2011, 11-03 Permit: 11005759 Sewer &: SPOKANE COUNTY
DEPARTMENT OF BUILDING & PLANNING
e
1026 WEST BROADWAY AVENUE • SPOKANE, WA 99260-0050
SPPOKMNf COU PI JI
Site Information Project Information
Site Address: 4212 N WOODLAWN RD Project Number: 11005759 Iny: 1 Issue Date: 11/3/2011
Permit Use: SEWER CONNECTION
Parcel Number: 45032.0110
Subdivision: STEVICK ADD Applicant: GOBER'S,LLC
Block: l Lot: 10 11215 E TRENT AVE
Zoning: SPOKANE, WA 99206 Phone:(509)924-5372
Contact: GOBER'S,LLC
Owner: I IARDIN,BEVERLY 11215 E TRENT AVE
Address: 4212 N.WOODLAWN RD. SPOKANE,WA 99206 Phone: (509)924-5372
SPOKANE,WA 99216
Setbacks-Front: Left: Right: Rear:
Building Inspector:
Water Dist:
Group Name:
Project Name:
Permits
Sewer Connection Permit Contractor: CORER'S,LLC License N: GOBERL*899L7 _
SEWER CONNECTION 1 $125.00 PROCESSING FEE 1 525.00
Total Permit Fee: $150.00
**FOR SEWER INSPECTIONS CALL THE UTILITIES DEPT AT(509)477-3604 FROM 8:30-5:00 MONDAY-FRIDAY PRIOR TO
COVER. ONE WORKING DAY NOTICE REQUIRED. PERMIT ALLOWS FOR A 30-MINUTE INSPECTION. ADDITIONAL
INSPECTION FEES APPLY AFTER 30 MINUTES.
**INSTALLER IS RESPONSIBLE TO INSURE ALL WASTEWATER DRAINS ARE CONNECTED TO THE SEWER AND MAY
BE REQUIRED TO PERFORM TESTS FOR VERIFICATION.INSTALLER IS TO FIELD LOCATE AND CONFIRM TILE
ELEVATION AND POSITION OF SEWER STUB PRIOR TO ANY OTHER EXCAVATION.
**SEWER STUBS AND DRY SIDE SEWERS ARE TO BE CHECKED PRIOR TO CONNECTION TO ENSURE THAT THEY
HAVE ACCEPTABLE GRADE AND ARE CLEAR AND UNOBSTRUCTED.SEWER LINES SHOULD BE CONSTRUCTED TO
ALLOW FOR GRAVITY FLOW FROM THE LOWEST LEVEL OF THE STRUCTURE.
**THE INSTALLER AND THIS PERMIT MUST BE PRESENT AT THE JOB SITE AT'11 IE SCHEDULED INSPECTION TIME.
BO'1'l I STATE LAW RCW 19.122 AND COUNTY CODE REQUIRES TIIE INSTALLER TO GIVE NOTICE OF EXCAVATION TO
OWNERS OF UNDERGROUND FACILITIES.
**CALL 1-800-424-5555 BEFORE YOU DIG--AT LEAST 2 WORKING DAYS IN ADVANCE. SPOKANE COUNTY CODE
REQUIRES THE INSTALLER COMPLY WITH ALJ,REQUIREMENTS OF THE WA STATE DEPT OF LABOR&INDUSTRIES,
INCLUDING THOSE RELATED TO TRENCH SAFETY.
Payment Summary
Total Fees AmountPaid AmountOwinp Tran Date Receipt H Payment Amt
$150.00 $150.00 8000 11/3/2011 5064 $15000
Processed By: SIJATIO,JULIE PERMIT
Printed By: Force, Faith Page I of 1
NOTICE
It is the responsibility of the applicant/permittee to see to it that the use described on the front of this permit complies with applicable codes and
requirements and that required inspections are requested Failure 10 request inspections as listed below and obtain the necessary approvals before
progressing beyond the point where inspections are required may necessitate removal of certain parts of the construction at the appli ant s/permi'tee s
or property owner's expense,At a minimum,the following inspections ARE REQUIRED by County Code:
I. FOOTING-all structures,including manufactured homes wvhen turns and reinforcement are in place and prior to placement of concrete.
NOTE: Ibis inspection includes reviewof the sumer -s setbacks from property lines.Mi n intent setbacks established by County zon-
ing
stablish IbyCountyzon-
ing regulation..Front.flanking,sid✓andear yard setb ks are measured from property lin6v. Curb lines ad fence Ines are 1101 necessarily
indicative of property lines.In 0 mile residential areas,the County can uch as 20 feet of right-of-way between your property and the
actual l i tpro vol street/curb.The responsibility to comply with applicable setback provisions lies solely with the permittee—neither Spokane
County nor its authorized representatives assume any responsibility for the fication or location of your property lines.Please verify their
location prior to locating your structure.Failure to properly locate the structure may require its relocation at the owner's/permittees expense.
2. FOUNDATION-when forms and rci nfmmmment are in place and prior to placement of concrete.
3. FRAMING-after all framing.bracing and blocking is in place.plumbing,mechanical rough-in inspections have been approved,and prior o
concealing.
4. INSULATION-prior to the installation of drywall.
5. PLUMBING-alter rough-in.before covering.and final.
6- MECIIANICAL-rough--in of piping,before covering,metal chimneys before concealment,and final.
7- FINALall permits-when complete and prior to occupancy and/or use.Please provide 24 hours notice. NOTE:In addition to inspection of
the structure,this inspection includes review of site improvements(typically depicted on the approved site plan)required by ordinance or as a
condition of approval of this permit.Items such as the installation of lire hydrants,lire department access,on-site drainage(`208 swales"),
road improvements,parking,and landscaping are common requirements of a permit/site plan which must be completed prior to final ap-
proval of a building or issuance of a Certificate of Occupancy.
8. MANUFACTURED HOMES-foundation inspections prior to pouring pads,Inspection of blocking/tie-downs,when completed per
manufacturers installation instructions. Final Inspection approval prior to occupancy: stairs,handrails,skirting,etc.,installations completed
WAINS Tag(s)must be affixed to the home,completed inspection record card and manufacturer's installation instructions must he available on
site.
9- SEWERS-prior to cover
10. RICHT-OF-WAY/APPROACH-prior to placement of concrete,or,if gravel approach,aftercompletlon-
In addition to the above,any plumbing or mechanical systems or material which would he concealed by framing.drywall.concrete.etc. must he
inspected prior to cover.Check with the department for"special inspections'in conjunction with commercial projects.
FOR INSPECTIONS:
TO INSURE PROMPT SERVICE.PLEASE GIVE ONE WORKING DAY/24 HOUR NOTICE.
PARTS OF YOUR PROJECT MAY REQUIRE PERMITS AND INSPECTIONS
FROM MORE THAN ONE AGENCY.
• Building,plumbing.mechanical and fire inspections Department • Road cuts for utilities or driveways-Division of Engineering&
of Building&Planting 477-3675 Roads-48-HOUR NOTICE REQUIRED 477-3600 oStte
• Construction in a flood plain-Division of Engineering&Roads 477- Department of Transportation 456-3000
3600 • Sewer connection,Division of Utilities-477-3604 or City Pub-
• Electrical wiring State Department of Labor and Industries 324-2640 lis Works Department 625-6360
• On-site at disposal system,Spokane Regional Flealth District • Asbestos.Renovations.and Demolitions-Spokane Regional
324-1560 Clean Air Agency 477-4727
PERMIT EXPIRATION & EXTENSION
Building permits shall automatically expire and become invalid by limitation of time three(3)years from the date of permit issuance.Other permits not
issued in conjunction with the construction or completion ofa building or structure shall automatically expire and become invalid by limitation of time
18 months from the date of permit issuance. The Director is authorized within his/her discretion to grant one(I)extension of time,for a period not to
exceed 180 days.A request for an extension shall be made by the permit holder in writing and shall he submitted to and RCei ved by the Spokane County
Building and Planning Department prior to the expiration date of the permit and shall demonstrate just cause for the requested extension.
REFUNDS
The building official may authorize refunding: (II Any feepaid which was erroneously paid or collected:or,(2) Not more than 809 of a permit fee
paid when no work has been done under the permit;or.(31 Not more than 80%of the plan review fee paid when an application for a permit for which
a plan review fee has been paid is withdrawn or canceled before any plan reviewing is done:or_(4)Any fee paid except on written application filed
by the original permittee not later than 18(1 days after the date of fee payment. Please note that application processing fees are nonrefundable unless
the application was erroneously processed.
MISTAKE?
If you think we've made an error in processing this permit or find erroneous information on the permit,please bring it to our attention immediately
by filing a written request for correction within 10 working days of discovery.All such requests should be directed to the Department of Building
and Planning at:
Spokane County Department of Building&Planning
1026 West Broadway Avenue Spokane, WA 99260
Phone: (509)477-3675 Fru: (509)477-4703 TDD: (509)477-7/33
REVISED 1200 EILD0 REIN