2011, 09-09 Permit: 11004588 Sewer SPOKANE COUNTY
� ` DEPARTMENT OF BUILDING & PLANNING
• 't y
41. It
af. ..
1026 WEST BROADWAY AVENUE• SPOKANE, WA 99260-0050
SPOKANE COIJ'C Y
Site Information Project Information
Site Address: 4505 N WOODLAWN RD Project Number: 11004588 Inv: 1 Issue Date: 9/9/2011
Permit Use: SEWER CONNECTION
Parcel Number: 45032.0906
Subdivision: EVA 0 I ST ADD Applicant: HENDERSON,RONALD
Block: Lot: 4505 N.WOODLAWN RD.
Zoning: UR-3 Urban Residential 3 5 SPOKANE VALLEY, WA 99216 Phone: (509)928-4743
Contact: HENDERSON,RONALD
Owner: I IENDERSON_RONALD& DEBBIE 4505 N.WOODLAWN RD.
Address: 4505 N WOODLAWN RD SPOKANE VALLEY, WA Phone: (509)928-4743
SPOKANE. WA 99216 99216
Setbacks-Front: Left: Right: Rear:
Building Inspector: ,JOHN LARSON
Water Dist:
Group Name:
Project Name:
Permits
Sewer Connection Permit Contractor: OWNER _ License p: OWNER
SEWER CONNECTION I SI25.00 PROCESSING FEE I $25110
- Total Permit Fee: $150.00
"FOR SEWER INSPECTIONS CALL TI IE UTILITIES DEPT AT(509)477-3604 FROM 8.30-5:00 MONDAY-FRIDAY PRIORI 0
COVER. ONE WORKING DAY NOTICE REQUIRED. PERMIT ALLOWS FOR A 30-MINUTE INSPECTION, ADDITIONAL
INSPECTION FEES APPLY AFTER 30 MINUTES.
*"CALL 1-800-424-5555 BEFORE YOU 1)10--AT LEAST2 WORKING DAYS IN ADVANCE-SPOKANE COUNTY CODE
REQUIRES TI TP.INSTALLER COMPLY W TTII ALL REQUIREMENTS OF THE WA STATE DEPT OF LABOR& INDUSTRIES,
INCLUDING THOSE RELATED TO TRENCH SAFETY.
"INSTALLER IS RESPONSIBLE TO INSURE ALL WASTEWATER DRAINS ARE CONNECTED TO THE SEWER AND MAY
BE REQUIRED 10 PERFORM TESTS FOR VERIFICATION, INSTALLER IS TO FIELD LOCATE AND CONFIRM THE
ELEVATION AND POSITION OF SEWER STUB PRIOR TO ANY OTHER EXCAVATION.
" SEWER STUBS AND DRY SIDE SEWERS ARE TO BE CHECKED PRIOR TO CONNECTION ENSURE TI IAT'THEY
HAVE ACCEPTABLE GRADE AND ARE CLEAR AND UNOBSTRUCTED,SEWER LINES SHOULD BE CONSTRUCTED TO
ALLOW FOR GRAVITY FLOW FROM THE LOWEST LEVEL OF THE STRUCTURE.
**TIM INSTALLER AND THIS PERMIT MUST BE PRESENT AT THE JOB SITE AT THE SCI'MUTED INSPECTION TIME.
BOTI I STATE LAW RCW 19.122 AND COUNTY CODE REQUIRES THE INSTALLER TO GIVE NOTICE OF EXCAVATION TO
OWNERS OF UNDERGROUND FACILITIES.
- - -- Payment Summary
Total Fees AmountPaid AmnuntOwinp Tran Date Receipt 04 Payment Amt
$15000 $150.00 $0.00 9/9/2011 4014 515000
Processed By: SI IATIO,JULIE PERMIT
Printed By: Force,Faith Page 1 of I
NOTICE
h is the responsibility of the applicant/pens lar to see to it that the use described on the front of this permit complies with applicable codes and
requirements and that IVQIIIIed inspections are requested.Failure to request inspections as listed below and obtain the necessary approvals before
progressing beyond the point where inspections cti<ns are required may necessitate removal of certain parts of the construction at the app' ant s'pu nittee y
or property owner's expense_At a minimum,the following inspections ARE REQUIRED by County Code:
I. FOOTING-all structures_including manufactured homes when forms and reinforcement are in place and prior to placement of concrete.
NOTE:This inspection includes review of the structure's setbacks from property lines.Minimum setbacks are established by County zon-
ing
g regulations.Front,flanking.side and rear yard setbacks are measured from property lines. Curb lines and fence lines arc not necessarily
indicative of property lines.Insome residential areas,the County can own as much as 20 feet of right-of-way between your property and the
actual improved street/curb.The responsibility to comply with applicable setback provisions lies solely with the permittee—neither Spokane
County nor its authorized representatives assume any responsibility for the verification or locution of your property lines.Please verify their
location prior to locating your stn¢tne.Failure to properly locate the structure may require its relocation at the owner's/permittees expense.
2. FOUNDATION -when forms and reinforcement are in place and prior to placement of concrete.
3. FRAMING-after all framing,bracing and blocking is in place,plumbing,mechanical rough-in inspections have been approved.and prior to
concealing.
4. INSULATION-prior to the installation of drywall.
5. PLUMBING-after rough-in.before covering,and final_
6. MECHANICAL-rough-in of piping,before covering,metal chimneys before concealment.and final.
7. FINAL-all permits-when complete and prior to occupancy and/or use.Please provide 24 hours notice NOTE: In addition to inspection of
the structure.this inspection includes review of site improvements(typically depicted on the approved site plan)required by ordinance or as a
condition of approval of this permit_Items such as the installation of fire hydrants,fire department access,on-site drainage("208 swales"),
road improvements,parking,and landscaping are common requirements of a permit/site plan which must he completed prior to final ap-
proval of a building or issuance of a Certificate of Occupancy.
8. MANUFACTURED HOMES-foundation inspections prior to pouring pads,inspection of blocking/tic-downs.when completed per
manufacturers installation instructions. Final Inspection approval prior to cupancy: stairs.handrails.skirting.etc..installations completed
WAINS Tag(s)must he affixed to the home,completed inspection record card and manufacturer's installation instructions must he available on
site.
9. SEWERS-prior to cover
M. RIGHT-OF-WAY/APPROACH-prior o placement of concrete,or,if gravel approach.after completion.
In addition to the above.any plumbing or mechanical systems or material which would be concealed by framing.drywall.concrete etc..must be
inspected prior to cover.Check with the department for"special inspections'in conjunction with commercial projects.
FOR INSPECTIONS:
TO 'NSURE PROMPT SERVICE,PLEASE GIVE ONE WORKING DAY/24 HOUR NOTICE
PARTS 01,YOUR PROJECT MAY REQUIRE PERMITS AND INSPECTIONS
FROM MORE THAN ONE AGENCY.
• Building.plumbing,mechanical and fire inspections-Department • Road cuts for utilities or driveways-Division of Engineering&
of Building& Planning 4773675 Roads-48-HOUR NOTICE REQUIRED 477-3600 or State
• Construction in a(loud plain-Division of Engineering&Roads 477- Department of Transportation 456-3000
3600 • Sewer connection.Division of Utilities-477-3604 or City Pub-
• Electrical wiring-State Department of Labor and Industries 324-2640 Iic Works Department 625-6300
• On-site waste disposal system,Spokane Regional Health District • Asbestos,Renovations,and Demolitions-Spokane Regional
324-1560 Clean Air Agency 477-4727
PERMIT EXPIRATION & EXTENSION
Building permits shall automatically expire and become invalid by limitation of time three(3)years from the date of permit issuance.Other permits not
issued in conjunction with the construction or completion of a building or structure shall automatically expire and become invalid by limitation of time
18 months from the date of permit issuance. The Director is authorized within his/her discretion to grant one(I)extension of time,fora period not to
exceed I 80 days.A request for an extension shall be made by the permit holder in writing and shall be submitted to and received by the Spokane County
Building and Planning Department prior to the expiration date of the permit and shall demonstrate just cause for the requested extension.
REFUNDS
The building official may authorize ref nd ing:(I)Any fee paid which was erroneously paid or collected: or,(2) Not more than 800 of a permit tee
paid when no work has been done under the permit;or.(3)Not more than 80'io of the plan rev few fee paid when an application for a permit for which
a plan review fee has been paid is withdrawn or canceled before any plan reviewing is done(or.(4)Any fee paid except on written application filed
by the original permittee not later than ISO days after the date of fee payment. Please note that application processing fees are nonrefundable unless
the application was erroneously processed.
MISTAKE?
If you think we've made an error in processing this permit or find erroneous information on the permit.please bring it to our attention immediately
by filing a written request for correction within 10 working days of discovery.All such requests should be directed to the Department of Building
and Planning at:
Spokane County Department of Building&Planning
1026 West Broadway Avenue S'pokune. WA 99260
Phone: (509)477-3675 Fax: (509)477-4703 TDD: (509)477-7133