2009, 08-26 Permit: 09004264 SewerSPOKANE COUNTY
DEPARTMENT OF BUILDING & PLANNING
1026 WEST BROADWAY AVENUE • SPOKANE, WA 99260-0050
SPOICA* COLN Y
Site Information
Site Address: 4226 N WOODLAWN RD
Parcel Number:
45032.0106
Subdivision:
CITY OF SPOKANE VALLEY
Block:
Lot
Zoning:
UR -3 Urbm Rcsidcntial 35
Owner:
MCHUGH, EL& MG
Address:
4226 N W OODLA W N RD
Setbacks - Front Left: Right:
SPOKANE, WA 99216-2229
Building Inspector: JOHN LARSON
Water Dist
TRENTWOOD
Project Information
Project Number: 09004264 Inv: I IssueDatc 8/262009
Permit Use: SEWER CONNECTION
Applicant COURCHAINE CONSTRUCTION
19818 E SPRAGUE
Payment Summary
GREENACRES, WA 99016
Phone: (509) 924-5485
Contact COURCHAINE CONSTRCCPION
AmountRidd
19818 F, SPRAGUE
Tran Date
GRE ENACRES, WA 99016
Phone: (509) 924-5485
Setbacks - Front Left: Right:
Rear:
Group Name:
Project Name
Permits
Sewer Connection Permit Contracmr: COURCHAINE CONSTRUCTION LiecoseH: COURCC-181R7
SEWERC06NECTION 1 $85.00 PROCFSSINGFEE 1 S1500
Total Permit Fee: 5100 00
--FOR SEWER INSPECTIONS CALL THE UTILITIES DEPT A] (509) 477-3604 FROM 8.30-5:00 MONDAY -FRIDAY PRIOR TO
COVER. ONE WORKING DAY NOTICE REQUIRED. PERMITALLOWS FOR A 30 -MINUTE INSPECTION. ADDITIONAL
INSPECTION FEES APPLY AFTER 30 MINUTES
--CALL 1-800-424-5555 BEFORE YOU DIG—A'FLEAS1F2 WORKING DAYS IN ADVANCE. SPOKANE COUNTY CODE
REQUIRES THE INSTALLER COMPLY WITH ALL REQUIREMENTS OF TI IF WA SI"ATE DEPT OF LABOR & INDUSTRIES,
INCLUDING THOSE RELATED TO FRENCH SAFETY.
-INSTALLER IS RESPONSIBLE TO INSURE, ALL WASTEWATER DRAINS ARE CONNEC"I'ED TO THE SEWER AND MAY
BE REQUIRED "I'O PERFORM TESTS FOR VERIFICATION. INSTALLER IS TO FIELD LOCATE, AND CONFIRM THE
ELEVATION AND POSITION OF SEWER STUB PRIOR TO ANY OTHER EXCAVATION.
"SEINER STUBS ARE TO BE CHECKED PRIOR TO CONNECTION TO ENSURE THAT I"HEY HAVE ACCEPTABLE GRADE
AND ARE CLEAR AND UNOBSTRUCTED FOTHE MAIN. SEWER LINES SHOULD BE CONSTRUCTED TO ALLOW FOR
GRAVITY FLOW FROM THE LOWEST LEVEL OF THE STRCCI'URE.
"THE INSTALLER AND THIS IS PERMIT MUST BE PRESENT AT THE JOB SITE AT THE SCHEDULED INSPECTION TIME.
BOTH STATE LA W RCW 19.122 AND COUNTY CODE REQUIRES THE INSTALLER TO GIVE NOTICE OF EXCAVATION TO
OWNERS OF UNDERGROUND FACILITIES.
Processed By: DOMPIER, DAWN PERMIT
Printed By: HINTZ, FAITH Page 1 of I
Payment Summary
Total Fees
AmountRidd
Amount0wine
Tran Date
Receipt
Payment Amt
$100.00
M00 00
$000
8/262009
3594
$100.00
Processed By: DOMPIER, DAWN PERMIT
Printed By: HINTZ, FAITH Page 1 of I
NOTICE
It is the responsibility of the applicant/permittee to see to it that the use described on the front of this permit complies with applicable codes and
requirements and that required Inspections are requested Failure to request inspections as listed below and obtain the necessary approvals before
progressing beyond the point where inspections are required may necessitate removal of certain parts of the construction at the applicant's/permittee s
OF property owner's expense. At a minimum, the following Inspections ARE REQUIRED by County Code.
1. FOOTING - all structures, including manufactured homes when forms and reinforcement are in place and prior to placement of concrete.
NOTE: This Inspection includes review of the structure's setbacks from property lines. Minimum setbacks are established by County zoning
regulations. Front, flanking, side and rear yard setbacks are measured from property lines. Curb lines and fence lines are not necessarily indicative of
property Imes. In some residential areas, the County can own as much as 20 feet of right-of-way between your property and the actual improved street/
curb. The responsibility to comply with applicable setback provisions Iles solely with the permittee—neither Spokane County nor its authorized
representatives assume any responsibility for the verification or location of your property lines. Please verify their location prior to locating your
structure. Failure to properly locate the structure may require its relocation at the owner's/permlttee's expense.
2. FOUNDATION - when forms and reinforcement are in place and prior to placement of concrete.
3. FRAMING - after all framing, bracing and blacking Is in place, plumbing, mechanical rough in inspections have been approved, and prior to
concealing.
4. INSULATION - prior to the Installation of drywall.
5. PLUMBING - after rough -in, before covering, and final.
6. MECHANICAL - rough -in of piping, before covering, metal chimneys before concealment, and final.
7. FINAL - all permits - when complete when complete and prior to occupancy and/or use. Please provide 24 hours notice.
NOTE: In addition to inspection of the structure, this inspection includes review of site improvements (typically depicted on the approved site
plan) required by ordinance or as a condition of approval of this permit Items such as the Installation of fire hydrants, fire department access,
on-site drainage ('208 sweles'), road improvements, parking, and landscaping are common requirements of a permit/site plan which
must be completed prior to final approval of a building or Issuance of a Certificate of Occupancy.
8. MANUFACTURED HOMES - foundation Inspections prior to pouring pads, inspection of Blocking/Tie-downs, when completed per manufacturers
installation instructions. Final Inspection approval prior to occupancy: stairs, handrails, skirting, etc., installations completed WAINSTag(s) must be
affixed to the home, completed Inspection record card and manufacturer's installation instructions must be available on site.
9. SEWERS - prior to cover
10. RIGHT-OF-WAV/APPROACH - prior to placement of concrete, or, if gravel approach, after completion.
In addition to the above, any plumbing or mechanical systems or material which would be concealed by framing, drywall, concrete, etc., must be inspected
prior to cover. Check with the department for "special inspections' in conjunction with commercial projects.
FOR INSPECTIONS:
TO INSURE PROMPT SERVICE, PLEASE GIVE ONE WORKING DAV/24 HOUR NOTICE .
PARTS OF YOUR PROJECT MAY REQUIRE PERMITS AND INSPECTIONS
FROM MORE THAN ONE AGENCY.
• Building plumbing, mechanical and fire Inspections, Department Road cuts for utilities or driveways, Division of Engineering&
of Building B Planning 477-3675 Roads - 48-HOUR NOTICE REQUIRED 477-3600 or
• Construction in a flood plain, Division of Engineering 8 Roads 477-3600 State Department of Transportation 456-3000
• Electrical wiring, State Department of Labor and Industries 324-2640 Sewer connection, Division of Utilities 477-3604 or City Public
• On-site waste disposal system, Spokane Regional Health District Works Department 625-6300
324-1560
PERMIT EXPIRATION
Unless otherwise noted, building, plumbing, fire and mechanical permits will be considered null and void by limitation if the work authorized by
the permit is not commenced within 180 days or is stopped for a period of 180 days, unless a written request for an extension of the permit is received and
approved by the Building Department prior to expiration. At a minimum an inspection should be requested at least once every 180 days to assure the
validity of the permit. Please call if you have any questions.
REFUNDS
All requests for building permit refunds must be made In writing by the applicanVpeondlee (shown on the reverse) no later than 180 days after the
date of fee Payment. Refunds of not more than 80% of the permit fee paid may be authorized when no work has been done under the permit. No
refunds may be authorized more than 180 days after fee payment. Please contact the other agencies with respect to their refund policy on all other permit
types
MISTAKE?
If you think we've made an error In processing this permit or find erroneous information on the permit, please bring it to our attention immediately by filing
a written request for correction within 10 working days of discovery. All such requests should be directed to the Department of Building and Planning at'.
.Spokane County Department of Building & Planning
10''6 Wer( BroucAral, Arena. Spnknne, Wt 99760
/'hone: (509) 477-3675 F -ac_ (509) 477-47/13 TDD: (509) 477-7133
krxIG-0 n ax Iu is, Pnw r