2012, 03-27 Permit: SW-12000004 SewerSPOKANE COUNTY BUILDING AND PLANNING
PERMIT
Application Number:
SW -12-000004
Permit Issued Date:
03/27/2012
Expiration Date: 03/28/2012
Project Description:
SEWER CONNECTION
Primary Contact:
LOSS EXCAVATION LLC
Applicant:
LOSS EXCAVATION LLC
Permit Type:
SEWER
Address:
603 N FELTS RD
SPOKANE VALLEY, WA 99206
Phone:
509-863-2785
Email:
SITE INFORMATION'
Site Address:
4203 N WOODLAWN RD
Owner:
MARTIN, TIMOTHY & JUDY
Parcel Number:
45032.0214
Address:
4203 N WOODLAWN RD
SPOKANE, WA 99216-2234
Subdivision:
STEVICK ADDITION
Phone:
Assessor's Description:
STEVICK ADD L14 62
Email:
Inspection Area:
Water District Trentwood Fire District Fire
District 1
Irrigation District #3
Zoning'
Land Area: 0.2755 acres / 12000 sqR
CONTRACTOR INFORMATION
General Contractor
LOSS EXCAVATION LLC
603 N FELTS RD
SPOKANE VALLEY, WA 99206
509-863-2785
--------- -----------------'
DETAILS:
Class Type Quantity Unit Charge Value
SEWER SEWER CONNECTION 1 $125.00 $125.00
$125.00
FEE DETAIL,
Processing - Utilities $25.94
Utilities Permit $125.00
Total Fee: $150.94
CONDITIONS:
CALL 1-800424-5555 BEFORE YOU DIG --AT LEAST 2 WORKING DAYS IN ADVANCE. SPOKANE COUNTY CODE REQUIRES THE
INSTALLER COMPLY WITH ALL REQUIREMENTS OF THE WA STATE DEPT OF LABOR & INDUSTRIES, INCLUDING THOSE
RELATED TO TRENCH SAFETY.
FOR SEWER INSPECTIONS CALL THE UTILITIES DEPT AT (509) 477-3604 FROM 8:30-5:00 MONDAY -FRIDAY PRIOR TO COVER.
ONE WORKING DAY NOTICE REQUIRED. PERMIT ALLOWS FOR A 30 -MINUTE INSPECTION. ADDITIONAL INSPECTION FEES
APPLY AFTER 30 MINUTES.
Date Printed: 031271201214'. 23 44 Printed by: IS APPPOOLIASP.NET A 0
SPOKANE COUNTY BUILDING AND PLANNING
PERMIT
Permit Issued Date:
Application Number: SW -12-000004 03/27/2012
Expiration Date: 03/28/2012
INSTALLER IS RESPONSIBLE TO INSURE ALL WASTEWATER DRAINS ARE CONNECTED TO THE SEWER AND MAY BE REQUIRED
TO PERFORM TESTS FOR VERIFICATION. INSTALLER IS TO FIELD LOCATE AND CONFIRM THE ELEVATION AND POSITION OF
SEWER STUB PRIOR TO ANY OTHER EXCAVATION. _________________
SEWER STUBS AND DRV SIDE SEWERS ARE TO BE CHECKED PRIOR TO CONNECTION TO ENSURE THAT THEY HAVE
ACCEPTABLE GRADE AND ARE CLEAR AND UNOBSTRUCTED. SEWER LINES SHOULD BE CONSTRUCTED TO ALLOW FOR
GRAVITY FLOW FROM THE LOWEST LEVEL OF THE STRUCTURE. _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _
THE INSTALLER AND THIS PERMIT MUST BE PRESENT AT THE JOB SITE AT THE SCHEDULED INSPECTION TIME. BOTH STATE
LAW RCW 19.122 AND COUNTY CODE REQUIRES THE INSTALLER TO GIVE NOTICE OF EXCAVATION TO OWNERS OF
UNDERGROUND FACILITIES.
Date Printed: 03127/2012 14'.23:44 Printed by. IIS APPPOOUASP. NET A 0