Loading...
2012, 04-10 Permit: SW-12001078 SewerSPOKANE COUNTY BUILDING AND PLANNING PERMIT DETAILS Class Type Quantity Unit Charge Value Permit Issued Date: Application Number: SW -12001078 $125.00 04/10/2012 Expiration Date: Project Description: SEWER CONNECTION Primary Contact: LAWS, CLINT H Processing - Utilities Applicant FOUL CONSTRUCTION Permit Type: SEWER Address: 18902 E 2ND AVE $125.00 Total Fee: SPOKANE VALLEY, WA 99027 $150.94 Phone: 509-979-5872 Email: SITE INFORMATION: Site Address: 4211 N WOODLAWN RD Owner. LAWS, CLINT H Parcel Number: 45032.0215 Address: 4211 N WOODLAWN RD SPOKANE, WA 99216 Subdivision: STEVICK ADDITION Phone: Assessor's Description: STEVICK ADD L15 B2 Email: Inspection Area: Water District: Tremwood Fire District: Fire District 1 Irrigation District #3 Zoning: Land Area: 0.2755 acres / 12000 sgtt CONTRACTOR INFORMATION: General Contractor POLJLCC`932BQ FOUL CONSTRUCTION 18902 E 2ND AVE SPOKANE VALLEY, WA 99027 509-979-5872 DETAILS Class Type Quantity Unit Charge Value SEWER SEWER CONNECTION 1 $125.00 $125.00 $125.00 FEE DETAIL: Processing - Utilities $25.94 Utilities Permit $125.00 Total Fee: $150.94 CONDITIONS: CALL 1-800424-5555 BEFORE YOU DIG --AT LEAST 2 WORKING DAYS IN ADVANCE. SPOKANE COUNTY CODE REQUIRES THE INSTALLER COMPLY WITH ALL REQUIREMENTS OF THE WA STATE DEPT OF LABOR & INDUSTRIES, INCLUDING THOSE RELATED TO TRENCH SAFETY. ___ FOR SEWER INSPECTIONS CALL THE UTILITIES DEPT AT (509) 477-3604 FROM 8:30-5:00 MONDAY -FRIDAY PRIOR TO COVER. ONE WORKING DAY NOTICE REQUIRED. PERMIT ALLOWS FOR A 30 -MINUTE INSPECTION. ADDITIONAL INSPECTION FEES APPLY AFTER 30 MINUTES. ---------------------------------------------------- Date Printed 041101201211:29:16 Printed it, IIS APPPOOLVeSP NET v4.0 SPOKANE COUNTY BUILDING AND PLANNING PERMIT Permit Issued Date: Application Number: SW -12001078 04/10/2012 Expiration Date: INSTALLER IS RESPONSIBLE TO INSURE ALL WASTEWATER DRAINS ARE CONNECTED TO THE SEWER AND MAY BE REQUIRED TO PERFORM TESTS FOR VERIFICATION. INSTALLER IS TO FIELD LOCATE AND CONFIRM THE ELEVATION AND POSITION OF SEWER STUB PRIOR TO ANY OTHER EXCAVATION. _ _ _ _ _ _ _ _ _ _ _ _ SEWER STUBS AND DRY SIDE SEWERS ARE TO BE CHECKED PRIOR TO CONNECTION TO ENSURE THAT THEY HAVE ACCEPTABLE GRADE AND ARE CLEAR AND UNOBSTRUCTED. SEWER LINES SHOULD BE CONSTRUCTED TO ALLOW FOR GRAVITY FLOW FROM THE LOWEST LEVEL OF THE STRUCTURE. _ _ _ _ _ _ _ _ _ _ _ THE INSTALLER AND THIS PERMIT MUST BE PRESENT AT THE JOB SITE AT THE SCHEDULED INSPECTION TIME. BOTH STATE LAW RCW 19.122 AND COUNTY CODE REQUIRES THE INSTALLER TO GIVE NOTICE OF EXCAVATION TO OWNERS OF UNDERGROUND FACILITIES. ---------------------------------------------------- Date___ Date Printed: 04110/2012 11'.29:16 Panted by: IIS APPPOOLW SP. NET v4.0