Loading...
2007, 12-04 Permit App: 07004610 Residence Project Number: 07004610 Inv: 1 Application Date: 12/4/2007 Page 1 of 3 THIS IS NOT A PERMIT Penalties will be assessed for commencing work without a permit Project Information: Permit Use: SFR W/ATT GAR Contact: BILL SQUIRES Address: 5621 S GLENDORA C-S-Z: SPOKANE WA 99223 Setbacks:Front 30 Left: 5 Right: 25 Rear: 47 Phone: (509)951-9339 Group Name: Site In formation: Project Name: Plat Key: Name: Range District: Sout Parcel Number: 45211.2304 Block: Lot: SiteAddress: 709 S WHIPPLE AVE Owner:Name: BILL SQUIRES Address: 5621 S GLENDORA Location::CSV SPOKANE WA 99223 Zoning: R-4 SF Res Urban District Water District: Hold: ❑ Area: 37,700 Sq Ft Width: 0 Depth: 0 Right Of Way(ft): 0 Nbr of Bldgs: 0 Nbr of Dwellings: 0 Review Information: ff a m... Review Building Plan Review Released',By: Originally Released: 11/21/2007 By: tmelbourn Driveway/Approach Released By: Originally Released: 12/4/2007 By: jdavis Landuse/Zoning/HE Conditions Released By: Originally Released: 12/3/2007 By: mpalaniuk Sewer Review Released By: Originally Released: 11/19/2007 By: jdavis Operator: JD Printed By: JD Print Date: 12/4/2007 Project Number: 07004610 Inv: 1 Application Date: 12/4/2007 Page 2 of 3 THIS IS NOT A PERMIT Penalties will be assessed for commencing work without a permit Building Permit Contractor: OWNER Firm: OWNER Phone: (000)000-0000 Building Characteristics Building Height 28 This Application: Total Project: Description Grp Type Notes Sq Ft Valuation Sq Ft Valuation 1&2 FAMILY R-3 VB 724 $66,144.64 724 $66,144.64 2ND FLOOR R-3 VB 817 $61,013.56 817 $61,013.56 BASEMENT U R-3 VB 724 $10,860.00 724 $10,860.00 DECK OPEN R-3 VB 196 $2,940.00 196 $2,940.00 GARAGE U-1 VB 472 $8,968.00 472 $8,968.00 Totals: 2,933 $149,926.20 2,933 $149,926.20 Item Description Units Unit Desc Fee Amount RESIDENTIAL PERMIT FEE 1 SELECT $1,273.75 WSBC SURCHARGE 1 SELECT $4.50 SF PLNS RVW<7999 SQ FT 1 SELECT $509.50 Permit Total Fees: $1,787.75 Mechanical Permit Contractor: OWNER Firm: OWNER Phone: (000)000-0000 Item Description Units Unit Desc Fee Amount GAS WATER HEATER 1 NUMBER OF $10.00 GAS APPLIANCE<=100,000BTU 1 NUMBER OF $12.00 GAS PIPING 3 #OF UNITS $3.00 AIR CONDITIONER:4-15 TONS 1 NUMBER OF $20.00 VENTILATING FANS 4 NUMBER OF $40.00 CLOTHES DRYER 1 NUMBER OF $10.00 RANGE 1 NUMBER OF $10.00 Permit Total Fees: $105.00 Operator: JD Printed By: JD Print Date: 12/4/2007 Project Number: 07004610 Inv: 1 Application Date: 12/4/2007 Page 3 of 3 THIS IS NOT A PERMIT Penalties will be assessed for commencing work without a permit Plumbing Permit Contractor: OWNER Firm: OWNER Phone: (000)000-0000 Item Description Units Unit Desc Fee Amount TOILETSBIDETS 3 NUMBER OF $18.00 SINKS 5 NUMBER OF $30.00 SHOWERS 1 NUMBER OF $6.00 TUBS 1 NUMBER OF $6.00 DISH WASHERS 1 NUMBER OF $6.00 GARBAGE DISPOSAL 1 NUMBER OF $6.00 CLOTHES WASHER 1 NUMBER OF $6.00 FLOOR DRAINS 1 NUMBER OF $6.00 MISCELLANEOUS FIXTURES 3 NUMBER OF $18.00 Permit Total Fees: $102.00 Notes: ,5M FENCING&LANDSCAPING TO BE INSTALLED PRIOR TO FINAL INSPECTION FOR SHP-28- 05--MH Pa ment Summa Permit Type Fee Amount Invoice Amount Amount Paid Amount Owing Building Permit $1,787.75 $1,787.75 $0.00 $1,787.75 Mechanical Permit $105.00 $105.00 $0.00 $105.00 Plumbing Permit $102.00 $102.00 $0.00 $102.00 $1,994.75 $1,994.75 $0.00 $1,994.75 Disclaimer: Submittal of this application certifies the owner(or person(s)authorized by the owner)has both examined and finds the information contained within to be true and correct,and agrees that all provisions of laws and/or regulations governing this type of work will be complied with. Subsequent issuance of a permit shall not be construed to be a permit for,or an approval of,any violation of any of the provisions of the code or of any other state or local laws or ordinances. Signature: Operator: JD Printed By: JD Print Date: 12/4/2007 Permit Center Vokane� 11703 E Sprague Ave,Suite B-3 PERMIT NUMBER: 1. ((A0 `V� Spokane Valley,WA 99206 PERMIT FEE: alley. (509)688-0036 FAX:(509)688-0037 www.spokanevalley.org Community Development Residential Construction INew Construction n Accessory Bldg Permit Application Addition/Remodel Deck Other: SITE ADDRESS: 7o 9. S _. t."/ti /lO it ASSESSORS PARCEL NO:_±t___C-A// /- Z 3O / LEGAL DESCRIPTION: J4+ -3 10 I {I r 1�►1 -Ave, Sf10ei Pig- Building Owner: Contractor: r Name: ?II 1NA V t/1-J Name: 0.1 a S t)W AeY Address: .S7 a. 1 c` G 14.,,,,30,-„, Address: City: 5�v1���tJt State: A Zip:tytaZ City: State: Zip: Phone: a S I -q%-v1 Fax: � Phone: Fax: Contractor Lic No: Exp Date: Contact Person City Business Lic.No: Name: Phone: Describe the scope of work in detail: Cost of Project: $ /1`"C,. a0' /VP L✓ !'`CMK C.Gel S 7-rvGIcc i-, Proposed Use: **************The following MUST be complete: (write N/A if not applicable)********************** HEIGHT TO PEAK: DIMENSIONS: #OF STORIES: Z TOTAL HABITABLE SPACE: F' -f ' % Li'-I MAIN FLOOR TO SQ. 2Nu FLOOR SQ. FTG: UNFIN BASEMENT SQ. FTG: IMPERVIO� ACE FTG:-.31- �31- 7zti --7,T---4-/ Ei1 .`. 7Z /`i FINISHED BASEMENT GARAGE SQ. FTq:_,. a CK/' OV. PATI(i SQ. FTG: 30% SLOPES ON SQ. FTG: C, LL S `f 7 Z 1 . . PROPERTY: #OF BEDROOMS: CONSTRU TIQN TYPE: ' a'T SOURCE SEWER OR SEPTIC? The permitee verifies, acknowledges and agrees by their signature that: 1) If this permit is for construction of or on a dwelling,the dwelling is/will be served by potable water. 2) Ownership of this City of Spokane Valley Permit inure to the property owner. 3) The signatory is the property owner or has permission to represent the property owner in this transaction. 4) All construction is to be done in full compliance with the City of Spokane Valley Development Code. Referenced codes are available for review at the City of Spokane Valley Permit Center. 5) This City of Spokane Valley Permit is not a permit or approval for any violation of federal, state or local laws, codes or ordinances.6) Plans or additional information may be required to be submitted,and subsequently approved before this application can be/procceess SIGNATURE:"`"\/,-jam DATE: 7 7'"p' / RECEIVED BY Method of Payment: Sl�pK�NE VALLEY. ❑ Cash [Check ❑ Mastercard ❑ VISA Bankcard#: Expires: VIN#: ,,fl '7 Authorized Signature: d'R'II ENTED REVISED 2/15/07 • Permit Center "' 11703 E Sprague Ave,Suite B-3 �ne jpy Spokane Valley,WA 99206 PERMIT NUMBER: l" (509)688-0036 FAX:(509)688-0037 PERMIT FEE: Community Development www.spokanevalley.org Plumbing Permit Application n Commercial Residential SITE ADDRESS: 7 0 CI S .. sAI L. e k Building Owner Name: tS In 1 Su ✓el Phone: c(,-\ _0(z•2.q Fax: Address: s-6 a.\ S_ 6 Iav‘30✓c". City: S(, k State: tAlA Zip: e q Contractor Name: ScI�W,t GAS ©w vu,,,-- Phone: Fax: Address: City: State: Zip: License No: City Business Lic: Contact Name: Phone: DESCRIPTION OF WORK #OF UNITS X COST = TOTAL AMOUNT 1 TOILETS WATER CLOSET,BIDETS '3 X $6.00 = j ` 2 URINALS X $6.00 = 3 TUBS 1 X $6.00 = 06,— v t) 4 SHOWERS(PER TRAP) BATH,STALL,ON-SITE BUILT 1 X $6.00 = 6' U v LAYS/BASINS,BAR,FLOOR,KITCHEN, 5 SINKS LAUNDRY,UTILITY,JANITOR,PHOTO, X $6.00 = < i,-C, X-RAY,FOOD,PREP/CULINARY MEAT . 6 DISHWASHER 1 X $6.00 = l- cl-U 7 CLOTHES WASHER I X $6.00 = 6 c=O 8 GARBAGE DISPOSAL I X $6.00 = i v a 9 WATER SOFTENER X $6.00 = 10 ELECTRIC WATER HEATER NOTE: IF GAS,SEE MECHANICAL X $6.00 = _ AREA,CASE,COIL,TRENCH, / vv 11 FLOOR DRAINS CONDENSATE ' X $6.00 = (9 12 ROOF DRAINS/OVERFLOW DRAINS X $6.00 ,= 13 FOUNTAINS,DRINKING X $6.00 = WATER PIPING/DRAIN-IN WASTE, NSTALLATION,ALTERATION,REPAIR, 14 VENT,PLUMBING,REVERSAL REVERSALS X $6.00 = 15 SEWAGE EJECTOR GRINDER,SUMP PUMP X $6.00 = ICE AN/OR COFFEE MAKER,HOSE BIB, 16 WATER USING DEVICE STEAMERX $6.00 = d °' PROOFER,CARBONATOR,SWAMP 1 F— COOLER VACUUM BREAKER,CHECK VALVE, AND R.P.B.P.D.FOR: VATS,TANKS, 17 CROSS CONNECTION DEVICE BOILERS X $6.00 = GREASE TRAP,SAND TRAP, 18 INTERCEPTORS CHEMICAL HOLDING TANK X $6.00 = 19 MEDICAL GAS(per outlet) NITROUS,OXYGEN X $6.00 = 20 MISCELLANEOUS PLUMBING FIXTURE X $6.00 = 21 PRIVATE SEWAGE DISPOSAUSYS X $20.00 = 22 INDUSTRIAL WASTE INTERCEPTOR X $15.00 = SUBTOTAL 2 Cy METHOD OF PAYMENT: PROCESSING FEE ❑CASH ❑CHECK 0 VISA 0 MC EXPIRES: $35.00 Card# VIN: TOTAL PERMIT FEE DUE: / 1 7 _ c:° RECEIVFD EV AUTHORIZED SIGNATURE: CITY nFSPn}<q NF vxal I REVISED 8/26/05 - -- PERMIT GEN r 8Y:.s..- AI 1 +r 4# Permit Center Stamm 11703 E Sprague Ave,Suite B-3 PERMIT NUMBER: �j V p ri�l`ll7' Spokane Valley,WA 99206 alley` (509)688-0036 FAX:(509)688-0037 PERMIT FEE: Community Development www.spokanevalley.org Mechanical Permit Application ❑ Commercial Residential SITE ADDRESS: 70 CI S- L./t,I ?It Building Owner Name: %,11 Phone: �ts�k-q33 q Fax: S ��n11 Address: S- l -a` , (o o r.-- City: S Atk State: A_ Zip: q q Z Z 3 Contractor Name: e)L,J✓��- Phone: Fax: dl Wit CLS Address: City: State: Zip: License No: City Business Lic: Contact Name: Phone: DESCRIPTION OF WORK #OF UNITS X COST = TOTAL AMOUNT 1 FUEL BURNING APPLIANCE Equal to or less than 100,000 i X $12.00 = /Z-'-" 2 FUEL BURNING APPLIANCE More than 100,000 X $15.00 = 3 UNLISTED APPLIANCE(Additional Fee) Equal to or less than 400,000 , X $50.00 = 4 UNLISTED APPLIANCE(Additional Fee) More than 400,000 X $100.00 = 5 USED APPLIANCE(WSEC min.AFUE rating) Equal to or less than 400,000 X $50.00 = 6 USED APPLIANCE(WSEC min.AFUE rating) More than 400,000 X $100.00 = 7 BOILER/REFRIGERATION 1-100M BTU X $12.00 = 8 BOILER/REFRIGERATION 101-500M BTU X $20.00 = 9 BOILER/REFRIGERATION 501-1,000M BTU X $25.00 = 10 BOILER/REFRIGERATION 1,001-1,750M BTU X $35.00 = 11 BOILER/REFRIGERATION More than 1,750M BTU X $60.00 = 12 GAS LOG,GAS INSERT,GAS FIREPLACE X $10.00 = 13 RANGE ( X $10.00 = /ay. r_to 14 DRYER i X $10.00 = / 0.--cYY 15 FUEL BURNING WATER HEATER ) X $10.00 = /c) `ted 16 MISC.FUEL BURNING APPLIANCE X $10.00 = 17 GAS PIPING(each outlet) '3 X $1.00 = 3 `c>c 18 DUCT SYSTEMS X $10.00 = 4/ 19 VENTILATING FANS X $10.00 = yo '-' 20 AIR HANDLER(DOES NOT include ducting) Equal to or less than 10,000 CFM X $12.00 = 21 AIR HANDLER(DOES NOT include ducting) Greater than 10,000 CFM X $15.00 = 22 EVAPORATIVE COOLERS X $10.00 = 23 TYPE I HOOD X $50.00 = 24 TYPE II HOOD X $10.00 = 25 HEAT PUMP/AIR CONDITIONER 0-3 TON X $12.00 = 26 AIR CONDITIONER 4-15 TON / X $20.00 = Z 0 ej c* 27 AIR CONDITIONER 15-30 TON X $25.00 = 28 AIR CONDITIONER 30-50 TON X $35.00 = 29 AIR CONDITIONER More than 50 TON X $60.00 = 30 LPG STORAGE TANK X $10.00 = 31 WOOD OR PELLET STOVE/INSERT X $10.00 = 32 WOOD STOVE-FREE STANDING X $25.00 = 33 REPAIR&ADDITIONS X $15.00 = 34 VENTILATION SYSTEMS X $12.00 = 35 VENTILATION MECHANICAL EXHAUST X $12.00 = 36 INCINERATOR-RESIDENCE X $19.00 = 37 INCINERATOR-COMMERCIAL RFC P I V XD M522.00 = METHOD OF PAYMENT: CITY nF SP XO! ►VELI Ey /0 Z ❑CASH 0 CHECK 0 VISA 0 MC EXPIRES: PROCESSING FEE $35.00 VIN: pp� -4.'U CARD#: TOTAL PERMIT TEE bUE: / 3 AUTHORIZED SIGNATURE: REVISED 8/26/05 PtilMll Ca.N I LFs L ±s 1 7,2. / , / / 'Mc&t h -Po L'✓ —7 16 trikr-%I 1 --00 71"- /0 Flo ' PLANNING DEPT. APPROVE, BY. ill- - ' DATE: P-/3/0".-2 L. r G RECEIVED BY CITY OF SPOKANE VAL Y I LQf= '7307 So it PERMIT GE ER For City Use Only PLUS Project Number Ca 7{ )(`' (6,t 'r`) Sjop •k lle °40°Va y 11703 E Sprague Ave Suite B-3 ♦ Spokane Valley WA 99206 509.688.0036 ♦ Fax: 509.688.0037 ♦ permitcenter@spokanevalley.org As part of our on-going commitment to customer service during the review process of your project application, we are providing you with a TARGET DATE for the initial technical application review. If for any reason we cannot meet this date, we will contact you with a revised target date. Your application review TARGET DATE is k The TARGET DATE is the date we estimate your project application will have had its initial technical review. It is not the date for approval or permit issuance. Tips for a Smoother Project Application Review ➢ Submit complete, accurate plans and documents. Extra time may be required for re-submittals as project application reviewers work on multiple applications and it may be several days before they can look at your new or revised information. ➢ Designate a specific contact person to communicate with the City. While the person designated as the applicant's contact person with the City can be changed, one individual with the expertise for dealing with reviewer comments would be the best choice for the entire review process. ➢ Call staff regarding the status of your project only after the target date shown at the top of the page. Although you should be contacted on or by the target date,please feel free to contact us if you haven't heard from us by your target date. Staff may contact you before the target date if the initial review is complete. By following this procedure,you will save time and allow the reviewers to complete the work more expeditiously. Steps in the Permit Process 1. Counter Complete. Your application has been accepted as counter complete. This means all of the required documents, as indicated on your Pre-Application Checklist have been submitted or have been approved for deferred submittal. This does not prevent technical staff from requesting additional information as a result of their technical review. 2. Quality Check. The next step in the process is a quality check to make sure that the application is reviewable and free from substantive flaws that would prevent technical staff from completing the technical review once it is started. When this step is complete, your application will be routed to the appropriate staff and remain in their review queue until it comes up for review. 3. Technical Compliance. Once an application is administratively complete, it is routed to technical staff for compliance review. Depending on the type of project, technical staff may include multiple reviewers. You should be contacted by phone,fax, email, or mail by your TARGET DATE once the initial technical compliance review is complete. 4. Permit Issuance. When the technical compliance review of the application is complete, including any subsequent re- submittals, each reviewer will approve their section of the application and route it to the Permit Center. When all sections of the application are received, a Permit Specialist will process the application and contact the person specified on your application for permit pick-up. Information regarding fees and pre-construction meetings (if required) will be provided by the Permit Specialist at that time. WHITE-APPLICANT PINK-BUILDING FILE REV 9/07