Loading...
2008, 05-28 Permit App: 08001809 Addition Project Number: 08001809 Inv: 1 Application Date: 5/28/2008 Page 1 of 2 THIS IS NOT A PERMIT Penalties will be assessed for commencing work without a permit Project Information: Permit Use: RES ADDITION Contact: R D PETTY CONSTRUCTION Address: 20111 E TRENT C-S-Z: OTIS ORCHARDS WA 99027 Setbacks:Front Left: Right: Rear: Phone: (509)924-0773 Group Name: Site Information: Project Name: Plat Key: Name: Range District: Sout Parcel Number: 45214.3301 Block: 1 Lot: 1 SiteAddress: 1221 S WHIPPLE RD Owner:Name: SUNDBURG,MARSHA Address: 1221 S WHIPPLE Location::CSV SPOKANE VALLEY,WA 99206 Zoning: UNKN Unknown Water District: Hold: ❑ Area: 10,114 Sq Ft Width: 0 Depth: 0 Right Of Way(ft): 0 Nbr of Bldgs: 0 Nbr of Dwellings: 0 Review Information: Review Building Plan Review Released By: Originally Released: 5/28/2008 By: tmelbourn Landuse/Zoning/HE Conditions Released By: Originally Released: 5/15/2008 By: mbasinger Operator: JD Printed By: jmm Print Date: 5/28/2008 Project Number: 08001809 Inv: 1 Application Date: 5/28/2008 Page 2 of 2 THIS IS NOT A PERMIT Penalties will be assessed for commencing work without a permit Building Permit Contractor: R D PETTY CONSTRUCTION Firm: R D PETTY CONSTRUCTION Address: 20111 E TRENT AVE Phone: (509)924-0773 OTIS ORCHARDS,WA 99027 This Application: Total Project: Description Grp Type Notes Sq Ft Valuation Sq Ft Valuation RES ADD R-3 VB (2)RES 0 $35,000.00 0 $35,000.00 ADDITION Totals: 0 $35,000.00 0 $35,000.00 Item Description Units Unit Desc Fee Amount RESIDENTIAL PERMIT FEE 1 SELECT $492.25 WSBC SURCHARGE 1 SELECT $4.50 SF PLNS RVW<7999 SQ FT 1 SELECT $196.90 Permit Total Fees: $693.65 Notes• ... «« ... Payment Summary• F Permit Type Fee Amount Invoice Amount Amount Paid Amount Owing Building Permit $693.65 $693.65 $0.00 $693.65 $693.65 $693.65 $0.00 $693.65 Disclaimer: Submittal of this application certifies the owner(or person(s)authorized by the owner)has both examined and finds the information contained within to be true and correct,and agrees that all provisions of laws and/or regulations governing this type of work will be complied with. Subsequent issuance of a permit shall not be construed to be a permit for,or an approval of,any violation of any of the provisions of the code or of any other state or local laws or ordinances. Signature: Operator: JD Printed By: jmm Print Date: 5/28/2008 Permit Center Scrrr ofL 11703E Sprague Ave, Suite B-3 PERMIT NUMBER: pokane Spokane Valley,WA 99206 PERMIT FEE: Valley. (509)688-0036 FAX: (509)688-0037 ��J www.spokanevalley.org Community Development Residential Construction n New Construction n Accessory Bldg Permit Applicationdition/Remodel Deck (l Other: SITE ADDRESS: l ASSESSORS PARCEL NO: LEGAL DESCRIPTION: Building Owner: Contractor: R y.3 7`ay Name: �/ Name: ,F47..e , Address. / / /!rte Address: //) City: S- � 1,/716,./ Staat(e: \_Zip: i9if 6.14... State: ZipIIO�2 Phone: /4, __ `� 7 2 f Fax: Phone: Gym L� 2 2,3 Fax: f 5 3 7 Contractor Lic No: Exp Date: 36k 2-- /<J -/ 7 —v9 Contact Person City Business Lic.No: Name: Phone: Describe the scope of work in detail: Cost of Project: $ JS_ . 60 1/74-1-16-7-1 TCS 06 v/ i; ` 1 �l Yl7' 5, :j-21 / /? ' - Proposed Use: --e--2,- **************The following MUST be complete: (write N/A if not applicable)********************** HEIGHT TO PEAK: DIMENSIONS: #OF STORIES: TOTAL HABITABLE SPACE: MAIN FLOOR TO SQ. 2"D FLOOR SQ. FTG: UNFIN BASEMENT SQ. FTG: IMPERVIOUS SURFACE FTG: � AREA: FINISHED BASEMENT GARAGE SQ. FTG: DECK/COV. PATIO SQ. FTG: 30%SLOPES ON SQ. FTG: PROPERTY: #OF BEDROOMS: CONSTRUCTION TYPE: HEAT SOURCE: SEWER OR SEPTIC? 57,�e/�_ The permitee verifies,acknowledges and agrees by their signature that: 1) If this permit is for construction of or on a dwelling,the dwelling is/will be served by potable water. 2) Ownership of this City of Spokane Valley Permit inure to the property owner. 3) The signatory is the property owner or has permission to represent the property owner in this transaction. 4) All construction is to be done in full compliance with the City of Spokane Valley Development Code. Referenced codes are available for review at the City of Spokane Valley Permit Center. 5) This City of Spokane Valley Permit is not a permit or approval for any violation of federal,state or local laws,codes or ordinances.6) Plans or additional information may be required to be submitted, and subsequently approved before this application can be processed. SIGNATURE: DATE: Method of Payment: ❑ Cash Check 0 Mastercard 0 VISA Bankcard#: Expires: VIN#: Authorized Signapire7 *7- REVISED 2/15!07 //�/ S Onoiis,\Nfttine 11703E Sprague Ave Suite B-3♦ Spokane Valley WA 99206 ♦509.688.0036 ♦ Fax: 509.688.0037 40* 'Valley ECompleted Building and Mechanical Application with: Accurate address, Parcel Number and/or Legal Description, description of work, owner and contractor information, signature and date. EX Three (3) sets of plans including Site Plan, elevations, floor plans, foundation plans with details, roof plan, framing plans and details. ❑X Show the height of any proposed buildings or accessory structures. pX Floor plan for each floor: Dimension to scale(minimum 1/8") and label each room (including sq footage of house and garage on plans) show each level of existing house and square footage of any additions. EEgress windows: Provide at least one window or exterior door approved for emergency escape or rescue from basement and in every room for sleeping. ❑X Floor framing details: Joist type, size, spacing and installation details. ❑X Roof framing plan and details ❑X Furnace and hot water heater location ❑X All header locations: type, size and connections ❑X Foundation plan ❑X Insulation information EDecks and Stairway details All braced wall panel types: show locations and details of installation, including engineered design Smoke detector locations 22" x 30" attic access location 18" x 24" crawl space access One-hour separation detail: between house and garage May 27, 2008 R.D. Petty Construction 20111 E. Trent Ave. Otis Orchards, WA 99027 RE: Permit No. 08-001809 Dear Mr. Petty: After a preliminary review of the submitted building plans for the additions to the residence of Marsha Sundburg at 1221 S. Whipple Rd, Spokane Valley, WA 99206, the following items need to be addressed: 1. The 2006 International Residential Code (IRC) Section R106.1.1 Information on construction documents. states: ... "Construction documents shall be of sufficient clarity to indicate the location, nature and extent of the work proposed and show in detail that it will conform to the provisions of this code and relevant laws, ordinances,rules and regulations, as determined by the building official." 2. The plans indicate that the living room wall and bedroom walls are being demolished and the existing windows and doors utilized in the two additions, but the sizes of those windows and doors is not legible on the reduced size floor plan submitted. This would be required to determine header sizes per IRC Section R602.7 and egress requirements per IRC Section R310. 3. The spacing of those windows next to the door and proximity to the floor in the living room might require the windows to be tempered glass per IRC Section R308.4. 4. When additions are constructed the dwelling shall be provided with smoke alarms throughout per IRC Section R313.2.1. 5. The exterior walls are subject to the bracing or shear wall requirements of IRC Section R602.10. 6. IRC Section R602.10.6 provides for the utilization of alternate brace wall panels if the prescriptive brace wall panels described in IRC Section R602.10.3 and R602.10.4 are not possible. 7. IRC Section R301.1.3 Engineered design. states: "When a building of otherwise conventional construction contains structural elements exceeding the limits of Section R301 or otherwise not conforming to this code, these elements shall be designed in accordance with accepted engineering practice"... This would require seismic and wind shear analysis by a licensed engineer. 8. The plans do not provide for a required radon system per the 2006 Washington State Ventilation and Indoor Air Quality Code (WSVIAC) Section 503 or a 6 mil ground cover per the 2006 Washington State Energy Code (WSEC) Section 502.1.6.7. 9. The plans do not provide for crawl space ventilation per IRC Section 408.1. 10. The plans do not provide for foundation damp proofing per IRC Section R406.1. 11. The plans do not provide for the joist sizing per IRC Section R502.3. • 12. The plans do not provide for the floor system sheathing per IRC Section R502.1.2. 13. The plans do not provide for anchor bolts or sole plates per IRC Section R403.1.6. 14. The plans do not provide for the height and spacing of the studs per IRC Section R602.3.1. 15. The plans do not provide for the box girder supports per IRC Section R606.14. This could extend to the foundation which may require expanded footings to support the loads per IRC Section 401.2. 16. The plans do not provide for weather resistant exterior wall envelope per IRC Section R703.1 and R703.6.3. 17. The plans do not provide for flashing per IRC Section R703.8. 18. The plans do not provide for interior wall covering per IRC Section R702.1 or a vapor retarder per the WSEC Section 502.1.6.6. 19. The plans do not provide for the ceiling finishes per IRC Section R805.1 or the vapor retarder per WSEC Section 502.1.6.3. 20. The plans do not provide for an attic access per IRC Section R807.1. 21. The plans do not indicate a top plate size per IRC Section R602.3.2. 22. The plans do not provide for attic ventilation per IRC Section R806. 23. The plans do not provide for unobstructed clearance to insulation for ventilation purposes per WSEC Section 502.1.4.3 and IRC Section 806.3. 24. The plans do not provide for rafter size and spacing for the overframe per IRC Section 802.2. 25. The plans do not provide for lateral bearing support of rafters per IRC Section R602.8.1 or fastening per the truss installation standards. 26. The plans do not provide for underlayment per IRC Section R905.2.3. 27. The plans do not provide for an ice barrier per IRC Section R905.2.7.1. 28. The plans indicate the deck is being moved forward but there are no construction details per IRC Section R502.2.2. Those details would provide clarification for concrete or wood decking,joists, footings, beams, etc. per IRC Section R106.1.1 and Chapter 5. 29. The plans do not provide for details on the deck guard rail per IRC Section R312. 30. The plans do not provide for stairs or landings per IRC Section R311.5. Until the above items are addressed satisfactorily, the permit cannot be issued. Attached is a check list of items which were required at the time of permit application. If you have any questions,please feel free to contact me at telephone (208) 688-0044. Sincerely yours, Tom Melbourn Plans Examiner, City of Spokane Valley ''.5 . . .. (JJ ' ,1i 0 \ . 1 1 ! e07 loi _____. —(6 /1 _. 1 r II,(G4 .,.4 , „-k.., ..), t 'rs7 ''''' ' I d''' 6'4'4)- ,..; 1 ,,, i' rs ' 1 1 ---->"z . -..,, (_•() 4..,..- T., H , , I), • 1 N),.. ,), **° I •\S 6 „ ! ! ! , .1 , i ! 1 1 I ! (\ APPROVED BY . L 0 V For City Use Only . PLUS Project Number ti,_ CITY OF pokine Project Address (ii .Valle ° y 11703 E Sprague Ave Suite B-3 • Spokane Valley WA 99206 509.688.0036 ♦ Fax: 509.688.0037 ♦ permitcenter@spokanevalley.org As part of our on-going commitment to customer service during the review process of your project application, we are providing you with a TARGET DATE for the initial technical application review. If for any reason we cannot meet this date, we will contact you with a revised target date. Your application review TARGET DATE is The TARGET DATE is the date we estimate your project application will have had its initial technical review. It is not the date for approval or permit issuance. Tips for a Smoother Project Application Review > Submit complete, accurate plans and documents. Extra time may be required for re-submittals as project application reviewers work on multiple applications and it may be several days before they can look at your new or revised information. ➢ Designate a specific contact person to communicate with the City. While the person designated as the applicant's contactperson with the City can be changed, one individual with the expertise for dealing with reviewer comments would be the best choice for the entire review process. ➢ Call staff regarding the status of your project only after the target date shown at the top of the page. Although you should be contacted on or by the target date,please feel free to contact us if you haven't heard from us by your target date. Staff may contact you before the target date if the initial review is complete. By following this procedure,you will save time and allow the reviewers to complete the work more expeditiously. Steps in the Permit Process 1. Counter Complete. Your application has been accepted as counter complete. This means all of the required documents, as indicated on your Pre-Application Checklist have been submitted or have been approved for deferred submittal. This does not prevent technical staff from requesting additional information as a result of their technical review. 2. Quality Check. The next step in the process isa quality check to make sure that the application is reviewable and free from substantive flaws that would prevent technical staff from completing the technical review once it is started. When this step is complete, your application will be routed to the appropriate staff and remain in their review queue until it comes up for review. 3. Technical Compliance. Once an application is administratively complete, it is routed to technical staff for compliance review. Depending on the type of project, technical staff may include multiple reviewers. You should be contacted by phone,fax, email,or mail by your TARGET DATE once the initial technical compliance review is complete. 4. Permit Issuance. When the technical compliance review of the application is complete, including any subsequent re- submittals, each reviewer will approve their section of the application and route it to the Permit Center. When all sections of the application are received, a Permit Specialist will process the application and contact the person specified on your application for permit pick-up. Information regarding fees and pre-construction meetings (if required) will be provided by the Permit Specialist at that time. WHITE-APPLICANT PINK-BUILDING FILE REV 9/07