Loading...
2013, 05-06 Permit App: APR-2013-0020 Approach • Community Development Department (Staff Use Only) Permit Center Sirioland."11:11111111111111k11703 East Sprague Avenue, Suite B-3 PERMIT NUMBER: 0--13 —e919 SpokaneValley, WA 99206 Tel: (509) 720-5240PERMIT FEE: 40000Valle3r* Fax: (509) 688-0037 permitcenter@ spokanevallev.orq APPROACH PERMIT APPLICATION PROJECT ADDRESS: Z 9 o 5 S , CZ x L i3 u R 4- 50 4- . j c1e) START DATE: s- t 7 — 13 ANTICIPATED COMPLETION DATE: S.- L i L3 BUILDING OWNER NAME: TI r j Pt L LC t.1 -- - MAILING ADDRESS: 2 —{ 0 .S 4L&) x L a u r Project # 0- °013 'X CITY: N)k (..4 e Vol, `tt j STATE: C4 AT ( Za E C E 1 V E D 6 f, i CONTACT PERSON NAME: 3-84 Ai t it t4 1 !!AY 0 6 2013 PHONE: FAX: CELL: 9 95 "- 7z, 91,3 CONTRACTOR NAME: .. 0l R Q -r- 7,:IZ C69 \L.P MIT CENTER 0 CoE l./�ry rh SUB # MAILING ADDRESS: 10 0 toTI J REV. # I 1 - CITY: 6 t d v-iti,ft/ t V14 (t L y STATE: tO lar J ZIP: 9 ' L d (o PHONE: FAX: 8/ / 1V 8 6 CELL: 9 ,' — S 9 0 9 CONTRACTOR LICENSE#: EXPIRES: CITY BUSINESS LICENSE#: OOpoa067* li PROJECT DESCRIPTION (Please Provide Site Sketch) OP*/1¢ Residential Driveway Commercial/Industrial Driveway O Existing Curb &Gutter D Rural Road Section • Culvert Installation 0 Sidewalk Repair/Construction O Other Conditions: Bond/Insurance certification must be on file with the City. DISCLAIMER The permitted verifies, acknowledges and agrees by their signature that: 1) if this permit Is for construction or on a dwelling, the dwelling is/will be served by potable water. 2) Ownership of this City of Spokane Valley permit Inure to the property owner. 3) The signatory is the property owner or has permission to represent the property owner In this transaction. 4) All construction is to be done In full compliance with the City of Spokane Valley Development code. Referenced codes are available for review at the City of Spokane Valley Permit Center. 5) The City of Spokane Valley permit Is not a permit or approval for any violation of federal, state or local laws, codes or ordinances. 6) Plans or additional information may be required to be submitted and s ently approved before this application can be processed. Signature ` \ K----b ' Date: 5 6 13 P:\Community Development\11 Forms\A.Building\Permit Center\Approach Permit 2-24-11.doc Page 1 of 2 APPROACH PERMIT APPLICATION REQUIRED SKETCH INFORMATION (Revised 1/25/10) Provide required measurements (in sketch boxes), and include street name. Check all existing conditions that apply: .Sidewalk DDrainage Ditch ft wide QDrywell (show location on sketch) ft from back of curb DOther (please describe below) ❑Streetside Swale Lu i DISTANCE FROM z; INEAREST PROPERTY LINE MAY BE LEFT OR RIGHT SIDE) FT(S E E TABLE) Lu! / d� ct dl LC1 M \ /CURBU APPROACHCONCRETE RETURN -4'---THROAT WIDTH OFT-----4' ( 1CURB WING (SEE TABLE) WING 'IF CORNER LOT, DISTANCE FROM STREET NAME w T $L.,i CURB RETURN n FT(SEE TABLE) STREET WITH CURB w I DISTANCE FROM z'- - NEAREST PROPERTY LINE _' MAY BE LEFT OR RIGHT SIDE) �n FT(SEE TABLE) ci_l 15'RADIUS E'; ASPHALT RADIUS APPROACH /RETURN EDGE OF I--THROAT WIDTH n FT I. -I ASPHALT (SEE TABLE) IF CORNER LOT, DISTANCE FROM STREET NAME RETURNRADIUS Q (SEE FT ABLE) STREET WITH ASPHALT EDGE Approach Requirements: • Maximum 2 approaches per property frontage; one on arterials. • Total width of approaches not to exceed 50% of frontage width. Residential Commercial A hgs Approaches Distance from Curb/Radius Return 15'minimum 75'minimum Separation between Approaches (measured from centerline to See Page 7-27 centerline of each approach) None specified / in City Street Standards Throat Width (flat portion) 16'min., 30'ma*. 30'min., 40'max. Wing Width (at curb line) 4 feet typical 4 feet typical Minimum Distance from Side Property Line (@ r/w) 5.0' 5.0' Minimum Distance from Crosswalk 5' , 5' P:\Community Development\11 Forms\A.Building\Permit Center\Approach Permit 2-24-11.doc Page 2 of 2 Sd1TYinhhhhhhhh Development Engineering .000alley 11707 E Sprague Ave Suite 106 ♦ Spokane Valley WA 99206 509.921.1000 ♦ Fax: 509.921.1008 ♦ cityhall®spokanevalley.org Approach Permit Application Review TO: Building Department Site Address: 2905 S Wilbur Project No: APR-2013-0020 Accepted Not Accepted Approach X Building Location Paved Access Notes: Saw cutting of existing curb to create an approach is not allowed within the City's jurisdiction. Approach is to be inspected by the City's ROW Inspector prior to concrete placement. Approach tro be constructed per Spokane valley Standard Plan R-112 7 Reviewed By: ,/ / OA �'7 �e-/ Date: 467 // 3 APPROACH PERMIT APPLICATION REQUIRED SKETCH INFORMATION (Revised 1/25/10) Provide required measurements (in sketch boxes), and include street name. Check all existing conditions that apply: l Sidewalk E Drainage Ditch ft wide ice=Drywell (show location on sketch) ft from back of curb Other (please describe below) jStreetside Swale zI DISTANCE FROM NEAREST PROPERTY LINE D 1I MAYBE LEFT OR RIGHT SIDE) FT(SEE TABLE) w ELI of al CONCRETE APPROACH CURB RETURN ii, \ . CI CURB' I'.-4'-- -- - THROATWIDTHQFT_4-4' - -1 WINO (SEE TABLE) WING NIF CORNER LOT, DISTANCE FROM STREET NAME J i L Qty 1. CURB RETURN n FT(SEE TABLE) STREET WITH CURB DISTANCE FROM 2; --NEAREST PROPERTY LINE m' MAY BE LEFT OR RIGHT SIDE) . In FT(SEE TABLE) Lt i a;i 15'RADIUS 213-11 ASPHALT RADIUS nI APPROACH RETURN 1 I EDGE OF I—THROAT EEITABLE) F CORNER LOT, ASPHALT DISTANCE FROM STREET NAME RADIUS RETURN =FT(SEE TABLE) STREET WITH ASPHALT EDGE Approach Requirements: • Maximum 2 approaches per property frontage; one on arterials. • Total width of approaches not to exceed 50%of frontage width. Residential Commercial A Approaches Distance from Curb/Radius Return 15'minimum 75'minimum Separation between Approaches (measured from centerline to See Page 7-27 centerline of each approach) None specified) in City Street Standards Throat Width (flat portion) 16'min., 30'ma 30'min., 40'max. Wing Width (at curb line) 4 feet typical ' 4 feet typical Minimum Distance from Side Property Line (@ r/w) 5.0' 5.0' Minimum Distance from Crosswalk 5' / 5' P:\Community Development\11 Forms\A.Building\Permit Center\Approach Permit 2-24-11.doc Page 2 of 2 A, 9 0 5 (--- ...:__,--, • i ),--- / • c-., 7_ \ Project •#-__' ..-°4:71(:)\ RECEIVED \ 1 0 6 2013 t ; 1 CSV PERMIT CENTER SUB # fl\ A 1.,.....---------- -------- n 11 4 1 1 i ! I s I s , 1 , .. : ,k i i ..., , 1 (4, - , 7