2015, 04-28 Permit: SW-15000388 Sewer SPOKANE COUNTY UTILITIES
PERMIT
Application Number: SW-15000388
Permit Issued Date: 04/28/2015
Expiration Date: 04/28/2016
Project Description: SEWER
Project Name: W PONDEROSA Applicant: POUL CONSTRUCTION
Primary Contact: POUL CONSTRUCTION 18902E 2ND AVE
Phone: 509-979-5872 Address: SPOKANE VALLEY,WA 99016
Phone: 509-979-5872
Email:
SITE INFORMATION:
Owner: ANDERBERG,MICHAEL D&CHALICE
Site Address: 4710 S WOODRUFF RD Address: 4710 S WOODRUFF RD
Parcel Number: 44052.0103 SPOKANE,WA 99206
Phone:
Assessor's Description: PONDEROSA ACRES 5TH ADD L3 B1
Email:
Inspection Area: :(509)-477-3675
Water District:Spokane County Water Fire District:Fire District 8
District#3
Land Area:43800 Square Feet
Zoning:
CONTRACTOR INFORMATION:
POULCC*932BQ, Exp.01/28/2017
POUL CONSTRUCTION
18902 E 2ND AVE SPOKANE VALLEY,WA 99016
509-979-5872
DETAILS:
Quantity Unit Charge Value
Class Type
SEWER SEWER CONNECTION 1 $125.00 $125.00
$125.00
FEE DETAIL:
Processing-Utilities $27.12
Utilities Permit $125.00
Total Fee: $152.12
CONDITIONS:
Undivided Interest Parcels:(44052.0103)(44052.0103)
Inside Public Transit Benefit Area —
CALL 1- 00-424-5555 BEFORE YOU DIG--AT
NSTALLLEAST WORKING CODE
UIRES
E COMPLY WITH ALL REQUIREMENTS STHE E WA STATE DEPT OF LABOR&INDUSTRIES, INCLLUDINGQTHOSE THE RELATED TO TRENCH SAFETY.
SEWER PERMITS ARE VALID FOR ONE(1)YEAR FROM THE DATE OF ISSUANCE.FOR SEWER INSPECTIONS CALL THE UTILITIES
DEPT AT(509)477-3604 FROM 8:30-5:00 MONDAY-FRIDAY PRIOR TO COVER.ONE WORKING DAY NOTICE REQUIRED.PERMIT
ALLOWS FOR A 30-MINUTE INSPECTION.ADDITIONAL INSPECTION FEES APPLY AFTER 30 MINUTES.
INSTALLER IS RESPONSIBLE TO INSURE ALL WASTEWATER DRAINS ARE CONNECTED TO THE SEWER AND MAY BE REQUIRED
TO PERFORM TESTS FOR VERIFICATION. INSTALLER IS TO FIELD LOCATE AND CONFIRM THE ELEVATION AND POSITION OF
SEWER STUB PRIOR TO ANY OTHER EXCAVATION.
Project Coordinator:Susan Clark
Date Printed:04/28/2015 13:01:42
SPOKANE COUNTY UTILITIES
PERMIT
Application Number: SW-15000388
Permit Issued Date: 04/28/2015
Expiration Date: 04/28/2016
SEWER STUBS AND DRY SIDE SEWERS ARE TO BE CHECKED PRIOR TO CONNECTION TO ENSURE THAT THEY HAVE
ACCEPTABLE GRADE AND ARE CLEAR AND UNOBSTRUCTED.SEWER LINES SHOULD BE CONSTRUCTED TO ALLOW FOR
GRAVITY FLOW FROM THE LOWEST LEVEL OF THE STRUCTURE.
THE INSTALLER AND THIS PERMIT MUST BE PRESENT AT THE JOB SITE AT THE SCHEDULED INSPECTION TIME. BOTH STATE
LAW RCW 19.122 AND COUNTY CODE REQUIRES THE INSTALLER TO GIVE NOTICE OF EXCAVATION TO OWNERS OF
UNDERGROUND FACILITIES.
Date Printed:04/28/2015 13:01:42
Project Coordinator Susan Clark