2009, 10-01 Permit App: 09003138 Remodel Project Number: 09003138 Inv: 1 Application Date: 10/1/2009 Page 1 of 2
THIS IS NOT A PERMIT
Penalties will be assessed for commencing work without a permit
Project Information:
Permit Use: BASEMENT REMODEL Contact: RENOVATIONS BY COVILLO
Address: 14420 E 20TH CT
C-S-Z: VERADALE,WA 99037
Setbacks:Front Left: Right: Rear: Phone: (509)891-6181
Group Name:
Site Information Project Name:
Plat Key: 002693 Name: TWIN VIEW ADD AMENDED PLAT District: Sout
Parcel Number: 45214.1408 Block: Lot:
SiteAddress: 1411 S WILBUR RD Owner:Name: CORCORAN,MICHAEL&DIANE
Address: 1411 S WILBUR RD
Location::CSV SPOKANE VALLEY,WA 99206
Zoning: R-3 SF Res District
Water District: 007 MODEL Hold: ❑
Area: .00 Acres Width: 0 Depth: 0 Right Of Way(ft): 0
Nbr of Bldgs: 0 Nbr of Dwellings: 1
Review Information:
Review
Building Plan Review Released By:
Originally Released: 9/30/2009 By: tmelbourn
Building Permit
Contractor: RENOVATIONS BY DAVE Firm: RENOVATIONS BY DAVE COVILL
Address: 14420 E 20TH CT Phone: (509)891-6181
VERADALE,WA 99037
This Application: Total Project:
Description Grp Type Notes Sq Ft Valuation Sq Ft Valuation
BASEMENT R R-3 VB BASEMENT 0 $15,000.00 0 $15,000.00
FINISH
Totals: 0 $15,000.00 0 $15,000.00
Item Description Units Unit Desc Fee Amount
RESIDENTIAL PERMIT FEE 1 SELECT $251.25
WSBCC SURCHARGE 1 SELECT $4.50
SF PLNS RVW<7999 SQ FT 1 SELECT $100.50
Permit Total Fees: $356.25
Operator: JD Printed By: jmm Print Date: 10/1/2009
Project Number: 09003138 Inv: 1 Application Date: 10/1/2009 Page 2 of 2
THIS IS NOT A PERMIT
Penalties will be assessed for commencing work without a permit
Plumbing Permit
Contractor: RENOVATIONS BY DAVE Firm: RENOVATIONS BY DAVE COVILL
Address: 14420 E 20TH CT Phone: (509)891-6181
VERADALE,WA 99037
Item Description Units Unit Desc Fee Amount
SHOWERS 1 NUMBER OF $6.00
Permit Total Fees: $6.00
Payment Summary: ,,,. ... ., ... .
Permit Type Fee Amount Invoice Amount Amount Paid Amount Owing
Building Permit $356.25 $356.25 $100.50 $255.75
Plumbing Permit $6.00 $6.00 $0.00 $6.00
$362.25 $362.25 $100.50 $261.75
Disclaimer:
Submittal of this application certifies the owner(or person(s)authorized by the owner)has both examined and finds the information
contained within to be true and correct,and agrees that all provisions of laws and/or regulations governing this type of work will be
complied with. Subsequent issuance of a permit shall not be construed to be a permit for,or an approval of,any violation of any of
the provisions of the code or of any other state or local laws or ordinances.
Signature:
Operator: JD Printed By: jmm Print Date: 10/1/2009
(Staff Use OnlyPERMIT NUMBER:SÔkane �
Valleyx PERMIT FEE:
CITY OF SPOKANE VALLEY
Community Development Department
Permit Center
11703 East Sprague Avenue, Suite B-3
Spokane Valley, WA 99206
Tel: (509) 688-0036
Fax: (509) 688-0037
permitcenter@sookanevalley.org
RESIDENTIAL CONSTRUCTION PERMIT APPLICATION
NEW CONSTRUCTION ADDITIO REMOD y 0ACCESSORY BUILDING
0 DECK OTHER
SITE ADDRESS:
ASSESSORS PARCEL NO.: LEGAL DESCRIPTION:
BUILDING OWNER NAME:
NAME: 74l/46. A6 ..%5 7) -J 6"C, d it��l�►
ADDRESS: ) '-/11 S . L
'
CITY: S STATE: c../4 ZIP: CI Z 0
PHONE: FAX: CELL: 5 6,76 7
CONTACT NAME: /A,vI vt ��li //( q
PHONE: FAX: eq./ " 55/Z— CELL: 7 /O
CONTRACTOR NAME: 2et'iY,a��k.2 ? } v c._ Cc_'\/, /\: <
MAILING ADDRESS: ///z 2e- 7-1 C/
CITY: S 6 Lt�JrL \/_C€ ] STATE: ZIP:(e.-"97*--
� 5`(' >7
PHONE: / FAX: 7 - CELL: ce Cn 7' 7t/6
7ZE.vc vC 5 5 Cf
CONTRACTOR LICENSE No.: EXPIRES: c. /Z_ /o CITY BUSINESS LICENSE NO.: &->C7.- `/z Z 51,7
DESCRIBE THE SCOPE OF WORK IN DETAIL AND INDICATE USE:
eskx.dx4 C fez-<_<,�a7 / I" eZ 2E`J c
C L uy�; c/7£'iiIC,5 7 c - _.,x--/.5",--7-‘1C S,4-1G�4-( -c-6, —
,,u t`J ems-/' i3<14$0,k, 1 4 e- f2' CrX. f 5,42/c.
PROPOSED USE:
Effective October 28, 2007 Page 1 of 2
C:\Documents and Settings\Dave\Local Settings\Temporary Internet
Files\Content.IE5\VZ8T098K\Residential%20Construction%20Permit%20App.1[1].doc
:3i3Cfr
****YOU MUST COMPLETE THE FOLLOWING****
MARK N/A IF NOT APPLICABLE
Height toPe . Dimensio No. of Stor. . Total Habitable,
Space:
Main Floor SO,- Upper Floc -SQ---- Unfinished Basement Finished Basement
FT: _ FT: SQ FT: 'j Zig__ SQ FT: // 1'Z
Garage SQ F- Deck/Covered Patio Impervious Surface 30% Slopes on
SQ FT: Area: Property:
No. of / Construction/ Heat Source: Sewer or
Bedrooms. Type: C xS Septic: C "(
TOTAL COST OF PROJECT: $ f j cc�o
DISCLAIMER
The permitted verifies,acknowledges and agrees by their signature that: 1) if this permit is for construction or on a dwelling,the dwelling is/will
be served by potable water. 2) Ownership of this City of Spokane Valley permit inure to the property owner. 3) The signatory is the property
owner or has permission to represent the property owner in this transaction. 4) All construction is to be done in full compliance with the City of
Spokane Valley Development code. Referenced codes are available for review at the City of Spokane Valley Permit Center. 5) The City of
Spokane Valley permit is not a permit or approval for any violation of federal, state or local laws, codes or ordinances. 6) Plans or additional
information may be required to be submitted and subsequently approved before this application can be processed. /
Signature Date: 2 "c,i1�
Method of payment: ❑ C sh ❑ Check ❑ Visa ❑ Mastercard
Bankcard #: EXP: VIN#:
Authorized Signature:
Effective October 28, 2007 Page 2 of 2
C:\Documents and Settings\Dave\Local Settings\Temporary Internet
Files\Content.IES\VZ8TO98K\Residential%20Construction%20Permit%20App.1[1].doc
Permit Center
Siokane 11703 E Sprague Ave,Suite B-3 PERMIT NUMBER:
P ivaii Spokane Valley,WA 99206
.Valley. (509)688-0036 FAX:(509)688-0037 PERMIT FEE:
permitcenter@spokanevalley.org
Community Development
Plumbing Permit Application F ( Commercial Residential
SITE ADDRESS: /47/i/ S bc//
Building Owner
Phone: / 7 , Fax:
Name: j2.CG(21_�
1 / ��-
Address: /4-/// S \--"/ City S V State: L '1 Zip: �7 Lu
Contractor
Name: ' �,A ie: �<:,v,A, Phone: Fax:
Address: 6- Z<.�y,, City: S �/l State: Zip: �� 7
License No: City Business Lic:
Contact/Project Manager:
Name: w /<<, Phone: 0�> j- '7Y4 5
#OF UNITS
PLUMBING FIXTURE ON A TRAP
TOILETS
URINALS
TUBS
SHOWERS(per trap)
Lav/Basins,Bar,Floor,Kitchen,Laundry,Utility,Janitor,Photo,X-ray,Food,
SINKS Prep/Culinary Meat
DISHWASHER
CLOTHES WASHER
GARBAGE DISPOSAL
WATER SOFTNER
FLOOR DRAIN Area,Case,Coil,Trench,Condensate
ROOF DRAIN/OVERFLOW DRAINS
FOUNTAIN,DRINKING
WATER PIPING/DRAIN-IN WASTE Installation,Alterations,Repair,Reversals
WATER USING DEVICE Ice and/or Coffee maker,hose bib,steamer proofer,carbonator,swamp cooler
PRIVATE SEWAGE DISPOSAL SYSTEM
WATER HEATER If Gas,See Mechanical
INDUSTRIAL WASTE PRETREATEMENT
INCEPTORS Including traps,vents except kitchen type grease interceptors functioning as fixture traps
REPAIR OR ALTERATION Water piping,drainage or vent piping
ATMOSPHERIC TYPE VACUUM BREAKER
BACK FLOW PROTECTIVE DEVICE Other than atmospheric type vacuum breakers
MEDICAL GAS
INCEPTORS
['CASH ❑CHECK 0 VISA 0 MC EXPIRES:
Card# VIN:
SIGNATURE:
CURRENT FEES AVAILABLE AT: http://www.spokanevalley.orq/under the quick links for Forms,Master Fee Schedule.
http://www.spokanevalley.org/uploads/Community_Development/Documents/Forms/Building/PlumbingPermitAppl ication040309.doc
For City Use Only
PLUS Project Number .Y"(CO-2)13Y
SCITY OFProject Address
ohne
4000
a eT
°
11703 E Sprague Ave Suite B-3 ♦ Spokane Valley WA 99206
509.688.0036 ♦ Fax: 509.688.0037 ♦ permitcenter®spokanevalley.org
As part of our on-going commitment to customer service during the review process of your project
application, we are providing you with a TARGET DATE for the initial technical application review. If for
any reason we cannot meet this date, we will contact you with a revvi ed target date.
Your application review TARGET DATE is
The TARGET DATE is the date we estimate your project application will have had its initial technical
review. It is not the date for approval or permit issuance.
Tips for a Smoother Project Application Review
➢ Submit complete, accurate plans and documents.
Extra time may be required for re-submittals as project application reviewers work on multiple applications and it
may be several days before they can look at your new or revised information.
➢ Designate a specific contact person to communicate with the City.
While the person designated as the applicant's contact person with the City can be changed, one individual with the
expertise for dealing with reviewer comments would be the best choice for the entire review process.
➢ Call staff regarding the status of your project only after the target date shown at the top of the page.
Although you should be contacted on or by the target date,please feel free to contact us if you haven't heard from us
by your target date. Staff may contact you before the target date if the initial review is complete. By following this
procedure,you will save time and allow the reviewers to complete the work more expeditiously.
Steps in the Permit Process
1. Counter Complete. Your application has been accepted as counter complete. This means all of the required
documents,as indicated on your Pre-Application Checklist have been submitted or have been approved for deferred
submittal. This does not prevent technical staff from requesting additional information as a result of their technical review.
2. Quality Check. The next step in the process is a quality check to make sure that the application is reviewable and free
from substantive flaws that would prevent technical staff from completing the technical review once it is started. When
this step is complete, your application will be routed to the appropriate staff and remain in their review queue until it
comes up for review.
3. Technical Compliance. Once an application is administratively complete, it is routed to technical staff for compliance
review. Depending on the type of project, technical staff may include multiple reviewers. You should be contacted by
phone,fax, email,or mail by your TARGET DATE once the initial technical compliance review is complete.
4. Permit Issuance. When the technical compliance review of the application is complete, including any subsequent re-
submittals, each reviewer will approve their section of the application and route it to the Permit Center. When all sections
of the application are received, a Permit Specialist will process the application and contact the person specified on your
application for permit pick-up. Information regarding fees and pre-construction meetings (if required) will be provided by
the Permit Specialist at that time.
WHITE—APPLICANT PINK—BUILDING FILE REV 9/07