Loading...
The URL can be used to link to this page
Your browser does not support the video tag.
2011, 08-31 Permit App: 11002604 Pole Bldg Addition
Project Number: 11002604 Inv: 1 Application Date: 8/31/2011 Page 1 of 2 THIS IS NOT A PERMIT Penalties will be assessed for commencing work without a permit Project Information. .x atm �# ��'k,..ne...a�m��u,� Permit Use: 20x40x8 POLE STRUCTURE ADDITION TO Contact: PACIFIC CONTRACTORS EXISTING POLE BLDG-RES STORAG Address: 101 N STONE C-S-Z: SPOKANE WA 99202 Setbacks:Front Left: Right: Rear: Phone: (509)534-4304 Group Name: Site Information: Project Name: Plat Key: 001838 Name: OPPORTUNITY TR#01-354 District: Sout Parcel Number: 45153.0107 Block: Lot: SiteAddress: 625 N WOODLAWN RD Owner:Name: SHERWOOD,JOHN D Address: 625 N WOODLAWN RD Location::CSV SPOKANE,WA 99216 Zoning: R-3 SF Res District Water District: 011 MODERN Hold: Area: .00 Acres Width: 220 Depth: 100 Right Of Way(ft): 50 Nbr of Bldgs: 1 Nbr of Dwellings: 1 Review Information: � s.� Review Building Plan Review Released By: Originally Released: 8/25/2011 By: tmelbourn Landuse/Zoning/HE Conditions I Released By: Originally Released: 8/25/2011 By: Mharnois Operator: MBB Printed By: JD Print Date: 8/31/2011 Project Number: 11002604 Inv: 1 Application Date: 8/31/2011 Page 2 of 2 THIS IS NOT A PERMIT Penalties will be assessed for commencing work without a permit Building Permit Contractor: PACIFIC METAL BUILDINGS INC. Firm: PACIFIC METAL BUILDINGS INC. Address: 101 N STONE ST Phone: (509)534-4304 SPOKANE,WA.99202 This Application: Total Project: Description Grp Type Notes Sq Ft Valuation Sq Ft Valuation POLE BDLG U-1 VB 800 $15,200.00 800 $15,200.00 Totals: 800 $15,200.00 800 $15,200.00 Item Description Units Unit Desc Fee Amount RESIDENTIAL PERMIT FEE 1 SELECT $265.25 ACCESSORY PLANS REVIEW 1 SELECT $66.31 WSBCC SURCHARGE 1 SELECT $4.50 Permit Total Fees: $336.06 Notes: _ .. A �z_ �.w... _ _ �J, - _ — _ Paving is not required as this addition is only for storage-MH Payment Summary: �z . ��� � _ Ym�. Permit Type Fee Amount Invoice Amount Amount Paid Amount Owing Building Permit $336.06 $336.06 $0.00 $336.06 $336.06 $336.06 $0.00 $336.06 Disclaimer: Submittal of this application certifies the owner(or person(s)authorized by the owner)has both examined and finds the information contained within to be true and correct,and agrees that all provisions of laws and/or regulations governing this type of work will be complied with. Subsequent issuance of a permit shall not be construed to be a permit for,or an approval of,any violation of any of the provisions of the code or of any other state or local laws or ordinances. Signature: Operator: MBB Printed By: JD Print Date: 8/31/2011 Community Development Department (Staff Use Only) � Permit Center CI `"', 11703 EastSpragueAvenu ,Site B-3 PERMITNUMBER: I1l ®ySTY0nij ne Spokane Valley, WA 99206 Ojn a. Tel: (509) 688-0036 PERMIT FEE: Valley. Fax: (509) 688-0037 ..•Ooermitcenter@sookanevalley.org RESIDENTIAL CONSTRUCTION PERMIT APPLICATION ❑i NEW CONSTRUCTION [Q ADDITION/REMODEL I ' • •Y BUILDING El DECK ❑ OTHER RECEIVED SITE ADDRESS: 6015— tkiec•ed((.-W i1 CSV PERMIT ASSESSORS PARCEL NO.: SIS . 0(0 . LEGAL DESCRIPT ON: CENTER BUILDING OWNER NAME: ••:,.. • 2011 NAME: John 56.0v049ct Name ADDRESS: '7--se- N J..11�4. jp— Submittal# CITY: S Po Y`C. V—""y STATE: L✓ '' ZIP: ql 2447 PHONE: ` // FAX: CELL: CONTACT NAME: /'°.G, 2 111 PHONE: (. 41'..7)13/--40 FAX: CELL: foo CONTRACTOR NAME: k4.4G `fle•1'a1 i ; l G1i , i n�s MAILING ADDRESS: 1 Q.1 IV• ave.• CITY: U"(i STATE: (/)4 ZIP" qb L ii� 7 • PHONE: (Sd1) c�T I - 5 d I FAX: CELL: CONTRACTOR LICENSE NO.: .PA"GI fr- gOJ .D/V EXPIRES: / / .oI3 CITY BUSINESS LICENSE NO.: 60 1‘12-S-Z 2- DESCRIBE THE SCOPE OF WORK IN DETAIL AND INDICATE USE & PROP ED USE: 3oi i d to K (lox g Po t e. 801►d1eyOO t r� ��iZr # ****YOU MUST COMPLETE THE FOLLOWING**** MARK N A IF NOT APPLICABLE Height to Peak: /4/kDimensino os:k• 0 No. of Stories: Total Habitable Space: Main Floor SQ FT: Upper Floor Q FTL Unfinished Base ent SQ Finished Ba ement SQ �TT FT: FT: /.f��" Garage SQ FT: Deck/Covered Patio SQ Impervious Su face 30%Slopes on poo FT: -+/A- Area: IV/k Property: N/ No. of Bedrooms: NM Construction YTyp f''li e, Heat Source: Sewer or Septic: po 64e., nag' TOTAL COST OF PROJECT: $ (O0wit,- 1O DISCLAIMER The permitted verifies, acknowledges and agrees by their signature that: 1) if this permit is for construction or on a dwelling,the dwelling is/will be served by potable water. 2)Ownership of this City of Spokane Valley permit inure to the property owner. 3) The signatory is the property owner or has permission to represent the property owner in this transaction. 4) All construction is to be done in full compliance with the City of Spokane Valley Development code. Referenced codes are available for review at the City of Spokane Valley Permit Center. 5) The City of Spokane Valley permit is not a permit or approval for any violation of federal, state or local laws,codes or ordinances. 6) Plans or additional information may be required to be submitted and subsequently approved before this application can be processed. SignatureWklAr �--� Date: d t lCkf, D I1 Updated 1-11-11 Page 1 of 1 http://www.spoka nevalley.org/filestorage/124/938/210/948/1496/Building_Permit_-_Residential_11-11-11.doc Community'Devefop'ment Department (Staff Use Only) Permit Center f Y �bo� - -. 11703 East Sprague Avenue, Suite B-3 PERMIT NUMBER: ` SCITY OFpokane Spokane Valley, WA 9920E, Tel: (509) 688-0036 PERMIT FEE: Valley Fax: 688-0037 permitcenitcenter@spokanevallev.orq RESIDENTIAL CONSTRUCTION PERMIT APPLICATION El NEW CONSTRUCTION El ADDITION/REMODEL [] ACCESSORY BUILDING 0 DECK / f 0 OTHER SITE ADDRESS: 6pZ6- (/)©0�L( WYE ASSESSORS PARCEL NO.: 1-1 S.-'l S3. 0107 LEGAL DESCRIPTION: BUILDING OWNER NAME: NAME: JQjih Jr el ADDRESS: 6 Zr' N 1/00.41//.''c"Jh CITY: S,p ' 0 r'L 1/441 `/7 STATE: ZIP: q�24 4O PHONE: ` FAX: CELL: CONTACT NAME: jot, 2•,.00/11,.. PHONE: FAX: CELL:6. 411...)13"7—6 4'42 CONTRACTOR NAME: .9./.-140 hlfe, -‘q 5' i d'nb'5i01-c...MAILING ADDRESS: /0/ /V 5Jvowe_• CITY: qp,k4tbsC, ? . STATE: VJ ' ZIP: CMa bL ( PHONE: J" 1) �.� –4 `�V c1 FAX: CELL: CONTRACTOR LICENSE No.: .P +FIVO)ZDV/"/EXPIRES: 69/14/7.013 CITY BUSINESS LICENSE NO.: 40 l ell.s-' l DESCRIBE THE SCOPE OF WORK IN DETAIL AND INDICATE USE & PROP ED USE: Soi ► d 20 x No x 8 Pole. Sol lou-l� (p.,,.►-� ****YOU MUST COMPLETE THE FOLLOWING**** MARK N/A IF NOT APPLICABLE Height to Peak: Dimensions: No. of Stories: Total Habitable /1/40/' X,No A, # I Space: Main Floor SQ FT: Upper Floor SQ FT• Unfinished Base ent SQ Finished Ba$ement SQ WAi - FT: FT: /J Garage SQ FT: Deck/Covered atio SQ Impervious Su face 30% Slopes on 10(Tia,�ioo FT: /4//b. Area: 1v/,.► Property: Ng' No. of Bedrooms: WA- Construction Typ Eula✓ Heat Source: Sewer or Septic: lou, k:6 elm TOTAL COST OF PROJECT: $ tp/f►WO• 't-- DISCLAIMER The permitted verifies, acknowledges and agrees by their signature that: 1) if this permit is for construction or on a dwelling,the dwelling is/will be served by potable water. 2) Ownership of this City of Spokane Valley permit inure to the property owner. 3) The signatory is the property owner or has permission to represent the property owner in this transaction. 4) All construction is to be done in full compliance with the City of Spokane Valley Development code. Referenced codes are available for review at the City of Spokane Valley Permit Center. 5) The City of Spokane Valley permit is not a permit or approval for any violation of federal, state or local laws,codes or ordinances. 6) Plans or additional information may be required to be submitted and subsequently approved before this application can be processed. 1 ) i3 Signature Date: I/ Updated 1-11-11 Page 1 of 1 http://www.spokanevalley.org/filestorage/124/938/210/948/1496/Building_Permit_-_Residential_11-11-11.doc RESIDENTIAL CHECK LIST DIRECTIONS: Place a check mark in box next to each document required for complete submittal. o SITE PLAN o Property lines and dimensions o Setbacks to property lines o Direction arrow pointing North and orientation to streets o Distance between buildings o Proposed/existing buildings (footprint and dimensions) o Right of way/easement location &sizes o Utilities, septic tank/drain field locations and distances o Driveway approach size and location BUILDING PLANS (3 SETS) (minimum 1/8 inch scale or completely dimensioned) ❑ Elevations (Front/Rear/Sides)with roof peak and wall height including basement: ❑ Foundation Plan (crawlspace, basement or slab on grade): o Footing sizes and locations o Supporting wood cripple walls or beams o Perimeter concrete foundation wall sizes ❑ Thickened concrete pads supporting o Crawlspace ventilation beams or girder trusses ❑ Floor Plan of each level (finished or unfinished)with dimensions: ❑Floor Joist direction, size and spacing ❑ Window and door location and sizes o Header, beam or concrete lintel sizes o Window well locations if applicable o Brace wall panel locations ❑ Room usage labels o Water heater and furnace locations o Smoke detector locations o Exhaust fan locations ❑Attic and crawl space access locations o Deck or concrete patio sizes and locations o Fire Wall construction ❑ Roof Plan: o Engineered truss direction and spacing o Ridge, eave and valley lines o Rafter and over frame direction, size and spacing o Beam and girder size and location ❑ Wall Section Detail including: Roof o Slope/roofing material/underlayment/ice dam protection o Truss or rafter size, spacing &connection o Sheathing size and type o Attic insulation/air space baffle/ventilation Ceiling o Joist size and spacing o Size of ceiling gypsum wall board Wall o Height/top plate/stud size and spacing/sole plate o Siding/exterior house wrap/anchor bolts o Exterior sheathing size and type o Insulation, vapor barrier, gypsum wall board Floor ❑ Joist size and spacing o Sheathing or concrete floor size/insulation Foundation Wall o Concrete or Masonry unit width o Footing bottom to finished ground level depth o Earth to wood separation distance o Horizontal &vertical reinforcement if any Footing o Size o Reinforcement if any Radon o Passive system with 6mil vapor barrier o Active system with 6 mil vapor barrier Miscellaneous Construction Details ❑ Deck: o Floor plan/side view/dimensions o Footings/post/and beam size and locations o Floor Joist/decking direction, size and spacing O Stairway tread rise &run and nosing 0 Handrail/Guard height&spacing 2.20— \ . • (, - ,;-".'..-:..-•:' ' ,•-•::: • I/ ...t.— . c\, . ' Wo •-* .._. , • , ..c.. --I FRooc Line -,\ I \ch \ • r. . — , ,1 0 Ft b b ri/L PI on----22'-----1 .. ..„......_._.--• ,. ,... . . • . . .. C);• III 1,:i4 _ • . •ci- • , . 1 . .c., (17,• s , • ----..; ti— . , . t • --:--,, c,( q,- - I , ,...\1., z . , - . 1 1 ) i -,, e 1 1 A--i.E • • N S.) P.O.E:A G.P 6 LJN ii) . ,. t 01 . ,$) \ 1 ...„; . ;;N.•7' EL ,...--...7.:7--ki c•fi L. ----?.....,-, 1 •k 1.0 \,.. ..-----48'-11.'----- 1-' 100.01111W_.....-----r. ...11..... . . ...... , • ...1 • ' „„ • , .- -- I lit s) I ''''''.N • :e, ICI) .!. .1,: „) :.'. '‘ ---- \ \i(Pt -1.,i1.:; l'. /k/i t:rtt:A --/ • • ../ 1 D , '..- SP TL: -----— , . .,___________,...—• \-Y----- --,1 i -,v.s. • % \ ,,,•-%—1 !\?PrillOVED • 1.-- • c.,4 o 7 I . AlV) (3.1. / , .--)‘ >VA/ 0 Pz -- i.4... 1-)/1 \ / --,v. ,-.7-0 ,v .:.:-.>.<122:':R!o....;-z:.),...)A) i.') )...),A,i 1_..••A '':,) 1 .--- . X — \ Target Date sheet For City Use Only SSj 'öline Project Address (_� ;' 11 ' t , �;' _• Valley®v 11703 E Sprague Ave Suite B-3 ♦ Spokane Valley WA 99206 509.720-5240♦ Fax: 509.688.0037 ♦ permitcenter®spokanevalley.org As part of our on-going commitment to customer service during the review process of your project application,we are providing you with a TARGET DATE for the initial technical application review. If for any reason we cannot meet this date,we will contact you with a revised target date. ` c. -• 1 ! Your application review TARGET DATE is �'" � ' - The TARGET DATE is the date we estimate your project application will have had its initial technical review. It is not the date for approval or permit issuance. Tips for a Smoother Project Application Review ➢ Submit complete,accurate plans and documents. Extra time may be required for re-submittals as project application reviewers work on multiple applications and it may be several days before they can look at your new or revised information. > Designate a specific contact person to communicate with the City. While the person designated as the applicant's contact person with the City can be changed, one individual with the expertise for dealing with reviewer comments would be the best choice for the entire review process. > Call staff regarding the status of your project only after the target date shown at the top of the page. Although you should be contacted on or by the target date,please feel free to contact us if you haven't heard from us by your target date.Staff may contact you before the target date if the initial review is complete.By following this procedure,you will save time and allow the reviewers to complete the work more expeditiously. Steps in the Permit Process 1. Counter Complete. Your application has been accepted as counter complete. This means all of the required documents, as indicated on your Pre-Application Checklist have been submitted or have been approved for deferred submittal. This does not prevent technical staff from requesting additional information as a result of their technical review. 2. Quality Check. The next step in the process is a quality check to make sure that the application is reviewable and free from substantive flaws that would prevent technical staff from completing the technical review once it is started. When this step is complete,your application will be routed to the appropriate staff and remain in their review queue until it comes up for review. 3.Technical Compliance.Once an application is administratively complete,it is routed to technical staff for compliance review. Depending on the type of project, technical staff may include multiple reviewers. You should be contacted by phone, fax, email, or mail by your TARGET DATE once the initial technical compliance review is complete. 4. Permit Issuance. When the technical compliance review of the application is complete, including any subsequent re- submittals, each reviewer will approve their section of the application and route it to the Permit Center.When all sections of the application are received,a Permit Specialist will process the application and contact the person specified on your application for permit pick-up.Information regarding fees and pre-construction meetings(if required)will be provided by the Permit Specialist at that time. li CD-003 V-7/06-21-11 Page 1 of 1