2013, 05-21 Permit: SW-13000775 SewerSPOKANE COUNTY UTILITIES
PERMIT
Application Number: SW -13000775
Project Description.
SEWER CONNECTION
Project Name:
TRENTWOOD
Primary Contact:
TILTON EXCAVATION, LLC
Phone:
509-226-1269
Permit Issued Date: 05/21/2013
Expiration Date: 05/21/2014
Applicant: TILTON EXCAVATION, LLC
Address: PO BOX 429
OTIS ORCHARDS, WA 99027
Phone: 509-226-1269
Email
SITE INFORMATION:
Site Address. 4019 N WOODLAWN RD Owner. CASTILLA, NICOLAS P & KRISTA L
Parcel Number45032.0310 Address' 12901 E ROCKWELL AVE
SPOKANE, WA 99216
Phone:
Assessor's Description: STEVICK ADD L10 B3 Email'.
Inspection Area'. : (509)1
Water District: Trenlwood Irrigation District Fire District: Spokane Valley Fire
#3
Zoning: Land Area: 11050 Square Feet
TILTOEL9376T, Exp. 01/30/2015
TILTON EXCAVATION, LLC
PO BOX 429 OTIS ORCHARDS, WA 99027
509-226-1269
DETAILS'
Class Type Quantity Unit Charge Value
SEWER SEWER CONNECTION 1 $125.00 $125.00
$125.00
FEE DETAIL
Processing - Utilities $26.32
Utilities Permit $125.00
Total Fee: $151.32
CONDITIONS
Plan review fee is required for all site plan reviews conducted by Spokane Valley Fire.
Inside Public Transit Benefit Area
CALL 1-800424-5555 BEFORE YOU DIG --AT LEAST 2 WORKING DAYS IN ADVANCE. SPOKANE COUNTY CODE REQUIRES THE
INSTALLER COMPLY WITH ALL REQUIREMENTS OF THE WA STATE DEPT OF LABOR & INDUSTRIES. INCLUDING THOSE
RELATED TO TRENCH SAFETY.
SEWER PERMITS ARE VALID FOR ONE (1) YEAR FROM THE DATE OF ISSUANCE. FOR SEWER INSPECTIONS CALL THE UTILITIES
DEPT AT (509) 477-3604 FROM 8:30-5:00 MONDAY -FRIDAY PRIOR TO COVER. ONE WORKING DAY NOTICE REQUIRED. PERMIT
ALLOWS FOR A 30 -MINUTE INSPECTION. ADDITIONAL INSPECTION FEES APPLY AFTER 30 MINUTES.
INSTALLER IS RESPONSIBLE TO INSURE ALL WASTEWATER DRAINS ARE CONNECTED TO THE SEWER AND MAY BE REQUIRED
TO PERFORM TESTS FOR VERIFICATION. INSTALLER IS TO FIELD LOCATE AND CONFIRM THE ELEVATION AND POSITION OF
SEWER STUB PRIOR TO ANY OTHER EXCAVATION.
Dale Printed 0512112013 10 13 06 Project Coordinator'. Kathy Cummings
SPOKANE COUNTY UTILITIES
PERMIT
Application Number'. SW -13000775
Permit Issued Date: 05/21/2013
Expiration Date: 05/21/2014
SEWER STUBS AND DRY SIDE SEWERS ARE TO BE CHECKED PRIOR TO CONNECTION TO ENSURE THAT THEY HAVE
ACCEPTABLE GRADE AND ARE CLEAR AND UNOBSTRUCTED. SEWER LINES SHOULD BE CONSTRUCTED TO ALLOW FOR
GRAVITY FLOW FROM THE LOWEST LEVEL OF THE STRUCTURE.
THE INSTALLER AND THIS PERMIT MUST BE PRESENT AT THE JOB SITE AT THE SCHEDULED INSPECTION TIME. BOTH STATE
LAW RCW 19.122 AND COUNTY CODE REQUIRES THE INSTALLER TO GIVE NOTICE OF EXCAVATION TO OWNERS OF
UNDERGROUND FACILITIES.
Dale Printed 05/21/201310'13:08 Project Coordinator. Kathy Cummings