Loading...
2009, 03-05 Permit App: 09000486 Finish Basement Project Number: 09000486 Inv: 1 Application Date: 3/5/2009 Page 1 of 2 THIS IS NOT A PERMIT Penalties will be assessed for commencing work without a permit Project Information: Permit Use: FINISHING BASEMENT-2 BEDROOMS, 1 BATH, Contact: CHAMBERLIN,CORBIN&ANDREA LAUNDRY ROOM Address: 1412 S WOODWARD RD C-S-Z: SPOKANE VALLEY,WA 99206 Setbacks:Front Left: Right: Rear: Phone: (509)924-1937 Group Name: Name: Site Information: Project Plat Key: 001507 Name: LYNCH ADD District: Sout Parcel Number: 45213.2102 Block: 1 Lot: 2 SiteAddress: 1412 S WOODWARD RD Owner:Name: CHAMBERLIN,CORBIN&ANDR Address: 1412 S WOODWARD RD Location::CSV SPOKANE VALLEY,WA 99206 Zoning: UNKN Unknown Water District: Hold: ❑ Area: 11,050 Sq Ft Width: 0 Depth: 0 Right Of Way(ft): 0 Nbr of Bldgs: 0 Nbr of Dwellings: 0 Review Information: Review Building Plan Review Released By: I Originally Released: 3/5/2009 By: RGUERRY Building Permit Contractor: OWNER Firm: OWNER Phone: (000)000-0000 This Application: Total Project: Description Grp Type Notes Sq Ft Valuation Sq Ft Valuation BASEMENT F R-3 VB BASEMENT 0 $5,000.00 0 $5,000.00 F Totals: 0 $5,000.00 0 $5,000.00 Item Description Units Unit Desc Fee Amount RESIDENTIAL PERMIT FEE 1 SELECT $111.25 WSBCC SURCHARGE 1 SELECT $4.50 SF PLNS RVW<7999 SQ FT 1 SELECT $44.50 Permit Total Fees: $160.25 Operator: jmm Printed By: JD Print Date: 3/5/2009 Project Number: 09000486 Inv: 1 Application Date: 3/5/2009 Page 2 of 2 THIS IS NOT A PERMIT Penalties will be assessed for commencing work without a permit Plumbing Permit Contractor: OWNER Firm: OWNER Phone: (000)000-0000 Item Description Units Unit Desc Fee Amount TOILETSBIDETS 1 NUMBER OF $6.00 SINKS 2 NUMBER OF $12.00 SHOWERS 1 NUMBER OF $6.00 CLOTHES WASHER 1 NUMBER OF $6.00 WATER PIPING-DWV 1 NUMBER OF $6.00 Permit Total Fees: $36.00 Notes Payment Summary: . . Permit Type Fee Amount Invoice Amount Amount Paid Amount Owing Building Permit $160.25 $160.25 $44.50 $115.75 Plumbing Permit $36.00 $36.00 $0.00 $36.00 $196.25 $196.25 $44.50 $151.75 Disclaimer: Submittal of this application certifies the owner(or person(s)authorized by the owner)has both examined and finds the information contained within to be true and correct,and agrees that all provisions of laws and/or regulations governing this type of work will be complied with. Subsequent issuance of a permit shall not be construed to be a permit for,or an approval of,any violation of any of the provisions of the code or of any other state or local laws or ordinances. Signature: Operator: jmm Printed By: JD Print Date: 3/5/2009 Scr11 cel � (Staff Use Only) pokane PERMIT NUMBER: o . PERMIT FEE: 111.. .LLL CITY OF SPOKANE VALLEY - , .. Community Development Department ;wNEVAL� Permit Center Ct1 yr O2 2"'�(% 11703 East Sprague Avenue, Suite B-3MA[t Spokane Valley, WA 99206 Tel: (509) 688-0036 'eER1 T �. Fax: (509) 688-0037 permitcenter@spokanevalley.orgtit RESIDENTIAL CO TR CTION PERMIT APPLICATION NEW CONSTRUCTION ADDITION/REMODEL ACCESSORY BUILDING !c_1\, 0 DECK OTHER SITE ADDRESS: /O'? -5. G112e . ASSESSORS PARCEL NO.: LEGAL DESCRIPTION: BUILDIINNG OWNER NAME: NAME: / �•,lr�j w /la 141%14,4 I 41 14,4I ADDRESS: Al (�/�D17/_4ld /J CITY:j//OL'� 1. L%/ STATE: ZIP: 99,9,/,‘,,99,9,/,‘,, --7 PHONE: y' y /-/ 7 FAX: AJf y4CELL:(5,42) 7p/ 7V v � .1 CONTACT NAME: Y a.d44,4464/,-1/4.- PHONE:E: FAX: CELL: CONTRACTOR NAME: u, p- MAILING ADDRESS: CITY: STATE: ZIP: PHONE: FAX: CELL: CONTRACTOR LICENSE No.: EXPIRES: CITY BUSINESS LICENSE NO.: DESCRIBE THE OPE OF WORK I DETAIL AND INDICATE USE: / s ! Tt1 !fr. Gc/Y//l //0/L40s�4�i✓I of -- 1a�.' .a/C. -LIF 4i�� �a�� "' ' [_i Gt/ w " __- ___iLi/.ice _ .� i�ii. •,.� �� / t �it� �S lli�i `�I PR•POSED USE: Effective October 28, 2007 Page 1 of 2 http://www.spokanevalley.org/uploads/Community_Development/Documents/Forms/Building/Residential Construction Permit App.l.doc ****YOU MUST COMPLETE THE FOLLOWING**** MARK N/A IF NQT APPLICABLE Height to Pepk: Dimensions: No. of Stories: Total Habitable 0010-001-1- 00)6 - Space: Main Floor SQ Upper Floor SQ Unfinished asement Finished asement FT: 009 FT: 1J/l., SQ FT: A) SQ FT: l� Garage SQ Deck/Coy/red Patio Impervious Surface 30% Slopes FT: 9e0 SQ FT: Al Area: Nik Property: No. of Construction Heat Source: Sewer or Bedrooms: Type: ,Jlettey' v /lv ( j Septic:., �DJ1 TOTAL COST OF PROJECT: $ `d (F4v7 Lr tei j DISCLAIMER The permitted verifies,acknowledges and agrees by their signature that: 1) if this permit is for construction or on a dwelling,the dwelling is/will be served by potable water. 2) Ownership of this City of Spokane Valley permit inure to the property owner. 3) The signatory is the property owner or has permission to represent the property owner in this transaction. 4) All construction is to be done in full compliance with the City of Spokane Valley Development de. Referenced codes are available for review at the City of Spokane Valley Permit Center. 5) The City of Spokane Valley permit is of permit or approval for any violation of federal, state or local laws, codes or ordinances. 6) Plans or additional information may be req ' d o be submitt subse ently approved before this application can be processed. Signature Date: Method of payment: ❑ Cash ❑ Check ❑ Visa ❑ Mastercard Bankcard #: EXP: VIN#: Authorized Signature: Effective October 28, 2007 Page 2 of 2 http://www.spokanevalley.org/uploads/Community_Development/Documents/Forms/Building/Residential Construction Permit App.l.doc crii t e (Staff Use Only) lanPERMIT NUMBER: 40100 Valley PERMIT FEE: CITY OF SPOKANE VALLEY Community Development Department Permit Center 11703 East Sprague Avenue, Suite B-3 Spokane Valley, WA 99206 Tel: (509) 688-0036 Fax: (509) 688-0037 permitcenter@spokanevalley.org PLUMBING PERMIT APPLICATION COMMERCIAL M RESIDENTIAL SITE ADDRESS: /- �, 04:5'lji'vjd I_I, BUILDING OWNER NAME: ft� ( YMN1/ /j Ii2 NAME: 6,40, L.44‘24,44,i,„--/v4/1_, ADDRESS: l Wp (4//tA/i � /e4'S 'jCITY: .> STATE: ZIP:PHONE ) ' �.1 - f-j / FAX: A)�//5�h CELL:( 70t--3-74/7 CONTACT NAME: -� ,t,�_ lif�3 C' PHONE: FAX: CELL: CONTRACTOR NAME: A ) MAILING ADDRESS: CITY: STATE: ZIP: PHONE: FAX: CELL: CONTRACTOR LICENSE No.: EXPIRES: CITY BUSINESS LICENSE NO.: Effective October 28, 2007 Page 1 of 2 http://www.spokanevalley.org/uploads/Community_Development/Documents/Forms/Building/Plumbing Permit App.1.doc DESCRIPTION OF WORK #OF UNITS X COST = TOTAL AMOUNT 1 TOILETS WATER CLOSET,BIDETS / X $6.00 = Cp X00 2 URINALS X $6.00 3 TUBS X $6.00 = 4 SHOWERS(PER TRAP) BATH,STALL,ON-SITE BUILT i X $6.00 = LAVS/BASINS,BAR,FLOOR,KITCHEN, 5 SINKS LAUNDRY,UTILITY,JANITOR,PHOTO, X $6.00 = /01.661 X-RAY,FOOD,PREP/CULINARY MEAT 6 DISHWASHER X $6.00 = 7 CLOTHES WASHER I X $6.00 = �en 8 GARBAGE DISPOSAL X $6.00 = 9 WATER SOFTENER X $6.00 = 10 ELECTRIC WATER HEATER NOTE: IF GAS,SEE MECHANICAL X $6.00 = AREA,CASE,COIL,TRENCH, 11 FLOOR DRAINS CONDENSATE X $6.00 = 12 ROOF DRAINS/OVERFLOW DRAINS X $6.00 = 13 FOUNTAINS,DRINKING X $6.00 = WATER PIPING/DRAIN-IN WASTE, NSTALLATION,ALTERATION,REPAIR, 2 / 14 VENT,PLUMBING,REVERSAL REVERSALS v I X $6.00 = 6 15 SEWAGE EJECTOR GRINDER,SUMP PUMP X $6.00 = ICE AN/OR COFFEE MAKER,HOSE BIB, 16 WATER USING DEVICE STEAMER X $6.00 = PROOFER,CARBONATOR,SWAMP COOLER VACUUM BREAKER,CHECK VALVE, AND R.P.B.P.D.FOR: VATS,TANKS, 17 CROSS CONNECTION DEVICE BOILERS X $6.00 = GREASE TRAP,SAND TRAP, 18 INTERCEPTORS CHEMICAL HOLDING TANK X $6.00 = 19 MEDICAL GAS(per outlet) NITROUS,OXYGEN X $6.00 = 20 MISCELLANEOUS PLUMBING FIXTURE X $6.00 = 21 PRIVATE SEWAGE DISPOSAL/SYS X $20.00 = 22 INDUSTRIAL WASTE INTERCEPTOR X $15.00 = SUBTOTAL 36:1,eta PROCESSING FEE $35.00 TOTAL PERMIT FEE DUE: 7/+ DISCLAIMER The permitted verifies, acknowledges and agrees by their signature that: 1) if this permit is for construction or on a dwelling,the dwelling is/will be served by potable water. 2) Ownership of this City of Spokane Valley permit inure to the property owner. 3) The signatory is the property owner or has permission to represent the property owner in this transaction. 4) All construction is to be done in full compliance with the City of Spokane Valley Development code. Referenced codes are available for review at the City of Spokane Valley Permit Center. 5) The City of Spokane Valley permit is not permit or appr val for any violation of federal, state or local laws, codes or ordinances. 6) Plans or additional information may be required o be submitted d subsequently approved before this application can be processed. Signature Date: pq -d9.3 Method of payment: ❑ Cash ❑ Check 0 Visa ❑ Mastercard Bankcard #: EXP: VIN#: Authorized Signature: Effective October 28, 2007 Page 2 of 2 http://www.spokanevalley.org/uploads/Community_Development/Documents/Forms/Building/Plumbing Permit App.1.doc 413" 12-13" 6'-0" p : 1 h : .1: p : .1 1 Di a ea) Unfinish • Bedroom ((�� I Storagg�./�r� 14 \ Bathroom ROOM` /laundry u fn \ II"1 i.----- I '10111111 h Family 1 1 Room 1 Bedroom 1 1 Office 1 Drawers e N r- s-z' 1s-0 WINDOW WELL: Egress WLndOWS enable SMOKE A ARMS ,SPIAL BE 1NTERCON- Min. 9 sq. ft. horizontal area. NECTE4 O IN SUCH A 53 cn ft..-.44" Si Min. 3 ft horizontal projection and width. MANNER T.IA S OF ONE P l ALARM AOT1 *`: 1 ,AI.ARMS. Max. 44 in. vertical depth without a ladder (B E D RIO 8, AREAS PROACH Fri G BEDR OMi.. �/Afrt CEILING WITH RISE Of 24'CON EACH LOOK) E UST`FANS so Sok2 c�O -a rK5Q1a-t,a� rR (1rL� � � kitchen i0 b ► r ©v. en4 l'o' wcis - aX0 &_ - C ..,.... SIlame ao,..*Valtley OR CODE COMPLIANC REVIEWED E PO NE Y BUILDING D3-IIVSION ' tc • - :;.- - .6 ,40.- c •••• i, CITY COPY For City Use.OnlyS �� PLUS Project Number L7-- OO poKaneCITY OF Project Address / {Z S ' Y� allei° 11703 E Sprague Ave Suite B-3 • Spokane Valley WA 99206 40000 509.688.0036 ♦ Fax: 509.688.0037 ♦ permitcenter@spokanevalley.org As part of our on-going commitment to customer service during the review process of your project application, we are providing you with a TARGET DATE for the initial technical application review. If for any reason we cannot meet this date, we will contact you with a revised target date. _ F Your application review TARGET DATE is The TARGET DATE is the date we estimate your project application will have had its initial technical review. It is not the date for approval or permit issuance. Tips for a Smoother Project Application Review ➢ Submit complete, accurate plans and documents. Extra time may be required for re-submittals as project application reviewers work on multiple applications and it may be several days before they can look at your new or revised information. ➢ Designate a specific contact person to communicate with the City. While the person designated as the applicant's contact person with the City can be changed, one individual with the expertise for dealing with reviewer comments would be the best choice for the entire review process. ➢ Call staff regarding the status of your project only after the target date shown at the top of the page. Although you should be contacted on or by the target date,please feel free to contact us if you haven't heard from us by your target date. Staff may contact you before the target date if the initial review is complete. By following this procedure,you will save time and allow the reviewers to complete the work more expeditiously. Steps in the Permit Process 1. Counter Complete. Your application has been accepted as counter complete. This means all of the required documents,as indicated on your Pre-Application Checklist have been submitted or have been approved for deferred submittal. This does not prevent technical staff from requesting additional information as a result of their technical review. 2. Quality Check. The next step in the process is a quality check to make sure that the application is reviewable and free from substantive flaws that would prevent technical staff from completing the technical review once it is started. When this step is complete, your application will be routed to the appropriate staff and remain in their review queue until it comes up for review. 3. Technical Compliance. Once an application is administratively complete, it is routed to technical staff for compliance review. Depending on the type of project, technical staff may include multiple reviewers. You should be contacted by phone,fax, email,or mail by your TARGET DATE once the initial technical compliance review is complete. 4. Permit Issuance. When the technical compliance review of the application is complete, including any subsequent re- submittals, each reviewer will approve their section of the application and route it to the Permit Center. When all sections of the application are received, a Permit Specialist will process the application and contact the person specified on your application for permit pick-up. Information regarding fees and pre-construction meetings (if required) will be provided by the Permit Specialist at that time. WHITE-APPLICANT PINK-BUILDING FILE REV 9/07