2006, 03-21 Permit App: 06000948 Pole Bldg Project Number: 06000948 Inv: 1 Application Date: 03/21/2006 Page 1 of 2 THIS IS NOT A PERMIT Penalties will be assessed for commencing work without a permit Project Information: Permit Use: 24 XETACHED POLE BUILDING Contact: EXCALIBUR STEEL STRUCTURES INC Address: PO BOX 14991 C-S-Z: SPOKANE,WA 99214-0991 Setbacks:Front 20 Left: 5 Right: 71 Rear: 5 Phone: (509)921-1300 Group Name: Site Information: Project Name: Plat Key: 002693 Name: TWIN VIEW ADD AMENDED PLAT District: F Parcel Number: 45214.1404 Block: Lot: SiteAddress: 1305 S WILBUR RD Owner:Name: MITCHEM,SHAWN Address: 1305 S WILBUR RD Location::CSV SPOKANE VALLEY,WA 99206 Zoning: UR-3.5 Urban Residential 3.5 Water District: Hold: ❑ Area: .00 Acres Width: 100 Depth: 140 Right Of Way(ft): 0 Nbr of Bldgs: 0 Nbr of Dwellings: 1 Review Information: Review Building Plan Review Rla "ed Bim` Landuse/Zoning/HE ConditionsRet " Sewer Review Released , Operator: CJJ Printed By: CJJ Print Date: 03/21/2006 Project.Number: 06000948 Inv: 1 Application Date: 03/21/2006 Page 2 of 2 THIS IS NOT A PERMIT Penalties will be assessed for commencing work without a permit Building Permit Contractor: EXCALIBUR STEEL Firm: EXCALIBUR STEEL STRUCTURE Address: PO BOX 14991 Phone: (509)921-1300 SPOKANE,WA 99214-0991 This Application: Total Project: Description Grp Type Notes Sq Ft Valuation Sq Ft Valuation GARAGE U-1 VB 576 $10,944.00 576 $10,944.00 Totals: 576 $10,944.00 576 $10,944.00 Item Description Units Unit Desc Fee Amount RESIDENTIAL PERMIT FEE 1 SELECT $195.25 ACCESSORY PLANS REVIEW 1 SELECT $48.81 WSBC SURCHARGE 1 SELECT $4.50 Permit Total Fees: $248.56 Payment Summary: Permit Type Fee Amount Invoice Amount Amount Paid Amount Owing Building Permit $248.56 $248.56 $0.00 $248.56 $248.56 $248.56 $0.00 $248.56 Disclaimer: Submittal of this application certifies the owner(or person(s)authorized by the owner)has both examined and finds the information contained within to be true and correct,and agrees that all provisions of laws and/or regulations governing this type of work will be complied with. Subsequent issuance of a permit shall not be construed to be a permit for,or an approval of,any violation of any of the provisions of the code or of any other state or local laws or ordinances. Signature: Operator: CJJ Printed By: CJJ Print Date: 03/21/2006 6'," -4ILDING PERMIT APPLICATION WORKSHEET CitITY o.�i . e Ccs J \t b S fine Valley Community Development Department �� �- �...� Building Division VMAR 21 2 11707 E. Sprague Avenue, Suite 106 all \� Spokane Valley, WA 99206 � `-J hone: 509 688-0036• Fax: 509 688-0037 5 0 \\ \\-„ 0 REQUIRED SITE INFORMATION Street Address: S, /3o 5 // am Assessor's Tax Parcel Number(s): Legal Description: PERMIT DESCRIPTION: NBuilding Permit ❑ Change in Use ❑ Grading ❑ Manufactured Home Relocation ❑ Tenant Improvement ❑ Fire Safety ❑ Other N OWNER/APPLICANT INFORMATION ❑ Owner: Shawn M A'c-k.A.-vv\ ❑ Applicant: . Phone: %.8- IZ15 Fax: Phone: Fax: Address: 5, 13as ki,liowr-- Address: tk. 1.b..ki �Q 99t-0(0 tY State Zip Code City State Zip Code 11 Contractor: FxectaekSr,un' / - ❑ Architect: Phone: It/—l30o Fax: 9V-6743 Phone: Fax: Address: P.D, 13 r,x IL(f ( Address: h+ ,w 2)kae. W A 1 7 z r y Ci State Zip Code City State Zip Code • WA State Contractor License#: 46ALSS c'oC6 Contact: Pa.,, _t Yo 1 Spokane Valley Bus. Liscense#: Contact 1 PERMIT/BUILDING INFORMATION I HEIGHT TO PEAK: DIMENSIN:OOrr / #OF STORIES: MAIN FLOOR T�OSQ FT„G:, 2""FLOOR SQ. FTG: UNFIN BASEMENT SQ. FTG: y FINISHED BASEMENT SQ.C9FTG: GARAGE SQ. FTG: DECK/COV. PATIO SQ. FTG: — OCCUPANCY GROUP: CONSTRUCTION TYPE: HEAT SOURCE: #OF BEDROOMS: TOTAL HABITABLE SPACE: IMPERVIOUS SURFACE AREA: COST OF PROJECT: 30%SLOPES ON PROPERTY: SEWER OR ON-SITE SEPTIC SYSTEM? MANUFACTURED HOME • Width: Length: Year: Pit Set: Manufacturer: RELOCATION Previous Address: Proposed Use: FIRE SAFETY Fire Sprinkler: # of Heads: Fire Alarm: Paint Booth: Tent: Fireworks Display: Blasting: Date/Time: Valuation: Above/Underground Storage Tank Size: WASHINGTON STATE NON-RESIDENTIAL ENERGY CODE Plans Examiner: Phone: Fax: Address: City State Zip Inspector: Phone: Fax: Address: City State Zip SPECIAL INSPECTIONS ❑ BOLTING ❑ CONCRETE ❑ REINFORCEMENT ❑ WELDING Firm Name: Phone: Fax: Inspector(s): DISCLAIMER The permitee verifies, acknowledges and agrees by their signature that: 1) If this permit is for construction of or on a dwelling, the dwelling is/will be served by potable water. 2) Ownership of this City of Spokane Valley Permit inure to the property owner. 3) The signatory is the property owner or has permission to represent the property owner in this transaction. 4) All construction is to be done in full compliance with the City of Spokane Valley Development Code. Referenced codes are available for review at the City of Spokane Valley Permit Center. 5) This City of Spokane Valley Permit is not a permit or approval for any violation of federal, state or local laws, codes or ordinances. Ownership of resulting development rights granted by any issued permi - • the proper y o ner. Print Name fA-U--C.... e-t/t) Signature Method of Payment: (Faxed permit applications will only be accepted with major bankcard) ❑ Cash ❑ Check ❑ Mastercard ❑ VISA ❑ Other Bankcard #: Expires: VIN#: Authorized Signature: QO, h 1,1 -; 41' ° PROVED 4 PLANNING DEPT. AP 204r By. _ C QM� DATE. 00 z LAI • PURLIN CONNECTION METHODS, A). PURLINS MAY BE HUNG S1 NOTES FOR FLOOR PLAN OFF THE TRUSS TOP CHORD S8 �1 INTERIOR FRAME WOOD POSTS, SEE FACES W/ STD. POST SCHEDULE THIS SHEET SIMPSON J❑IST HANGERS 2 GABLE WALL POSTS - 6' X 6' TYPICAL OR EQUAL, B). PURLINS MAY BE DOOR POSTS - 4' X 6' TYPICAL BUTTED AND NAILED FOOTING DIMENSIONS, B + 1' 8'1 D = 3' 0' W/(2) 16d NAILS S7 MAXIMUM POST SPACING 12' 0' INTO EACH PURLIN, �3 PURLINS @ 24' O.C„ BEARING OR C). PURLINS MAY BE $g J❑IST HANGERS (TYPICAL) LAPPED ANDNAILED W/(3) 16dNAILS, SZ c'" _Li SPANS 12' TO 60' ON CONNECTION METHODS Ng ' j�INGBCOC Low A 'B' AND 'C', TOENAIL w F'BACK SIDE OF PURLIN S8 yIN J ¢ DOUBLE TRUSSES W/(1) 16d NAIL INTO N 0- q �- EACH TOP CHORD MEMBER. N z a z ¢ z MfrR, N, ., of C3 S 9 w a w a -1 w T' o J J o ODJ G I �. I X o X � N xJ w a w i as ;j S7E o ?o D ° `r DOUBLE TRUSSES, S4 < - ¢ ¢ NU �U 00 S11 a a za A A S5 tD U o �O U. m U 1 0 0 0 0 I x x 0 I x� °Ouvoti4CU.w cu 10 M C4 ml w SINGLE TRUSS 2 F - PLAN VIEW SEE N.T.S. 12 41 Z SI MANUFACTURED TRUSS TOP CHORDS FOOTING I KNEE CONCRETE - MINIMUM 28 DAY COMPRESSIVE STRENGTH F'c = 2,000 psi, 4 SACK MIX FOR_�� CONCRETE TRUSS DESIGN BY TRUSS MANUFACTURER "H'• J (SD NOTES FOR SECTION A -A EAVEA4 RIDGE PURLINS ON ROOF END TRUSS TOP CHORD, NAILING SHALL CONFORM TO TABLE 2304.9.1 & OTHER APPLICABLE SECTIONS OF CHAPTER 23 OF SI Q TYPICAL PURLIN, SEE FLOOR L) GALVANIZED, SILICONE BRONZE, COPPER OR STAINLESS STEEL. CCA TREATED WOOD SHALL 3•-0"- 3'-0" 3 -0:'-- 3'-0" 3'-0" Sal -NO PLAN FOR SIZE LJ pJ)RLINS3 S2 TRUSS DESIGN BY OTHERS Z AS3 N4fC77Q, X 5' 6' x 6' 0' M (r W1Z' X 6" W X ff'Wf2'R 6" 6" X B" W/Z• x 6" ---2fi" 6' X Ir V4IZ' X 6" W X 10" W17- X W 2- X 6' @ 24' O.C., 10' BAYS LJ MrNpI 0 2' X 6' @ 24' O.C., 12' BAYS 13DF-L GIRTS WITH PLATED, GASKETED 1' OR LONGER METAL TO WOOD FASTENERS. PANELS SHALL BE =SApNAL #2 GIRTS FLAT @ 24' O.C, D L) SOIL COMPACTION - ALL BACKFILLED SOIL BENEATH FOOTINGS SHALL BE COMPACTED WITH A 9 CONCRETE FOOTING, SEE SCHEDULE P�GIST x$04 2 G/ METHOD D. SS EXTEND POST TO TOP OF PURLIN W WXD 'B" 0 ROOF FASTENED TO PURLINS WITH N YD S7 1 1/2' LONG WOODFAST TEKS. W X 6' 6" N 6• 6'x6'WfT1[B"--26- 6' X 6"1NJZ'X 6" ------ d"_M VWZ' X 6" 6•x 8'•W2'XO- 6' x 16' W_ _IZ_ ' _x 6_ 6' X 17' 7N 0 WALLS FASTENED TO - - 5 2' X 6' OR 2' X 8' EAVE GIRT 2 - 16d NAILS �_ -k. N/Fj ,,,,,,�p�cr GIRTS WITH V LONG KNEE BRACE, IF REQ'D, SEE POST SCHEDULE 3'-0" 3•-0" 3'-0" T-O"- 3•-0•' 3'-0" 3',2" NO NO N4 NO AND DETAIL 2 WOODFAST TEKS. BUILDING SECTION A -A N.T.S. SINGLE OVERHEAD DOOR OPTION FRONT ELEVATION NOTES FOR FRONT ELEVATION N.T.S. Sg HALF TRUSS DESIGN BY OTHERS SUPPORT PURLINS @ END TRUSS W/2' X 6' S6 TREATED 2' X 6' BOTTOM GIRT S2 2' X 10' HEADER S3 2' X 6' GIRTS @ 24' O.C„ 10' BAYS, DF -L #2 2' X 6' GIRTS @ 24' D.C., 12' BAYS, DF -L #2 S4 2' X 8' FACIA BOARDS SS TREATED WOOD POSTS, SIZED PER SCHEDULE S6 TREATED 2' X 6' BOTTOM GIRT OR TREATED 2' X 10' BOTTOM GIRT -%S3 S2 S4 � DETAIL 1 - TRUSS COLUMN CONNECTION, PURLIN SUPPORT N.T.S. NOTES FOR FOOTING DETAIL S1 TREATED POSTS AS SIZED PER SCHEDULE 2 VIBRATE OR ROD CONCRETE TO OBTAIN FULL BEARING UNDISTURBED SOIL FOOTING DETAIL N.T.S. TREATED POST TYPICAL TRUSS BOTTOM CHORD BRACING NOTES FOR TRUSS BOTTOM CHORD BRACING N,T,S, S1 GABLE END TRUSS 0 DOUBLE INTERIOR TRUSSES S3 GABLE END POST S4 2' X 4' BOTTOM CHORD BRACING @ 10' 0' O.C, SS 2' X 3' BLOCK WITH 4 - 10d NAILS TO BOTTOM CHORD BRACE - 16d GALV, NAILS CH GIRT 2'X6'OR2'X8' GIRT (FLAT) TYPICAL GIRT CONNECTION 8 - 16d NAILS GABLE END TRUSS 2' X 6' X 18' BOLTING BLOCK - 16d NAI ° °°�---C❑RNER POST ° ° ° ° o° 2' X 6' X 18' ° BOLTING BL❑CK DETAIL 3 DOUBLE OVERHEAD DOOR ❑PTI❑N OPTIONAL FRONT ELEVATION N.T.S. SINGLE SLIDING DOOR ❑PTI❑N OPTIONAL FRONT ELEVATION N.T.S. OPTIONAL FRONT ELEVATION N.T.S. - 16d NAILS TYP, GABLE END TRUSS CONNECTION USE BOLTING BLOCKS BELOW ALL CORNER COLUMN GIRTS SPLIT SLIDER DOOR ❑PTI❑N OPTIONAL FRONT ELEVATION N.T.S. NOTES FOR ❑PTI❑NAL FRONT ELEVATIONS S1 HALF TRUSS DESIGN BY OTHERS S2 2' X 10' HEADER UP TO 12'-0' DOORS 2' X 12' HEADER UP TO 20'-0' DOORS 2' X 12' BACKED WITH 2' X 6' UP TO 24'-0' S3 2' X 6' HEADER S4 4' X 6' DOOR POST - 8' THRU 14' WALL HEIGHT W/ 2' X 6' FACER. 6' X 6' DOOR POST - 16' & 18' WALL HEIGHT W/ 2' X 8' FACER. SS DOUBLE 2' X 6' KINGPOST DETAIL 2 - KNEE BRACE NOTES FOR DETAIL 2-'.NEEBRACE S1 TRUSS TOP CHORDDESIGN BY OTHERS S2 TRUSS BOTTOM CH2D, DESIGN BY OTHERS S3 2' X 6' KNEE BRAE S4 WOOD POST, SEE DST/FOOTING SCHEDULE S5 3/4' DIA. BOLT 9 2' X 6' OR 2' X ' TRUSS SEAT EACH SIDE OF POST @ EACH NEE BRACE CONNECTION S7 NAIL KNEE BRACEFO POST WITH 4 - 16d NAILS SS NAIL BOLTING BLCK TO POST BRACE WITH 8 - Sd NAILS S9 4 - 10d NAILS NOTES, KNEE BRACE REQUIREIWHERE SHOWN ON POST/FOOT4G SCHEDULE, BRACE NOT REQUIRED T GABLE END TRUSSES. TYPICAL SIDE ELEVATION TES FOR SDE ELEVATION )2' X 8' WADER ) 2' X 10' FADER FOR 10' & 12' SLIDING DIORS 2' X 8' HIADER FOR 8' & SMALLER SLIDING DORS TRUSS WEB BRACING INTERIOR OR GABLE END TRUSSES NOTES FOR TRUSS WEB BRACING: TRUSS DIAGRAMS WILL OFTEN REQUIRE WEB MEMBER BRACING, WHICH IS SHOWN ON TRUSS DRAWINGS iS THE METHOD OF TRUSS WEB BRACING SHOWN ABOVE REPLACES 1' X 4' OR 2' X 4' WEB MEMBER BRACING, FOLLOW THESE INSTRUCTIONS FOR ALL WEB MEMBER BRACING TO REPLACE 'RAT -RUN' WEB OLTRU0d NAILS @ 6' D.C. r --40d NAILS @ 6' O.C. X 6' OR 2' X 8' X 4' SS -BRACE L -BRACE WEB MEMBER TRUSS WEB MEMBER SECTION B -B SECTION B -B AT INTERIOR TRUSSES AT GABLE END TRUSS BUILDING SPECIFICATIONS, GENERAL - ALL BUILDING CONSTRUCTION SHALL CONFORM TO THE 2003 EDITION OF THE INTERNATIONAL BUILDING CODE (IBC 2003) AND ALL STATE & LOCAL BUILDING CODES, THESE SPECIFICATIONS AND PLANS ARE DESIGNED FOR 30 OR 40 PSF LIVE (SNOW) LOAD, 85 & 90 MPH WIND SPEED, EXPOSURE B AND SESMIC DESIGN CATEGORY C. DESIGN LOADS - ROOF LL = 30 OR 40 PSF ROOF DEAD LOAD = 5 PSF( CEILING LL = 0 PSF CEILING DL = 1 PSF # ROOF DL ALLOWS FOR A MAXIMUM OF 3' THICKNESS OF FIBERGLASS INSULATION, MAXIMUM SOIL BEARING PRESSURE = 2,000 PSF IG MAXIMUM SOIL BEARING PRESSURE IS BASED ON SAND SILTY SAND CLAY CLAYEY SAND AND THE FOLLOWING MINIMUM ROOF AAPHRAGM REQUIREMENTS ARE NEEDED, ■ ROOF STEEL, 29 GAUGE GRAN) -RIB III, 36' WIDTH OR EQUIVALENT ■ FIELD SCREWS, #10 x 1 1/2' AT 9' O.C. (NEXT TO HIGH RIB) ■ EAVE AND RIDGE PURLIN SCR=WS, #14 xl 1/2' AT BOTH SIDES OF EACH MAJOR RIB THE FOLLOWING MINIMUM ENDWALL DIAPHRAGM REQUIRMENTS ARE NEED, ■ ENDWALL STEEL, 29 GAUGE GRAND -RIB III, 36' WIDTH OR EQUIVALE ■ FIELD SCREWS, #10 x 1 1/2' .1 9' OC. (NEXT TO HIGH RIB) ■ BASE GIRT, END TRUSS, AND DOOR HEADER SCREWS, #14 x 1 1/2' @ BOTH SIDES OF EACH MAJW RIB. SANDY GRAVEL OR BETTER PER IHC TABLE 1804,2. LESSER SOIL CONDITIONS WILL REQUIRE SI MANUFACTURED TRUSS TOP CHORDS FOOTING I KNEE CONCRETE - MINIMUM 28 DAY COMPRESSIVE STRENGTH F'c = 2,000 psi, 4 SACK MIX FOR_�� CONCRETE TRUSS DESIGN BY TRUSS MANUFACTURER "H'• WOOD - STRUCTURAL LUMBER SHALL CONFORM TO DF -L #2 OR BETTER OR HEM -FIR #2 OR (SD PURLIN SUPPORT STRUT 2' X 6' X FULL EAVEA4 RIDGE PURLINS ON ROOF END TRUSS TOP CHORD, NAILING SHALL CONFORM TO TABLE 2304.9.1 & OTHER APPLICABLE SECTIONS OF CHAPTER 23 OF 10'-R'_ _ 10'-0' 10•'-_ -12'-0" 10•-0• " 0' L DEPTH OF TOP CHORD PLUS PURLIN. x 6" x 6" --- x 6" -_18'-_ x 6• WfT X 6" - ---_20:•- 6' x10" 6'x10' GALVANIZED, SILICONE BRONZE, COPPER OR STAINLESS STEEL. CCA TREATED WOOD SHALL 3•-0"- 3'-0" 3 -0:'-- 3'-0" 3'-0" Sal -NO NAIL PURLINS W/(3) 16d NAILS EL 2U 0_211- 0.20 020- _0.24_ _024_--20'-0' 0.27 pJ)RLINS3 p NOTEn VM S REWSI TYPICAL SCREW PATTERN, EXCEPT AS NAIL STRUT TO TOP CHORD W/(3) 16d _12-0"_ 12-0' 12-0 _ -_ 120"_ -1S'-0" 12-0" _ 12-0• 12' 0' N4fC77Q, X 5' 6' x 6' 0' M (r W1Z' X 6" W X ff'Wf2'R 6" 6" X B" W/Z• x 6" ---2fi" 6' X Ir V4IZ' X 6" W X 10" W17- X W NAILS EACH SIDE, STEEL SHEETING SCREW PATTERNS MrNpI 0 MANUFACTURED TRUSS - NAIL TO EACH NO GIRTS WITH PLATED, GASKETED 1' OR LONGER METAL TO WOOD FASTENERS. PANELS SHALL BE =SApNAL SIDE OF POST WITH 4 - 16d NAILS S FN SOIL COMPACTION - ALL BACKFILLED SOIL BENEATH FOOTINGS SHALL BE COMPACTED WITH A POST ON TOP NAILING BLOCK P�GIST x$04 2 G/ METHOD D. S5 WOOD POST, SEE POST/FOOTING SCHEDULE. "H" WXD 'B" 0 4 - lOd NAILS REQUIRED VOLUME YD S7 SOLID BLOCKING AT CONNECTION POINTS, W X 6' 6" N 6• 6'x6'WfT1[B"--26- 6' X 6"1NJZ'X 6" ------ d"_M VWZ' X 6" 6•x 8'•W2'XO- 6' x 16' W_ _IZ_ ' _x 6_ 6' X 17' 7N 0 TYP. PURLIN, SEE FLOOR PLAN FOR SIZE TRUSS LOADING, TOP CHORD LIVE LOAD = 30 OR 40 PSF DEAD LOAD = 5 PSF 1" - 5 2' X 6' OR 2' X 8' EAVE GIRT 2 - 16d NAILS �_ -k. N/Fj ,,,,,,�p�cr 10 KNEE BRACE, IF REQ'D, SEE POST SCHEDULE 3'-0" 3•-0" 3'-0" T-O"- 3•-0•' 3'-0" 3',2" NO NO N4 NO AND DETAIL 2 _-- NO --NO_ NO 11 2' X 6' X 24' OR 2' X 8' X 24' BLOCK 3'-'" No 1® 1 - 3/4' 0 MACHINE BOLT THRU TRUSS T, CHORD LIVE LOAD 1 - 3/4' 0 MACHINE BOLT THRU KNEE BRACE COLUMN FOOTING 1 - 3/4' 0 MACHINE BOLT THRU BOLTING BLOCK SPACING •'H" 3 - 3/4' 0 M, BOLT @ BOLTING BLOCK - 24' & 3 "T" REQUIRED 4 - 3/4' 0 M. BOLT @ BOLTING BLOCK - 36' & 4 0-0" -10'-0"_ 14'-0" 161.0• -_10'-0•_ 20'-0• - -22'-0" 6' X 61 6' x 6• 6_11 6' W0 x 6" 6' k 6' WIZ' x 6" 6• X S' 6' x 6W12" x 61• 6' x 10' 6- x 10" 112" x 6• 6' X 10' Wf2" X 6' 5 - 3/4' 0 M. BOLT @ BOLTING BLOCK - 50' NO EL 47 _047 _0.47 0.47 047 6 - 3/4' 0 M. BOLT @ BOLTING BLOCK - 60' 3'-0"NO 3'16';- 3•-0" 3'-0'• 3'-0"- 3•-0" 1 3'-211 (Q 4 - 16d NAILS NO -- NO DOUBLE OVERHEAD DOOR ❑PTI❑N OPTIONAL FRONT ELEVATION N.T.S. SINGLE SLIDING DOOR ❑PTI❑N OPTIONAL FRONT ELEVATION N.T.S. OPTIONAL FRONT ELEVATION N.T.S. - 16d NAILS TYP, GABLE END TRUSS CONNECTION USE BOLTING BLOCKS BELOW ALL CORNER COLUMN GIRTS SPLIT SLIDER DOOR ❑PTI❑N OPTIONAL FRONT ELEVATION N.T.S. NOTES FOR ❑PTI❑NAL FRONT ELEVATIONS S1 HALF TRUSS DESIGN BY OTHERS S2 2' X 10' HEADER UP TO 12'-0' DOORS 2' X 12' HEADER UP TO 20'-0' DOORS 2' X 12' BACKED WITH 2' X 6' UP TO 24'-0' S3 2' X 6' HEADER S4 4' X 6' DOOR POST - 8' THRU 14' WALL HEIGHT W/ 2' X 6' FACER. 6' X 6' DOOR POST - 16' & 18' WALL HEIGHT W/ 2' X 8' FACER. SS DOUBLE 2' X 6' KINGPOST DETAIL 2 - KNEE BRACE NOTES FOR DETAIL 2-'.NEEBRACE S1 TRUSS TOP CHORDDESIGN BY OTHERS S2 TRUSS BOTTOM CH2D, DESIGN BY OTHERS S3 2' X 6' KNEE BRAE S4 WOOD POST, SEE DST/FOOTING SCHEDULE S5 3/4' DIA. BOLT 9 2' X 6' OR 2' X ' TRUSS SEAT EACH SIDE OF POST @ EACH NEE BRACE CONNECTION S7 NAIL KNEE BRACEFO POST WITH 4 - 16d NAILS SS NAIL BOLTING BLCK TO POST BRACE WITH 8 - Sd NAILS S9 4 - 10d NAILS NOTES, KNEE BRACE REQUIREIWHERE SHOWN ON POST/FOOT4G SCHEDULE, BRACE NOT REQUIRED T GABLE END TRUSSES. TYPICAL SIDE ELEVATION TES FOR SDE ELEVATION )2' X 8' WADER ) 2' X 10' FADER FOR 10' & 12' SLIDING DIORS 2' X 8' HIADER FOR 8' & SMALLER SLIDING DORS TRUSS WEB BRACING INTERIOR OR GABLE END TRUSSES NOTES FOR TRUSS WEB BRACING: TRUSS DIAGRAMS WILL OFTEN REQUIRE WEB MEMBER BRACING, WHICH IS SHOWN ON TRUSS DRAWINGS iS THE METHOD OF TRUSS WEB BRACING SHOWN ABOVE REPLACES 1' X 4' OR 2' X 4' WEB MEMBER BRACING, FOLLOW THESE INSTRUCTIONS FOR ALL WEB MEMBER BRACING TO REPLACE 'RAT -RUN' WEB OLTRU0d NAILS @ 6' D.C. r --40d NAILS @ 6' O.C. X 6' OR 2' X 8' X 4' SS -BRACE L -BRACE WEB MEMBER TRUSS WEB MEMBER SECTION B -B SECTION B -B AT INTERIOR TRUSSES AT GABLE END TRUSS BUILDING SPECIFICATIONS, GENERAL - ALL BUILDING CONSTRUCTION SHALL CONFORM TO THE 2003 EDITION OF THE INTERNATIONAL BUILDING CODE (IBC 2003) AND ALL STATE & LOCAL BUILDING CODES, THESE SPECIFICATIONS AND PLANS ARE DESIGNED FOR 30 OR 40 PSF LIVE (SNOW) LOAD, 85 & 90 MPH WIND SPEED, EXPOSURE B AND SESMIC DESIGN CATEGORY C. DESIGN LOADS - ROOF LL = 30 OR 40 PSF ROOF DEAD LOAD = 5 PSF( CEILING LL = 0 PSF CEILING DL = 1 PSF # ROOF DL ALLOWS FOR A MAXIMUM OF 3' THICKNESS OF FIBERGLASS INSULATION, MAXIMUM SOIL BEARING PRESSURE = 2,000 PSF IG MAXIMUM SOIL BEARING PRESSURE IS BASED ON SAND SILTY SAND CLAY CLAYEY SAND AND THE FOLLOWING MINIMUM ROOF AAPHRAGM REQUIREMENTS ARE NEEDED, ■ ROOF STEEL, 29 GAUGE GRAN) -RIB III, 36' WIDTH OR EQUIVALENT ■ FIELD SCREWS, #10 x 1 1/2' AT 9' O.C. (NEXT TO HIGH RIB) ■ EAVE AND RIDGE PURLIN SCR=WS, #14 xl 1/2' AT BOTH SIDES OF EACH MAJOR RIB THE FOLLOWING MINIMUM ENDWALL DIAPHRAGM REQUIRMENTS ARE NEED, ■ ENDWALL STEEL, 29 GAUGE GRAND -RIB III, 36' WIDTH OR EQUIVALE ■ FIELD SCREWS, #10 x 1 1/2' .1 9' OC. (NEXT TO HIGH RIB) ■ BASE GIRT, END TRUSS, AND DOOR HEADER SCREWS, #14 x 1 1/2' @ BOTH SIDES OF EACH MAJW RIB. SANDY GRAVEL OR BETTER PER IHC TABLE 1804,2. LESSER SOIL CONDITIONS WILL REQUIRE DIAPHRAGM SCREWS REVIEW AND FOOTING SIZE ADJUSTMENT BY THE ENGINEER. FOOTING I KNEE CONCRETE - MINIMUM 28 DAY COMPRESSIVE STRENGTH F'c = 2,000 psi, 4 SACK MIX FOR_�� CONCRETE FOOTINGS. CAST IN PLACE CONCRETE CONSTRUCTION SHALL CONFORM TO ACI 318-92. "H'• WOOD - STRUCTURAL LUMBER SHALL CONFORM TO DF -L #2 OR BETTER OR HEM -FIR #2 OR DIAPHRAGM SCREWS @ ENDWALL BASE GIRT ACROSS BETTER BY WWPA GRADING RULES. MAXIMUM MOISTURE CONTENT SHALL BE 19% BY WEIGHT. EAVEA4 RIDGE PURLINS ON ROOF END TRUSS TOP CHORD, NAILING SHALL CONFORM TO TABLE 2304.9.1 & OTHER APPLICABLE SECTIONS OF CHAPTER 23 OF 10'-R'_ _ 10'-0' 10•'-_ -12'-0" 10•-0• " 0' L THE IBC. ALL NAILS INT❑ PRESERVATIVELY TREATED WOOD SHALL BE ZINC COATED HOT DIP x 6" x 6" --- x 6" -_18'-_ x 6• WfT X 6" - ---_20:•- 6' x10" 6'x10' GALVANIZED, SILICONE BRONZE, COPPER OR STAINLESS STEEL. CCA TREATED WOOD SHALL 3•-0"- 3'-0" 3 -0:'-- 3'-0" 3'-0" Sal -NO CONFORM TO THE REQUIREMENTS OF AWPA STANDARDS C-16, C-22, C-23, C-24 & C-28, POSTS EL 2U 0_211- 0.20 020- _0.24_ _024_--20'-0' 0.27 FOR BUILDINGS SHALL BE AS NOTED ON THE PLANS, ALL POST MATERIALS SHALL BE HEM -FIR p NOTEn VM S REWSI TYPICAL SCREW PATTERN, EXCEPT AS #2 OR BETTER, FULL DIMENSION AND GRADED BY WWPA GRADING RULES, HARDWARE SHALL BE _12-0"_ 12-0' 12-0 _ -_ 120"_ -1S'-0" 12-0" _ 12-0• 12' 0' SIMPSON OR APPROVED EQUAL. ALL BOLTS SHALL CONFORM TO ASTM A307, METAL PANELS MAY X 5' 6' x 6' 0' M (r W1Z' X 6" W X ff'Wf2'R 6" 6" X B" W/Z• x 6" ---2fi" 6' X Ir V4IZ' X 6" W X 10" W17- X W BE DELTA RIB STYLE, GALVANIZED OR PAINTED, 29 GAUGE THICKNESS, ASTM A653 STRUCTURAL STEEL SHEETING SCREW PATTERNS QUALITY (SQ), Fy = 80,0 ksl, ROOF PANELS SHALL BE FASTENED TO PURLINS WITH PLATED, N.T.S GASKETED 1 1/2' LONG METAL TO WOOD FASTENERS. WALL PANELS SHALL BE FASTENED TO NO GIRTS WITH PLATED, GASKETED 1' OR LONGER METAL TO WOOD FASTENERS. PANELS SHALL BE =SApNAL INSTALLED AND FASTENED ACCORDING TO THE MANUFACTURERS RECOMMENDATIONS, S FN SOIL COMPACTION - ALL BACKFILLED SOIL BENEATH FOOTINGS SHALL BE COMPACTED WITH A POST VIBRATORY COMPACTOR TO 95% OF THE PROCTOR DENSITY AS DETERMINED BY ASTM A1557, P�GIST x$04 2 G/ METHOD D. CONCRETE SPACING "H" WXD 'B" DIA. TRUSSES SHALL BE DESIGNED BY AND BEAR THE SEAL OF AN ENGINEER REGISTERED TO REQUIRED VOLUME YD 4 974 041" 10'-a' 14'-0" 16'•0"_B"MB' 18•-0'• 22'-0" 24•-0" W X 6' 6" N 6• 6'x6'WfT1[B"--26- 6' X 6"1NJZ'X 6" ------ d"_M VWZ' X 6" 6•x 8'•W2'XO- 6' x 16' W_ _IZ_ ' _x 6_ 6' X 17' PRACTICE IN THE STATE OF WASHINGTON, 3'-0.. 3-W' 3 -0" -__NO 3'-0" 3'-0-• YA"- 3'-0•' 9•-2"- 3•.3•' 1 NO TRUSS LOADING, TOP CHORD LIVE LOAD = 30 OR 40 PSF DEAD LOAD = 5 PSF 1" - pg9/FCIF SOP SSIO TOP CHORD BOTTOM CHORD DEAD LOAD = 1 PSF 2 - 16d NAILS �_ -k. N/Fj ,,,,,,�p�cr 6", 8' OR 10' POST NAILING PATTERN FOR POST LAMINATIONS NOTE: 2" X 6" LAMINATE MUST BE A TREATED MEMBER AND MUST EXTEND TO THE BOTTOM OF THE FOOTING. LAMINATE MAY BE SPLICED ABOVE MID HEIGHT OF COLUMN POSVFOOTING SCHEDULE 1Z - 24' SPANS 30 & 40 PSF LIVE LOAD POST 11 COLUMN FOOTING I KNEE BRACE I CONCRETE 'SPACING I "H'• WXD •B"DIA. "I' REQUIRED VOLUME YD 10'-R'_ _ 10'-0' 10•'-_ -12'-0" 10•-0• " 0' L B-0'• 6" 10•-0"_ G' 6" 14'-0" 6' i6'-0' 6'%0' 10'-0' x 6" x 6" --- x 6" -_18'-_ x 6• WfT X 6" - ---_20:•- 6' x10" 6'x10' 18•' _ 10" 16' -5•-0•-_NO 20' 21' 3•-0"- 3'-0" 3 -0:'-- 3'-0" 3'-0" Sal -NO NO -- EL 2U 0_211- 0.20 020- _0.24_ _024_--20'-0' 0.27 No O _ _N NO_ _ NO_ _12-0"_ 12-0' 12-0 _ -_ 120"_ -1S'-0" 12-0" _ 12-0• 12' 0' 0-0" 6 10'-0' 12'-0" 16'-0" 18•-0• 27-ir X 5' 6' x 6' 0' M (r W1Z' X 6" W X ff'Wf2'R 6" 6" X B" W/Z• x 6" ---2fi" 6' X Ir V4IZ' X 6" W X 10" W17- X W _26" 26'_ -26' 29' 26'- 26' 3'4" 3' 3'-0" T -O" 3'-011. 3'-0•' 3'Z" NO __No NO No _041 _0.41- 041 IL41_ _ 041 _ _ 041 044 _ NO _ NO NO POSTIFOOTING SCHEDULE N SPANS, 90 & 40 PSF LIVE LOAD POST COLUMN FOOTING 1KNEEBRACE CONCRETE SPACING "H" WXD 'B" DIA. •'T•' REQUIRED VOLUME YD 10'-0' -10'-0" -10'-P--12'-0" t0'-0' _10,0- 10.4- -_10'U--20% 10'-0" - 10•-0• 041" 10'-a' 14'-0" 16'•0"_B"MB' 18•-0'• 22'-0" 24•-0" W X 6' 6" N 6• 6'x6'WfT1[B"--26- 6' X 6"1NJZ'X 6" ------ d"_M VWZ' X 6" 6•x 8'•W2'XO- 6' x 16' W_ _IZ_ ' _x 6_ 6' X 17' 26' .-26". 26' 26 26'- 20• -26"- 26' 1 3'-0.. 3-W' 3 -0" -__NO 3'-0" 3'-0-• YA"- 3'-0•' 9•-2"- 3•.3•' 1 NO 0.41 _IL41_ _0.41_ _041- _041_ 0.44 045 No NO _NO -_0.41- No NO N0 NO 12-0' 1&0_ 12-0" 12-U' _ ar _ 12-i 12-0- _12-'0_ _8'-0"_ _-0'A" 12'-0" 14•-0" _16'-0" 18•-0• -211'-0" 22'-0'_ W x W 6_x 6' G X 6' Wf7' X 6" 6 X 8•' - - 6 x B• WIZ' x 6" 6 X 10"-- -- 6' x 1r 6' x 17' WIZ' X 6' 2B" -2[r'- -21Y 20' 2B n,-3'-0" 20 - 28" 3'-0" 3•-0" 3'-0" T-O"- 3•-0•' 3'-0" 3',2" NO NO N4 NO _047 -0.47 0.47_ _-_EL47_ (Of -_0.47_ _ 047_ _-- NO --NO_ NO - NO 26 3'-'" No _05_ 0.56 POSTIFOOTING SCHEDULE 36 SPANS & 30 40 PSF LIVE LOAD POST COLUMN FOOTING KNEE BRACE CONCRETE SPACING •'H" WXD 'B -DIA. "T" REQUIRED VOLUME YD -10•-0'- - _10'-0"-_12'-0_ _-10"-_- '-0 10•-0' -10•-0"- -10'-0"24'-0' 0-0" -10'-0"_ 14'-0" 161.0• -_10'-0•_ 20'-0• - -22'-0" 6' X 61 6' x 6• 6_11 6' W0 x 6" 6' k 6' WIZ' x 6" 6• X S' 6' x 6W12" x 61• 6' x 10' 6- x 10" 112" x 6• 6' X 10' Wf2" X 6' 26' 20 3•-0•' 3'-D" NO EL 47 _047 _0.47 0.47 047 NO 20'_-0 20' 20' 20" -26' - -211" 20' 3'-0"NO 3'16';- 3•-0" 3'-0'• 3'-0"- 3•-0" 1 3'-211 _ NO NO NO -- NO 047_ 047 No -_ 0.47_- 0.50 _ YES _ 12-0'041" 112-W- - - _ 12-6'_ _ 12-0'_ _ 12-0'•_ 12-0' _10'-0• - -- _ 92'-0' _14•-0" wir 10'-0" W X 6• 6' x 6" 37 9Z' 3'-0" 3•-0•' NO NO _ 0.62 -062 - eX - 6' X 6' Wf7' x 6" 6' X it -. - - - 6' x O'112'x 6" 6-x 10' - --- 37' _-32'_- 32"_ - 3'-0" 9'-0•• - _3'-0" 3'-01 - -- NO 0.62 NO N0 NO _ _062_ a62 _062 20'-0' 22'-0"6 B' M 10' W12' -X6•' M 1Z' _37_ 37' 37' 3'0"- 3'2" NO 0.62 0.66 _ NO _124' 102- 24%(r 6' x 12' WIZ' x 6' 3Z' 3.3" 1NO 0. W POSTIFOOTING SCHEDULE 40 SPANS 30 & 40 PSF LIVE LOAD POST COLUMN FOOTING KNEE BRACE CONCRETE SPACING "H" W X D 'B•' DIA. "T" REQUIRED VOLUME, YD 70M]" -_ 10'-0" 10'-0' 10'•0' _ _ 10•-0' _10'-0'_ _10'-0•_ _ 10'-0' 10'-0' _0 10'- 0-0" 10'-0" 12' -Ir _14'-0• _16•-0" 16'-0" 18•-0• 20•-0' 22'-0" 24'-0 ' W X 6' 6' x 6• 6• X 6' Wf2• X 6" 6' X 6'WIZ'X 8" W X S' - - - - 6'x0'WJZ'x6-• W x 0• W12' X 6" 6' x 10' &' x 10' W17' X &' 6' x ' ----- 1Z 30' 3•-0" 3•-0•' T -V 3'-0" -3'-0" 3--r---NO 3•-0" 3'-0'• 3'-0" 055_ 30- 30_ 90' -Mr, -30'_ _ 30' 30 30' _NO NO 055_ NO 055 NO _ 0.55_ 056 - YES _ NO NO NO _055_ 055 0.55 055 _ 0.59 30 3'2•' YES 12-0' _B'-0•' -sr- _ 12-P 12-0' _ 12-0 _12-0 12-0' _72.0' 2-' 10'•0'_ 12 U" - 14 0"_ 16-0' 10-0' 20•-0" 22' -0' W X 6• 6' x 6' 6 x 6 Wf7' x 6" - 6 x 0" 6 X 0 Wf2"X V 6 x 10' 6' X_1U" 112" x 6' 6' X 1Z' 33" 3'-0"_ 9'-0" _ 3-0 NO NO NO _066 93 S: - 33 _0.60_ 066 -- 3•-0 _ 3--0' NO -- 086 NO _33 33" 33" 3'-0" 3•-0•' 3.2" NO _066_ 066_ NO 066_ a70_ _70 12-0' 24'- 0'6' X 12' W/Z' X 6' _93' 93' 9'2" _NO NO 0.72 POS7/FOOTING SCHEDULE 40 TO 52'SPAN5 30&40PSF LIVE LOAD POST COLUMN FOOTING KNEE BRACE CONCRETE SPACING ••H'• WXD '13" DIA. "T" REQUIRED VOLUME YD _10141_ 10'-0' _10' 0'- 10'-U•• _ 10'-0' - 10'-0' 10'-0' 10'-0' 10•-0' 10•-0' 0-0'• -12•-0" 14'-0' 16'-0" 161-0" 18'-0" 20'-0' 22'-0' I 24'-0' 6' x 6' Irl ' x 6"- 6' x W WIZ'x 6" 6' x 6' W/Z' X 0"- 6' X 8" - - - _- 0' X 91 W171 x 61• 6' X 0' W12" X 6' 6' X 10' 6' X 10' W12" X 6• 1&'X 12"W12" X 6' _34" 31' -- 34" 94' 34'x_ 94•' 34" 34" 34" 34" 3'-0" 7-13" 3'-0'• 3.1-01, 3'-0"- 3•-0•• 3'-0" 3'-D" 3'-0" 1 3'-0" NO -NO 070_ 0.70_ _0_70_ _ 0.70 _ _ 070 _ 070 NO NO YES _ NO NO YES NO YES 070 070 0.70 I 0.70 12-0' _ 12-0' _ _ 12-0'_ 12-11 -12-0"-- 12-0' 12-0' _ 12-0' _ 12-0' 1241" 0-0" 10'-W 12'-0' 14'-B" -- 16'-0" 18'-0• -0 20'' 22'-0• 24'-U" 6' X 6"-- _ 6' X G WfT X 6" 6'X6'WIZ'XV s• x B" - '- 6' x 0' WfZ' X 6" 6" X 10' 6•x 10' W/2' x 6' VX 17' Wf2' X 6' " x 6' 6' X 1Z' 112_k&: _36'_ 36' -W_- - 361 ------ 36' 39, _36 _ 36'_ 36' 3'-0"_ 3•-0" 3•-0„ 3'-01' 3'-0" _3'-0'• 3'-0'• _3'-_2'• 72" NO 0.79__ 079_ __ NO _--- NO -- No NO YES --078_ a79 --- O79 0_79 MO_ _ 0.79_ _ 089_ 1 R03 NO 1 NO POST/FOOTING SCHEDULE ST TO 6U'SPANS, 30&40PSF LIVE LOAD POST COLUMN FOOTING KNEE BRACE CONCRETE SPACING ••H" I WXD '13" DIA. "T•' REQUIRED VOLUME, YD -10'-0' _ 101.0'- _- 10' -Cr' _10'-0' 10'-0'- .: d0' -U SAO' -0" - 10•-0• 0-0'• 90'-0 12•-0" 14'-0" 16'-0"_ 18'-0• 20'-0' -0 22'' I 24• -Ir 6' x 6' 3171 . 36' 30_ -36'- 38'- 96 96' 30" 3•-41' 3'-0'- 3-0•' _ 3'-0" xz- NO -NO -No -- - NO _ _.-- No NO -YES- NO 1 YES - -0.79 0.70 -- [L7-9- 7910'-0' 479 079_ 0.79 -0.79 079 -- IL83 Ir M 6'. 6• 6• X wr X6"__ 6' X 0' 6' x S•W2•X 6" 6' x 10, ----- -- 6•' X_10' WIZ' X W 6' x 10' W12" x 6' I G• X 12" -- 3•--0" _ 3'-0" -0" 3' 3'-2•' _ 12-0'_ 12-0" 12-0' -120'- _ 12-0' -12-0'_ _12-0'_ 12-0' 12.0' 0-0" 10'-0" 12'-0" -14Mr -16--W _7_8•-0' _20'-0' 22•-0' 24'.ir 6' x 6' 6' X 6.112" X 6" 6' x 0" 6'x0'Wf2X-0- 6' x 0' WJZ' x 6" 6' x 10' - - - _ 40'_ 40' _40' 40' 7.0"_ 3'-0" 3'-0" 3•-0" NO 0.97 007_ 0.07 au NO NO NO 40' 3'-0" 9•-0•:- NO 097 - _04F- 0.97_ 11B7 1.03 --YES_- 6' X 10' W12" X 6' W X 17' WJ7' X 6' 6' X 1Z' WIT' X WI _41r _40 40' 40' 3'-0"_ 3•-0" 1 3'2" NO NO NO NOTE: 1. THE NEXT LARGER SIZE POST MAY BE SUBSTITUTED FOR POSTS WITH 2" X 6" LAMINATIONS. 2. ENDWALL POSTS SHALL BE 6" X 6" ROUGH CUT HEM -FIR #2 TREATED POSTS UP TO 16'-0' WALL HEIGHT. ABOVE 16' WALL HEIGHT, ENDWALL POSTS SHALL BE 6" X 8" ROUGH CUT HEM -FIR ##2 POSTS. 3. FOOTINGS FOR ENDWALL POSTS SHALL BE A MINIMUM OF 118"0 X 3'-0" DEEP FOR WALL HEIGHTS TO 16'-0". ABOVE 16' WALL HEIGHT, FOOTINGS SHALL BE 24"0 X V-4" DEEP. 4. ABOVE FOOTING DESIGNS ARE FOR POST FRAME BUILDINGS WITH CONCRETE FLOORS (CONTRAINED POSTS). IF BUILDINGS WILL NOT HAVE EXPIRES 12 29 07 A CONCRETE FLOOR, INCREASE FOOTING DIAMETER X 2" & FOOTING DEPTH X 4 WAMBEKE ENGINEERING 2913 E. 61st Court STRUCTURAL DESIGN FOR POST FRAME BUILDINGS 12' TO 60' SPANS, 30 & 40 PSF LIVE LOAD, 2003 IBC EXCALIBUR STEEL STRUCTURES, INC. P. 0. BOX 14991 SPOKANE; WASHINGTON 99214-0991 BY DATE DRAWING NO., REV. DRAWN CHECKED AMBEKE 01-08-06 EXCALIBUR.IBC2003.BOLT-0 A EV BY DATE DESCRIPTION OF CHANGE PROJECT 2006 SCALE,N.T,S. SHEET, I DF I PROVIDE DIAGRAMS AND ENGINEERING LAYOUTS FOR ROOF TRUSSES, BEAMS AND FLOOR SYSTEMS PRIOR TO FRAMING INSPECTIONS CITY COPY THIS BUILDING SUBJECT TO FIELD INSPECTION CORRECTIONS Spin VIS ONR ,EpV0i KAhLED\FAC �u°CI�.)pE