revised target date.
Your application review TARGET DATE is
The TARGET DATE is the date we estimate your project application_ will have had its initial technical review.It is
not the date for approval or permit issuance.
Tips for a Smoother Project Application Review
➢ Submit complete,accurate plans and documents.
Extra time may be required for re-submittals as project application reviewers work on multiple applications and it may be
several days before they can look at your new or revised information.
> Designate a specific contact person to communicate with the City.
While the person designated as the applicant's,contoct perm with the City can be changed, one individual with the expertise
for dealing with reviewer comments would be the best choice for the entire review process.
> Call staff regarding the status of your project only after the target date shown at the top of the page.
Although you should be contacted on or by the target date,please feel free to contact us if you haven't heard from us by your
target date.Staff may contact you before the target date if the initial review is complete.By following this procedure,you will
save time and allow the reviewers to complete the work more expeditiously.
Steps in the Permit Process
1. Counter Complete. Your application has been accepted as counter complete. This means all of the required documents, as
indicated on your Pre-Application Checklist have been submitted or have been approved for deferred submittal. This does
not prevent technical staff from requesting additional information as a result of their technical review.
It
2.Quality Check. The next step in the process is a quality check to make sure that the application is reviewable and free from
substantive flaws that would prevent technical staff from completing the technical review once it is started. When this step is
complete,your application will be routed to the appropriate staff and remain in their review queue until it comes up for review.
3.Technical Compliance.Once an application is administratively complete,it is routed to technical staff for compliance review.
Depending on the type of project,technical staff may include multiple reviewers. You should be contacted by phone, fax, email,
or mail by your TARGET DATE once the initial technical compliance review is complete.
4. Permit Issuance. When the technical compliance review of the application is complete, including any subsequent re-
submittals,each reviewer will approve their section of the application and route it to the Permit Center.When all sections of the
application are received, a Permit Specialist will process the application and contact the person specified on your application for
permit pick-up.Information regarding fees and pre-construction meetings(if required)will be provided by the Permit Specialist at
that time.
CD-003 V-7/06-21-11 Page 1 of 1