2008, 08-05 Permit App: 08002691 ShopProject Number: 08002691 Inv: 1
Application
THIS IS NOT A PERMIT
Penalties will be assessed for commencing work without a permit
Date: 8/5/2008 Page 1 of 2
Project Information:
Permit Use: NEW 28 X 27.5 HOBBY SHOP Contact: DIVERSIFY BUILDING & ELECTRIC
Address: PO BOX 28
C - S - Z: MICA, WA 99023
Setbacks: Front Left: Right: Rear: Phone: (509) 768-2434
Group Name:
Site Information: Project Name:
Plat Key: 000082 Name: ARA BOONE ADD
District: Nort
Parcel Number: 45172.1014 Block:
SiteAddress: 1026 N WILLOW RD
Location:: CSV
Zoning: 12-3 SF Res District
Water District: 011 MODERN
Area: 12,018 Sq Ft Width: 0
Nbr of Bldgs: 1 Nbr of Dwellings: 1
Review Information:.m_., m,
Lot:
Owner: Name: MAXEY, GARY L
Address: 1026 N WILLOW RD
SPOKANE VALLEY, WA 99206-404
Hold: ❑
Depth: 0 Right Of Way (ft): 0
Review
Building Plan Review
Released By:
Originally Released: 8/5/2008 By: tmelbourn
Landuse/Zoning/11E Conditions
ReleasedBy:
Originally Released: 7/31/2008 By: cjjanssen
Permits:
Operator: jmm Printed By: jmm
Print Date: 8/5/2008
Project Number: 08002691
Inv: 1 Application Date: 8/5/2008
THIS IS NOT A PERMIT
Penalties will be assessed for commencing work without a permit
Contractor: DIVERSIFY BUILDING &
Address: PO BOX 28
MICA, WA 99023
Description Gm Type
GARAGE U-1 VE
Item Description
RESIDENTIAL PERMIT FEE
ACCESSORY PLANS REVIEW
WSBC SURCHARGE
Building Permit
Page 2 of 2
Firm: DIVERSIFY BUILDING & ELECTR
Phone: (509) 768-2434
This Application:
Notes So Ft Valuation
GARAGE 770 $14,630.00
Totals: 770 $14,630.00
Units Unit Desc
1 SELECT
I SELECT
1 SELECT
Permit Total Fees:
Total Project:
Sq Ft Valuation
770 $14,630.00
770 $14,630.00
Fee Amount
$251.25
$62.81
$4.50
$318.56
Notes:
Payment Summary:
Permit Type Fee Amount Invoice Amount Amount Paid Amount Owing
Building Permit $318.56 $318.56 $0.00 $318.56
$318.56 $318.56
$0.00 $318.56
Disclaimer:
Submittal of this application certifies the owner (or person(s) authorized by the owner) has both examined and finds the information
contained within to be true and correct, and agrees that all provisions of laws and/or regulations governing this type of work will be
complied with. Subsequent issuance of a permit shall not be construed to be a permit for, or an approval of, any violation of any of
the provisions of the code or of any other state or local laws or ordinances.
Signature:
Operator jmm Printed By: jmm Print Date: 8/5/2008
CITY OF SPOKANE VALLEY
Community Development Department
Permit Center
11703 East Sprague Avenue, Suite B-3
Spokane Valley, WA 99206
Tel: (509) 688-0036
Fax: (509) 688-0037
permitcenter0spokaneval ley.org
PERMIT NUMBER:
PERMIT FEE:
(Staff Use Only)
y ENCD By
cm( OF SPOKANE VALLEY
L3Y:
JUL 3 i 2008
ERMIT CENTER
RESIDENTIAL CONSTRUCTION PERMIT APPLICATION
•
0 NEW CONSTRUCTION 0 ADDITION/REMODEL 1 ACCESSORY BUILDING
0 DECK 0 OTHER
SITE ADDRESS: /0.2a /1/v, l✓//Zo i /?d,
ASSESSORS PARCEL NO.: y5/,„ /o/y LEGAL DESCRIPTION:
BUILDING OWNER NAME: 6,4'/ /'vf., p
NAME:
ADDRESS: /O zC wil4d / ,Qo
CITY: 5644W6 vdII#/
PHONE: soy�%zy z97C
CONTACT NAME: Scor -f" /*A7Y /
STATE: 1✓4 ZIP: 9700 6.
Fax: ^
CELL: $[ff. Z3o. RA,a
PHONE: 5509, $ 2.9"35°
FAX: —j0/ . 537 .5770 CELL: 54'7CS,25'3y
CONTRACTOR NAME: ,0JVaSj cy /,g(/ji 1,Vfr /94/p
MAILING ADDRESS:
f?o zr
Cm: /1i/ oaf
PHONE: 5-4::>9. 7G8 ZV 3 /
Lvvaex.rs j6'5�3
CONTRACTOR LICENSE NO.'
STATE: Ivi
ZIP: "foZ 3
FAX: So •535/•37'C CELL: soy •71r.grzvsy
EXPIRES: /94:57‘y CITY BUSINESS LICENSE NO.:
DESCRIBE THE S,CO,JE OF WORK IN DETAIL AND INDICATE USE:
2r'K27/z M B>' SW*P
PROPOSED USE:
Effective October 28, 2007
f •\I'care \narv\Annnaha\1nral\Mirrncnft\Winrinwc\Tomnnrary Tntaroot
Page 1 of 2
****YOU MUST COMPLETE THE FOLLOWING****
Height to Peak:
22
Dimensions:
zre27�'s:
No. of Stories: .• .,
/V2
Total Habitable
Space ,0
•- 7
Main Floor SQ
FT: p✓/4
Upper Floor SQ
FT: ,V4
Unfinished Basement
SQ FT: iy4
Finished Basement
SQ FT: aq
Garage SQ FT:
770
Deck/Covered Patio
SQ FT: «,q
Impervious Surface
Area; .22C0^�•,,"`' '
30% Slopes on
Property: ,v4
e' .
No. of
Bedrooms: /Li%
Construction. 0-" ' '
Type: coat see
`Heat Source:
N4
Sewer or
Septic: "
TOTAL COST OF PROJECT: $ /2i poo
DISCLAIMER
The permitted verifies, acknowledges and agrees by their signature that: 1) if this permit is for construction or on a dwelling, the dwelling Is/will
be served by potable water. 2) Ownership of thls City of Spokane Valley permit Inure to the property owner. 3) The signatory Is the property
owner or has permission to represent the property owner In this transaction. 4) All construction is to be done In full compliance with the City of
Spokane Valley Development code. Referenced codes are available for review at the City of Spokane Valley Permit Center. 5) The City of
Spokane Valley permit Is not a permit or approval for any violation of federal, state or local laws, codes or ordinances. 6) Pians or additional
Information may, be required to.be submitted and subsequently approved before this,applicatlon can be processed.
_ L.Lacasse„
Signature
Method of payment: 0 Cash 0 Check
Bankcard #:
Date: 7/ tXer
0 Visa ❑ Mastercard
EXP: VIN#:
Authorized Signature:
Effective October 28, 2007 Page 2 of 2
r••\I icare\r an,\Annrlata\I nral\Mirmcnff\Win,lnwe\Tomnnrary Tnharnat
Spokane
'Valley
CITY OF SPOKANE VALLEY
Community Development Department
Permit Center
11703 East Sprague Avenue, Suite B-3
Spokane Valley, WA 99206
Tel: (509) 688-0036
Fax: (509) 688-0037 Bc:
Dermitcenter(a)sookanevallev.ora
PERMIT NUMBER:
PERMIT FEE:
(Staff Use Only)
I-LAC(/�
CITY OF SPOKANE VALLEY
JUL 11 2008
MIT CENTER
RESIDENTIAL CONSTRUCTION PERMIT APPLICATION
❑ NEW CONSTRUCTION ❑ ADDITION/REMODEL a ACCESSORY BUILDING
❑ DECK ❑ OTHER
SITE ADDRESS: /9Z4 /Y jvieeoW Rio
ASSESSORS PARCEL NO.: e/5/72./0/y LEGAL DESCRIPTION:
BUILDING OWNER NAME: GX7A'/ 71;A7/0/
NAME:
ADDRESS: /o7C A//GLUy,/ /CG
CITY: 5PdR 4', vm.eey
PHONE: 54'7 • gze/ z..? 7c
FAX:
CONTACT NAME:
STATE:
/l//
ZIP: 9%0V.‘
CELL: 6471P, , e3c g%o c
PHONE: 507 • 7 Z9'' FAX: 5',7 5 3Y- 3770 CELL:
CONTRACTOR NAME: /914,5-)/6)/eL$:4-fC/CA12_
MAILING ADDRESS:
,' eoX Zr" "7/6.7
CITY:/C,rj
STATE: [1/47
PHONE: 5' • K -r- Z 5/35/ FAX: 5-'09 5-W 3774 -
CELL:
ZIP: /%Z3
Svy' 76d'- ze-/'
CONTRACTOR LICENSE No.: ,O) veiGirsilt972 C_ EXPIRES: AQ/S/Q 9 CITY BUSINESS LICENSE NO.:
DESCRI,SE THE SCOPE OF WORK IN DETAIL AND INDICATE USE:
zr-e �4/o,43y Ss,�f k'/ 7,/ /9 z8" /X/5P,+,�T izow se �✓i�c i3�
.4.0PE17 7-0 .5Akee 042s.
PROPOSED USE:
h/c0D L✓oiek
Effective October 28, 2007
Page 1 of 2
****YOU MUST COMPLETE THE FOLLOWING****
MARK N/A IF NOT APPLICABLE
Height to Peak:
2.2 '
Dimensions:
2 ir X 35 ' 2 //ZS
No. of Stories:
/
Total Habitable
Space: re -A)
Main Floor SQ
FT: 4y -e-/0
Upper FI or SQ
FT: 4/4,
Unfinished Basement
SQ FT: 4//47SQ
Finished B sement
FT: Afiy
Garage SQ -FT:
.X445- 77c2
Deck/Covered Pato
SQ FT: y20 --00/,1
Impervious Surface
Area: Adt
30% Slopes on
Property: 40
No. of
Bedrooms: '/
Constructionfim
Type: /1/00.x"/jzosf-
Heat Source:
40
Sewer or
Septic: Ski.'-�
TOTAL COST OF PROJECT: $ /2»W
DISCLAIMER
The permitted verifies, acknowledges and agrees by their signature that: 1) If this permit is for construction or on a dwelling, the dwelling is/will
be served by potable water. 2) Ownership of this City of Spokane Valley permit inure to the property owner. 3) The signatory is the property
owner or has permission to represent the property owner in this transaction. 4) All construction is to be done in full compliance with the City of
Spokane Valley Development code. Referenced codes are available for review at the City of Spokane Valley Permit Center. 5) The City of
Spokane Valley permit is not a permit or approval for any violation of federal, state or local laws, codes or ordinances. 6) Plans or additional
information may be required to be submitted and subsequently approved before this application can be processed.
Signature
Method of payment: ❑ Cash ❑ Check
Bankcard #:
Date: 7/../or
❑ Visa 0 Mastercard
EXP: VIN#:
Authorized Signature:
Effective October 28, 2007
Page 2 of 2
Spokane
Val iey
Site Address: 1026 N WILLOW RD
Parcel Number: 45172.1014
Zoning: R-3
Fire District: FD 01
Project
Transmittal
City of Spokane Valley
Community Development
Department
11703 E. Sprague Ave, Suite B3
Spokane Valley, WA 99206
Phone: 509.688.0036
Water District: MODERN
New project ❑
Previous pre -app meeting ❑
Plan revisions
Transmittal Date:
Thursday, July 31, 2008
Project Number: 08002691
Applicant: DIVERSIFY BUILDING & ELECTRIC
PO BOX 28
MICA, WA 99023
(509) 768-2434
e-mail:
Contact: DIVERSIFY BUILDING & ELECTRIC
PO BOX 28
MICA, WA 99023
(509) 768-2434
e-mail:
Owner: MAXEY, GARY L
1026 N WILLOW RD
SPOKANE VALLEY, WA 99206-404
e-mail:
Occupant:
e-mail:
Contractor: DIVERSIFY BUILDING & ELECTRIC Arch/Engineer:
PO BOX 28
MICA, WA 99023
(509) 768-2434
e-mail:
�7 %,"
Project NEW 28 X 30`HOBBY SHOP AND'28 X 15 PATIO
Description:
D
D'~
U
Please send all plan review and project comments via e-mail to the
highlighted individuals.
Building
Landuse
Engineer
Utilities
Health
Fire Dist
Assessor
SITE PLANS
,
:
ADDITIONAL DETAIL
PAGE
\
VOA
�@ �1.0__OA We.-------
1`
Please send all plan review and project comments via e-mail to the
highlighted individuals.
Spokane
jUalley
For City Use Only
PLUS Project Number ? Z ci
Project Address in 2 co /"? (J 1 0.)
11703 E Sprague Ave Suite B-3 • Spokane Valley WA 99206
509.688.0036 • Fax: 509.688.0037 • permitcenter@spokanevalley.org
As part of our on-going commitment to customer service during the review process of your project
application, we are providing you with a TARGET DATE for the initial technical application review. If for
any reason we cannot meet this date, we will contact you with a revised target date.
Your application review TARGET DATE is
The TARGET DATE is the date we estimate your project application will have had its initial technical
review. It is not the date for approval or permit issuance.
Tips for a Smoother Project Application Review
➢ Submit complete, accurate plans and documents.
Extra time may be required for re -submittals as project application reviewers work on multiple applications and it
may be several days before they can look at your new or revised information.
Designate a specific contact person to communicate with the City.
While the person designated as the applicant's contact person with the City can be changed, one individual with the
expertise for dealing with reviewer comments would be the best choice for the entire review process.
> Call staff regarding the status of your project only after the target date shown at the top of the page.
Although you should be contacted on or by the target date, please feel free to contact us if you haven't heard from us
by your target date. Staff may contact you before the target date if the initial review is complete. By following this
procedure, you will save time and allow the reviewers to complete the work more expeditiously.
Steps in the Permit Process
1. Counter Complete. Your application has been accepted as counter complete. This means all of the required
documents, as indicated on your Pre -Application Checklist have been submitted or have been approved for deferred
submittal. This does not prevent technical staff from requesting additional information as a result of their technical review.
2. Quality Check. The next step in the process is a quality check to make sure that the application is reviewable and free
from substantive flaws that would prevent technical staff from completing the technical review once it is started. When
this step is complete, your application will be routed to the appropriate staff and remain in their review queue until it
comes up for review.
3. Technical Compliance. Once an application is administratively complete, it is routed to technical staff for compliance
review. Depending on the type of project, technical staff may include multiple reviewers. You should be contacted by
phone, fax, email, or mail by your TARGET DATE once the initial technical compliance review is complete.
4. Permit Issuance. When the technical compliance review of the application is complete, including any subsequent re -
submittals, each reviewer will approve their section of the application and route it to the Permit Center. When all sections
of the application are received, a Permit Specialist will process the application and contact the person specified on your
application for permit pick-up. Information regarding fees and pre -construction meetings (if required) will be provided by
the Permit Specialist at that time.
WHITE -APPLICANT PINK - BUILDING FILE REV 9/07
7C
647ey 7),A7xy
/o-76 N. WJ 2 )1/ SIJ
14172 iilg
5"?• Zia• nob'
,l 2 1
rua
EY/5,3
yah 54
,t
25
£'L/6w:Py1
w
PLANNING DEPT. APPRO ED'
BY.
DATE: I k8
//:/ _W./77
Mio1 ,-W
New :4
crio sQ Fr:
id.e.er
Sh14P
776 s4 fT ,\�/'
�..
1
gzvl,
w iI
NIw
4
;4)/
/°-X /t/. I/02)0W €12
57o,eeV 11/A7
9 6
Sa`, . Z3° • 7oz'
Nx
�---fir
C��'i
t11
25
jsTj✓6-
avvm#0 y1
CIL
NEW 54)8
rk) —141 90 SR ter:
Oaf
%N41✓
776 sq fz
w
/,4-D- yr
d
RA/
_ yo y z. comp 426,1
o✓cn /6 0. s. 6.
1 /8 GAP
BE i JVEEN SHEATHING
?!?uses Ivn
51z>R46e/iirric
SPACE 6t/izr /i✓.
2y" ac..
g021,4
14a- SCT74>i✓
I\o kRT(C_ SToij6�
f,404„ '6 w)ZG /3 Fxcwdcp,
/ozgNu2«✓
lo et' /3' iv/ 6401.7 �9
R602.10.4 Brace Wall Panel min. 48 in.— 96 in.
R602.10.5 Continuous Wood Structural Panel Sheathing
R602.10.6.1 Alternate Brace Wall Panel min.28in.-42in.
R602.10.6.2 Alternate Brace Wall Panel min.l6in.-24in.
IBC 2305 Engineered Shear Wall Bracing
"no
X1/0 47-77G
Pa,
PCG -up ro0o4
• CEty of
SPOKANE VALLEY BUILDING DEPARTMENT
11707 E. Sprague Avenue. #105, Spokane. Valley, Washington 692O5 - T t 509-555-0035 - Fax 509-586-0037
Following is a typical crass -sec -Son for a residential garage. It may not represent the proposed project if you are using finis rie 5
as a porn of your plan submittal, please complete the requested infonra5on in the baxes provided on both sides of this sheet
This completed sheet, along with any addi5oral information needs to be submitted with your apliinca5on and be on site a1 the 5me
of inspection.
PROTECTION AND OPENINGS BETWEEN
DWELLINGS AND PRIVATE GARAGES SHALL HAVE:
1) MATEPJALS APPROVED FOR ONE HOUR FIRE
RESISTIVE CONSTRUCTION ON THE GAP,AGE SIDE
513''TYPE 'X GYP BOARD (HABITABLE SPACE ABOVE)
`1/2' GYP BOARD (RESIDENCE/ATTIC. FLOOPJCEILING)
2) OPENINGS BETWEEN GARAGE AND RESIDENCE
SHALL BE EQUIPPED WITH SOUD WOOD DOOR, SOUD OR
HONEYCOMB CORE STEEL DOORS NOT LESS THAN 1 318',
OR 20 MINUTE FIRE RATED DOORS.
ALTERNATE FOUNDATION FOR
ACCESSORY BUILDINGS FROM
400 SQ. FT. TO 3000 SQ. FT.
SECTION A -A
/2Co5.?F7:
NOTE:
Diagonal wall bracing required on
each corner and every 25 feet of waft
Watts within 3 feet of a property fine or
within 3 feet of a dw Thr must be 1 hour
rated. (516' type 'X' gypsum sheathing
on both sides of wall). Openings are not
permitted in these walls. Garages over
3,000 sq. ft. require protection when
loser than 20 Feet b the property fine.
Parapets may be required.
ENGINEERED TRUSS OR
RAFTER SIZE AND SPACING
2 x%o@ 2y oz.
RQO LNG ATERIAL
ROOFING PAPEi
MAN t5
ROOF
7EATHING
o. s. 6,
SOLID BLOCKING
BETWEEN.TRUSSES
4ivP CG,PS
WALL SHEATHING
SIDING
`//✓Y2
1
6' MIN.
24' MIN.
1
DOUBLE TOP PLATE
WALL HEIGHT, /0
alc ,@ IC o.C.
PRESSURE TREATED
SOLE PLATE
3-12' CONCRETE SLAB
)f!�111
Cl i
6* MIN it
5'x12'
FOOTING
,a$
ANCHOR BOLTS
12'x9' MIN.
(7" INTO CONCRETE)
6' O. C. OR APPROVED
ANCHOR INSTALLED
PER MANUFACTURER.
FOUNDATION PLAN
PLEASE COMPLETE THE FOLLOWING INFORMATION AND ADD ON E DRAWING BELOW.
BUILDING DIMENSIONS: '' itipiwocke
Z7 X
GARAGE OPENING AND HEADER SIZE:
Zr
5Y2X/.5X- ' i ,XC /tit. J (4J
INDICATE THE LOCATION AND SIZE OF ALL WINDOWS AND DOORS ON THE PLAN.
0
z
W
J
RIDGE LINE
WIDTH
' z8' I
-
LJ co
Please note that while every effort is made to assure the accuracy of the information contained in this brochure is
not warranted for accuracy. This document is not intended to address alt aspects or regulatory requirements for a
project and should serve as a starting point for your investigation. For detailed informafion on a particular project,
permit, or code requirement refer directly to applicable file and/or code/regulatory documents or contact the
appropriate division.
I
AIM vest
Fl U
r1frtA
e r11 OT
'NO
T O?L$U
8001T3 RROO✓1OI Cd 20.0 111 J'
3-z2eio
3
—2 often s
4httr3
.0•
^sr1iI
. FiILF..Fe.F
8001T3 RROO✓1OI Cd 20.0 111 J'
Driveway Approach Deviations, relocations or alter-
ations to existing or designated driveway approaches in
subdivisions will require a right of way permit address-
ing storm water engineered configuration and sizing.
PROVIDE DIAGRAMS AND
ENGINEERING LAYOUTS FOR
ROOF TRUSSES, BEAMS AND
FLOOR SYSTEMS PRIOR TO FRAMING
INSPECTIONS
CITY COPY
THIS BUILDING SUBJECT
TO FIELD INSPECTION CORRECTIONS
REVIEWED FOR COD. CO
SPOKANE VALLEY BU I.)IN
LANCE
DIVISION
06-