1973, 02-15 Permit App: K573 Residence _ _ _
_
•
County of Spokane, Washington -33.5-i...? - ofOf
BUILDING CODES DEPARTMENT. COURTHOUSE. SPOKANE, WASHINGTON 99201
Job #14
APPLICATION FOR LAND USE OR STRUCTURE PERMIT e.4)
GENERAL REQUIREMENTS PERMIT FEE.I" 0
PERMIT REQUIRED. A land use or structure permit is required by County Resolution to erect a building or structure of an7
kind or alter any building or structure already erected, or to change a land use. Construction must conform with the
Spokane County Building Code and Zoning Ordinance. Construction is subject to inspection.
WATER. Water supply must be approved by the County and State Health Departments. Where work on water connections disturbs
the surface, shoulders or ditches of County Roads, permission must be obtained from the County Engineer's Office.
SEWAGE SYSTEM. Permits are required in all cases by County Resolutions Nos. 45-133 and 47.235.
SET-HACK FROM PROPERTY LINES. In most zones and under most circumstances, a set-back from the front property line, of at
least 25' is required, a 5' side yard, 15' side yard from a flanking street, and a 25' rear yard are required.
STATE HIGHWAYS. Where the structure abuts a State Highway, clearance must be obtained pertaining to set-back and ingress
and egress.
COUNTY ROADS. Work on street right-of-way may not be performed until staked by County Road Department and work must be
performed in accordance with stakes. Points of ingress and egress must be approved by the County Engineer.
MOVING OF BUILDINGS. A permit is required to move an existing building. When a building is moved on a County or State
Highway, clearance must be obtained from the County Engineer and/or State Highway Department.
ACCESSORY BUILDINGS. Accessory buildings (garages, sheds, etc.) require a separate permit.
RESTRICTIVE COVENANTS. Buildersshould check provisions of covenants or dedications and easements running with the land
I 0 ANTS. 1
which are enforceable through civil action. County Officials can not bring action to enforce covenants or dedications.
APPLICANT FILL IN BELOW THIS LINE I
Name of Owner Kappen Construction, Inc Address South 25 Blake Road Phone WA 4-0771
Architect_ Phone Engineer phone
Contractor Kappen Construction, IncAddress South 25 Blake Road Phone WA 4-0771
Legal Description of Property (Give complete description from deed, tax receipt, etc.)
____ lot 8, Block 1 , ALOHA ADDITION
- 3') 5Y2 -- CS S
- 6 V/DESCRIPTION OF WORK:New y Addition Remodel Moving Bldg.Zone ( Fire Zone
Size of I Jt 80' X 125' Sewage System sewer Stories _.. 1
Const. frame Dimensions 24 X 40 + 14' X 22 Total Sq. Ft. 1 431 Valuation $24,550
(Frame;concrete,brick,etc.)
Rooms 6 Baths 1 BasementfUll Foundation Const. Callerete Chimney Fireplace
(Full, part, none)
Heat. System electric Type of Roofing COMP OS1t1071Ext. Finish wood (Kind) (Number)
Int. Wall Finish rd
Use of Bldg. residence No. of Units 1 / Bedrooms 3
Garage_ or Carport Attached 14 x 22 carport Private Detatched —
PLOT PLAN
-6r aw sketch with dimensions showing: (1) property lines; (2) street or road locations; (3) location of existing and
• ..osed buildings; (4) distance to property lines and streets; (5) dimensions of buildings; (6) location of sewage sys-
tem and water supply lines. State License No.
NORTH
Ind. Ins. Acct. No.
see attached
REQUIRED
Plumbing Permit
en Heating Permit
m
in 0 Sewage Permit
Plans Received
Plans Checked
Plans Returned
Plans Picked Up
Plans Mailed
4
g 1 SOUTH 1
Vr I hereby cer 'fy informati bmitte. is correct and there are no other structures located on this property except
as shown. - /
February 15, 1973
Owner or Agent Date
A LAND USE OR STRUCTURE PERMIT MUST BE ON THE PREMISES BEFORE CONSTRUCTION COMMENCES.
THIS IS NOT A PERMIT. 1
DOOT WRITE BELOW THIS LINE
;7-- (2c"-
�
Your street address will be � /05--1 a zone is
Sewage Permit Number Issued Building Permit $'7 ? Receipt 6 _Issued
Remarks y� -- �� % !�'i J ___
&K
Form 523 Bldg. Code
I
KAPPEN CONSTRUCTION,' INC.
S. 25 Blake
Spokane, Washington 99216 Requested Price
Wa 4-0771 Lot Cost 3,500.00
PLOT PLAN
/ 1
T ELEVATIONS:
N ), Crown of Street-4-. 3g'
i—/ Finish Floor -Ygef ___
\ik
125 '
+
kAl t 'r-, Fra'
I, 22 ' __1,
T0.Pc
•4 I JI
tag' - 1 4, G
24' .
U IV
-o F, F =.-2.('3 I w
w o o
OD oW
o cp --s _J
0 - o O
D sewer line
70i
"water line
N I 26, * , .
`"'
I .6Y1
v5 ve 125 '
I i
Scale: 1 "=20'
Basic: 1004 ; Sg. Ft. 1004 ' Legal Lot 8, Block 1 , Aloha Addition
T
FHA Case # ; Job # 14 ;_
Address:
- r
Mortgage Co. Sherwood & Roberts SPECIAL INSTRUCTIONS:
Power Co. ' Water Co. , *
Model
a
Plumber ; i 'c1er-Kosa