2009, 07-06 Permit App: 09001962 Pool Project Number: 09001962 Inv: 1 Application Date: 7/6/2009 Page 1 of 2
THIS IS NOT A PERMIT
Penalties will be assessed for commencing work without a permit
Project Information:
Permit Use: NEW INGROUND SWIMMING POOLS Contact: DORR,JIM&PATTI
Address: 16004 E WELLESLEY
C-S-Z: SPOKANE VALLEY, WA 99212
Setbacks:Front Left: Right: Rear: Phone: (509)891-2324
Group Name:
Site Information: Project Name:
Plat Key: 002847 Name: WELLESLEY MANOR 01ST ADD District: East
Parcel Number: 45012.2408 Block: Lot:
SiteAddress: 16004 E WELLESLEY AVE Owner:Name: DORR,JIM&PATTI
Address: 16004 E WELLESLEY
Location::CSV SPOKANE VALLEY, WA 99212
Zoning: R-3 SF Res District
Water District: 001 TRENTWOOD Hold: ❑
Area: .00 Acres Width: 0 Depth: 0 Right Of Way(ft): 60
Nbr of Bldgs: 1 Nbr of Dwellings: 1
Review Information: 4,z n, p y A. :; .;. ::
Project Number: 09001962 Inv: 1 Application Date: 7/6/2009 Page 2 of 2
THIS IS NOT A PERMIT
Penalties will be assessed for commencing work without a permit
It shall be unlawful for any person to throw,drain,pour or otherwise discharge unauthorized waters or
other liquids onto City property,rights-of-way,or border easements without written permission of the
director of public works.
Pa ment Summa
Permit Type Fee Amount Invoice Amount Amount Paid Amount Owing
Swimming Pool $56.50 $56.50 $0.00 $56.50
$56.50 $56.50 $0.00 $56.50
Disclaimer:
Submittal of this application certifies the owner(or person(s)authorized by the owner)has both examined and finds the information
contained within to be true and correct,and agrees that all provisions of laws and/or regulations governing this type of work will be
complied with. Subsequent issuance of a permit shall not be construed to be a permit for,or an approval of,any violation of any of
the provisions of the code or of any other state or local laws or ordinances.
Signature:
Operator: jinni Printed By: JD Print Date: 7/6/2009
Permit Center
��
11703 E Sprague Ave,Suite B-3 PERMIT NUMBER:
Spokane Spokane Valley,W,P1; 9 _ C)— /$ 'ERMIT FEE:
(509)6. reici"_ A : sb9 8 37
Valley£ ww iftYokan&dlev.urg �k.=-L Y
Community Development JUL 0 2 2009
Residential Construction New Construction Accessory Bldg
.w,i, C%i`11 ii
Permit ApplicatioIY., Addition/Remodel n Deck
71,0ther:
SITE ADDRESS: IL 00'9 L.- - "V F- 1.E`-,:t.,. .� G �1r \k t LQ:9 V V A 1 1 -1
ASSESSORS PARCEL NO: LEGAL DESCRIPTION:
Building Owner: Contractor:
Name: Name:
> in, 1 1 )o(f \-)a.. { x il'
Address: Address:
1 tra)1-t E . i i C I ES�r
City: rt J C. ' State: ; A'A Zip:r I J`L City: State: Zip:
Phone: ! Fax: Phone: Fax:
Contractor Lic No: Exp Date:
Contact Person City Business Lic.No:
Name: P4 4-1-1 00,-,---
Phone: (5ci) g9r-232J-
Describe the scope of work in detail: Cost of Project: $ y OO U
4—h owo U y, of /l vi.e.� sl";1 vv, I hi) p u v I.
Proposed Use: TU S W L
**************The following MUST be complete: (write N/A if not applicable)**********************
HEIGHT TO PEAK: DIMENSIONS: #OF STORIES: - TOTAL HABITABLE SPACE:
MAIN FLOOR TO Q. 2"" FLOOR SQ. FTG: UNFIN BASEMENT SQ. FTG: IMPERVIOUS SURFACE
FTG: �r (! ; AREA:
FINISHED BASEMENT GARAGE SQ. FTG: DECK/COV. PATIO SQ. FTG: 30% SLOPES ON
SQ. FTG: )`1r,:, IV`A (\,i Pt PROPERTY:
#OF BEDROOMS: CONSTRUCTION TYPE: HEAT SOURCE: SEWER OR SEPTIC?
( f J j)iC''L,
The permitee verifies, acknowledges and agrees by their signature that: 1) If this permit is for construction of or on a dwelling,the
dwelling is/will be served by potable water. 2) Ownership of this City of Spokane Valley Permit inure to the property owner. 3) The
signatory is the property owner or has permission to represent the property owner in this transaction. 4) All construction is to be done
in full compliance with the City of Spokane Valley Development Code. Referenced codes are available for review at the City of
Spokane Valley Permit Center. 5) This City of Spokane Valley Permit is not a permit or approval for any violation of federal, state or
local laws,codes or ordinances.6) Plans or additional information may be required to be submitted,and subsequently approved before
this application can,be
processed.
SIGNATURE: '�-d-_ DATE: 62/Z9/0q
Method of Payment:
❑ Cash 0 Check 0 Mastercard 0 VISA
Bankcard#: Expires: VIN#:
Authorized Signature:
REVISED 2/15107
•
SCITY
pokane
p
( o0
Valley®
11703 E Sprague Ave Suite B-3 ♦ Spokane Valley WA 99206
509.688.0036 ♦ Fax: 509.688.0037 ♦ cityhall®spokanevalley.org
Residential Plan Submittal Minimums
❑ Completed Building & Mechanical application with: Accurate address, Parcel
Number and/or Legal Description, description of work, owner and contractor
information, signature, and date.
❑ Two sets of plans including Site Plan, elevations, floor plans, foundation plans
With details, roof plan, framing plans & details.
❑ Show the height of any proposed buildings or accessory structures.
❑ Floor plan for each floor: Dimension to scale (minimum 1/8") and label each
Room (including sq. footage of house and garage on plans) Show each
level of existing house and square footage of any additions.
❑ All braced wall panel types: show locations and details of installation, including
engineered design.
❑ Egress windows: Provide at least one window or exterior door approved for
Emergency escape or rescue from a basement and in every room for sleeping.
O Smoke detector locations
O 22" X 30" attic access location
❑ 18" X 24" crawl space access:
❑ One-hour separation detail: between house and garage
❑ Floor framing details: Joist type, size, spacing and installation details
❑ Roof framing plan and details
❑ Furnace and hot water heater location.
❑ All header locations: type, size, and connections
❑ Foundation plan
O Insulation information
• If
• V
301- 11
?roposEt
yp� 9001- *.5'
PLANNING DEPT. APPROVED I V/
•
BY:___DAd&AfkeNnr----
DATE: 1.____LALLSLI-- y .
5
2.q
poo
Hovese ATtpctiED
--2,72 > il'0o1.1 E. w u.*stY €71m
Y `7 O' >,
E I 022
ELLts LEY AVE • TV\l/
For City Use Only
• PLUS Project Number
CITY OF
Spoliane Project Address 400
a11ej ° 11703 E Sprague Ave Suite B-3 ♦ Spokane Valley WA 99206
509.688.0036 ♦ Fax: 509.688.0037 ♦ permitcenter@spokanevalley.org
As part of our on-going commitment to customer service during the review process of your project
application, we are providing you with a TARGET DATE for the initial technical application review. If for
any reason we cannot meet this date, we will contact you with a revised target date.
Your application review TARGET DATE is ' `
The TARGET DATE is the date we estimate your project application will have had its initial technical
review. It is not the date for approval or permit issuance.
Tips for a Smoother Project Application Review
➢ Submit complete, accurate plans and documents.
Extra time may be required for re-submittals as project application reviewers work on multiple applications and it
may be several days before they can look at your new or revised information.
➢ Designate a specific contact person to communicate with the City.
While the person designated as the applicant's contact person with the City can be changed, one individual with the
expertise for dealing with reviewer comments would be the best choice for the entire review process.
➢ Call staff regarding the status of your project only after the target date shown at the top of the page.
Although you should be contacted on or by the target date,please feel free to contact us if you haven't heard from us
by your target date. Staff may contact you before the target date if the initial review is complete. By following this
procedure,you will save time and allow the reviewers to complete the work more expeditiously.
Steps in the Permit Process
1. Counter Complete. Your application has been accepted as counter complete. This means all of the required
documents, as indicated on your Pre-Application Checklist have been submitted or have been approved for deferred
submittal. This does not prevent technical staff from requesting additional information as a result of their technical review.
2. Quality Check. The next step in the process is a quality check to make sure that the application is reviewable and free
from substantive flaws that would prevent technical staff from completing the technical review once it is started. When
this step is complete, your application will be routed to the appropriate staff and remain in their review queue until it
comes up for review.
3. Technical Compliance. Once an application is administratively complete, it is routed to technical staff for compliance
review. Depending on the type of project, technical staff may include multiple reviewers. You should be contacted by
phone,fax,email,or mail by your TARGET DATE once the initial technical compliance review is complete.
4. Permit Issuance. When the technical compliance review of the application is complete, including any subsequent re-
submittals, each reviewer will approve their section of the application and route it to the Permit Center. When all sections
of the application are received, a Permit Specialist will process the application and contact the person specified on your
application for permit pick-up. Information regarding fees and pre-construction meetings (if required) will be provided by
the Permit Specialist at that time.
WHITE—APPLICANT PINK—BUILDING FILE REV 9/07