2012, 09-28 Permit App: BLD-2012-1684 Storage Bldg Permit( *sr
` 11707 L wprague Ave,Suite 106 ,, PERMIT NUMBER:Spkan4� e Spokane Valley,WA 99206 PERMIT FEE:
.00,0valley. (509)688-0036 FAX: (509)688-0037
"J www.spokanevaIlev.org : C ��1C t--/2-16F
�2_ B e'
Community Development o j o ct, r:_ I f7 9
Residential Construction [X New Con truction A FT &o%y Bldg
Permit Application ❑ Additionemodel ❑, k
Other: II z:° - L r Z012
� t ! c:, ,' (- , ,` T , L PiTEI`
SITE ADDRESS: D (W i b v--4
�1 ! SUB T .- z �. r
ASSESSORS PARCEL NO: 145 9 q • /5-7 LEGAL DESCRIh.TiOIaL,,...,. L ' . r L-----
_
Building Owner: Contractor:
Name: Ke Viva e-1-14. \e K Name:7-6/04/ $ COUdnY I3u/Lb4 gs .TAIL.
Address: ,;(90 5—. S L0:1
1 l u v Address: 59/8 6w 784/7-/wEd/4
City: Po -t- V/cc.\Ne Y State:)A ZiP:7?-208 Ci City:-Yotehtz Vitar State:WA, Zip:f93/2
Phone Tei\ 9?S 72931 Fax: Phone:6)9 S.3s Nab Fax:coq 5343,
Contractor Lic No:T"492./23C6 Exp Date: 06130/, S
•
Contact Person City Business Lic.No: 6,0/ 05 495-
Name: GGGE Bued1 E7T -
Phone: 509 535 9086 EXT 211
Describe the scope of work in detail: Cost of Project: $ /3 6q5
t
VotSrvticr if- 21/X 3a x to -6 sTo1r+Ct 201E-apic
Proposed Use: -5+ita_, e
**************The following MUST be complete: (write N/A if not applicable)********************** 6
HEIGHT T PtErAK: DIMENSIONS: , n #OF STORIES: TOTAL HA (TABLE SPACE:
1 y 29'A30'x io-b ,fJNl� N 4--
NT FLOOR TO SQ. 2"" FLOOR
�jSQ. FTG: UNPIN BASE/M�ENT SQ. FTG: IMPERVlO S SURFACE
FTG: 720 Nj( /�'�T AREA: /v/4,..
FINISHED BA FaMENT GARAGE SQ. FTG: DECK/COV:P 1O SQ. FTG: 30% SLOPES ON
SQ. FTG: fNr� 7-2--c-2 /1 PR,,OEERTY:
#OF BED MS: CONSTRUCTION TYPE: HEAT SO1 E: YYER)R SEPTIC?
r� Po sr FR/fill
The permitee verifies, acknowledges and agrees by their signature that: 1) If this permit is for construction of or on a dwelling,the
dwelling is/will be served by potable water. 2) Ownership of this City of Spokane Valley Permit inure to the property owner. 3) The
signatory is the property owner or has permission to represent the property owner in this transaction. 4) All construction is to be done
in full compliance with the City of Spokane Valley Development Code. Referenced codes are available for review at the City of
Spokane Valley Permit Center. 5) This City of Spokane Valley Permit is not a permit or approval for any violation of federal, state or
local laws, codes or ordinances.6) Plans or additional information may be required to be submitted, and subsequently approved before
this application can be processed. ,
SIGNATURE: DATE:
Method of Payment:
0 Cash gl Check 0 Mastercard 0 VISA
Bankcard#: Expires: VIN#:
.
'Authorized Signature:
REVISED 2115!07
i
Residential Driveway
Sökane PAVING WAIVER
\1illey Community Development— Planning Division
11703 E Sprague Ave Suite B-3 • Spokane Valley WA 99206
509.720.5026 ♦ Fax: 509.688.0037•planning@spokanevallev.org
Spokane Valley Municipal Code(SVMC)Section 19.40.020.B; "All residential driveway and off-street parking areas shall be paved with
asphalt,Portland cement,grasscrete,paver blocks or other equivalent hard surface material'. A paving waiver can only be granted if
the structure you are proposing is not going to require a driveway for daily use.
PART I —OWNER INFORMATION
OWNER NAME: 41/0-14._ri` ‘3,247 PARCEL#: q5-2._51,,,s--)i.
ADDRESS: 0,c7 cc-, U) 1.44,---
CITY: 5A ZyteuTATE: ZIP: �'��2.19!e7PHONE:' '7 ) /2 FAX:AL/COI�-- I CELL: �+ EMAIL: A,(Sij CJA/fr..4 601
PART Il —DETAILS OF PAVING WAIVER
1. Do you have an existing garage for parking daily use vehicles? 0 YES ❑ NO
2. Is the proposed detached structure used for storage only? X YES ❑ NO
3. Do you plan on using the detached structure to park vehicles? KYES ❑ NO If yes, then
what type of vehicles? I'eCI"ecicmc4\
4. Do you plan to conduct a business from proposed detached structure? ❑ YES 7INO if so, what
is the nature of your business? `*
tt PART III—AUTHORIZATION
I,(PRINT NAME) �)a lIC� owner, hereby confirm that the information provided on this
form is true and correct. I acknowledge that any change in the foregoing conditions,could require
the City to impose pa 'ng requirements. I further agree to report any change in these conditions to
• the Spokan- /alley , unity Development Department, Planning Division, within 30 days.
ilk LW.0 VW / // 7"'I 3—/2_
Owne ignatur- Date
PART IV— DECISION
STAFF HAS REVIEWED THE PROPOSED PAVING WAIVER ON BEHALF OF THE COMMUNITY DEVELOPMENT
DIRECTOR AND FIND THE REQUEST IS GRANTED AT ZOO 5 S W a 1-30.0.._SAID ADDRESS FOR PERMIT#: 11 L17 •- Zo 12. - no9q
`- ii4tf.___Ti, ?:(---
Pla runDivision Staff Signature Date ?/2.3/2-°12— - '
Created 6/27/11 Page 1 of 1
J L )4 I I_`,fr\ ?9's- 72,9'3 PLANNING DEPT. APPROVED
Poky-cl. .\ p _
S pokkie..Ute«cy q 92_a
DATE: 9lz*3 wiz- ..
O
1
pr'�� W� E
N :///,/;7'
7
.�� as
1 . C- g i
,> R0 7
_..., , , Copow,8 30 ,
tom _. .
s4
, _ 1
5
i 1-,- 1---, -r-j.C' ikt, i !I.-6 �
.� I
t
r n d <.
fD3 f
FA. <.
/� � fix'
_
e
V
I.
1 L
r
„ Y x
s
a
i,