Loading...
2015, 02-10 Permit App: APR-2015-0010 Approach*ion°lane 4jValley Community Development Department Permit Center 11703 East Sprague Avenue, Suite B-3 Spokane Valley, WA 99206 Tel: (509) 720-5240 Fax: (509) 688-0037 permitcenter(aspokanevall ev.org (Staff Use Only) PERMIT NUMBER: PERMIT FEE: APPROACH PERMIT APPLICATION PROJECT ADDRESS: START DATE: z//0 /.,5 BUILDING OWNER NAME: At.. 1,,c.,rcl MAILING ADDRESS: / ANTICIPATED COMPLETION DATE: Z /1 Z- /13 - luood ru-PF CITY: 5 f kej„tAt_ V L` //L... STATE: W' CONTACT PERSON NAME: . rick 1449(44_1( PHONE: 5c9-- 4/gy- /3I FAx: CONTRACTOR NAME: ZIP: X924 CELL: MAILING ADDRESS: Q"y /3i j� /4 Z 9 3 CITY: ribSTATE: •/A // q� ZIP: c/ Z /5/- -0793 PHONE'1,,. JV l .- 3/? 47e -cg `! FAX: ID 9 - T 7 T �C F76 CELL: CONTRACTOR LICENSE #: ($Z (Mg y /I EXPIRES: 03- 3/ /20/5 CITY BUSINESS LICENSE #: L)L,X 905 PROJECT DESCRIPTION (Please Provide Site Sketch) El Residential Driveway ❑ Commercial/Industrial Driveway ❑ Existing Curb & Gutter 0 Rural Road Section ❑ Culvert Installation 0 Sidewalk Repair/Construction ❑ Other Conditions: Bond/Insurance certification must be on file with the City. DISCLAIMER The permitted verifies, acknowledges and agrees by their signature that: 1) if this permit is for construction or on a dwelling, the dwelling is/will be served by potable water. 2) Ownership of this City of Spokane Valley permit inure to the property owner. 3) The signatory is the property owner or has permission to represent the property owner in this transaction. 4) All construction is to be done in full compliance with the City of Spokane Valley Development code. Referenced codes are available for review at the City of Spokane Valley Permit Center. 5) The City of Spokane Valley permit is not a permit or approval for any violation of federal, state or local laws, codes or ordinances. 6) Plans or additional information may be required to be submitted and subsequently approved before this application can be processed. Signature DE -001: V-1 Date: "2 //el/5 — RECEIVED CSV PERMIT CENTER FEB 1 0 2015 Project#.419R-10A--6910 Name Submittal # Page 1 of 2 APPROACH PERMIT APPLICATION REQUIRED SKETCH INFORMATION Provide required measurements (in sketch boxes), and include street name. Check all existing conditions that apply: ❑Sidewalk ft wide ft from back of curb DStreetside Swale ❑Drainage Ditch ❑Drywell (show location on sketch) ID Other (please describe below) wI Z u a, Oi DISTANCE FROM NEAREST PROPERTY LINE MAY BE LEFT OR RIGHT SIDE) FT (SEE TABLE) CONCRETE APPROACH CURB J wi W. ai O 4'--1- THROAT WIDTH Z FT ----1-4' WING (SEE TABLE) WING STREET NAME Odisu STREET WITH CURB DISTANCE FROM NEAREST PROPERTY LINE MAY BE LEFT OR RIGHT SIDE) FT (SEE TABLE) ASPHALT APPROACH CURB RETURN I NF CORNER LOT, DISTANCE FROM CURB RETURN n FT (SEE TABLE) 15' RADIUS RADIUS RETURN EDGE OF ASPHALT �--THROAT WIDTH n FT -1 (SEE TABLE) STREET NAME STREET WITH ASPHALT EDGE IF CORNER LOT, DISTANCE FROM RADIUS RETURN Q FT (SEE TABLE) Approach Requirements: • Maximum 2 approaches per property frontage; one on arterials. • Total width of approaches not to exceed 50% of frontage width. DE -001: V-1 Page 2 of 2 Residential Approaches Commercial Approaches Distance from Curb/Radius Retum 15' minimum 75' minimum Separation between Approaches (measured from centerline to centerline of each approach) None specified See Page 7-27 in City Street Standards Throat Width (flat portion) 16' min., 30' max. 30' min., 40' max. Wing Width (at curb line) 4 feet typical 4 feet typical Minimum Distance from Side Property Line (@ r/w) 5.0' 5.0' Minimum Distance from Crosswalk 5' 5' DE -001: V-1 Page 2 of 2