Loading...
2010, 03-08 Permit: 10000844 SewerSPOKANE COUNTY DEPARTMENT OF BUILDING & PLANNING 1026 WEST BROADWAY AVENUE• SPOKANE, WA 99260.0050 Site Address: 4521 N WOODLAWN RD Parcel Number: 45032.0908 Subdivision: CITY OF SPOKANE VALLEY Block: Lot: Zoning: AmounlPaid Owner: SEABOLDT, BRYAN Address: 4521 N WOODLAWN RD $140.00 SPOKANE, WA 99216 Building Inspector: JOHN LARSON Water Dist: $14000 Project Information Project Number: 10000844 Inv: I Issue Date: 3/82010 Permit Use: SEWER CONNECTION Applicant: REVIVAL PLUM BING/CALKINS PLUMB 4034 E PACIFIC SPOKANE WA 99202 Phone: (509) 768-2009 Contact: REVIVAL PLUMBING/CALKINS PLUMB 4034 E PACIFIC SPOKANE WA 99202 Phone: (509) 768-2009 Setbacks- Front: Left. Right: Rear: Croup Name: Project Name: Permits Sewer Connection Permit Contractor: REVIVALPLUMBING licensee: REVIVP1927RA PROCESSING FEE 1 515.00 SI SEWER CONNECTION 1 5125.00 Tata] Permit Fee: $140.00 -FOR SEWER INSPECTIONS CALL THE UTILITIES DEPT AT (509) 477-3604 FROM 8:30-5:00 MONDAY -FRIDAY PRIOR TO COVER. ONE WORKING DAY NOTICE REQUIRED. PERMIT ALLOWS FOR A 30 MINUTE INSPECTION. ADDITIONAL INSPECTION FEES APPLY AFTER 30 MINUTES. "CALL 1-800-424-5555 BEFORE YOU DIG --AT LEAST 2 WORKING DAYS IN ADVANCE. SPOKANE COUNTY CODE REQUIRES THE INSTALLER COMPLY WITH ALL REQUIREMENTS OF THE WA STATE DEPT OF LABOR & INDUSTRIES, INCLUDING THOSE RELATED TO TRENCH SAFETY. '*INSTALLER IS RESPONSIBLE TO INSURE ALL WASTEWATER DRAINS ARE CONNECTED TO THE SEWER AND MAY BE REQUIRED TO PERFORM TESTS FOR VERIFICATION. INSTALLER IS TO FIELD LOCATE AND CONFIRM THE ELEVATION AND POSITION OF SEWER STUB PRIOR TO ANY OTHER EXCAVATION. "SEWER STUBS ARE TO BE CHECKED PRIOR TO CONNECTION TO ENSURE THAT THEY HAVE ACCEPTABLE GRADE AND ARE CLEAR AND UNOBSTRUCTED TO THE MAIN. SEWER LINES SHOULD BE CONSTRUCTED TO ALLOW FOR GRAVITY FLOW FROM THE LOWEST LEVEL OF THE STRUCTURE. **I HE INSTALLER AND THIS PERMIT MUST BE PRESENT AT THE JOB SITE AT THE SCHEDULED INSPECTION TIME. BOTH STATE LAW RCW 19.122 AND COUNTY CODE REQUIRES THE INSTALLER TO GIVE NOTICE OF EXCAVATION TO OWNERS OF UNDERGROUND FACILITIES. Processed By: SHATTO, JULIE PERMIT Printed By: Force, Faith Page I of 1 Payment Summary Total Fees AmounlPaid AmountOwing Tran Date Reece Payment Amt $140.00 $140.00 $0.00 3/8/2010 705 $14000 Processed By: SHATTO, JULIE PERMIT Printed By: Force, Faith Page I of 1 NOTICE Itis the responsibility of the applicantpermatee to see to it that the use described on the front of this permit complies with applicable codes and requirements and that required inspections are requested- Failure to request inspections as listed below and obtain the necessary approvals before progressing beyond the point where Inspections are required may necessitate removal of certain parts of the construction at the applicant 's/permi0ee's or property owner's expense- At a minimum, the following Inspections ARE REQUIRED by County Code: 1. FOOTING - all structures. Including manufactured homes when forms and reinforcement are In place and prior to placement of concrete. NOTE: This inspection includes review of the structures setbacks from property lines. Minimum setbacks are established by County zoning regulations. Front, flanking, side and rear yard setbacks are measured from property Imes. Curb Imes and fence lines are not necessarily Indicative of property Imes. In some residential areas, the County can own as much as 20 feet of rig brof-way between your property and the actual improved droop curb- The responsibility to comply with applicable setback provisions lies solely with the permittee -neither Spokane County nor its authorized representatives assume any responsibility for the verification or location of your property lines. Please verify their location prior to locating your structure- Failure to properly locate the structure may require Its relocation at the owner 'slipermittee's expense- s. FOUNDATION - when forms and reinforcement are In place and prior to placement of concrete - 3. FRAMING - after all framing, bracing and blocking Is In place, plumbing, mechanical rough -in Inspections have been approved, and prior to concealing. 4. INSULATION - prior to the installation of drywall. 5. PLUMBING - after rough in. before covering, and final. 6. MECHANICAL - rough -in of piping, before covering, metal chimneys before concealment, and final. 7. FINAL - all permits - when complete when complete and prior to occupancy and/or use. Please provide 24 hours notice. NOTE: In addition to Inspection of the structure, this inspection includes review of site improvements (typically depicted on the approved slid plan) required by ordinance or as a condition of approval of this permit. Items such as the installation of fire hydrants, fire department access, on-site drainage ("208 swales"), road improvements, parking, and landscaping are common requirements of a moral plan which must be completed prior to final approval of a building or issuance of a Certificate of Occupancy. 8. MANUFACTURED HOMES - foundation Inspections prior to pouring pads, inspection of Blocking/Tie-downs, when completed per manufacturers Installation instructions. Final Inspection approval prior to occupancystairs, handrails,skirting,etc ., installations completed WAINSTaged must be affixed to the home, completed inspection record card and manufacturer's Installation Instructions must be available on site. 9. SEWERS prior to cover 10. RIGHT-OF-WAV/APPROACH - prior to placement of concrete, or, if gravel approach, after completion. In addition to the above, any plumbing or mechanical systems or material which would be concealed by framing, drywall, concrete, etc., must be'mspected prior to cover. Check with the department for "special inspections' in conjunction with commercial projects. FOR INSPECTIONS: TO INSURE PROMPT SERVICE, PLEASE GIVE ONE WORKING DAY/24 HOUR NOTICE . PARTS OF YOUR PROJECT MAY REQUIRE PERMITS AND INSPECTIONS FROM MORE THAN ONE AGENCY. • Building, plumbing mechanical and fire Inspections, Department Road cuts for utilities or driveways, Division of Engineering& of Building&Planning 477-3675 Roads - 48-HOUR NOTICE REQUIRED 477-3600 or • Construction in a flood plain, Division of Engineering 8 Roads 477-3600 State Department of Transportation 456-3000 • Electrical wiring, State Department of Labor and Industries 324-2640 Sewer connection, Division of Utilities 477-3604 or City Public • On-site waste disposal system, Spokane Regional Health District Works Department 625-6300 324-1560 PERMIT EXPIRATION Unless otherwise noted, building, plumbing, Ore and mechanical permits will be considered null and void by limitation if the work authorized by the permit is not commenced within 180 tlays or is stopped fora period of 180 tlays, unless a written request for an extension Of the permits received and approved by the Building Department prior to expiration. At a minimum an inspection should be requested at least once every 180 days to assure the validity of the permit. Please call if you have any questions. REFUNDS All requests for building permit refunds must be made in writing by the applicampermittee (shown on the reverse) no later than 180 days after the date of fee payment. Refunds of not more than 80% of the permit fee paid may be authorized when no work has been tion under the permit. No refunds may be authorized more than 180 days atter fee payment. Please contact the other agencies with respect m their refund policy on all other permit types. MISTAKE? If you think we've made an error in processing this permit or find erroneous Information on the permit, please bring it to our attention immediately by filing a written request for correction within 10 working days ediscoveI, All such requests should be directed to the Departmentof Building and Planning at, Spokane Coanty Department oJ'Building & Planning 1026 West Broad»ay Avenge Spakmte, Wil 99260 Phone: (509) 477-3675 Fres: (509) 477-4703 TDD: (509) 477-7133